About this file

Attachment 4 - Sample Letter of Commitment

View the file

Other files

File Type Posted
Amendment_0003_SF30_W912GB-14-R-0030.pdf PDF
Amend_0002_SF30_W912GB-14-R-0030_FY15_Israel_MATOC.pdf PDF
RFP_IS-15-0001_Atch6_KitchenDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch5_Special_Specification_Site_276_23Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ElecDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_PlumbingDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch1_Price_Schedule_Site_276_28Sep2014.pdf PDF
RFP_IS-15-0001_Atch6_WaterproofDrawings-Bldg_7_276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_RoadsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_AC_Drawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_StructuralDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch2_OSP_Worksheet_Directions_Site_276.pdf PDF
RFP_IS-15-0001_Atch6_ElevatorsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch9_Key_Personnel_and_Performance_Certificate_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch4_SRs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch7_Soil_Boring_Plan-Logs-276_Facility.pdf PDF
RFP_IS-15-0001_Atch6_FuelDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_3.zip ZIP file
RFP_IS-15-0001_Atch3_OSP_Worksheet-Site_276_DFAC_and_Energy_Center.xls XLS spreadsheet
RFP_IS-15-0001_Atch8_Submittal_Schedule_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch6_SiteDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_2.zip ZIP file
RFP_IS-15-0001_Atch10_USACE_Specs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_1.zip ZIP file
RFP_IS-15-0001_Transmittal_Ltr_Site_276_30Sep14.pdf PDF
RFP_IS-15-0001_Atch6_Drawing_List-276_Facility-29Sep2014.pdf PDF
Amend_0001_Atch1_14-R-0030_Revised_Experience_Overview_Sheet_27Sep14.docx DOCX document
Amendment_0001_W912GB-14-R-0030_FY15_Israel_MATOC_30Sep14.pdf PDF
Atch_1_Experience_Overview_Sheet.docx DOCX document
Atch_3_Past_Performance_Questionnaire.docx DOCX document
Atch_10_Host_Nation_Technical_Requirements.zip ZIP file
Atch_7_Contractor_Certification_Key_Personnel_and_Performance.docx DOCX document
W912GB-14-R-0030_FY15_Israel_MATOC_Solicitation_2Sep14.pdf PDF
Atch_8_PriceSchedule.xls XLS spreadsheet
Atch_5_Sample_Off-Shore_Procurement_Worksheet_with_Directions.doc DOC document
Atch_2_Experience_Information_Sheet.docx DOCX document
Atch_11_Sample_Contract_Requirements_-_SRs_29Aug14.pdf PDF
Atch_9__USACE_Specs_29Aug14.pdf PDF
Atch_6_Disclosure_of_Lobbying_Activities.doc DOC document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY15 Israel MATOC

Solicitation W912GB-14-R-0030 (Attachment 4)

SAMPLE

LETTER OF COMMITMENT

(PRIME CONTRACTOR LETTERHEAD)

US Army Corps of Engineers

(Insert Date) Europe District

Konrad Adenauer Ring 39, Box 7

ATTN: Contracting Officer

65187 Wiesbaden, Germany

Subject: Letter of Commitment for Solicitation No. W912GB-14-R-0030, FY15 Israel MATOC In the event that Prime Contractor X is awarded a contract under the subject solicitation, Prime Contractor X commits to using Subcontractor Y as a subcontractor for the services described in this Letter of Commitment and Subcontractor Y agrees to perform as a subcontractor to Prime Contractor X for those services.

Prime Contractor X will perform as the prime contractor while Subcontractor Y will perform the following services as a subcontractor under the resultant contract:

(describe the work to be performed by the subcontractor, i.e. electrical, mechanical, civil, etc.)

Prime Contractor X may be credited with the experience, expertise and/or past performance of Subcontractor Y as they relate to the services described in this Letter of Commitment.

In the event that Prime Contractor X is awarded the resultant contract, another firm cannot be substituted for Subcontractor Y without prior written approval of the contracting officer. Approval or disapproval of a substitute subcontractor is a matter within the sole discretion of the Contracting Officer, considering such factors as whether the contracting officer considers the proposed substitute to be equally qualified and the substitution to be in the best interests of project execution.

In approving a substitution, the contracting officer may impose such conditions on the substitution as the contracting officer deems appropriate in the exercise of his/her sole discretion.

In the event Prime Contractor X is not awarded a contract under the subject solicitation, this Letter of Commitment is null and void.

John D. Prime

Shlomo D. Sub

Prime Contractor X

Subcontractor Y

Title

Title Attachment (4) – Sample Letter of Commitment