W912EF24R0010 Amendment 00002.pdf
PDF 384 KB Posted
- Attached to
- Lower Snake River Navigation Lock Tainter Valve System Upgrades Federal contract opportunity
- Solicitation number
- W912EF24R0010
About this file
This document is an amendment to solicitation W912EF24R0010 for the Lower Snake River Navigation Lock Tainter Valve System Upgrades project. The amendment revises several technical specifications and drawings related to the project.
The key details are:
- The project scope involves replacing 16 tainter valves (4 at each of 4 locations) and associated mechanical and electrical equipment for the navigation lock culverts.
- The work includes fabrication of replacement parts, removal of existing equipment, and installation of the new equipment.
- The contractor or subcontractor performing the fabrication must be certified under the AISC quality program with Fracture Critical Endorsement.
- The project has an estimated construction value between $10-25 million and requires performance and payment bonds.
- The contractor will be responsible for an on-site safety and health program, quality control system, and use of the Government's Construction Contractor Module software.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the Plans and Specifications. See Summary of Changes and attached Amendment 0002 documents.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF24R0010
X 9B. DATED (SEE ITEM 11)
31-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2024
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CYNTHIA JACOBSEN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF24R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
Summary of changes for Amend-0002 LSR Navigation Lock Tainter Valve System Upgrades
1. Revised the following Specifications (See revised specification for details):
a. SECTION 05 50 03.00 28 MISCELLANEOUS METAL FABRICATION AND WELDING.
Revised Paragraph 3.3.1 “Embedded Stainless Steel Liner Repair”.
Revised Paragraph 3.3.2 “Bullnose Stainless Steel Liner Repair”.
b. SECTION 09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES.
Revised Paragraph 1.3.1 “Qualified Painting Contractor”.
Added Paragraph 3.1.2 “Ferrous Surfaces Subject to Atmospheric Exposures”.
Added Paragraph 3.3.4 “System No. 23-F-Z”.
Revised Paragraph 3.5 PAINTING SCHEDULES.
Renumbered Paragraphs.
c. SECTION 35 05 40.14 28 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES.
Revised Paragraph 2.4.4 “Pump Motors”.
Deleted Paragraph 2.4.9 “High Temperature Alarm”.
Revised Paragraph 2.4.12 “Pressure Transducers”.
Revised Paragraph 2.4.15.3. “Hydraulic High Oil Temperature Alarm Switch”.
Revised Paragraph 2.5.2 “Pipe”.
Renumbered Paragraphs.
2. Revised the following Drawings (See clouded areas for revisions).
a. Volume 1:
a. SHEET SD201.
b. SHEET M-502.
c. SHEET M-506.
b. Volume 2:
a. SHEET SD201.
b. SHEET M-502.
c. SHEET M-506.
c. Volume 3:
a. SHEET SD201.
b. SHEET M-502.
c. SHEET M-506.
d. Volume 4:
a. SHEET SD201.
b. SHEET M-502.
c. SHEET M-506.
(End of Summary of Changes)