This document is a pre-solicitation notice for a multiple award task order contract to provide design-build and design-bid-build construction services for U.S. Forces throughout Italy. The U.S. Army Corps of Engineers Europe District intends to award a pool of five indefinite delivery indefinite quantity contracts with a total value not to exceed $49,999,995 over five one-year ordering periods. Services will include real property repair, maintenance, construction, renovation, utilities work, demolition, and environmental remediation. Interested firms must submit qualifications by March 22, 2019 demonstrating compliance with Italian S.O.A certification requirements and anti-mafia laws to be included on a restricted planholders list and receive the formal solicitation, which will be released on or after March 29, 2019. The source selection will use a two-phase design-build evaluation process. Task orders will be primarily located in Vicenza, Livorno, and Aviano but may occur throughout Italy.
B.08.02.12 Attach 12 - SEED Project #2 Package REVISED (As of Amendment 0010)
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
US ARMY CORPS OF ENGINEERS, EUROPE DISTRICT
KONRAD ADENAUER RING 39
65187 WIESBADEN, GERMANY
2 July 2019
SUBJECT: Request for Proposal (RFP) Amendment for a new Task Order under the FY19 Italy Design Build / Design Bid Build MATOC resulting from RFP W912GB19R0031; Buildings 11101 and 11102 Renovations, Longare, Italy (DC-19- 0056) - SEED Project #2
RFP Phase Two Offerors:
The purpose of this Amendment is to provide an updated price schedule identified necessary as a result of bidder inquiries. All else remains unchanged.
As a reminder. Offerors shall submit inquiries in writing via “Bidder Inquiry” in ProjNet at www.projnet.org\projnet. The bidder inquiry key is RH675A-FFGS94, this is the same key utilized for the MATOC solicitation. Please ensure to being your inquiry with the project number (DC-19-0056) to ensure inquiries are handled properly.
Your point of contact for this contract action is contact Mr. Jason Malak, Contract
Specialist (+49 611 9744 2278 / jason.r.malak@usace.army.mil). As an alternate, please feel free to contact the undersigned (+49 611 9744 2127 / joshua.d.mueller@usace.army.mil).
Sincerely, Joshua Mueller Contracting Officer
Enclosures:
SEED #2 Revised Bid Schedule
PRICE SCHEDULE
Request for Proposal (RFP)
Renovate Building 1, 2, & Hardstand Caserma Longare, Italy
The Offeror shall bid on all base bid and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the bid schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.
Base Item Period of Performance: The base period of performance is 600 calendar days from issuance of the notice to proceed (NTP).
Notice to Proceed (NTP) and Contract Completion Date. (See FAR 52.211-10) A single notice to proceed will be issued for the design and construction, after receipt and approval of the BLG and DBA insurance certificates. The contractor shall commence work within 7 days following the NTP and complete the entire work for use not later than 600 calendar days following the NTP. Option 1 may affect the completion date—if Option 1 is exercised, the completion date shall be 600 calendar days following the initial NTP or 450 calendar days following the exercise of option 1, whichever is later. Option 2 and Option 3 do not affect the completion date—if Option 2 is exercised, the completion date shall be within the base or Option 1 period of performance, whichever is later.
This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.
Prices: All prices are to be proposed in EURO (€).
BASE ITEMS: The base items include all labor, transportation, equipment, materials, and any other services necessary for the design and renovation as described in the Statement of Work and specifications except any work described in the options below.
CLIN 0001 Base Item 1: Building 2 Design €____________
CLIN 0002 Base Item 2: Building 2 Construction €____________
CLIN 0003 Base Item 3: Hardstand Area Design €____________
CLIN 0004 Base Item 4: Hardstand Area Construction €____________
CLIN 0005 Base Item 5: Building 2 SIPRNET, NIPRNET & Others Fiber Communications Lines and Equipment
CLIN 0006 Base Item 6: Building 2 Cyber Security €____________
TOTAL PRICE – ALL BASE €____________
OPTION ITEMS:
CLIN 0007A Option Item 1A: Building 1 Second & Third Floor Design €____________
PRICE SCHEDULE
Request for Proposal (RFP)
Renovate Building 1, 2, & Hardstand Caserma Longare, Italy
CLIN 0007B Option Item 1B: Building 1 Second & Third Floor Construction €____________
CLIN 0007C Option Item 1E: Building 1 SIPRNET, NIPRNET & Others Fiber
Communications Lines and Equipment
CLIN 0007D Option Item 1F: Building 1 Cyber Security €____________
CLIN 0008 Option Item 2: Building 5 Demo €____________
CLIN 0009 Option Item 3A: Design of Seismic Retrofitting of Building 2 €____________
CLIN 0010 Option Item 3B: Construction of Seismic Retrofitting of Building 2 €____________
TOTAL PRICE – ALL BASE €____________
TOTAL PRICE – ALL BASE & OPTIONS €____________
| SEED #2 RFP Letter Amendment |
| Bid Schedule - B2 Hardstand B1 (Amd 10) |
| 2019-07-02T16:53:45+0200 | |
| MUELLER.JOSHUA.D.1401560188 |