B.08 RFP_Att#14 - Past Performance Information Sheet.docx

DOCX document 20 KB Posted

Attached to
Water Supply Storage System Bazum Village, Armenia (Design-Build Construction)
Solicitation number
W912GB26RA030
Issued by

About this file

This is a Past Performance Information Sheet template designed for contractors submitting proposals to the Water Supply Storage System Bazum Village, Armenia (Design-Build Construction) solicitation (W912GB26RA030). The form requires offerors to document relevant past project experience by providing detailed information about previously completed work, including project name, contract number, location, completion date, final cost, and scope description. Contractors must specify whether work was new construction, renovation, or both, and clearly delineate square footage or square meters for each type. The form requires identification of the contractor's role—whether as Prime Contractor (performing at least 15% of work and managing all other work), Subcontractor, Joint Venture, or Key Subcontractor with a signed letter of commitment—and requests explanation of how that role demonstrates relevant experience for the current procurement.

The template emphasizes detailed documentation of self-performed work percentages, design-build or design-bid-build methodology, and whether projects were previously completed for the United States Department of Defense. For Joint Ventures, subcontractors, and key subcontractors, the form requires specific explanations of how the past experience provides added benefit to the current solicitation, including documentation of work performance responsibility and management of assigned portions. This form is integral to the evaluation of contractor qualifications for the firm fixed price design-build construction contract, estimated between $350,000 and $800,000 USD, being executed by the Department of the Army European Command.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Supply System for Bazum Village Armenia

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. ___________________________________________________, Page 1

Project Name, Contract number, and Location:

Past Performance:

1. The day, month, and year work was completed: _______________

2. Is this project more than 75% complete? ____ Yes ____ No If “No” explain current percentage of completion, if yes and between 75-99% complete please explain how the percentage was calculated and what work remains.

3. The final cost of this project $_________________________

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for this project:

o Design- Build or Design-Bid-Build o Scope of the project, to include purpose/use of facility.

o Size of the project, differentiate square footage of new construction versus renovation if project includes both.

o Type and percentage of work that was self-performed.

o Whether the project involved new construction, renovation, or both. Clearly delineate square meters for construction and renovation.

o Whether the project was completed for the United States DoD.

(Continue typing if required to provide more information) PROJECT NO. ___________________________________________________, Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 15% of the work and managed all other work for the project.

Subcontractor: A contractor that performed part of the project work but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror may take credit for the Key Subcontractor’s past performance if it was meaningful to this procurement. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

5. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed, and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

File details come from the government source that posted it. Updated .