24R0010 Amendment 0007.pdf

PDF 303 KB Posted

Attached to
Lower Snake River Navigation Lock Tainter Valve System Upgrades Federal contract opportunity
Solicitation number
W912EF24R0010
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document is an Amendment to Solicitation/Modification of Contract for the Lower Snake River Navigation Lock Tainter Valve System Upgrades project, Solicitation Number W912EF24R0010.

The amendment revises Specification Section 35 20 16.46 28 and drawing Sheets M-506 tables for Volumes 1-4, updating the quantity of crosshead items from 1 to 2 per valve. The scope of work includes replacing sixteen tainter valves and associated mechanical and electrical equipment across four navigation lock projects in Washington. Key requirements include AISC certification for the fabricator, on-site safety and quality control programs, and use of the Government's Construction Contractor Module software. This is a firm-fixed-price hybrid construction and supply contract with an estimated construction value between $10 million and $25 million.

View the file

Other files for this federal contract opportunity

Other files attached to Lower Snake River Navigation Lock Tainter Valve System Upgrades, newest first.
File Type Posted
24R0010_35 20 16.46 28_Amend-0007.pdf PDF
24R0010_Plans_V2_Amend006.pdf PDF
24R0010_Plans_V4_Amend006.pdf PDF
24R0010 Solicitation Amendment 0006.pdf PDF
24R0010_Plans_V1_Amend006.pdf PDF
24R0010_05 50 03.00 28_Amend-0006.pdf PDF
24R0010_Plans_V3_Amend006.pdf PDF
24R0010 Amendment 0005.pdf PDF
24R0010_Plans_V2_Amend005.pdf PDF
24R0010_Plans_V1_Amend005.pdf PDF
24R0010_Plans_V3_Amend005.pdf PDF
24R0010_35 05 40.14 28_Amend-0005.pdf PDF
24R0010_Plans_V4_Amend005.pdf PDF
24R0010_Plans_V2_Amend004.pdf PDF
24R0010_Plans_V3_Amend004.pdf PDF
W912EF24R0010 Amendment 0004.pdf PDF
24R0010_Plans_V1_Amend004.pdf PDF
24R0010_TechSpec_Amend-0004.pdf PDF
24R0010_Plans_V4_Amend004.pdf PDF
W912EF24R0010_TechSpec_Amend-0003_v2.pdf PDF
W912EF24R0010 Amend-0003.pdf PDF
W912EF24R0010_SUBMITTAL REGISTER_Amend-0003.pdf PDF
W912EF24R0010 Amendment 00002.pdf PDF
24R0010_Plans_V3_Amendment002.pdf PDF
24R0010_Plans_V4_Amendment002.pdf PDF
24R0010_TechSpecs_Amend-0002.pdf PDF
24R0010_Plans_V2_Amendment002.pdf PDF
24R0010_Plans_V1_Amendment002.pdf PDF
W912EF24R0010_TechSpec_Amend-0001.pdf PDF
W912EF24R0010 Amend 0001.pdf PDF
W912EF24R0010_SUBMITTAL REGISTER_Amend-0001.pdf PDF
Copy of W912EF24R0010 Contractor Attendance List.xlsx XLSX spreadsheet
W912EF24R0010 OFFEROR EXPERIENCE FORM.pdf PDF
24R0010v2_SupplementalDrawings_LGA.pdf PDF
H.08.01 24R0010_Plans_V3.pdf PDF
H.08.01 24R0010_Plans_V2.pdf PDF
Attachment A PAST PERFORMANCE EVALUATION QUESTIONNAIRE FORM.pdf PDF
B.08.02 W912EF24R0010 LSR NL Tainter Valves Sys. Ugrades Solicitation.pdf PDF
24R0010v1_SupplementalDrawings_LMA.pdf PDF
24R0010v3_SupplementalDrawings_LLA.pdf PDF
H.08.04 TechSpec_24R0010_LSR NL Tainter Vlvs.pdf PDF
24R0010v4_SupplementalDrawings_HLD.pdf PDF
H.08.01 24R0010_Plans_V4.pdf PDF
LSR-NavLock-Tainter Valves_JA Cisco (revised)_Signed 24R0010-1.pdf PDF
H.08.01 24R0010_Plans_V1.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

05-Sep-2024

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE W912EF 7. ADMINISTERED BY (If other than item 6) CODE

USAED, WALLA WALLA - CONTRACTING DIV.

CYNTHIA JACOBSEN

201 N. THIRD AVENUE

WALLA WALLA WA 99362

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W912EF24R0010

X 9B. DATED (SEE ITEM 11)

31-Jul-2024

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT S/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to revise:

1. Specification Section 35 20 16.46 28 and

Sheets M-506 tables for Volumes 1-4. See summary of changes and attachment.

All other terms and conditions remain unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

05-Sep-2024

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912EF24R0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0007

Summary of changes for Amend-0007 LSR Navigation Lock Tainter Valve System Upgrades

W912EF24R0010

1. Revised the following Specifications (See revised specification for details):

a. SECTION 35 20 16.46 28 TAINTER VALVE SEALS AND LINKAGES.

• Revised Paragraph 1.1 REFERENCES.

• Revised Paragraph 2.1.1.2 “Steel Tubing”.

2. Revised the following Drawings as described below.

a. Volume 1:

a. SHEET M-506, Table CROSSHEAD-PUSHROD ASSEMBLY.

i. Item 1 CROSSHEAD: Quantity hereby updated to 2.

b. Volume 2:

c. Volume 3:

d. Volume 4:

(End of Summary of Changes)

W912EF24R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
a. SECTION 35 20 16.46 28 TAINTER VALVE SEALS AND LINKAGES.