C-02 _13-R-0007 _Attachment_2 _ExperienceInfoSheet.docx
DOCX document 37 KB Posted
- Attached to
- FY 2013 ITALY Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W912GB13R0007
About this file
W912GB-13-R-0007 Attachment 2 Experience Information Sheet
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
FY2013 Italy
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 10 projects, more than 10 will not be evaluated; less than 10 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed, work in Italy is more relevant: ___________________________________
2. The day, month, and year work was completed; work must not be earlier than 2006: _______________
3. The final cost of this project, must be between €50,000 and €5,000,000 ($62,500 and $6,250,000): $_________________________
4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
5. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:
1. Renovations of multi-story buildings or barracks;
1. Repair/replacement of all major building systems such as electrical, mechanical, civil, maintenance and repair of facilities;
1. Concrete and/or asphalt roads, pavements, airfield runway work;
1. Civil works;
1. Environmental work;
1. Design and/or design build.
(Continue typing if required to provide more information)
ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.
6. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.
File details come from the government source that posted it. Updated .