RFP IS-15-0001 Attachment 3 - OSP Worksheet

View the file

Other files

File Type Posted
Amendment_0003_SF30_W912GB-14-R-0030.pdf PDF
Amend_0002_SF30_W912GB-14-R-0030_FY15_Israel_MATOC.pdf PDF
RFP_IS-15-0001_Atch6_KitchenDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch5_Special_Specification_Site_276_23Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ElecDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_PlumbingDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch1_Price_Schedule_Site_276_28Sep2014.pdf PDF
RFP_IS-15-0001_Atch6_WaterproofDrawings-Bldg_7_276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_RoadsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_AC_Drawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_StructuralDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch2_OSP_Worksheet_Directions_Site_276.pdf PDF
RFP_IS-15-0001_Atch6_ElevatorsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch9_Key_Personnel_and_Performance_Certificate_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch4_SRs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch7_Soil_Boring_Plan-Logs-276_Facility.pdf PDF
RFP_IS-15-0001_Atch6_FuelDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_3.zip ZIP file
RFP_IS-15-0001_Atch8_Submittal_Schedule_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch6_SiteDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_2.zip ZIP file
RFP_IS-15-0001_Atch10_USACE_Specs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_1.zip ZIP file
RFP_IS-15-0001_Transmittal_Ltr_Site_276_30Sep14.pdf PDF
RFP_IS-15-0001_Atch6_Drawing_List-276_Facility-29Sep2014.pdf PDF
Amend_0001_Atch1_14-R-0030_Revised_Experience_Overview_Sheet_27Sep14.docx DOCX document
Amendment_0001_W912GB-14-R-0030_FY15_Israel_MATOC_30Sep14.pdf PDF
Atch_1_Experience_Overview_Sheet.docx DOCX document
Atch_3_Past_Performance_Questionnaire.docx DOCX document
Atch_10_Host_Nation_Technical_Requirements.zip ZIP file
Atch_7_Contractor_Certification_Key_Personnel_and_Performance.docx DOCX document
W912GB-14-R-0030_FY15_Israel_MATOC_Solicitation_2Sep14.pdf PDF
Atch_8_PriceSchedule.xls XLS spreadsheet
Atch_5_Sample_Off-Shore_Procurement_Worksheet_with_Directions.doc DOC document
Atch_2_Experience_Information_Sheet.docx DOCX document
Atch_4_Letter_of_Commitment.doc DOC document
Atch_11_Sample_Contract_Requirements_-_SRs_29Aug14.pdf PDF
Atch_9__USACE_Specs_29Aug14.pdf PDF
Atch_6_Disclosure_of_Lobbying_Activities.doc DOC document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

OSP WORKSHEET
RFP IS-15-0001 FY15 Israel MATOC
Site 276 DFAC & Energy Center, Israel - 28 Sep 2014 (Attachment 3)
Total Contract Price from Proposal$ - 0
Exempted Materials
A. Bulk Materials
1. Excavation and Fill$ - 0
2. Sand$ - 0
3. Aggregate$ - 0
4. Stone$ - 0
5. Concrete Masonry Units$ - 0
6. Fired Brick$ - 0
7. Asphalt$ - 0
8. Concrete$ - 0
9. Fuel, Petroleum Products$ - 0
10. Temporary Electric Costs$ - 0
11. Water$ - 0
12. Other Bulk Material (plaster, plastic pipe & conduit, etc.)$ - 0
B. Other Construction Materials not Manufactured in Israel$ - 0
C. Items Exempted from the Buy American considerations pursuant to US/Israeli agreements (Annex A)$ - 0
D. Materials from Other Designated Countries$ - 0
E. Specified Contracts (Bezeq, etc.)$ - 0
F. Foreign (non-US, non-Israeli, non-designated country) for which the cost of US materials including$ - 0
transportation and handling exceed the cost of foreign purchase by at least 50%
G. Cost to provide Housing, office space and logistic support$ - 0
H. Labor Associated with Exempt Items$ - 0
Subtotal$ - 0
Non-Exempted Items
IsraeliForeignUS
I. Materials/Installed Equipment
1. Steel/Misc Metals$ - 0$ - 0$ - 0
2. Wood Products$ - 0$ - 0$ - 0
3. Roofing$ - 0$ - 0$ - 0
4. Finishes$ - 0$ - 0$ - 0
5. Electrical$ - 0$ - 0$ - 0
6. Plumbing/Sanitation$ - 0$ - 0$ - 0
7. Installed Equipment (does not include Exempt items)$ - 0$ - 0$ - 0
J. Contractor Construction Equipment Costs$ - 0$ - 0$ - 0
K. Contractor Labor Cost$ - 0$ - 0$ - 0
L. Mobilization/Demobilization Costs (not included in exempt costs)$ - 0$ - 0$ - 0
M. Contractor Indirect Costs (overhead)$ - 0$ - 0$ - 0
N. Contractor Supervision$ - 0$ - 0$ - 0
O. All other costs not included above$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0
SUMMARY
Total US Content$0
Total Non-Exempt Foreign Content$0
Total Exempted Materials, US Content, and Non-Exempt Foreign Content (Should Equal Proposal)$0
Percent Foreign Content (Waivered Foreign/Adjusted Value)0.00%
0