B.08.02.02_Attach_2_ExpInfoSheet_19R0031_REVISED.docx
DOCX document 40 KB Posted
- Solicitation number
- W912GB-19-R-0031
About this file
This pre-solicitation notice announces a planned multiple award task order contract for design-build and design-bid-build construction services throughout Italy. Interested firms must submit qualification documentation by March 22, 2019 demonstrating compliance with Italian decrees and certifications in categories including industrial and other buildings, water and gas pipelines, utility systems, roads and bridges, and environmental remediation. Joint ventures must also submit documentation demonstrating how the team meets requirements. Firms meeting the qualifications will be included on a restricted plan holders list and invited to submit proposals in response to a formal solicitation expected to be issued on or after March 29, 2019, with proposals due at least 30 days later. The objective of the multiple award task order contracts is to provide construction services for U.S. forces in Italy, with a total ceiling of $49,999,995 over one base year and four option years. Task orders will be primarily for work in Vicenza, Livorno, and Aviano.
B.08.02.02 Attach 2 ExpInfoSheet 19R0031 REVISED
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
Fiscal Year 2019 Italy DB DBB MATOC W912GB-19-R-0031
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name:
Experience:
1. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).
2. The final cost of this project: €_________________________
3. The location the work was performed is: ___________________________________
4. The day, month, and year work was completed: _______________
5. Is this project more than 50% complete by the closing date of this solicitation? ____ Yes ____ No
6. Work involves building renovations, civil work, or environmental is fundamentally for Design -Build or Design—Bid-Build construction work? ____ Yes ____ No (see RFP Section 00 22 00 for further details)
____ Design-Build ____ Design-Bid-Build
6. Describe the nature of the work. Do not provide a listing of existing or previous contracts, but rather provide detailed information of the construction work.
(Continue typing if required to provide more information)
ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
File details come from the government source that posted it. Updated .