About this file

RFP IS-15-0001 Attachment 1 - Price Schedule

View the file

Other files

File Type Posted
Amendment_0003_SF30_W912GB-14-R-0030.pdf PDF
Amend_0002_SF30_W912GB-14-R-0030_FY15_Israel_MATOC.pdf PDF
RFP_IS-15-0001_Atch6_KitchenDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch5_Special_Specification_Site_276_23Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ElecDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_PlumbingDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_WaterproofDrawings-Bldg_7_276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_RoadsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_AC_Drawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_StructuralDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch2_OSP_Worksheet_Directions_Site_276.pdf PDF
RFP_IS-15-0001_Atch6_ElevatorsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch9_Key_Personnel_and_Performance_Certificate_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch4_SRs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch7_Soil_Boring_Plan-Logs-276_Facility.pdf PDF
RFP_IS-15-0001_Atch6_FuelDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_3.zip ZIP file
RFP_IS-15-0001_Atch3_OSP_Worksheet-Site_276_DFAC_and_Energy_Center.xls XLS spreadsheet
RFP_IS-15-0001_Atch8_Submittal_Schedule_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch6_SiteDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_2.zip ZIP file
RFP_IS-15-0001_Atch10_USACE_Specs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_1.zip ZIP file
RFP_IS-15-0001_Transmittal_Ltr_Site_276_30Sep14.pdf PDF
RFP_IS-15-0001_Atch6_Drawing_List-276_Facility-29Sep2014.pdf PDF
Amend_0001_Atch1_14-R-0030_Revised_Experience_Overview_Sheet_27Sep14.docx DOCX document
Amendment_0001_W912GB-14-R-0030_FY15_Israel_MATOC_30Sep14.pdf PDF
Atch_1_Experience_Overview_Sheet.docx DOCX document
Atch_3_Past_Performance_Questionnaire.docx DOCX document
Atch_10_Host_Nation_Technical_Requirements.zip ZIP file
Atch_7_Contractor_Certification_Key_Personnel_and_Performance.docx DOCX document
W912GB-14-R-0030_FY15_Israel_MATOC_Solicitation_2Sep14.pdf PDF
Atch_8_PriceSchedule.xls XLS spreadsheet
Atch_5_Sample_Off-Shore_Procurement_Worksheet_with_Directions.doc DOC document
Atch_2_Experience_Information_Sheet.docx DOCX document
Atch_4_Letter_of_Commitment.doc DOC document
Atch_11_Sample_Contract_Requirements_-_SRs_29Aug14.pdf PDF
Atch_9__USACE_Specs_29Aug14.pdf PDF
Atch_6_Disclosure_of_Lobbying_Activities.doc DOC document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BID-BUILD SITE 276 FACILITIES - CONSTRUCT DINING FACILTIY & ENERGY CENTER

CLIN Description Column A Column B Column C Job

Base Bid Construction

The base items include all labor, transportation, equipment, materials, and any other services necessary for the completion of the project requirements and shall be provided in accordance with all specifications, drawings and all other documents provided with the solicitation and as amended.

0001 Building 7 - DFAC & General Mobilization $________ $________ $________ $________

The scope of works includes construction of a Kitchen and Dining Room Building with a total floor area of about 2000 m². Also includes General Mobilization works as addressed in SR-0. Period of Performance is 540 calendar days from Issuance of

NTP. Liquidated Damages for CLIN 0001 are $3,246.00 per day.

0002 Site Development Works around the Buildings to Include Building 9 - Miss Carey $________ $________ $________ $________

The scope of works involves site and infrastructure works located inside the boundary area markings for Dining Building #7 in accordance with referenced Drawing name

Bldgs 7-8 SiteWorks004/file name 09877-007-01-004. Period of Performance is 120 calendar days from Issuance of NTP. Liquidated Damages for CLIN 0002 are

$313.00 per day.

0003 Dismantling of Existing Structures and Facilities $________ $________ $________ $________

The scope of work includes the dismantling of all of the utilities, installations, retaining walls, fences, buildings, foundations, slabs, etc. on the site for purposes of execution of the new project as identified. Period of Performance is 120 calendar days from

Issuance of NTP. Liquidated Damages for CLIN 0003 are $313.00 per day.

TOTAL PRICE BASE BID $________ $________ $________ $________

In addition, Offerors shall complete the OSP Worksheet for this project.

The above OSP provisions are incorporated into the contract resulting from this solicitation.

Offerors shall provide their price in the following categories:

Column A: FAR/DFAR exempted materials (Reference FAR 25.104)

Column B: Residual non-exempt IBOP foreign content

Job: Total price for bid item.

Column C: US content

In addition, notwithstanding the status of Israel as a designated country under IBOP, no Israeli content will be allowed on this contract except bulk materials (such as sand, gravel, or other soil material, plant materials, stone, cement or cement products, concrete masonry units or fired brick and other materials as listed in the OSP worksheet), materials described in the "Direction on Israeli Content - Other Bulk Items" and other items specifically authorized for purchase in Israel either in the contract specifications or by express written authorization of the Contracting Officer (not ACO or COR). Labor to deliver and install bulk or other exempted materials is likewise allowed to be Israeli content. If it is determined that the Contractor under this solicitation has used unauthorized Israeli content, payments to the Contractor may be reduced by the value of the unauthorized Israeli content or at the Government's option, the Contractor may be required to remove the unauthorized content and replace it with authorized content.

Contractors participating in this solicitation must be U.S. firms or joint ventures of U.S. firms. Offers from non- U.S. firms will be rejected. Israeli subcontractors and Israeli labor may be used for work associated with exempted materials.

PRICE SCHEDULE

SUPPLIES AND SERVICES AND PRICES/COSTS

28-Sep-14

The Offeror shall bid on all base bid and option items. Provide completion of all construction of awarded items from notice to proceed as described in the Price Schedule. The total period of performance of the base bid CLINS and options CLINS if awarded, are identified in each CLIN. The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance. Liquidated Damages (LDs) are applicable in the amounts indicated in each CLIN below. In accordance with the Request for Proposal (RFP) Offerors are required to provide Defense Base Act (DBA) insurance if applicable. Costs for DBA insurance shall be included in the proposal if applicable.

The Government reserves the right to award any of the contract options, not later than 120 calendar days following issuance of Notice-to-Proceed with the base bid work.

Any optional work awarded shall be completed as noted in the Option CLIN. For those projects designated as “Design-Build-Build", the solicitation package provides all necessary plans and specifications necessary to construct the project. For those projects designated "Design/Build" the contractor will be required to prepare a detailed design as well as provide for construction of the project.

Reference is made to the clauses in this solicitation implementing the U.S. Government International Balance of Payments Program (IBOP) and to U.S. Government policies concerning Off-Shore Procurement (OSP), including Federal Acquisition Regulation (FAR), part 25 and Department of Defense FAR Supplement (DFARS), Part 225. Offerors are advised that a waiver of OSP requirements will not be available for this procurement. Accordingly, at least 51% of the dollar value of this contract, exclusive of the cost of bulk materials, or other items that the FAR or DFARS exclude from Buy American considerations, must be of U.S. origin. Please note that this is different from the rules governing projects under the Wye River Program.

Site 276 DFAC & Energy Center RFP IS-15-0001 FY15 Israel MATOC

Attachment 1

DESIGN-BID-BUILD SITE 276 FACILITIES - CONSTRUCT DINING FACILTIY & ENERGY CENTER

PRICE SCHEDULE

SUPPLIES AND SERVICES AND PRICES/COSTS

28-Sep-14

CLIN Option Bid Items Description

Optional Bid Construction

The following Option includes all labor, transportation, equipment, materials, and any other services necessary for the completion of the project requirements and shall be provided in accordance with all specifications, drawings and all other documents provided with the solicitation and as amended.

0004 Option Building 8 - Energy Building $________ $________ $________ $________ The scope of works includes construction of an Energy Center with a total floor area of approximately 200 m². Includes work at the Energy Center shed. Period of

Performance is 300 calendar days from Issuance of NTP. Liquidated Damages for CLIN 0004 are $2,809 per day.

TOTAL PRICE OPTION ITEMS $________ $________ $________ $________

TOTAL PRICE BASE BID AND OPTION ITEMS $________ $________ $________ $________

Columns A, B and C are intended for Government use only. These items are not for bidding purposes or CLIN’s and are only evaluated for compliance with OSP requirements.

Price Proposal includes _____ or does not _____ include the cost for DBA insurance premiums. Mark as appropriate.

End of Bid Schedule