C-05 _13-R-0007 _Solicitation_FY13_Italy_MATOC _20_DEC_2012.pdf

PDF 407 KB Posted

Attached to
FY 2013 ITALY Multiple Award Task Order Contract (MATOC)
Solicitation number
W912GB13R0007
Issued by

About this file

W912GB-13-R-0007 Solicitation Italy MATOC 20 December 2012

View the file

Other files

File Type Posted
13-R-0007 _Pre-Proposal_Conference_sign-in_sheet _07_February_2013.pdf PDF
C-5_13-R-0007_Amend_0006_25Feb2013.pdf PDF
Italy2013presentation07FEB2013.pdf PDF
C-5 _13-R-0007 _Amendment_0004 _11_February_2013.pdf PDF
C-02 _13-R-0007 _Attachment_4 _BankLetterAssuranceSample.docx DOCX document
C-5 _13-R-0007 _Amendment_0003 _05_February_2013.pdf PDF
C-05 _MATOC-D_Section_00_41_00_Pricing_Schedule111.xlsx XLSX spreadsheet
C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx DOCX document
C-5 _13-R-0007 _Amendment_0002 _22_January_2013.pdf PDF
01_78_00_Completion_Procedures.pdf PDF
00_73_15.15_Time_Extensions_for_Unusually_Severe_Weather.pdf PDF
02_82_14.00_10_Asbestos_Hazard_Control_Activities.pdf PDF
01_00_15_Design_After_Award.pdf PDF
02_41_00_Demolition_and_Deconstruction.pdf PDF
01_33_00_Submittal_Procedures.pdf PDF
Construction_Signs.pdf PDF
00_73_16.02_Special_Conditions_for_Projects_in_Italy.pdf PDF
01_45_01_USACE_Quality_Control.pdf PDF
01_32_01.00_10_Project_Schedule.pdf PDF
01_35_26.15_Additional_Safety_and_Occupational_Health_Requirements_for_Projects_in_Italy.pdf PDF
01_45_01.10_USACE_QUALITY_CONTROL_SYSTEM_(QCS).pdf PDF
01_35_26_Safety_and_Occupational_Health_Requirements.pdf PDF
01_78_23_Operation_and_Maintenance_Data.pdf PDF
00_73_15_General_Conditions.pdf PDF
C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx DOCX document
C-02 _13-R-0007 _Attachment_3 _PastPerformanceClientForm.docx DOCX document
C-02 _13-R-0007 _Attachment_5 _BankLetterGuaranteeSample.docx DOCX document
C-02 _13-R-0007 _Attachment_4 _BankLetterAssuranceSample.docx DOCX document
C-02 _13-R-0007 _Attachment_1 _ExperienceOverviewSheet.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY13 Italy MATOC:

Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Aw ard Task Order Contracts (MATOC) for the purpose of providing real property repair and maintenance, design build, environmental w ork, force protection w ork, and construction services in the areas for U.S. Forces and/or Facilities throughout Italy. Up to 15% of project w ork may be performed outside of the geographical area of consideration, including other countries for w ork that is w ithin the scope of the contract w ork.

Contact for this solicitation w ill be as follow s:

Contract Specialist, Ms. Sarah Dow ns (Primary POC) Email address: sarah.dow ns@usace.army.mil Telephone No: +49(0)611 9744-2624.

Contracting Officer, Ms. Rachael Raposa Email address: rachael.raposa@usace.army.mil Telephone No: +49(0)611 9744-2600.

Contracts Supervisor, Ms. Wendy Fields Email address: w endy.d.f ields@usace.army.mil Telephone No: +49(0)611 9744-2218.

SARAH DOWNS 011-49-611-9744-2624

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

20-Dec-2012

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________22 Jan 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

US ARMY CORP OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912GB-13-R-0007 108

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912GB-13-R-0007

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 6,000,000 Job

ITALY MATOC BASE YEAR

FFP

BASE CLIN: Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for ITALY to provide real property repair and maintenance, environmental work, force protection work, and construction services in Italy, and any work for US Forces and/or Facilities throughout Italy.

Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

The minimum guarantee for the entire contract is $10,000.00.

BASE YEAR: 12 months from award.

FOB: Destination

NET AMT

Defense Base Act Insurance (DBA); Base

FFP

The amount listed by offeror on this CLIN is the estimated DBA Insurance premium (estimated payroll of the offeror and its subcontractors time the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the Government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalcution of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.

0003 6,000,000 Job

OPTION ITALY MATOC OPTION ONE

FFP

BASE CLIN: Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for ITALY to provide real property repair and maintenance, environmental work, force protection work, and construction services in Italy, and any work for US Forces and/or Facilities throughout Italy.

Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

The minimum guarantee for the entire contract is $10,000.00.

OPTION ONE PERIOD: 12 months from award.

OPTION Defense Base Act Insurance (DBA); OPTION

FFP

The amount listed by offeror on this CLIN is the estimated DBA Insurance premium (estimated payroll of the offeror and its subcontractors time the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the Government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalcution of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract

0005 6,000,000 Job

OPTION ITALY MATOC OPTION TWO

FFP

BASE CLIN: Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for ITALY to provide real property repair and maintenance, environmental work, force protection work, and construction services in Italy, and any work for US Forces and/or Facilities throughout Italy.

Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

The minimum guarantee for the entire contract is $10,000.00.

OPTION TWO PERIOD: 12 months from award.

OPTION Defense Base Act Insurance (DBA); OPTION

FFP

The amount listed by offeror on this CLIN is the estimated DBA Insurance premium (estimated payroll of the offeror and its subcontractors time the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the Government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalcution of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract

0007 6,000,000 Job

OPTION ITALY MATOC OPTION THREE

FFP

BASE CLIN: Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for ITALY to provide real property repair and maintenance, environmental work, force protection work, and construction services in Italy, and any work for US Forces and/or Facilities throughout Italy.

Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

The minimum guarantee for the entire contract is $10,000.00.

OPTION THREE PERIOD: 12 months from award.

OPTION Defense Base Act Insurance (DBA); OPTION

FFP

The amount listed by offeror on this CLIN is the estimated DBA Insurance premium (estimated payroll of the offeror and its subcontractors time the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the Government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalcution of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract

0009 6,000,000 Job

OPTION ITALY MATOC OPTION FOUR

FFP

BASE CLIN: Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for ITALY to provide real property repair and maintenance, environmental work, force protection work, and construction services in Italy, and any work for US Forces and/or Facilities throughout Italy.

Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

The minimum guarantee for the entire contract is $10,000.00.

OPTION FOUR PERIOD: 12 months from award.

OPTION Defense Base Act Insurance (DBA); OPTION

FFP

The amount listed by offeror on this CLIN is the estimated DBA Insurance premium (estimated payroll of the offeror and its subcontractors time the applicable rate(s)). The DBA insurance premium amount varies with payroll and the nature of services and will, therefore, be taken into account during price evaluation of offers. The actual amount paid by the Government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalcution of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract

Section 00100 - Bidding Schedule/Instructions to Bidders

ORDERING INSTRUCTIONS

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

3. TASK ORDERS REQUEST FOR PROPOSALS

1.1 When the Government has a work request, a Request for Proposal (RFP) will be issued. The RFP shall include information concerning the statement of work, guide specifications, drawings, attachments, information pertaining to a site visit, design requirements for design-build projects, evaluation criteria, and any other requirements for submissions (e.g., proposal requirements, bid schedule, etc.). As to Bank Letter of Guarantee and Bank Letter of Assurance, see samples provided as attachments and Section 00700-Contract clauses.

1.2 Depending upon the requirements of each task order, the Contractor will provide one of the following in response to an RFP: (a) lump sum price, (b) a price for each line item in the Schedule (when optional items are used), or (c) technical proposal in one package and the price proposal in a separate package.

1.3 Offerors attendance at site visits is considered vital to preparation of competitive and cost-effective offers, and to understanding the total results desired by the Government. Failure to attend site visits shall not be used as an excuse for omission or miscalculation in offers, and may be taken into consideration in determining a Contractor’s eligibility to participate in future Task Orders. The Contractors will not be reimbursed for attendance during negotiations, site visits, proposal preparation or other pre-Task Order award costs. The Contractor Officer reserves the right to make attendance at site visits mandatory for specific Task Orders and to reject offers by Contractors who have not attended the site visits.

1.4 Contractors shall respond within the number of calendar days stated in the RFP by submitting a proposal to the Contracting Officer in accordance with requirements stated in the RFP.

1.5 Proposals will either be accepted as is or negotiated to the mutual agreement of both the Government and the Contractor. Upon conclusion of satisfactory discussions or negotiations (if required), a Task Order will be issued by the Contracting Officer reflecting the negotiated order price and payment terms as outlined in the statement of work or specifications. In any instance where there is failure to reach agreement on price, the Government reserves the right to withdraw the project and have it completed by other means or to use the order unilaterally based upon Offeror’s proposed coefficients on the Bidding Schedule.

2. EVALUATION METHOD AND PROCEDURES OF RFPs

2.1 When an RFP for a Task Order is issued, the Government intends to select the most advantageous, responsive, and responsible proposal resulting in the Best Value to the Government, price and other factors considered. It is anticipated that the majority of the Task Orders will be awarded based on competition, but the Government reserves the right to the award Task Orders as follows:

1. Price only

2. Price/Technical, to include schedule of work (Best Value)

3. Unilateral issuance of order using the Unit Price Book award coefficients, see paragraph 6. this Section

2.2 All MATOC Contractors will be given a fair opportunity to bid on Task Orders over $3,000.00 unless one of the following exceptions apply:

a. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays;

b. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;

c. The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardess were given a fair opportunity to be considered for the original order; or

d. It is necessary to place an order to satisfy a minimum guarantee.

2.3 The Contracting Officer, in making decisions in award of any individual Task Order, will consider factors such as past performance on earlier Task Orders under MATOC, quality, timeliness, or other factors that the Contracting Officer determines to be relevant in awarding a particular Task Order. Award factors will vary depending on the unique requirements for each Task Order;

however, pricing will be a consideration.

2.4 When an RFP for a Task Order is issued with price as the only criteria, the low responsive Offeror will be awarded the Task Order. During the administration of this contract prices as part of Price Proposal(s) shall not exceed the Unit Price Book prices including the contract award coefficient(s). The Government reserves the right to request back-up documentation, engineering computations, and take offs to substantiate the Offeror’s Price Proposals. In the case of a unilateral award, the Government will issue the award based on the UPB price and the Contractor’s award coefficient.

2.5 When both technical and price are considered, award of a Task Order resulting from an RFP will be based on technical rating and price being considered. If the Government determines technical rating of greater importance to price or price to be of greater importance to technical rating or of equal importance to the technical rating, then the RFP will describe criteria to be utilized in evaluating the Task Order proposal.

2.6 The Government’s payment of the Lump Sum Amount of individual Task Orders shall constitute full compensation to the Contractor for (1) Furnishing all plant, labor equipment, appliances, and materials; and (2) Performing all operations required to complete the work in conformity with the drawings, specifications and/or statement of work. The Contractor shall include in their proposal costs of all work required by drawings, specifications, and/or statement of work.

2.7 The requirement procedures for Defense Base Act (DBA) is located in the contract clause 52.000-

4106 DEFENCE BASE ACT INSURANCE RATES – LIMITATION FIXED-PRICE (APR 2011).

DBA shall be reimbursed per Task Order and shall be itemized as a Line Item on individual Task Orders. Cost for DBA is not considered to be part of the coefficients.

3. TASK ORDER AWARD

3.1 Whenever possible, award will be made without discussions. If discussions are held each MATOC Contractor may be request to provide a final proposal revision. Task Order award will be made based on the basis for award as described in the Request for Proposal. The Government will notify Contractors when any Task Order (competed or otherwise awarded) is awarded under the MATIC procedures.

3.2 Task Orders will be issued on DD Form 1155. Orders may be placed via mail, telephone, facsimile or electronic commerce. The Task Order becomes binding when the Contracting Officer signs the Order.

3.3 In accordance with FAR 16.505(a)(7), no protest under Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a Task Order Contract except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract. Notice to Proceed (NTP) will be issued separately after receipt of an acceptable Bank Letter of Guaranty, if required, and approved submittals as identified per Task Order or for Task Order awards over $10,000,000. Debriefs are authorized for task orders over $5,000,000 in accordance with FAR Part 16.505.

3.4 In accordance with FAR Part 16.505(b)(6), the Head of the Contracting Activity is required to appoint a task and delivery order ombudsman. If the Contractor believes it was not fairly considered for a particular Task Order, the Contractor may present the matter to the Contracting Officer. The Contractor may appeal the explanation or decision of the Contracting Officer to the US Army Corps of Engineers (USACE) Ombudsman at the following address: Headquarters, US Atlantic PARC., Directorate of Contracting, ATTN: PARC., 60 Forsyth Street S.W., Room 10M35, Atlanta, Georgia 30303-8801. The ombudsman shall have the authority to:

a. Review complaints from contractors awarded multiple award contracts that they have not been afforded a fair opportunity to be considered for award of a particular task order.

b. After coordination with the Contracting Officer, and if he/she agrees with the Contractor, require that a Contracting Officer take corrective action regarding the complaint.

4. EMERGENCY ORDERING PROCEDURES

a. On rare occasions when the development of problems during other than normal duty hours arise which may jeopardize the operation of the areas, the contractor will be required to respond to the Government needs within four (4) hours following telephone notification which may be made at any time in any twenty-four hour period. To accomplish this, the Contractor will provide to the COR a number at which he can be reached on a twenty-four hour basis.

b. The Contractor shall, within five (5) hours (unless the Contracting Officer determines that additional time is required) following such notification, provide a proposal. The time of commencement and completion shall be as specified by the Government.

c. The Proposal will be reviewed for completeness and any concerns or inconsistencies will be negotiated.

d. The Contractor will be verbally advised to proceed by the Contracting Officer or his authorized representative.

e. Written confirmation by the Government and the requirements will be prepared and submitted the following work day, if practicable.

f. A deliver order will then be issued.

5. SOLE SOURCE

When it is necessary to negotiate with one firm on a sole-source basis, the Offeror’s proposed coefficients on the Bidding Schedule applied to the UPB may be utilized in establishing the price. For any items not covered by UPB, that are within the scope of the contract, the Contractor shall provided competitive quotes to establish a fair and reasonable price which shall be negotiated and incorporated into Task Orders. The Contractors coefficients will be applied to the overall UPB price to establish the total value of the Task Order. There may be circumstances where proposals will be negotiated without Offeror’s proposed coefficients on the Bidding Schedule applied to the UPB, such as follow-on work and items of work not covered by the UPB,

6. COEFFICIENT AND DEFINITIONS

6.1 Contractor’s coefficients shall contain all costs, in additional to those contained in the Unit Price Book (UPB) 2011. The coefficients are a numerical factor that represents Contractor costs (indirect and direct costs, etc.) and profit not considered to be included in the UPB data. The Contractor’s coefficients shall contain all Contractors costs inclusive of profit, all overhead (to include home office and field overhead), labor burden, insurance, adjustments to listed prices, general and administrative expenses, subcontractor mark-up, mobilization and demobilization, and all other costs including, but not limited to, compliance with environmental laws, permits, preparation of reports, correspondence and documentation required by law or these specifications, tax laws, protection and/or moving of government property and engineering services. Engineering services include those services that are incidental to construction, and completing submittals for construction work. The coefficients shall also include costs necessary to interface with Government representatives, and coordination with occupants and other Contractors as necessary. The coefficients shall also include, but is not limited to, costs for:

a. Subcontractors overhead and profit

b. All coast associated with bank guarantee

c. All waste and excess material

d. Employee payroll taxes, insurance, and fringe benefits

e. Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)

f. Compliance with environmental laws (overhead [indirect] cost associated with performing work incompliance with EPA/OSHA regulations including local Government requirements, including obtaining any necessary licenses and permits, reporting requirements, etc.)

g. Mobilization and close out for the total contract and each Task Order

h. Compliance with protection and safety laws and Italian safety laws (i.e., safety rails, face and clothing protection, PSC, third party coordination for design, etc.)

i. Clean up

j. Traffic and work-site signs and barriers

k. Project management and supervision

l. Quality control

m. Office management and equipment

n. Depreciation of mobile office(s)

o. Protection of Government property

p. Interest associated with funding of equipment and payroll

q. As built drawings

r. Permits, licenses, and fees

s. Other risk of doing business (i.e., risk of lower than expected dollar value

t. Risk of a high inflation cost for option periods; risk of poor subcontractor performance and re-performance

6.2 The Unit Price Book is based on Euro. The Government will make all Task Order awards and all payment for the entire life of the base contract and all exercised options in Euros.

6.3 Primary Design and Secondary Service Costs. It is anticipated that Task Orders are typically award to the low Offeror. However, when Task Orders are issued utilizing the coefficients applied to the Unit Price Book prices, then the requirements of this paragraph apply. All requirements associated with Design for Design Build projects will be negotiated per Task Order. All requirements associated with Architectural-Engineering Services projects requiring those services will be negotiated per Task Order. (All safety costs associated with project coordination are included in coefficient costs and lump sum prices.)

6.4 Validity of Coefficients. Each set of coefficients for the base period and each of the four (4) option periods shall be valid and remain in full force for the duration of the contract.

Unit Price Book. The Unit Price Book which is considered part of this contract shall be used as a pricing tool for the duration of this contract. The Unit Price Book is based primarily on European Standards.

7. PLANS AND SPECIFICATIONS

The Government will provide the contractor one copy of the construction drawings and statement of work (with pertinent supplemental specifications) upon issuance of each Task Order. All further reproduction shall be at the Contractor’s expense. The Government will provide these as hard copy or as electronic media, such as e-mail or CD ROM. When directed, the Contractor shall complete Government drawings or provide design drawings for design/build projects, reference Technical Specifications.

8. CONTRACTOR TASK ORDER SUBMITTALS

The Government requires all documentation (i.e., certificates, licenses, resumes, etc.) submitted and made available for verification purposes shall be in the English language in accordance with Local Clause 52.000-4043.

8.1 Contractor’s Project Manager

a. The Contractor shall appoint an English speaking individual to be the Contractor’s Project Manager. The Contractor’s Project Manager shall have a minimum of five (5) years of construction management experience. Verification documentation will be made available to the Government upon request.

b. This individual shall conduct the overall management coordination on this contract and serve as the central point of contact with the Contracting Officer or his/her authorized representative for the performance of all work. An additional English speaking individual must be designated to act for the Project Manager, when work is being performed during the absence of the Project Manager.

c. The Contractor shall provide to the U.S. Government, within seven (7) days of award, the names, addresses, and home phone numbers of the Project Manager and the alternate Contractor personnel with authority to act for the Contractor if the Project Manager cannot be contacted.

The Contractor shall also provide the Government, at the Pre-construction Conference, the names, address, and home phone numbers of the Project Manager’s supervisor.

d. When the Contractor wishes to change authorized Contractor personnel, a ten (10) workday advance written notice of change shall be provided to and approved by the Contracting Officer or his/her representative prior to any change. The Project Manager and/or any alternates designated to act for them, shall have full authority to contractually commit the Contractor for action on matters pertaining to administration of this contract. The Project Manager and his alternate shall be able to understand, speak, and write basic and technical English.

8.2 Correspondence: All correspondence shall be in the English language in accordance with Contract Clause FAR 52.215-1, Instruction to Offerors and “CORRESPONDENCE IN THE ENGLISH LANGUAGE”, (Local Clause 52.000-4043).

8.3 Submittals, Shop Drawings, and As-Builts

a. The Contractor is responsible for preparation of all shop drawings, submittals, and as-builts for each Task Order when required and as specified per Task Order. Submittals shall be approved by the COR in accordance with Specification Section 01 33 00.

b. The Contractor shall develop submittals for the Base Contract and shall provide these submittals to the Contracting Officer (KO) for review and approval no later than fifteen (15) calendar days after award of the contract. In the event any of the Base Contract submittals are disapproved by the KO, the Contractor shall revise the disapproved submittal to address all comments and resubmit to the KO within seven (7) days of receipt of comments. Base Contract submittals shall include but are not limited to Safety Plan, Quality Control Plan, and the Bank Letter of Assurance.

c. The Contractor shall update contract submittals and provide to the KO and/or COR, whichever is applicable, for review and approval whenever changes occur or are proposed. All Task Order submittals shall be prepared in accordance with the FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION and Specification Section 01 33 00 requirements.

8.4 Quality Control

The Contractor shall submit a Quality Control Plan. The plan shall adhere to Specification 01451.

The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with FAR 52.246-12 INSPECTION OF CONSTRUCTION.

8.5 Safety

Refer to the safety clauses in the contract.

8.6 Asbestos Plan

When required, the Contractor shall submit an Asbestos Plan that demonstrates the Contractor’s ability to perform asbestos abatement in accordance with AHERRA and EPA requirements and Section 00106 Asbestos Abatement. The Plan shall identify how key personnel are to be trained and/or certified and how annual training will be provided and documented. A plan for how the asbestos will be handled when encountered during non-asbestos work (contingency) shall be included. The Plan shall state that the COR will be notified prior to working with asbestos or if previously unidentified asbestos is encountered. If asbestos work is to be performed by a subcontractor, the experience and certification of credentials shall be provided. If the firm will perform the asbestos abatement, the firm’s certified personnel shall be identified and a copy of their latest certification provided.

8.7 Permits and Responsibilities

Permits and Responsibilities are the responsibility of the Contractor as required in Contract Clause “PERMITS AND RESPONSIBILITIES” (FAR 52.236-7) and Local Clause 52.000-4006.

8.8 Schedules

Schedules shall be negotiated and determined per Task Order. Schedules shall be submitted to the Government for acceptance in accordance with Specification Section 01 32 01.00.10. Delays as a result of weather shall be as addressed in SR 415-1-15, Unusually Severe Weather Conditions.

8.9 Contractor’s Responsibility

a. The contractor shall be held responsible for any and all damages attributed to the actions of the Contractor or its subcontractors outside the limits of construction, including drainage structure, electrical or telephone facilities, pavement and other facilities.

b. When required, the Contractor shall lay out their work from Government established base lines and/or bench marks as indicated per Task Order. The Contractor shall furnish at their own expense all stakes, templates, platforms, equipment, tools, material, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades as established per Task Order.

c. The Contractor shall erect and maintain temporary barricades, if required, to limit public access to hazardous areas. Barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

d. The Contractor shall be responsible for the security of their equipment.

e. Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall become the property of the contractor unless otherwise stated in the Task Order. Stored material, whether new or salvaged, shall be neatly stacked.

f. All debris shall be removed and the area restored to its original condition, including top soil and seeding if necessary.

8.10 Changes

Changes shall be determined in accordance with the provisions of Contract Clause, “CHANGES”

(FAR 52.243-4).

8.11 Warranty of Construction – Europe

The Contractor warrants that the work is performed in a satisfactory manner and meets industry standards. The Contractor shall provide an understood warranty of two (2) years for all construction and as applicable in the Contract Clause “WARRANTY OF CONSTRUCTION EUROPE” (FAR 52.246-2100). Extended warranties if applicable shall be provided per Task Order.

8.12 Close Out

All shop drawings, if required, warranties, extended warranties, test records, inspection certifications, and manufacturer certificates shall be provided to the Contracting Officer. The Contractor shall certify in writing that upon completion of the work and cleanup of the work areas that the site is environmentally clean with no Hazardous, Toxic and Radioactive Wastes (HTRW) contaminates resulting from the Contractor’s operation.

8.13 Payments

Payments shall be in accordance with Contract Clause FAR 52.232-5, Payments Under Fixed-Price Construction Contracts.

9. PERFORMANCE OF TASK ORDERS

9.1 In performance of work under this contract, the Contractor shall:

a. At the end of each work week, provide the Contracting Officer’s Representative (COR) or authorized representative with a work schedule for the next week complete with an Activity Hazard Analysis (AHA), listing the Task Orders to be worked and the required trades for the following week. The Contracting Officer’s Representative shall be notified immediately if revisions to the Task Order are necessary during the work week.

b. Arrange with the COR or authorized representative a sequence of procedures, means of access, space for storage or materials and equipment, use of approaches, corridors, and stairways. Since space for storage is limited in work areas, the majority of storage must be outside or at the Contractor’s assigned area. Only materials to be used for work under this contract may be stored at the assigned area.

c. The buildings and work areas may be occupied during performance of work under this contract.

The Contractor shall take particular care in the execution of the work in all computer, mechanical, electrical, and telephone equipment areas. Uninterrupted operations must be maintained in these areas.

10. TIME EXTENSIONS

Time extensions for contract changes will depend upon the extent, if any, but when the changes cause delay in the completion of the various elements of construction. The Change Order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The Change Order also may provide an equitable readjustments of liquidated damages under the new completion schedule.

11. LIQUIDATED DAMAGES – CONSTRUCTION

a. The Liquidated Damages are specified in individual Task Orders and the Contractor fails to complete the work within the time specified in a Task Order, or any extension, the Government may assess liquidated damages for each day of delay in accordance with FAR Clause 52.211-12.

b. For any Task Orders accomplished at one (1) site for which delay costs are applicable at the same time, the liquidated damages shall be concurrent and cumulative and applied as stated in each individual Task Order.

12. EVALUATION OF CONTRACTOR PERFORMANCE

In accordance with AFARS 5117.9005, the Contractors performance will be evaluated upon completion of each Task Order. Evaluations may be performed on all Task Orders, regardless of the dollar amount. As an alternative, the Contractors performance may be evaluated upon completion of work on several small Task Orders with a total dollar value of $100,000 or more. Interim evaluations may be prepared at any time during performance when determined to be in the best interest of the Government.

13. SPECIAL TECHNICAL SPECIFICATIONS

All work shall be performed as specified herein, per each Task Order requirements, and the Specifications.

13.1 A list of specifications is as follows:

SECTION 00 73 15 GENERAL CONDITIONS, dated 04/10

SECTION 00 73 15.15 TIME EXTENSIONS FOR UNUSUALLY SEVERE

WEATHER, dated 01/09 SECTION 00 73 16.02 SPECIAL CONDITIONS FOR PROJECTS IN ITALY, dated 10/09

SECTION 01 00 15 DESIGN AFTER AWARD, dated 12/11

SECTION 01 32 01.00 10 PROJECT SCHEDULE

SECTION 01 33 00 SUBMITTAL PROCEDURES, dated 07/09

SECTION 01 35 26 SAFETY AND OCCUPATIONAL HEALTH

REQUIREMENTS, dated 03/12

SECTION 01 35 26.15 ADDITIONAL SAFETY AND OCCUPATIONAL HEALTH

REQUIREMENTS FOR PROJECTS IN ITALY, dated 08/10

SECTION 01 45 01 USACE QUALITY CONTROL, dated 03/12 SECTION 01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS), dated 04/08 SECTION 01 78 00 COMPLETION PROCEDURES, dated 02/10

SECTION 01 78 23 OPERATION AND MAINTENANCE DATA

SECTION 02 41 00 DEMOLITION AND DECONSTRUCTION, dated 05/10 SECTION 02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES, dated 02/10 EP 310-1-6A CONSTRUCTION SIGNS, dated 06/06

14. Construction Specifications and Standards

The Unit Price Book is based on the German construction standards (Deutsches Institut fur Normung e.V.) DIN Standards. Provided as part of these contract documents, is a cross referencing sheet that correlates the DIN Standards to European Standards. In addition there are also some correlations for some Turkish Standards. Contractors must at a minimum follow the DIN Standards; however, Contractors may follow the equivalent European or Turkish Standards or Italian. Contractors may submit for approval other country standards. Contractors are reminded no substitution to the construction standards is allowed without written approval from the Contracting Officer or the Contracting Officer’s Representative (COR).

15. PAYMENT

No separate payment, except as specified herein, will be made for the work covered under this section and all costs in connection therewith will be included in the applicable contract price to which the work pertains.

SUMMARY OF WORK

SECTION 01 11 00

SUMMARY OF WORK

1.1 GENERAL INFORMATION

a. PERFORMANCE PERIOD: A base period of one (1) year and four (4) option periods of one (1) year each.

b. MAXIMUM CONTRACT VALUE: $30,000,000 for the life of contract and $6,000,000 for the base period and $6,000,000 for each option period.

c. MINIMUM GUARANTEE: The minimum guarantee amount is $10,000 for the base year and is the full amount in consideration for all years.

d. TASK ORDER LIMITATIONS: The Minimum Task Order is $50,000 and the Maximum Task

Order is limited to $16,500,000. All task orders will be awarded and invoices paid in Euros.

e. BANK LETTER OF GUARANTEE and LETTER OF ASSURANCE: The Bank Letter of Assurance shall be $450,000. The Bank Letters of Guarantee will be provided per task order.

f. UNIT PRICE BOOK (UPB): The Schedule of Services and rates (SSR), dated 2010, is to be used as the contract specification in the execution of work under this contract.

g. UNIT PRICE BOOK is the terminology used by the U.S. Army for Schedule of Services and Rates (SSR). The terms shall be used interchangeably in this solicitation and final contract.

h. The terms shall be used interchangeably in this solicitation and final contract.

1.2 PURPOSE AND SCOPE:

The purpose of this U.S. Army Corps of Engineers Europe District (USACE EUD) Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) is to provide real property repair and maintenance, design build, environmental work, force protection work, and construction services in the areas for U.S. Forces and/or Facilities throughout Italy.

Use of the MATOC will provide the Government with a construction product delivery method that can accommodate quick and straight-forward projects, as well as some small but complex projects, and can help minimize design effort and related overhead expenditures, as well as handle compressed schedules.

Task Orders will primarily address new construction, design-build, general building renovation, road and airfield pavement repair, utility work to include water, sewer, electrical and gas and general environmental work including, but not limited to, incidental minor construction, excavation, plumbing, demolition, electrical, structural, mechanical, concrete work, and environmental remedial work. Project work may also include Force Protection type projects and Design Build projects for various construction type projects. Contract awards are anticipated for any work that will cover the geographical area of Italy, which includes all U. S. Government Facilities throughout Italy. Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

1.3 GEOGRAPHICAL LOCATION

Work will be performed primarily servicing the U.S. Forces and/or Facilities throughout Italy.

Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.

Some work may be performed outside of these locations under each contract. Successful Offerors shall be required to meet specific country requirements that shall be identified per Task Order. The Government reserves the right to issue additional contracts in the area of responsibility.

PRICE SCHEDULE

Italy 2013 MATOC - SECTION 00 41 00 PRICING SCHEDULE

BASE YEAR

Line Item No.

Book No.

Description Coef ficie nt

Wei ght Fact or

Line Item

Weight

(1) (2) (3) (4) (5) (6)

Category 1: Books Ordered Most Often NOTE: Offeror is required to bid on each book individually in this category.

301 15 Road construction works 8 0.00

302 50 Plaster, gypsum and stucco work 8 0.00

303 55 Joinery works 8 0.00

304 60 Metal construction and locksmith 8 0.00

305 63 Painting and Wallpaper works 8 0.00

306 65 Floor covering works 8 0.00

307 80 Heating plants and central industrial water 8 0.00

308 82 Electrical work 8 0.00

Category 2: Books Ordered Often

309 Coefficient for all books listed below this line: (11 Books) 6 0.00

00 Earthworks NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.

30 Masonry works

31 Concrete and reinforced concrete works

34 Carpentry and wood construction works

38 Roofing and roof sealing works

39 Flashing and sheet metal works

52 Tile and slab works

53 Screed works

57 Hardware works

61 Glazing works

81 Gas, water and sewer installation work

Category 3: Books Ordered Least Often

310 Coefficient for all books listed below this line: (11 Books) 2 0.00

06 Sewer Work NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual

Coefficient that will be applied, if items from one of these books is ordered.

07 Underground Pressure Pipeline Work

08 Drainage and drainage works

20 Landscaping Work

21 Insulation works on technical systems

51 Scaffolding

54 Asphalt Paving Work

56 Wood flooring works

79 Room Ventilation Work

84 Lightning protection systems

98 Asbestos removal works

BOTTOM LINE SUM 0.00

OPTION YEAR 1

Line Item No.

Book No.

Description Coe ffici ent

Wei ght Fact or

Line Item

Weight

(1) (2) (3) (4) (5) (6)

Category 1: Books Ordered Most Often NOTE: Offeror is required to bid on each book individually in this category.

201 15 Road construction works 8 0.00

202 50 Plaster, gypsum and stucco work 8 0.00

203 55 Joinery works 8 0.00

204 60 Metal construction and locksmith 8 0.00

205 63 Painting and Wallpaper works 8 0.00

206 65 Floor covering works 8 0.00

207 80 Heating plants and central industrial water 8 0.00

208 82 Electrical work 8 0.00

Category 2: Books Ordered Often

209 Coefficient for all books listed below this line: (11 Books) 6 0.00

00 Earthworks NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual

Coefficient that will be applied, if items from one of these books is ordered.

30 Masonry works

31 Concrete and reinforced concrete works

34 Carpentry and wood construction works

38 Roofing and roof sealing works

39 Flashing and sheet metal works

52 Tile and slab works

53 Screed works

57 Hardware works

61 Glazing works

81 Gas, water and sewer installation work

Category 3: Books Ordered Least Often

210 Coefficient for all books listed below this line: (11 Books) 2 0.00

06 Sewer Work NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual

Coefficient that will be applied, if items from one of these books is ordered.

07 Underground Pressure Pipeline Work

08 Drainage and drainage works

20 Landscaping Work

21 Insulation works on technical systems

51 Scaffolding

54 Asphalt Paving Work

56 Wood flooring works

79 Room Ventilation Work

84 Lightning protection systems

OPTION YEAR 2

Line Item No.

Book No.

Description Coef ficie nt

Wei ght Fact or

Line Item

Weight

(1) (2) (3) (4) (5) (6)

Category 1: Books Ordered Most Often NOTE: Offeror is required to bid on each book individually in this category.

301 15 Road construction works 8 0.00

302 50 Plaster, gypsum and stucco work 8 0.00

303 55 Joinery works 8 0.00

304 60 Metal construction and locksmith 8 0.00

305 63 Painting and Wallpaper works 8 0.00

306 65 Floor covering works 8 0.00

307 80 Heating plants and central industrial water 8 0.00

308 82 Electrical work 8 0.00

Category 2: Books Ordered Often

309 Coefficient for all books listed below this line: (11 Books) 6 0.00

00 Earthworks NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.

30 Masonry works

31 Concrete and reinforced concrete works

34 Carpentry and wood construction works

38 Roofing and roof sealing works

39 Flashing and sheet metal works

52 Tile and slab works

53 Screed works

57 Hardware works

61 Glazing works

81 Gas, water and sewer installation work

Category 3: Books Ordered Least Often

310 Coefficient for all books listed below this line: (11 Books) 2 0.00

06 Sewer Work NOTE: Coefficient for this category is not to be a sum

Coefficient that will be applied, if items from one of these books is ordered.

07 Underground Pressure Pipeline Work

08 Drainage and drainage works

20 Landscaping Work

21 Insulation works on technical systems

51 Scaffolding

54 Asphalt Paving Work

56 Wood flooring works

79 Room Ventilation Work

84 Lightning protection systems

OPTION YEAR 3

Line Item No.

Book No.

Description Coef ficie nt

Wei ght Fact or

Line Item

Weight

(1) (2) (3) (4) (5) (6)

Category 1: Books Ordered Most Often NOTE: Offeror is required to bid on each book individually in this category.

301 15 Road construction works 8 0.00

302 50 Plaster, gypsum and stucco work 8 0.00

303 55 Joinery works 8 0.00

304 60 Metal construction and locksmith 8 0.00

305 63 Painting and Wallpaper works 8 0.00

306 65 Floor covering works 8 0.00

307 80 Heating plants and central industrial water 8 0.00

308 82 Electrical work 8 0.00

Category 2: Books Ordered Often

309 Coefficient for all books listed below this line: (11 Books) 6 0.00

00 Earthworks NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.

30 Masonry works

31 Concrete and reinforced concrete works

34 Carpentry and wood construction works

38 Roofing and roof sealing works

39 Flashing and sheet metal works

52 Tile and slab works

53 Screed works

57 Hardware works

61 Glazing works

81 Gas, water and sewer installation work

Category 3: Books Ordered Least Often

310 Coefficient for all books listed below this line: (11 Books) 2 0.00

06 Sewer Work NOTE: Coefficient

Coefficient that will be applied, if items from one of these books is ordered.

07 Underground Pressure Pipeline Work

08 Drainage and drainage works

20 Landscaping Work

21 Insulation works on technical systems

51 Scaffolding

54 Asphalt Paving Work

56 Wood flooring works

79 Room Ventilation Work

84 Lightning protection systems

OPTION YEAR 4

Line Item No.

Book No.

Description Coef ficie nt

Wei…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .