About this file
This is a Past Performance Overview Spreadsheet designed to evaluate contractor experience and qualifications for the Water Supply Storage System project in Bazum Village, Armenia. The spreadsheet template requests documentation of relevant past projects including project name, performing entity (prime, subcontractor, or joint venture), total contract amount, project start and completion dates, percentage of work self-performed, and project status (substantial completion at 90% or greater). The evaluation criteria specifically seek evidence of design-build construction experience, projects located in the Caucuses region (Armenia, Azerbaijan, Georgia), and prior work for the U.S. Army Corps of Engineers (USACE) or similar U.S. Government construction agencies.
The spreadsheet identifies key technical competencies required for the Bazum project: construction of water supply systems, water collection systems, automation control systems, general concrete work for foundations and walkways, and general electrical work for utility power hook-up and lighting. Offerors submitting proposals for this firm fixed price design-build construction contract (estimated project value $350,000-$800,000 USD) must complete this spreadsheet demonstrating relevant past performance in these specific areas. The solicitation number is W912GB26RA030, and the contracting agency is the Department of the Army European Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Name | Performed by: | Total Amount | Project Start Date | Project Completion Date | Project substantially complete (at least 90% complete) | Percentage of work that was self-performed | Design-Build construction Project | Project located in Caucuses region, (Armenia, Azerbaijan, Georgia | Demonstrates working for USACE or similar US Government construction agency | Construction of Water Supply System | Construction of Water Collection System | Construction of Automation Control System | General concrete work (foundations; walkway; etc.) | General concrete work (foundations; walkway; etc.) | General elecrical work for utility power hook-up and lighting | ||
| Prime | Subcontractor | Joint Venture | |||||||||||||||
| Water Supply Storage System for Bazum Village |