C-05 _MATOC-D_Section_00_41_00_Pricing_Schedule111.xlsx

XLSX spreadsheet 63 KB Posted

Attached to
FY 2013 ITALY Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
W912GB13R0007
Issued by
Department of the Army Corps of Engineers Engineering District Europe

About this file

Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to FY 2013 ITALY Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
13-R-0007 _Pre-Proposal_Conference_sign-in_sheet _07_February_2013.pdf PDF
Italy2013presentation07FEB2013.pdf PDF
C-5_13-R-0007_Amend_0006_25Feb2013.pdf PDF
C-5 _13-R-0007 _Amendment_0004 _11_February_2013.pdf PDF
C-5 _13-R-0007 _Amendment_0003 _05_February_2013.pdf PDF
C-02 _13-R-0007 _Attachment_4 _BankLetterAssuranceSample.docx DOCX document
C-5 _13-R-0007 _Amendment_0002 _22_January_2013.pdf PDF
C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx DOCX document
00_73_15.15_Time_Extensions_for_Unusually_Severe_Weather.pdf PDF
01_00_15_Design_After_Award.pdf PDF
02_41_00_Demolition_and_Deconstruction.pdf PDF
01_45_01_USACE_Quality_Control.pdf PDF
01_32_01.00_10_Project_Schedule.pdf PDF
02_82_14.00_10_Asbestos_Hazard_Control_Activities.pdf PDF
00_73_16.02_Special_Conditions_for_Projects_in_Italy.pdf PDF
Construction_Signs.pdf PDF
01_78_23_Operation_and_Maintenance_Data.pdf PDF
00_73_15_General_Conditions.pdf PDF
01_35_26_Safety_and_Occupational_Health_Requirements.pdf PDF
01_78_00_Completion_Procedures.pdf PDF
01_33_00_Submittal_Procedures.pdf PDF
01_35_26.15_Additional_Safety_and_Occupational_Health_Requirements_for_Projects_in_Italy.pdf PDF
01_45_01.10_USACE_QUALITY_CONTROL_SYSTEM_(QCS).pdf PDF
C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx DOCX document
C-02 _13-R-0007 _Attachment_1 _ExperienceOverviewSheet.docx DOCX document
C-05 _13-R-0007 _Solicitation_FY13_Italy_MATOC _20_DEC_2012.pdf PDF
C-02 _13-R-0007 _Attachment_4 _BankLetterAssuranceSample.docx DOCX document
C-02 _13-R-0007 _Attachment_3 _PastPerformanceClientForm.docx DOCX document
C-02 _13-R-0007 _Attachment_5 _BankLetterGuaranteeSample.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE
BASE YEAR
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
10115Road construction works80.00
10250Plaster, gypsum and stucco work80.00
10355Joinery works80.00
10460Metal construction and locksmith80.00
10563Painting and Wallpaper works80.00
10665Floor covering works80.00
10780Heating plants and central industrial water80.00
10882Electrical work80.00
Category 2:Books Ordered Often
109Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
110Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00

Option Yr 1

Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE
OPTION YEAR 1
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
20115Road construction works80.00
20250Plaster, gypsum and stucco work80.00
20355Joinery works80.00
20460Metal construction and locksmith80.00
20563Painting and Wallpaper works80.00
20665Floor covering works80.00
20780Heating plants and central industrial water80.00
20882Electrical work80.00
Category 2:Books Ordered Often
209Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
210Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00

Option Yr 2

Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE
OPTION YEAR 2
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
30115Road construction works80.00
30250Plaster, gypsum and stucco work80.00
30355Joinery works80.00
30460Metal construction and locksmith80.00
30563Painting and Wallpaper works80.00
30665Floor covering works80.00
30780Heating plants and central industrial water80.00
30882Electrical work80.00
Category 2:Books Ordered Often
309Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
310Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00

Option Yr 3

Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE
OPTION YEAR 3
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
30115Road construction works80.00
30250Plaster, gypsum and stucco work80.00
30355Joinery works80.00
30460Metal construction and locksmith80.00
30563Painting and Wallpaper works80.00
30665Floor covering works80.00
30780Heating plants and central industrial water80.00
30882Electrical work80.00
Category 2:Books Ordered Often
309Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
310Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00

Option Yr 4

Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE
OPTION YEAR 4
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
30115Road construction works80.00
30250Plaster, gypsum and stucco work80.00
30355Joinery works80.00
30460Metal construction and locksmith80.00
30563Painting and Wallpaper works80.00
30665Floor covering works80.00
30780Heating plants and central industrial water80.00
30882Electrical work80.00
Category 2:Books Ordered Often
309Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
310Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00

Total Bottom Line Sum

Base Period, Option 1, Option 2
Bottom Line Sum Base Year0.00
Bottom Line Sum Option Year One0.00
Bottom Line Sum Option Year Two0.00
Bottom Line Sum Option Year Two0.00
Bottom Line Sum Option Year Two0.00
Total Bottom Line Sum0.00

File details come from the government source that posted it. Updated .