About this file

Amendment 0002 - W912GB-14-R-0030 FY15 Israel MATOC

View the file

Other files

File Type Posted
Amendment_0003_SF30_W912GB-14-R-0030.pdf PDF
RFP_IS-15-0001_Atch6_KitchenDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch5_Special_Specification_Site_276_23Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ElecDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_PlumbingDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch1_Price_Schedule_Site_276_28Sep2014.pdf PDF
RFP_IS-15-0001_Atch6_WaterproofDrawings-Bldg_7_276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_RoadsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_AC_Drawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_StructuralDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch2_OSP_Worksheet_Directions_Site_276.pdf PDF
RFP_IS-15-0001_Atch6_ElevatorsDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch9_Key_Personnel_and_Performance_Certificate_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch4_SRs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch7_Soil_Boring_Plan-Logs-276_Facility.pdf PDF
RFP_IS-15-0001_Atch6_FuelDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_3.zip ZIP file
RFP_IS-15-0001_Atch3_OSP_Worksheet-Site_276_DFAC_and_Energy_Center.xls XLS spreadsheet
RFP_IS-15-0001_Atch8_Submittal_Schedule_Site_276_28Sept14.pdf PDF
RFP_IS-15-0001_Atch6_SiteDrawings-276_Facility.zip ZIP file
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_2.zip ZIP file
RFP_IS-15-0001_Atch10_USACE_Specs_Site_276_28Sep14.pdf PDF
RFP_IS-15-0001_Atch6_ArchDrawings-276_Facility_-_1.zip ZIP file
RFP_IS-15-0001_Transmittal_Ltr_Site_276_30Sep14.pdf PDF
RFP_IS-15-0001_Atch6_Drawing_List-276_Facility-29Sep2014.pdf PDF
Amend_0001_Atch1_14-R-0030_Revised_Experience_Overview_Sheet_27Sep14.docx DOCX document
Amendment_0001_W912GB-14-R-0030_FY15_Israel_MATOC_30Sep14.pdf PDF
Atch_1_Experience_Overview_Sheet.docx DOCX document
Atch_3_Past_Performance_Questionnaire.docx DOCX document
Atch_10_Host_Nation_Technical_Requirements.zip ZIP file
Atch_7_Contractor_Certification_Key_Personnel_and_Performance.docx DOCX document
W912GB-14-R-0030_FY15_Israel_MATOC_Solicitation_2Sep14.pdf PDF
Atch_8_PriceSchedule.xls XLS spreadsheet
Atch_5_Sample_Off-Shore_Procurement_Worksheet_with_Directions.doc DOC document
Atch_2_Experience_Information_Sheet.docx DOCX document
Atch_4_Letter_of_Commitment.doc DOC document
Atch_11_Sample_Contract_Requirements_-_SRs_29Aug14.pdf PDF
Atch_9__USACE_Specs_29Aug14.pdf PDF
Atch_6_Disclosure_of_Lobbying_Activities.doc DOC document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W2SDXXXXXXXXXX

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page

POC: Glenn Adams, Contract Specialist Email: glenn.adam@usace.army.mil Phone: +49 (0)611 9744 2723

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Oct-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-14-R-0030

X 9B. DATED (SEE ITEM 11)

02-Sep-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2014

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB-14-R-0030

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of the is Amendment is to: 1) Provide responses to interest party’s request for information, clarifications and questions and 2) update several Federal Acquisition Regulations (FAR) clauses.

Note: All USACE Israel Industry Day – New York City presentations have been added to the Federal Business Opportunties (FedBizOpps) Notice W912GB-14-X-0100 on FBO.

1. Amendment 0001 dated 30 September 2014 provided responses to interest party’s request for information, clarifications and, questions 1 through 14. This Amendment provides the following responses:

15. Question: Ref. Attachment 9, Section 00 73 15 Item 1.20: This section requires that all Key Personnel speak English as well as the native language(s) of site workers. This would mean that all key personnel must speak multiple languages, which is unduly burdensome. Is it acceptable for the Prime Contractor’s key personnel to be fluent in English, and subcontractor management personnel to speak English and the native language of the site workers?

Response: The key personnel MUST speak English, but shall communicate (via translators if necessary) with site workers in native language(s).

16. Question: Regarding Letters of Commitment for Design Firms. We understand that our response to Factor

4 – Design Capability Plan should include our approach for obtaining and selecting Designers of Record.

Since Factor 4 is submitted in Phase 2, this precludes us from submitting letters of commitment for these firms with our Phase 1 proposal. Are letters of commitment for design firms required in Phase 1?

Response: Letters of Commitment for Design Firms shall be submitted with Phase II for Factor 4 (Design Capability Plan)

2. All other requirements of the solicitation as amended remain unchanged.

SECTION 00700 - CONTRACT CLAUSES

The following included by full text have been revised:

52.243-4 CHANGES (JUN 2007)

(a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or

W912GB-14-R-0030

indicated to be a change order, make changes in the work within the general scope of the contract, including changes--

(1) In the specifications (including drawings and designs);

(2) In the method or manner of performance of the work;

(3) In the Government-furnished property or services; or

(4) Directing acceleration in the performance of the work.

(b) Any other written or oral order (which, as used in this paragraph (b), includes direction, instruction, interpretation, or determination) from the Contracting Officer that causes a change shall be treated as a change order under this clause; provided, that the Contractor gives the Contracting Officer written notice stating

(1) the date, circumstances, and source of the order and

(2) that the Contractor regards the order as a change order.

(c) Except as provided in this clause, no order, statement, or conduct of the Contracting Officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment.

(d) If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any such order, the Contracting Officer shall make an equitable adjustment and modify the contract in writing. However, except for an adjustment based on defective specifications, no adjustment for any change under paragraph (b) of this clause shall be made for any costs incurred more than 20 days before the Contractor gives written notice as required. In the case of defective specifications for which the Government is responsible, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with the defective specifications.

(e) The Contractor must assert its right to an adjustment under this clause within 30 days after

(1) receipt of a written change order under paragraph (a) of this clause or (2) the furnishing of a written notice under paragraph (b) of this clause, by submitting to the Contracting Officer a written statement describing the general nature and amount of the proposal, unless this period is extended by the Government. The statement of proposal for adjustment may be included in the notice under paragraph (b) above.

(f) No proposal by the Contractor for an equitable adjustment shall be allowed if asserted after final payment under this contract.

(End of clause)

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

When costs are a factor in any price adjustment under this contract, the contract cost principles and procedures in FAR part 31 and DFARS part 231, in effect on the date of this contract, apply.

(End of clause)