Sheet1
| OSP WORKSHEET | |||
| RFP IS-15-0001 FY15 Israel MATOC | |||
| Site 276 DFAC & Energy Center, Israel - 28 Sep 2014 (Attachment 3) | |||
| Total Contract Price from Proposal | $ - 0 | ||
| Exempted Materials | |||
| A. Bulk Materials | |||
| 1. Excavation and Fill | $ - 0 | ||
| 2. Sand | $ - 0 | ||
| 3. Aggregate | $ - 0 | ||
| 4. Stone | $ - 0 | ||
| 5. Concrete Masonry Units | $ - 0 | ||
| 6. Fired Brick | $ - 0 | ||
| 7. Asphalt | $ - 0 | ||
| 8. Concrete | $ - 0 | ||
| 9. Fuel, Petroleum Products | $ - 0 | ||
| 10. Temporary Electric Costs | $ - 0 | ||
| 11. Water | $ - 0 | ||
| 12. Other Bulk Material (plaster, plastic pipe & conduit, etc.) | $ - 0 | ||
| B. Other Construction Materials not Manufactured in Israel | $ - 0 | ||
| C. Items Exempted from the Buy American considerations pursuant to US/Israeli agreements (Annex A) | $ - 0 | ||
| D. Materials from Other Designated Countries | $ - 0 | ||
| E. Specified Contracts (Bezeq, etc.) | $ - 0 | ||
| F. Foreign (non-US, non-Israeli, non-designated country) for which the cost of US materials including | $ - 0 | ||
| transportation and handling exceed the cost of foreign purchase by at least 50% | |||
| G. Cost to provide Housing, office space and logistic support | $ - 0 | ||
| H. Labor Associated with Exempt Items | $ - 0 | ||
| Subtotal | $ - 0 | ||
| Non-Exempted Items | |||
| Israeli | Foreign | US | |
| I. Materials/Installed Equipment | |||
| 1. Steel/Misc Metals | $ - 0 | $ - 0 | $ - 0 |
| 2. Wood Products | $ - 0 | $ - 0 | $ - 0 |
| 3. Roofing | $ - 0 | $ - 0 | $ - 0 |
| 4. Finishes | $ - 0 | $ - 0 | $ - 0 |
| 5. Electrical | $ - 0 | $ - 0 | $ - 0 |
| 6. Plumbing/Sanitation | $ - 0 | $ - 0 | $ - 0 |
| 7. Installed Equipment (does not include Exempt items) | $ - 0 | $ - 0 | $ - 0 |
| J. Contractor Construction Equipment Costs | $ - 0 | $ - 0 | $ - 0 |
| K. Contractor Labor Cost | $ - 0 | $ - 0 | $ - 0 |
| L. Mobilization/Demobilization Costs (not included in exempt costs) | $ - 0 | $ - 0 | $ - 0 |
| M. Contractor Indirect Costs (overhead) | $ - 0 | $ - 0 | $ - 0 |
| N. Contractor Supervision | $ - 0 | $ - 0 | $ - 0 |
| O. All other costs not included above | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 |
| SUMMARY | |||
| Total US Content | $0 | ||
| Total Non-Exempt Foreign Content | $0 | ||
| Total Exempted Materials, US Content, and Non-Exempt Foreign Content (Should Equal Proposal) | $0 | ||
| Percent Foreign Content (Waivered Foreign/Adjusted Value) | 0.00% | ||
| 0 |