About this file

RFP IS-15-0001 Attachment 9 - Key Personnel Performance Certification

View the file

Other files

File Type Posted
Amendment_0003_SF30_W912GB-14-R-0030.pdf PDF
Amend_0002_SF30_W912GB-14-R-0030_FY15_Israel_MATOC.pdf PDF
RFP_IS-15-0001_Atch6_KitchenDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch5_Special_Specification_Site_276_23Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ElecDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_PlumbingDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch1_Price_Schedule_Site_276_28Sep2014.pdf PDF
RFP_IS-15-0001_Atch6_WaterproofDrawings-Bldg_7_276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_RoadsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_AC_Drawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_StructuralDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch2_OSP_Worksheet_Directions_Site_276.pdf PDF
RFP_IS-15-0001_Atch6_ElevatorsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch4_SRs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch7_Soil_Boring_Plan-Logs-276_Facility.pdf PDF
RFP_IS-15-0001_Atch6_FuelDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_3.zip ZIP file
RFP_IS-15-0001_Atch3_OSP_Worksheet-Site_276_DFAC_and_Energy_Center.xls XLS spreadsheet
RFP_IS-15-0001_Atch8_Submittal_Schedule_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch6_SiteDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_2.zip ZIP file
RFP_IS-15-0001_Atch10_USACE_Specs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_1.zip ZIP file
RFP_IS-15-0001_Transmittal_Ltr_Site_276_30Sep14.pdf PDF
RFP_IS-15-0001_Atch6_Drawing_List-276_Facility-29Sep2014.pdf PDF
Amend_0001_Atch1_14-R-0030_Revised_Experience_Overview_Sheet_27Sep14.docx DOCX document
Amendment_0001_W912GB-14-R-0030_FY15_Israel_MATOC_30Sep14.pdf PDF
Atch_1_Experience_Overview_Sheet.docx DOCX document
Atch_3_Past_Performance_Questionnaire.docx DOCX document
Atch_10_Host_Nation_Technical_Requirements.zip ZIP file
Atch_7_Contractor_Certification_Key_Personnel_and_Performance.docx DOCX document
W912GB-14-R-0030_FY15_Israel_MATOC_Solicitation_2Sep14.pdf PDF
Atch_8_PriceSchedule.xls XLS spreadsheet
Atch_5_Sample_Off-Shore_Procurement_Worksheet_with_Directions.doc DOC document
Atch_2_Experience_Information_Sheet.docx DOCX document
Atch_4_Letter_of_Commitment.doc DOC document
Atch_11_Sample_Contract_Requirements_-_SRs_29Aug14.pdf PDF
Atch_9__USACE_Specs_29Aug14.pdf PDF
Atch_6_Disclosure_of_Lobbying_Activities.doc DOC document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISRAEL FOREIGN MILITARY SALES CONTRACTOR'S CERTIFICATION

PRIME CONTRACTOR KEY PERSONNEL & PERFORMANCE REQUIREMENTS

RFP IS-15-0001 FY15 Israel MATOC Site 276 DFAC & Energy Center

(Attachment 9 – 28 September 2014)

In accordance with the USACE specifications provided with the Solicitation or Request for Proposal (RFP), the United States based Prime Contractor is required for Foreign Military Sales (FMS) contracts to provide Key Personnel on the Israel project site(s) using employees on the payroll of the US based Prime Contractor. Key Personnel positions cannot be staffed with personnel from Prime Contractor subsidiary(s) or any Subcontractor(s).

The number of Key Personnel required will be determined by the nature, location(s) and/or complexity of the requirements of a project and will be specifically identified in the Solicitation or RFP. As a minimum the following Key Personnel positions are required:

1. Project Manager (PM)

2. Site Superintendent (SS)

3. Contractor Quality Control Manager (CQCM)

4. Site Safety and Health Officer (SSHO)

In addition, the requirements of Federal Acquisition Regulation (FAR) Clause 52.236-1 “Performance of Work by Contractor” states: “The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work to be performed under the contract”.

Offeror is required to submit this certification with their price proposal.

CERTIFICATE

I, ___________________________________, certify that I am the ___________________________________ of (Printed or Typed Name) (Fill in Title of the Company’s Legally Bound Individual

US based Company _______________________________________________ certify I have read, understand and will provide the FMS Key Personnel and perform as Prime Contractor in accordance with FAR Clause 52.236-1 as stipulated in the documents of the solicitation or RFP identified above.

(Signature of the Company’s Legally Bound Individual completing CERTIFICATE)

File details come from the government source that posted it. Updated .