24R0010_Plans_V4_Amendment002.pdf
PDF 403 KB Posted
- Attached to
- Lower Snake River Navigation Lock Tainter Valve System Upgrades Federal contract opportunity
- Solicitation number
- W912EF24R0010
About this file
This document is a set of technical drawings and a bill of materials related to a federal contract opportunity for the Lower Snake River Navigation Lock Tainter Valve System Upgrades project.
The key details are:
- The U.S. Army Corps of Engineers, Walla Walla District is the contracting agency for this Hybrid Construction with Supply project, Solicitation No. W912EF24R0010.
- The scope of work includes replacing 16 tainter valves (4 at each of 4 navigation lock sites) along with associated mechanical and electrical components.
- The contractor or subcontractor performing the fabrication must be AISC certified, including the Fracture Critical Endorsement.
- The construction portion is estimated between $10-25 million. Performance and payment bonds will be required for the construction.
- Only one pair of valves will be replaced at a time to maintain navigation operations.
- The contractor will be responsible for cranes, rigging, quality control, and safety management per EM 385-1-1 requirements.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EL 300.0 DRAIN VALVES 1 & 2
EL 294.00 FILL VALVES 3 & 4
SEE MECHANICAL SHEETS FOR
DEMOLITION ABOVE THE LIFTING EYES
FLOW
REMOVE VALVE BODY
BOTTOM OF CULVERT
TOP OF CULVERT
REMOVE ALL TRUNNION
COMPONENTS THAT ARE NOT
EMBEDDED IN CONCRETE
CENTERLINE TRUNNION
REMOVE GROUT AND PULL TEST EXISTING EMBEDDED
CONCRETE ANCHORS AT ALL WALL-MOUNTED BRACKETS
FOR THE PUSHRODS AND GUIDE ASSEMBLY PER
SPECIFICATIONS SECTION 03 30 53.00 28.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
FI
LE
N O
R :\d
7\
H L5
1_ S-
N av lo ck
_M as te rM od el
2.
rv t 8/
/2
1:
:0
PM
SD201
W
AL
LA
W
AL
LA
D
IS
TR
IC
T
N
R
D A
VE
W
AL
LA
W
AL
LA
, W
AS
H
IN
G
TO
N
D . I
R O
N S
G . I
G
LE
SI
AS
JU
LI
O M
O R
EL
O
S
III
, P .E
B.
M
AS
O
N
AP
R
IL
W
2E F2
4R
XX
XX
XX
-X
X- X-
XX
XX
FI
N
AL
IH
N -1
-5 -8
/1
C U
LV
ER
T
SH
AF
T
D
EM
O
LI
TI
O
N S
EC
TI
O N
IC
E
H
AR
BO
R
L O
C K
AN
D
D
AM
TA
IN
TE
R
V
AL
VE
S
YS
TE
M U
PG
R
AD
E
SN
AK
E R
IV
ER
, O R
EG
O
N , W
AS
H
IN
G
TO
N
A N
D
ID
AH
O
N
AV
IG
AT
IO
N
L O
C K
VOLUME 4
1/2" = 1'-0"A1 DEMO SECTION - VALVE BODY AND TRUNNION BASE
1. DRY WEIGHT OF EXISTING VALVE BODY IS APPROXIMATELY 20 TONS.
NOTES:
AU
G
0 1' 2' 4'
C
H
AN
G
ED
N O
TE
B
C
D
E
F
G
H
SHEET ID
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
SI
ZE
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4
J
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C O
N
TR
AC
T
N O
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
P
N
M
L
K
A
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VOLUME 4
M-502
FI
LE
N O
IH
N -1
-3 -8
/1
BI
LL
O
F M
AT
ER
IA
L
AN
D
D
ET
AI
L
VI
EW
S C
YL
IN
D
ER
A
SS
EM
BL
Y
CYLINDER ASSEMBLY
SHEETWEIGHT (LBS)MATERIALDESCRIPTIONQTYITEM
SEE SPECIFICATIONS397.86PER CYLINDER MANUFACTURERCYLINDER HEAD11
SEE SPECIFICATIONS2744.21PER CYLINDER MANUFACTURERCYLINDER BODY12
M-5031070.79ASTM A36 STEELCYLINDER BASE13
M-50414.08UNS C95400PACKING GLAND - CYLINDER SUPPORT14
EXISTING1071.26EXISTINGEMBEDDED CYLINDER SUPPORT15
SEE SPECIFICATIONS13.94PER CYLINDER MANUFACTURERPISTON LOCKNUT16
SEE SPECIFICATIONS164.27PER CYLINDER MANUFACTURERPISTON17
M-5041180.75SEE SPECIFICATIONSPISTON ROD18
SEE SPECIFICATIONS2.24SEE SPECIFICATIONSSTEP SEAL PISTON RING59
M-50427.75UNS S41600 CONDITION TBUMPER PLATE210
M-50412.22NITRILE BUTADIENE RUBBER
BONDED TO PLATE
RUBBER BUMPER111
M-504142.98UNS S21800BUMPER ADAPTER112
FI
N
AL
TA
IN
TE
R
V
AL
VE
S
YS
TE
M U
PG
R
AD
E
N
AV
IG
AT
IO
N
L O
C K
SN
AK
E R
IV
ER
, O R
EG
O
N , W
AS
H
IN
G
TO
N
A N
D
ID
AH
O
IC
E
H
AR
BO
R
L O
C K
AN
D
D
AM
W
2E F2
4R
AN
SI
D
M
AY
W
XX
XX
X-
XX
-X
-X
XX
W
AL
LA
W
AL
LA
, W
AS
H
IN
G
TO
N
N
R
D A
VE
W
AL
LA
W
AL
LA
D
IS
TR
IC
T
KE
VI
N R
EN
SH
AW
, P
.E
B.
E
D D
Y
B.
M
C N
EI
L
A.
D
IC
KM
AN
US Army Corps of Engineers
VERIFY BASE FITUP WITH
CYLINDER DIMENSIONS
A1 SCALE:
EXPLODED VIEW - CYLINDER
ASSEMBLY
NTS
G5 SCALE:
PLAN - CYLINDER
ASSEMBLY
3/4" = 1'-0"
0 1' 2' 3'
A8 SCALE:
ELEVATION - CYLINDER
ASSEMBLY
3/8" = 1'-0" 0 2' 4' 6' A12 SCALE:
SECTION - CYLINDER
ASSEMBLY
3/4" = 1'-0" 0 1' 2' 3'
A12
H15 SCALE:
DETAIL - TOP OF CYLINDER
NTS
A15 SCALE:
DETAIL - BOTTOM OF CYLINDER
NTS
J15
A15
'-9
" S
TR
O
KE
L
EN
G
TH
CYLINDER ROD
PACKING
7/
8"
3' -0
/8
" EXISTING CYLINDER
SUPPORT
LEGEND
NEW ITEMS
EXISTING ITEMS
CENTERLINE
GENERAL NOTES
1. CYLINDER SHOWN AS A CONCEPTUAL DRAWING. SEE SPECIFICATION FOR
DETAILS. ENSURE CYLINDER IS STANDARD MANUFACTURER PRODUCT.
2. PISTON ROD MUST FIT WITHIN EXISTING CYLINDER SUPPORT.
SEE NOTE 2
C
H
AN
G
ED
T
AB
LE
M
AT
ER
IA
LS
, N O
TE
A
N D
D
EL
ET
ED
D
IM
EN
SI
O N
B
C
D
E
F
G
H
SHEET ID
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
SI
ZE
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4
J
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C O
N
TR
AC
T
N O
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
P
N
M
L
K
A
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VOLUME 4
M-506
FI
LE
N O
IH
N -1
-3 -8
/2
BI
LL
O
F M
AT
ER
IA
L
AN
D
D
ET
AI
L
VI
EW
S C
R O
SS
H
EA
D
A
SS
EM
BL
Y
CROSSHEAD-PUSHROD ASSEMBLY
SHEETWEIGHT (LBS)MATERIALLENGTHDESCRIPTIONQTYITEM
M-5071192.91UNS S31600 CROSSHEAD21
-2051.22ASTM A564 TYPE 630 CONDITION 115022'PUSHROD - VALVE 1 & 2 - INTERMEDIATE12 -2053.22ASTM A564 TYPE 630 CONDITION 115022'- 1/4"PUSHROD - VALVE 1 & 2 - LOWER13 -1951.09ASTM A564 TYPE 630 CONDITION 115020'-11 1/2"PUSHROD - VALVE 1 & 2 - UPPER14 -1578.6ASTM A564 TYPE 630 CONDITION 115017'-1"PUSHROD - VALVE 3 & 4 - INTERMEDIATE 115 -1578.6ASTM A564 TYPE 630 CONDITION 115017'-1"PUSHROD - VALVE 3 & 4 - INTERMEDIATE 216
-1730.8ASTM A564 TYPE 630 CONDITION 115018'-8"PUSHROD - VALVE 3 & 4 - LOWER17
-1664.71ASTM A564 TYPE 630 CONDITION 115017'-11 3/4"PUSHROD - VALVE 3 & 4 - UPPER18
THIS SHEET75.41UNS S21800 PUSHROD CONNECTOR79
7/8" X 1.000" DEEP
4X TYP
1'-1"
5" 1/2" 2" 1/2" 5"
5"
6 1/2"6 1/2"
7/8" X 1.500" DEEP
BOTH ENDS
6"
90°"
A17 SCALE:
END VIEW - PUSHROD
CONNECTOR
6" = 1'-0"
E17 SCALE:
ISOMETRIC - PUSHROD
CONNECTOR
NTS
GENERAL NOTES
1. QUANTITIES SHOWN ARE FOR ONE FILL VALVE, ONE DRAIN VALVE
0.125" X 45° CHAMFER
BOTH ENDS
3/
8"
ENDS NEED TO BE PERPENDICULAR
TO CENTERLINE WITHIN 0.0005" TIR
SE
E
TA
BL
E
FO
R L
EN
G
TH
S
0.
5"
4 1/2"-6 UN-3B
6"
RC9 FIT IN
GUIDES
1/
2" 1/2"
A6 SCALE:
SECTION - TYPICAL PUSHROD
3" = 1'-0"
H6 SCALE:
PLAN VIEW - TYPICAL PUSHROD
3" = 1'-0"
A1 SCALE:
EXPLODED VIEW
NTS 0 3" 6" 9" 12"
0 3" 6" 9" 12"
0 1" 2" 3" 4"0 1" 2" 3" 4"A11 SCALE:
ELEVATION - PUSHROD CONNECTOR
6" = 1'-0"
FI
N
AL
TA
IN
TE
R
V
AL
VE
S
YS
TE
M U
PG
R
AD
E
N
AV
IG
AT
IO
N
L O
C K
SN
AK
E R
IV
ER
, O R
EG
O
N , W
AS
H
IN
G
TO
N
A N
D
ID
AH
O
IC
E
H
AR
BO
R
L O
C K
AN
D
D
AM
W
2E F2
4R
AN
SI
D
M
AY
W
XX
XX
X-
XX
-X
-X
XX
W
AL
LA
W
AL
LA
, W
AS
H
IN
G
TO
N
N
R
D A
VE
W
AL
LA
W
AL
LA
D
IS
TR
IC
T
KE
VI
N R
EN
SH
AW
, P
.E
B.
E
D D
Y
B.
M
C N
EI
L
A.
D
IC
KM
AN
4-1/2"-6UN-3B
4-1/2"-6UN-3B
4-1/2"-6UN-3B 4-1/2"-6UN-3B
C
H
AN
G
ED
T
AB
LE
M
AT
ER
IA
LS
| HL506181SD201XXX_Amend002 |
| Sheets |
| SD201 - CULVERT SHAFT DEMOLITION SECTION |
| HL506181M-502XXX_Amend002 |
| HL506181M-506XXX_Amend002 |
File details come from the government source that posted it. Updated .