SECTION 01 78 23 OPERATION AND MAINTENANCE DATA

View the file

Other files for this federal contract opportunity

Other files attached to FY 2013 ITALY Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
13-R-0007 _Pre-Proposal_Conference_sign-in_sheet _07_February_2013.pdf PDF
Italy2013presentation07FEB2013.pdf PDF
C-5_13-R-0007_Amend_0006_25Feb2013.pdf PDF
C-5 _13-R-0007 _Amendment_0004 _11_February_2013.pdf PDF
C-5 _13-R-0007 _Amendment_0003 _05_February_2013.pdf PDF
C-02 _13-R-0007 _Attachment_4 _BankLetterAssuranceSample.docx DOCX document
C-5 _13-R-0007 _Amendment_0002 _22_January_2013.pdf PDF
C-05 _MATOC-D_Section_00_41_00_Pricing_Schedule111.xlsx XLSX spreadsheet
C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx DOCX document
02_82_14.00_10_Asbestos_Hazard_Control_Activities.pdf PDF
00_73_16.02_Special_Conditions_for_Projects_in_Italy.pdf PDF
Construction_Signs.pdf PDF
00_73_15_General_Conditions.pdf PDF
01_35_26_Safety_and_Occupational_Health_Requirements.pdf PDF
01_78_00_Completion_Procedures.pdf PDF
01_33_00_Submittal_Procedures.pdf PDF
01_35_26.15_Additional_Safety_and_Occupational_Health_Requirements_for_Projects_in_Italy.pdf PDF
01_45_01.10_USACE_QUALITY_CONTROL_SYSTEM_(QCS).pdf PDF
00_73_15.15_Time_Extensions_for_Unusually_Severe_Weather.pdf PDF
01_00_15_Design_After_Award.pdf PDF
02_41_00_Demolition_and_Deconstruction.pdf PDF
01_45_01_USACE_Quality_Control.pdf PDF
01_32_01.00_10_Project_Schedule.pdf PDF
C-05 _13-R-0007 _Solicitation_FY13_Italy_MATOC _20_DEC_2012.pdf PDF
C-02 _13-R-0007 _Attachment_4 _BankLetterAssuranceSample.docx DOCX document
C-02 _13-R-0007 _Attachment_3 _PastPerformanceClientForm.docx DOCX document
C-02 _13-R-0007 _Attachment_5 _BankLetterGuaranteeSample.docx DOCX document
C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx DOCX document
C-02 _13-R-0007 _Attachment_1 _ExperienceOverviewSheet.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 78 23

OPERATION AND MAINTENANCE DATA

03/09

PART 1: GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 SUBMISSION OF OPERATION AND MAINTENANCE DATA

1.3.1 Package Quality

1.3.2 Package Content

1.3.3 Changes to Submittals

1.4 TYPES OF INFORMATION REQUIRED IN O&M MANUALS

1.4.1 Operating Instructions

1.4.2 Preventive Maintenance

1.4.3 Corrective Maintenance (Repair)

1.4.4 Corrective Maintenance Work-Hours

1.4.5 Appendices

PART 2: PRODUCTS

PART 3: EXECUTION

3.1 TRAINING

PART 1: GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM) (2005) Stewardship for the Cleaning of Commercial and Institutional Buildings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-10 Operation and Maintenance Data Operation and Maintenance Manuals; G Operations and Maintenance Training course schedule, syllabus, and training materials; G Video of Training Sessions

1.3 SUBMISSION OF OPERATION AND MAINTENANCE DATA

Submit Operation and Maintenance (O&M) Data specifically applicable to this contract and a complete and concise depiction of the provided equipment, product, or system. Organize and present information in sufficient detail to clearly explain O&M requirements at the system, equipment, component, and subassembly level. Include an index preceding each submittal. Submit in accordance with this section and Section 01330 SUBMITTAL PROCEDURES.

SECTION 01 78 23 OPERATION AND MAINTENANCE DATA (03/09)

1.3.1 Package Quality

Documents must be fully legible. Poor quality copies and material with hole punches obliterating the text or drawings will not be accepted.

1.3.2 Package Content

Data package content shall be as shown in the paragraph titled "Schedule of Operation and Maintenance Data Packages." Comply with the data package requirements specified in the individual technical sections, including the content of the packages and addressing each product, component, and system designated for data package submission.

1.3.3 Changes to Submittals

Manufacturer-originated changes or revisions to submitted data shall be furnished by the Contractor if a component of an item is so affected subsequent to acceptance of the O&M Data. Changes, additions, or revisions required by the Contracting Officer for final acceptance of submitted data, shall be submitted by the Contractor within 30 calendar days of the notification of this change requirement.

1.3.4 Language

O&M Manuals shall be provided in both English and Host Nation language.

1.4 TYPES OF INFORMATION REQUIRED IN O&M MANUALS

1.4.1 Operating Instructions

Include specific instructions, procedures, and illustrations for the following phases of operation:

(1) Safety Precautions: list personnel hazards and equipment or product safety precautions for all operating conditions.

(2) Operator Prestart: Include procedures required to set up and prepare each system for use.

(3) Startup, Shutdown, and Post-Shutdown Procedures: Provide narrative description for Startup, Shutdown and Post-shutdown operating procedures including the control sequence for each procedure.

(4) Normal Operations: Provide narrative description of Normal Operating Procedures. Include Control Diagrams with data to explain operation and control of systems and specific equipment.

(5) Emergency Operations: Include Emergency Procedures for equipment malfunctions to permit a short period of continued operation or to shut down the equipment to prevent further damage to systems and equipment. Include Emergency Shutdown Instructions for fire, explosion, spills, or other foreseeable contingencies. Provide guidance and procedures for emergency operation of all utility systems including required valve positions, valve locations and zones or portions of systems controlled.

(6) Operator Service Requirements: Include instructions for services to be performed by the operator such as lubrication, adjustment, inspection, and recording gage readings.

(7) Environmental Conditions: Include a list of Environmental Conditions (temperature, humidity, and other relevant data) that are best suited for the operation of each product, component or system. Describe conditions under which the item equipment should not be allowed to run.

1.4.2 Preventive Maintenance

Include the following information for preventive and scheduled maintenance to minimize corrective maintenance and repair.

(1) Lubrication Data: Include preventative maintenance lubrication data, in addition to instructions for lubrication provided under paragraph titled "Operator Service Requirements":

a. A table showing recommended lubricants for specific temperature ranges and applications.

b. Charts with a schematic diagram of the equipment showing lubrication points, recommended types and grades of lubricants, and capacities.

c. A Lubrication Schedule showing service interval frequency.

(2) Preventive Maintenance Plan and Schedule: Include manufacturer's schedule for routine preventive maintenance, inspections, tests and adjustments required to ensure proper and economical operation and to minimize corrective maintenance. Provide manufacturer's projection of preventive maintenance work-hours on a daily, weekly, monthly, and annual basis including craft requirements by type of craft. For periodic calibrations, provide manufacturer's specified frequency and procedures for each separate operation.

1.4.3 Corrective Maintenance (Repair)

Include manufacturer's recommended procedures and instructions for correcting problems and making repairs.

(1) Troubleshooting Guides and Diagnostic Techniques: Include step-by-step procedures to promptly isolate the cause of typical malfunctions. Describe clearly why the checkout is performed and what conditions are to be sought.

Identify tests or inspections and test equipment required to determine whether parts and equipment may be reused or require replacement.

(2) Wiring Diagrams and Control Diagrams: Wiring diagrams and control diagrams shall be point-to-point drawings of wiring and control circuits including factory-field interfaces. Provide a complete and accurate depiction of the actual job specific wiring and control work. On diagrams, number electrical and electronic wiring and pneumatic control tubing and the terminals for each type, identically to actual installation configuration and numbering.

(3) Maintenance and Repair Procedures: Include instructions and a list of tools required to repair or restore the product or equipment to proper condition or operating standards.

(4) Removal and Replacement Instructions: Include step-by-step procedures and a list required tools and supplies for removal, replacement, disassembly, and assembly of components, assemblies, subassemblies, accessories, and attachments. Provide tolerances, dimensions, settings and adjustments required. Instructions shall include a combination of text and illustrations.

(5) Spare Parts and Supply Lists: Include lists of spare parts and supplies required for maintenance and repair to ensure continued service or operation without unreasonable delays. Special consideration is required for facilities at remote locations. List spare parts and supplies that have a long lead-time to obtain.

1.4.4 Corrective Maintenance Work-Hours

Include manufacturer's projection of corrective maintenance work-hours including requirements by type of craft. Corrective maintenance that requires completion or participation of the equipment manufacturer shall be identified and tabulated separately.

1.4.5 Appendices

Provide information required below and information not specified in the preceding paragraphs but pertinent to the maintenance or operation of the product or equipment. Include the following:

(1) Product Submittal Data: Provide a copy of all SD-03 Product Data submittals required in the applicable technical sections.

(2) Manufacturer's Instructions: Provide a copy of all SD-08 Manufacturer's Instructions submittals required in the applicable technical sections.

(3) O&M Submittal Data: Provide a copy of all SD-10 Operation and Maintenance Data submittals required in the applicable technical sections.

(4) Parts Identification: Provide identification and coverage for all parts of each component, assembly, subassembly, and accessory of the end items subject to replacement. Include special hardware requirements, such as requirement to use high-strength bolts and nuts. Identify parts by make, model, serial number, and source of supply to allow reordering without further identification. Provide clear and legible illustrations, drawings, and exploded views to enable easy identification of the items. When illustrations omit the part numbers and description, both the illustrations and separate listing shall show the index, reference, or key number that will cross-reference the illustrated part to the listed part. Parts shown in the listings shall be grouped by components, assemblies, and subassemblies in accordance with the manufacturer's standard practice.

Parts data may cover more than one model or series of equipment, components, assemblies, subassemblies, attachments, or accessories, such as typically shown in a master parts catalog

(5) Warranty Information: List and explain the various warranties and include the servicing and technical precautions prescribed by the manufacturers or contract documents in order to keep warranties in force.

Include warranty information for primary components such as the compressor of air conditioning system.

(6) Personnel Training Requirements: Provide information available from the manufacturers that is needed for use in training designated personnel to properly operate and maintain the equipment and systems.

(7) Testing Equipment and Special Tool Information: Include information on test equipment required to perform specified tests and on special tools needed for the operation, maintenance, and repair of components.

(8) Contractor Information: Provide a list that includes the name, address, and telephone number of the General Contractor and each Subcontractor who installed the product or equipment, or system. For each item, also provide the name address and telephone number of the manufacturer's representative and service organization most convenient to the project site. Provide the name, address, and telephone number of the product, equipment, and system manufacturers.

PART 2: PRODUCTS

(Not Applicable)

PART 3: EXECUTION

3.1 TRAINING

In addition to any other contract requirements, the Contractor shall provide operational and maintenance training for all systems furnished under this contract in accordance with this section. The training shall not take place until the operation and maintenance manuals are submitted and approved.

Training will be given to personnel responsible for the operation and maintenance of the system at the installation. Orient training to the specific system being installed under this contract. Use operation and maintenance manual as the primary instructional aid in contractor provided activity personnel training. Manuals shall be delivered for each trainee with two additional sets delivered for archiving at the project site.

Submit a training course schedule, syllabus, and training materials 21 calendar days prior to the start of training. Obtain approval of the training course before beginning that phase of training. Furnish a qualified instructor approved by the system manufacturer to conduct training for the specific system.

Training manuals shall include an agenda, defined objectives and a detailed description of the subject matter for each lesson. Furnish audio-visual equipment and all other training materials and supplies. A training day is defined as 8 hours of classroom or lab instruction, including two 15 minute breaks and excluding lunch time, Monday through Friday, during the daytime shift in effect at the training facility. For guidance, the Contractor should assume the attendees will have a high school education.

The Contractor shall videotape the training session on digital media (DVD) and provide three copies to the Government.

-- End of Section --