Atch_8_PriceSchedule.xls
XLS spreadsheet 76 KB Posted
- Solicitation number
- W912GB-14-R-0030
About this file
Attachment 8 - Price Schedule
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| SECTION 00101 PRICING SCHEDULE | BASE YEAR | Solicitation W912GB-14-R-0030 FY15 ISRAEL MATOC (Atch 8) | |||
| Item | Description | Coefficient | Weight Factor | Line Item Weight | |
| 1 | 2 | 3 | 4 | 5 | 6 |
| 101AA | 1 | Earth works | 7 | 0.00 | |
| 101AB | 2 | Concrete works | 7 | 0.00 | |
| 101AC | 3 | Pre-cast concrete elements | 7 | 0.00 | |
| 101AD | 4 | Masonry works | 7 | 0.00 | |
| 101AE | 5 | Waterproofing works | 8 | 0.00 | |
| 101AF | 6 | Joinery | 8 | 0.00 | |
| 101AG | 7 | Plumbing and engineering installations | 8 | 0.00 | |
| 101AH | 8 | Electrical works | 8 | 0.00 | |
| 101AI | 9 | Rendering works | 6 | 0.00 | |
| 101AJ | 10 | Floor and wall tiling | 8 | 0.00 | |
| 101AK | 11 | Painting | 8 | 0.00 | |
| 101AL | 12 | Aluminum Works | 8 | 0.00 | |
| 101AM | 14 | Stonework | 4 | 0.00 | |
| 101AN | 15 | Air conditioning installations | 8 | 0.00 | |
| 101AO | 16 | Heating installations | 4 | 0.00 | |
| 101AP | 17 | Lifts (Elevators) | 2 | 0.00 | |
| 101AQ | 19 | Metal structure | 6 | 0.00 | |
| 101AR | 20 | Carpentry | 4 | 0.00 | |
| 101AS | 22 | Industrialized components | 8 | 0.00 | |
| 101AT | 24 | Demolitions and dismantling | 7 | 0.00 | |
| 101AU | 30 | Furniture and equipment installed in the building | 8 | 0.00 | |
| 101AV | 34 | Fire detection and fighting Systems | 6 | 0.00 | |
| 101AW | 35 | Control systems in buildings | 2 | 0.00 | |
| 101AX | 40 | Site development | 7 | 0.00 | |
| 101AY | 41 | Gardening and irrigation | 5 | 0.00 | |
| 101AZ | 42 | Outdoor furniture | 2 | 0.00 | |
| 101BA | 44 | Fencing | 8 | 0.00 | |
| 101BB | 50 | Concrete surfaces | 6 | 0.00 | |
| 101BC | 51 | Roadworks | 8 | 0.00 | |
| 101BD | 57 | Water pipelines, sewers and rainwater drainage | 7 | 0.00 | |
| 101BE | 58 | Air-Raid shelters and protected areas | 8 | 0.00 | |
| BOTTOM LINE SUM | 0.00 | ||||
| Formulas: | |||||
| Line Item Weight = Coefficient Column (4) * Weight Factor Column (5) | |||||
| Bottom Line Sum Base Year = sum of all Base Year Clins Column (1) | |||||
| Total Bottom Line Sum = Bottom Line Sums for of all Years |
Option 1
| SECTION 00101 PRICING SCHEDULE | Option Year 1 | Solicitation W912GB-14-R-0030 FY15 ISRAEL MATOC (Atch 8) | |||
| Item | Description | Coefficient | Weight Factor | Line Item Weight | |
| 1 | 2 | 3 | 4 | 5 | 6 |
| 101AA | 1 | Earth works | 7 | 0.00 | |
| 101AB | 2 | Concrete works | 7 | 0.00 | |
| 101AC | 3 | Pre-cast concrete elements | 7 | 0.00 | |
| 101AD | 4 | Masonry works | 7 | 0.00 | |
| 101AE | 5 | Waterproofing works | 8 | 0.00 | |
| 101AF | 6 | Joinery | 8 | 0.00 | |
| 101AG | 7 | Plumbing and engineering installations | 8 | 0.00 | |
| 101AH | 8 | Electrical works | 8 | 0.00 | |
| 101AI | 9 | Rendering works | 6 | 0.00 | |
| 101AJ | 10 | Floor and wall tiling | 8 | 0.00 | |
| 101AK | 11 | Painting | 8 | 0.00 | |
| 101AL | 12 | Aluminum Works | 8 | 0.00 | |
| 101AM | 14 | Stonework | 4 | 0.00 | |
| 101AN | 15 | Air conditioning installations | 8 | 0.00 | |
| 101AO | 16 | Heating installations | 4 | 0.00 | |
| 101AP | 17 | Lifts (Elevators) | 2 | 0.00 | |
| 101AQ | 19 | Metal structure | 6 | 0.00 | |
| 101AR | 20 | Carpentry | 4 | 0.00 | |
| 101AS | 22 | Industrialized components | 8 | 0.00 | |
| 101AT | 24 | Demolitions and dismantling | 7 | 0.00 | |
| 101AU | 30 | Furniture and equipment installed in the building | 8 | 0.00 | |
| 101AV | 34 | Fire detection and fighting Systems | 6 | 0.00 | |
| 101AW | 35 | Control systems in buildings | 2 | 0.00 | |
| 101AX | 40 | Site development | 7 | 0.00 | |
| 101AY | 41 | Gardening and irrigation | 5 | 0.00 | |
| 101AZ | 42 | Outdoor furniture | 2 | 0.00 | |
| 101BA | 44 | Fencing | 8 | 0.00 | |
| 101BB | 50 | Concrete surfaces | 6 | 0.00 | |
| 101BC | 51 | Roadworks | 8 | 0.00 | |
| 101BD | 57 | Water pipelines, sewers and rainwater drainage | 7 | 0.00 | |
| 101BE | 58 | Air-Raid shelters and protected areas | 8 | 0.00 | |
| BOTTOM LINE SUM | 0.00 | ||||
| Formulas: | |||||
| Line Item Weight = Coefficient Column (4) * Weight Factor Column (5) | |||||
| Bottom Line Sum Base Year = sum of all Base Year Clins Column (1) | |||||
| Total Bottom Line Sum = Bottom Line Sums for of all Years |
Option 2
| SECTION 00101 PRICING SCHEDULE | Option Year 2 | Solicitation W912GB-14-R-0030 FY15 ISRAEL MATOC (Atch 8) | |||
| Item | Description | Coefficient | Weight Factor | Line Item Weight | |
| 1 | 2 | 3 | 4 | 5 | 6 |
| 101AA | 1 | Earth works | 7 | 0.00 | |
| 101AB | 2 | Concrete works | 7 | 0.00 | |
| 101AC | 3 | Pre-cast concrete elements | 7 | 0.00 | |
| 101AD | 4 | Masonry works | 7 | 0.00 | |
| 101AE | 5 | Waterproofing works | 8 | 0.00 | |
| 101AF | 6 | Joinery | 8 | 0.00 | |
| 101AG | 7 | Plumbing and engineering installations | 8 | 0.00 | |
| 101AH | 8 | Electrical works | 8 | 0.00 | |
| 101AI | 9 | Rendering works | 6 | 0.00 | |
| 101AJ | 10 | Floor and wall tiling | 8 | 0.00 | |
| 101AK | 11 | Painting | 8 | 0.00 | |
| 101AL | 12 | Aluminum Works | 8 | 0.00 | |
| 101AM | 14 | Stonework | 4 | 0.00 | |
| 101AN | 15 | Air conditioning installations | 8 | 0.00 | |
| 101AO | 16 | Heating installations | 4 | 0.00 | |
| 101AP | 17 | Lifts (Elevators) | 2 | 0.00 | |
| 101AQ | 19 | Metal structure | 6 | 0.00 | |
| 101AR | 20 | Carpentry | 4 | 0.00 | |
| 101AS | 22 | Industrialized components | 8 | 0.00 | |
| 101AT | 24 | Demolitions and dismantling | 7 | 0.00 | |
| 101AU | 30 | Furniture and equipment installed in the building | 8 | 0.00 | |
| 101AV | 34 | Fire detection and fighting Systems | 6 | 0.00 | |
| 101AW | 35 | Control systems in buildings | 2 | 0.00 | |
| 101AX | 40 | Site development | 7 | 0.00 | |
| 101AY | 41 | Gardening and irrigation | 5 | 0.00 | |
| 101AZ | 42 | Outdoor furniture | 2 | 0.00 | |
| 101BA | 44 | Fencing | 8 | 0.00 | |
| 101BB | 50 | Concrete surfaces | 6 | 0.00 | |
| 101BC | 51 | Roadworks | 8 | 0.00 | |
| 101BD | 57 | Water pipelines, sewers and rainwater drainage | 7 | 0.00 | |
| 101BE | 58 | Air-Raid shelters and protected areas | 8 | 0.00 | |
| BOTTOM LINE SUM | 0.00 | ||||
| Formulas: | |||||
| Line Item Weight = Coefficient Column (4) * Weight Factor Column (5) | |||||
| Bottom Line Sum Base Year = sum of all Base Year Clins Column (1) | |||||
| Total Bottom Line Sum = Bottom Line Sums for of all Years |
Option 3
| SECTION 00101 PRICING SCHEDULE | Option Year 3 | Solicitation W912GB-14-R-0030 FY15 ISRAEL MATOC (Atch 8) | |||
| Item | Description | Coefficient | Weight Factor | Line Item Weight | |
| 1 | 2 | 3 | 4 | 5 | 6 |
| 101AA | 1 | Earth works | 7 | 0.00 | |
| 101AB | 2 | Concrete works | 7 | 0.00 | |
| 101AC | 3 | Pre-cast concrete elements | 7 | 0.00 | |
| 101AD | 4 | Masonry works | 7 | 0.00 | |
| 101AE | 5 | Waterproofing works | 8 | 0.00 | |
| 101AF | 6 | Joinery | 8 | 0.00 | |
| 101AG | 7 | Plumbing and engineering installations | 8 | 0.00 | |
| 101AH | 8 | Electrical works | 8 | 0.00 | |
| 101AI | 9 | Rendering works | 6 | 0.00 | |
| 101AJ | 10 | Floor and wall tiling | 8 | 0.00 | |
| 101AK | 11 | Painting | 8 | 0.00 | |
| 101AL | 12 | Aluminum Works | 8 | 0.00 | |
| 101AM | 14 | Stonework | 4 | 0.00 | |
| 101AN | 15 | Air conditioning installations | 8 | 0.00 | |
| 101AO | 16 | Heating installations | 4 | 0.00 | |
| 101AP | 17 | Lifts (Elevators) | 2 | 0.00 | |
| 101AQ | 19 | Metal structure | 6 | 0.00 | |
| 101AR | 20 | Carpentry | 4 | 0.00 | |
| 101AS | 22 | Industrialized components | 8 | 0.00 | |
| 101AT | 24 | Demolitions and dismantling | 7 | 0.00 | |
| 101AU | 30 | Furniture and equipment installed in the building | 8 | 0.00 | |
| 101AV | 34 | Fire detection and fighting Systems | 6 | 0.00 | |
| 101AW | 35 | Control systems in buildings | 2 | 0.00 | |
| 101AX | 40 | Site development | 7 | 0.00 | |
| 101AY | 41 | Gardening and irrigation | 5 | 0.00 | |
| 101AZ | 42 | Outdoor furniture | 2 | 0.00 | |
| 101BA | 44 | Fencing | 8 | 0.00 | |
| 101BB | 50 | Concrete surfaces | 6 | 0.00 | |
| 101BC | 51 | Roadworks | 8 | 0.00 | |
| 101BD | 57 | Water pipelines, sewers and rainwater drainage | 7 | 0.00 | |
| 101BE | 58 | Air-Raid shelters and protected areas | 8 | 0.00 | |
| BOTTOM LINE SUM | 0.00 | ||||
| Formulas: | |||||
| Line Item Weight = Coefficient Column (4) * Weight Factor Column (5) | |||||
| Bottom Line Sum Base Year = sum of all Base Year Clins Column (1) | |||||
| Total Bottom Line Sum = Bottom Line Sums for of all Years |
Option 4
| SECTION 00101 PRICING SCHEDULE | Option Year 4 | Solicitation W912GB-14-R-0030 FY15 ISRAEL MATOC (Atch 8) | ||||
| Item | Description | Coefficient | Weight Factor | Line Item Weight | ||
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 101AA | 1 | Earth works | 7 | 0.00 | ||
| 101AB | 2 | Concrete works | 7 | 0.00 | ||
| 101AC | 3 | Pre-cast concrete elements | 7 | 0.00 | ||
| 101AD | 4 | Masonry works | 7 | 0.00 | ||
| 101AE | 5 | Waterproofing works | 8 | 0.00 | ` | |
| 101AF | 6 | Joinery | 8 | 0.00 | ||
| 101AG | 7 | Plumbing and engineering installations | 8 | 0.00 | ||
| 101AH | 8 | Electrical works | 8 | 0.00 | ||
| 101AI | 9 | Rendering works | 6 | 0.00 | ||
| 101AJ | 10 | Floor and wall tiling | 8 | 0.00 | ||
| 101AK | 11 | Painting | 8 | 0.00 | ||
| 101AL | 12 | Aluminum Works | 8 | 0.00 | ||
| 101AM | 14 | Stonework | 4 | 0.00 | ||
| 101AN | 15 | Air conditioning installations | 8 | 0.00 | ||
| 101AO | 16 | Heating installations | 4 | 0.00 | ||
| 101AP | 17 | Lifts (Elevators) | 2 | 0.00 | ||
| 101AQ | 19 | Metal structure | 6 | 0.00 | ||
| 101AR | 20 | Carpentry | 4 | 0.00 | ||
| 101AS | 22 | Industrialized components | 8 | 0.00 | ||
| 101AT | 24 | Demolitions and dismantling | 7 | 0.00 | ||
| 101AU | 30 | Furniture and equipment installed in the building | 8 | 0.00 | ||
| 101AV | 34 | Fire detection and fighting Systems | 6 | 0.00 | ||
| 101AW | 35 | Control systems in buildings | 2 | 0.00 | ||
| 101AX | 40 | Site development | 7 | 0.00 | ||
| 101AY | 41 | Gardening and irrigation | 5 | 0.00 | ||
| 101AZ | 42 | Outdoor furniture | 2 | 0.00 | ||
| 101BA | 44 | Fencing | 8 | 0.00 | ||
| 101BB | 50 | Concrete surfaces | 6 | 0.00 | ||
| 101BC | 51 | Roadworks | 8 | 0.00 | ||
| 101BD | 57 | Water pipelines, sewers and rainwater drainage | 7 | 0.00 | ||
| 101BE | 58 | Air-Raid shelters and protected areas | 8 | 0.00 | ||
| BOTTOM LINE SUM | 0.00 | |||||
| Formulas: | ||||||
| Line Item Weight = Coefficient Column (4) * Weight Factor Column (5) | ||||||
| Bottom Line Sum Base Year = sum of all Base Year Clins Column (1) | ||||||
| Total Bottom Line Sum = Bottom Line Sums for of all Years |
Total
| Base Period and Four (4) Option Periods | |
| Bottom Line Sum Base Year | 0.00 |
| Bottom Line Sum Option Year 1 | 0.00 |
| Bottom Line Sum Option Year 2 | 0.00 |
| Bottom Line Sum Option Year 3 | 0.00 |
| Bottom Line Sum Option Year 4 | 0.00 |
| Total Bottom Line Sum | 0.00 |
| Solicitation W912GB-14-R-0030 FY15 ISRAEL MATOC (Atch 8) |
File details come from the government source that posted it. Updated .