C-05 _MATOC-D_Section_00_41_00_Pricing_Schedule111.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- FY 2013 ITALY Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W912GB13R0007
About this file
Pricing Schedule
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE | |||||
| BASE YEAR | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 101 | 15 | Road construction works | 8 | 0.00 | |
| 102 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 103 | 55 | Joinery works | 8 | 0.00 | |
| 104 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 105 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 106 | 65 | Floor covering works | 8 | 0.00 | |
| 107 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 108 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 109 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 110 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 |
Option Yr 1
| Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE | |||||
| OPTION YEAR 1 | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 201 | 15 | Road construction works | 8 | 0.00 | |
| 202 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 203 | 55 | Joinery works | 8 | 0.00 | |
| 204 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 205 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 206 | 65 | Floor covering works | 8 | 0.00 | |
| 207 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 208 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 209 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 210 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 |
Option Yr 2
| Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE | |||||
| OPTION YEAR 2 | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 301 | 15 | Road construction works | 8 | 0.00 | |
| 302 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 303 | 55 | Joinery works | 8 | 0.00 | |
| 304 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 305 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 306 | 65 | Floor covering works | 8 | 0.00 | |
| 307 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 308 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 309 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 310 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 |
Option Yr 3
| Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE | |||||
| OPTION YEAR 3 | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 301 | 15 | Road construction works | 8 | 0.00 | |
| 302 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 303 | 55 | Joinery works | 8 | 0.00 | |
| 304 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 305 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 306 | 65 | Floor covering works | 8 | 0.00 | |
| 307 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 308 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 309 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 310 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 |
Option Yr 4
| Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE | |||||
| OPTION YEAR 4 | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 301 | 15 | Road construction works | 8 | 0.00 | |
| 302 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 303 | 55 | Joinery works | 8 | 0.00 | |
| 304 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 305 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 306 | 65 | Floor covering works | 8 | 0.00 | |
| 307 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 308 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 309 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 310 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 |
Total Bottom Line Sum
| Base Period, Option 1, Option 2 | |
| Bottom Line Sum Base Year | 0.00 |
| Bottom Line Sum Option Year One | 0.00 |
| Bottom Line Sum Option Year Two | 0.00 |
| Bottom Line Sum Option Year Two | 0.00 |
| Bottom Line Sum Option Year Two | 0.00 |
| Total Bottom Line Sum | 0.00 |
File details come from the government source that posted it. Updated .