This document is a Conceptual Site Plan (Attachment 2.2) for a Request for Proposal (RFP) issued by the U.S. Army Corps of Engineers, Europe District, located in Wiesbaden, Germany. The project involves designing and constructing a water supply system for Bazum Village in Armenia under Project #574554.
The plan depicts Option 2 of the water supply system design, which utilizes a drilled well as the water source. Key infrastructure components include two 100,000-liter water storage tanks with a shared concrete foundation, a borehole with pump, an enclosed pump and chlorination station (separated by an internal wall), a chlorination system, an intake pump, and a stilling basin. The design requires relocation of existing chain-link fencing to accommodate proposed structures, installation of new security fencing with gates to control unauthorized access while permitting authorized personnel entry, a telecommunications enclosure with concrete pad, and a light pole for site illumination. An existing abandoned water collection tank will remain in place with repairs made to the surrounding concrete fence. The plan specifies that all proposed water tanks must remain accessible to water trucks and maintenance vehicles, and that the borehole, pump, and chlorination station shall be enclosed for security and weather protection. Contractors are required to field-verify all existing conditions shown in the aerial imagery, GIS data, and site visit photos before commencing work.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS
E E
E E
C O
M M
C O
M M
E E E E E
COMM
COMM
W
W
W
W
W10
W W WPROPOSED WATER LINE
PROPOSED CONCRETE PAVEMENT
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
G
ER
M
AN
Y
AN
SI
D
W
AT
ER
S
U
PP
LY
S
YS
TE
M F
O R
B
AZ
U M
V
IL
LA
G
E
AR
M
EN
IA
VI
LL
AG
E O
F
BA
ZU
M
, A R
M
EN
IA
PR
O
JE
C T
R
FP
M
YE
R
KL
EI
N
KL
EI
N
C O
N C
EP
TU
AL
S
IT
E
PL
AN
O
PT
IO
N
ATT 2.2
SCALE: 1:300
CONCEPT SITE PLANA1
GENERAL SHEET NOTES
1. DRAWINGS PROVIDED FOR INFORMATION ONLY AND MUST BE
VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. EXISTING CONDITIONS SHOWN ARE THE COMBINED RESULT OF
AERIAL IMAGERY, GIS, AND SITE VISIT PHOTOS. CONTRACTOR MUST
FIELD VERIFY ALL EXISTING CONDITIONS.
3. THERE WILL BE ONE FOUNDATION FOR THE TWO PROPOSED
WATER TANKS.
4. OPTION 2 IS USING A DRILLED WELL TO TAKE WATER FROM THE
GROUND.
5. THE BOREHOLE, PUMP, AND CHLORINATION STATION SHALL BE
ENCLOSED FOR SECURITY AND TO PROTECT THEM FROM THE
ELEMENTS.
6. THE PUMP AND CHLORINATION STATION CAN SHARE AN
ENCLOSURE, BUT MUST BE SEPARATED BY A WALL
7. THE EXISTING WATER COLLECTION TANK WAS PROPOSED TO BE
ABANDONED IN PLACE. THE CUSTOMER SUGGESTED REPAIRING
THE EXISTING CONCRETE FENCE TO LIMIT ACCESS TO THE
ABANDONED STRUCTURE.
8. ENSURE THAT THE PROPOSED WATER TANKS ARE ACCESSIBLE TO
WATER TRUCKS AND MAINTENANCE VEHICLES.
9. THE EXISTING CHAIN LINK FENCE WILL REQUIRE RELOCATION TO
ACCOMMODATE THE PROPOSED STRUCTURES.
10.PROVIDE FENCING WITH GATES TO PREVENT UNAUTHORIZED
ACCESS TO THE SITE FEATURES BUT ALLOW EASY ACCESS TO
AUTHORIZED PERSONNEL.
11.
KEYNOTESXX
1 EXISTING HIGHWAY M3
EXISTING ABANDONED WATER COLLECTION TANK2
EXISTING ELECTRICAL SUBSTATION3
PROPOSED TWO 100,000 LITER WATER STORAGE TANKS
WITH CONCRETE FOUNDATION
PROPOSED ENCLOSURE AND CONCRETE FOUNDATION FOR
PUMP AND WATER TREATMENT STATION
EXISTING CONCRETE FENCE
LEGEND
EXISTING FENCE
Meters
24120
E E EPROPOSED POWER SUPPLY
EXISTING CHAIN LINK FENCE
PROPOSED CHLORINATION SYSTEM
EXISTING BUILDING FOOTPRINT
PROPOSED STILLING BASIN
EXISTING APPROXIMATE
RIVER PATH
PROPOSED CHLORINATION STATION
PROPOSED INTAKE PUMP
PROPOSED WATER BOREHOLE
WITH PUMP
PROPOSED WATER BOREHOLE WITH PUMP
EXISTING ELECTRICAL SUBSTATION BUILDING WITH
ALTERNATE ELECTRICAL SUBSTATION
PROPOSED TELECOMMUNICATIONS ENCLOSURE WITH
CONCRETE PAD
PROPOSED LIGHT POLE
PROPOSED FENCE
| Sheets and Views |
| RFP ATT 2 -OP 2 |
File details come from the government source that posted it. Updated .