W912EF20R0001McNary Exciters Governors and Powerhouse Controls Upgrade.pdf
PDF 7 MB Posted
- Solicitation number
- W912EF20R0001
About this file
This solicitation is for a construction contract to upgrade exciters, governors, and powerhouse controls at McNary Dam in Umatilla, Oregon. Key work includes upgrading digital governors and static exciters for 14 main generator units, replacing governor mechanical systems, modifying generator switchboards and control rooms, installing new fiber optic networks and HMIs, and replacing powerhouse communication equipment. The upgrades must be completed by January 2025 to support a coordinated outage plan. Work will occur in pairs of units over 16-20 week windows to return units to service. The contractor must staff multiple daily shifts and 7-day work weeks to meet the schedule. The contract value is estimated between $25-100 million. Proposals are due as specified in the solicitation. The contract will be fixed price.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV01338392
CONSTRUCTION PROJECT: MCNARY EXCITERS, GOVERNORS, AND POWERHOUSE CONTROLS UPGRADES
HILLARY A MORGAN 509-527-7214
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
14-May-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________8 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Aug 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
509-527-7802FAX:TEL: 509-527-7214 TEL: FAX:
W912EF20R0001 77
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
INDEX
Section 00 10 00, Solicitation Contract Form Section 00 21 00, Instructions Section 00 45 00, Representations and Certifications Section 00 70 00, Conditions of the Contract Section 00 73 00 Supplementary Conditions Technical Specifications Drawings
Section 00 21 00 - Instructions
ATTENTION TO OFFERORS
The successful offeror must provide the following information upon request to assist in the Contracting Officer’s determination of contractor responsibility.
QUALIFICATIONS
1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal year and certified by an officer of the company.
2. The name of your banking firm, telephone number and the name of the individual to contact for a line-of-credit reference.
Banking Institution ______________________________________________
Telephone Number ______________________________________________
Person to Contact ______________________________________________
Email Address ______________________________________________
3. Tax Identification Number ___________________________________
4. Years of experience (in the field of the proposed work)._______________________ Indicate similarity of work currently under way to work required for this project.
5. List of present work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
6. List of previous work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
7. Percentage of work under this contract to be subcontracted _______________ %
Return completed form with all attachments to:
Hillary Morgan Contracting Division Walla Walla District Corps of Engineers 201 North Third Walla Walla, WA 99362-1876
NPW FL 118 (Rev Oct 2009)
Walla Walla District Corps of Engineers McNary Exciters, Governors, and Powerhouse Controls Upgrades
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000
ITEM DESCRIPTION QUANTITY U/M U/P
AMOUNT
EXCITATION WORK BASE ITEMS
0001 Excitation System For Units 1 And 2 1 JOB XXXXX $________
0002 Excitation System For Units 3 And 4 1 JOB XXXXX $________
0003 Excitation System For Units 5 And 6 1 JOB XXXXX $________
0004 Excitation System For Units 7 And 8 1 JOB XXXXX $________
0005 Excitation System For Units 9 And 10 1 JOB XXXXX $________
0006 Excitation System For Units 11 And 12 1 JOB XXXXX $________
0007 Excitation System For Units 13 And 14 1 JOB XXXXX $________
0008 Excitation System Controller 1 JOB XXXXX $________
EXCITATION BASE ITEMS TOTAL $____________
POWERHOUSE CONTROLS BASE ITEMS
0009 Generator Switchboard For Units 1 and 2 1 JOB XXXXX $________
0010 Generator Switchboard For Units 3 and 4 1 JOB XXXXX $________
0011 Generator Switchboard For Units 5 and 6 1 JOB XXXXX $________
0012 Generator Switchboard For Units 7 and 8 1 JOB XXXXX $________
0013 Generator Switchboard For Units 9 and 10 1 JOB XXXXX $________
0014 Generator Switchboard For Units 11 and 12 1 JOB XXXXX $________
0015 Generator Switchboard For Units 13 and 14 1 JOB XXXXX $________
0016 Control Room Switchboard Panel SC7 For Units 1 and 2 1 JOB XXXXX $________
0017 Control Room Switchboard Panel SC6 For Units 3 and 4 1 JOB XXXXX $________
0018 Control Room Switchboard Panel SC5 For Units 5 and 6 1 JOB XXXXX $________
0019 Control Room Switchboard Panel SC4 For Units 7 and 8 1 JOB XXXXX $________
0020 Control Room Switchboard Panel SC3 For Units 9 and 10 1 JOB XXXXX $________
0021 Control Room Switchboard Panel SC2 For Units 11 and 12 1 JOB XXXXX $________
0022 Control Room Switchboard Panel SC1 For Units 13 and 14 1 JOB XXXXX $________
0023 Common Control Network and Communications System for Units 1 thru 14 1 JOB XXXXX $________
POWERHOUSE CONTROLS BASE ITEMS TOTAL $_____________
GOVERNOR WORK BASE ITEMS
0024 Governor Controls For Units 1 And 2 1 JOB XXXXX $________
0025 Governor Controls For Units 3 And 4 1 JOB XXXXX $________
0026 Governor Controls For Units 5 And 6 1 JOB XXXXX $________
0027 Governor Controls For Units 7 And 8 1 JOB XXXXX $________
0028 Governor Controls For Units 9 And 10 1 JOB XXXXX $________
0029 Governor Controls For Units 11 And 12 1 JOB XXXXX $________
0030 Governor Controls For Units 13 And 14 1 JOB XXXXX $________
0031 Governor Maintenance Tool 1 EA XXXXX $________
0032 Units 1 Through 4 Gate And Blade Distributing Valve Spare Parts 1 JOB XXXXX $________
0033 Units 5 Through 14 Gate And Blade Distributing Valve Spare Parts 1 JOB XXXXX $________
GOVERNOR BASE ITEMS TOTAL $__________
GOVERNOR MECHANICAL SYSTEM WORK BASE ITEMS
0034 Demolish and Remove Emergency Wicket Gate Closure System 1 JOB XXXXX $________
0035 Remove and replace the Compressed Air System 1 JOB XXXXX $________
0036 Remove and replace the Governor Oil Pumps, Units 1-2 1 JOB XXXXX $________
0037 Remove and replace the Governor Oil Pumps, Units 3-4 1 JOB XXXXX $________
0038 Governor Mechanical System for Units 1 and 2 1 JOB XXXXX $________
0039 Governor Mechanical System for Units 3 and 4 1 JOB XXXXX $________
0040 Governor Mechanical System for Units 5 and 6 1 JOB XXXXX $________
0041 Governor Mechanical System for Units 7 and 8 1 JOB XXXXX $________
0042 Governor Mechanical System for Units 9 and 10 1 JOB XXXXX $________
0043 Governor Mechanical System for Units 11 and 12 1 JOB XXXXX $________
0044 Governor Mechanical System for Units 13 and 14 1 JOB XXXXX $________
0045 Governor Mechanical System for Station Service Unit 1 1 JOB XXXXX $________
0046 Governor Mechanical System for Station Service Unit 2 1 JOB XXXXX $________
GOVERNOR MECHANICAL SYSTEM BASE ITEMS TOTAL $____________
ALL BASE ITEMS TOTAL $_____________
GOVERNOR WORK OPTIONAL ITEMS
0047 GATE DISTRIBUTING VALVE WORK FOR
UNITS 1 AND 2 (OPTIONAL)
0047AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0047AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0047AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0047AD Provide New Gate Distributing Valve Pilot Piston (Optional) 2 EA $_______ $________
0048 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 1 AND 2 (OPTIONAL)
0048AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0048AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0048AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0048AD Provide New Blade Distributing Valve Pilot
0049 GATE DISTRIBUTING VALVE WORK FOR
UNITS 3 AND 4 (OPTIONAL)
0049AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0049AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0049AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0049AD Provide New Gate Distributing Valve Pilot
0050 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 3 AND 4 (OPTIONAL)
0050AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0050AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0050AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0050AD Provide New Blade Distributing Valve Pilot
0051 GATE DISTRIBUTING VALVE WORK FOR
UNITS 5 AND 6 (OPTIONAL)
0051AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0051AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0051AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0051AD Provide New Gate Distributing Valve Pilot
0052 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 5 AND 6 (OPTIONAL)
0052AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0052AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0052AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0052AD Provide New Blade Distributing Valve Pilot
0053 GATE DISTRIBUTING VALVE WORK FOR
UNITS 7 AND 8 (OPTIONAL)
0053AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0053AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0053AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0053AD Provide New Gate Distributing Valve Pilot
0054 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 7 AND 8 (OPTIONAL)
0054AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0054AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0054AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0054AD Provide New Blade Distributing Valve Pilot
0055 GATE DISTRIBUTING VALVE WORK FOR
UNITS 9 AND 10 (OPTIONAL)
0055AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0055AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0055AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0055AD Provide New Gate Distributing Valve Pilot
0056 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 9 AND 10 (OPTIONAL)
0056AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0056AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0056AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0056AD Provide New Blade Distributing Valve Pilot
0057 GATE DISTRIBUTING VALVE WORK FOR
UNITS 11 AND 12 (OPTIONAL)
0057AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0057AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $_________
0057AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $_________
0057AD Provide New Gate Distributing Valve Pilot Piston (Optional) 2 EA $_______ $_________
0058 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 11 AND 12 (OPTIONAL)
0058AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0058AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0058AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0058AD Provide New Blade Distributing Valve Pilot
0059 GATE DISTRIBUTING VALVE WORK FOR
UNITS 13 AND 14 (OPTIONAL)
0059AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0059AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0059AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0059AD Provide New Gate Distributing Valve Pilot
0060 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 13 AND 14 (OPTIONAL)
0060AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0060AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0060AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0060AD Provide New Blade Distributing Valve Pilot
GOVERNOR OPTIONAL ITEMS TOTAL $____________
COLLECTOR RING REFURBISHMENT OPTIONAL ITEMS
0061 COLLECTOR RING REFURBISHMENT
FOR UNITS 1 AND 2 (OPTIONAL)
0061AA Refurbishment Unit 1 (Optional) 1 JOB XXXXX $________ 0061AB Refurbishment Unit 2 (Optional) 1 JOB XXXXX $________
0062 COLLECTOR RING REFURBISHMENT
FOR UNITS 3 AND 4 (OPTIONAL)
0062AA Refurbishment Unit 3 (Optional) 1 JOB XXXXX $________ 0062AB Refurbishment Unit 4 (Optional) 1 JOB XXXXX $________
0063 COLLECTOR RING REFURBISHMENT
FOR UNITS 5 AND 6 (OPTIONAL)
0063AA Refurbishment Unit 5 (Optional) 1 JOB XXXXX $________ 0063AB Refurbishment Unit 6 (Optional) 1 JOB XXXXX $________
0064 COLLECTOR RING REFURBISHMENT
FOR UNITS 7 AND 8 (OPTIONAL)
0064AA Refurbishment Unit 7 (Optional) 1 JOB XXXXX $________ 0064AB Refurbishment Unit 8 (Optional) 1 JOB XXXXX $________
0065 COLLECTOR RING REFURBISHMENT
FOR UNITS 9 AND 10 (OPTIONAL)
0065AA Refurbishment Unit 9 (Optional) 1 JOB XXXXX $________ 0065AB Refurbishment Unit 10 (Optional) 1 JOB XXXXX $________
0066 COLLECTOR RING REFURBISHMENT
FOR UNITS 11 AND 12 (OPTIONAL)
0066AA Refurbishment Unit 11 (Optional) 1 JOB XXXXX $________ 0066AB Refurbishment Unit 12 (Optional) 1 JOB XXXXX $________
0067 COLLECTOR RING REFURBISHMENT
FOR UNITS 13 AND 14 (OPTIONAL)
0067AA Refurbishment Unit 13 (Optional) 1 JOB XXXXX $________ 0067AB Refurbishment Unit 14 (Optional) 1 JOB XXXXX $________
COLLECTOR RING OPTIONAL ITEMS TOTAL $____________
NERC COMPLIANCE OPTIONAL ITEMS
NERC Compliance Testing and Reporting For Units 1 and 2 (Optional)
0068AA NERC Compliance Unit 1 (Optional) 1 JOB XXXXX $________ 0068AB NERC Compliance Unit 2 (Optional) 1 JOB XXXXX $________
For Units 3 and 4 (Optional)
0069AA NERC Compliance Unit 3 (Optional) 1 JOB XXXXX $________ 0069AB NERC Compliance Unit 4 (Optional) 1 JOB XXXXX $________
For Units 5 and 6 (Optional)
0070AA NERC Compliance Unit 5 (Optional) 1 JOB XXXXX $________ 0070AB NERC Compliance Unit 6 (Optional) 1 JOB XXXXX $________
For Units 7 and 8 (Optional)
0071AA NERC Compliance Unit 7 (Optional) 1 JOB XXXXX $________ 0071AB NERC Compliance Unit 8 (Optional) 1 JOB XXXXX $________
For Units 9 and 10 (Optional)
0072AA NERC Compliance Unit 9 (Optional) 1 JOB XXXXX $________ 0072AB NERC Compliance Unit 10 (Optional) 1 JOB XXXXX $________
For Units 11 and 12 (Optional)
0073AA NERC Compliance Unit 11 (Optional) 1 JOB XXXXX $________ 0073AB NERC Compliance Unit 12 (Optional) 1 JOB XXXXX $________
For Units 13 and 14 (Optional)
0074AA NERC Compliance Unit 13 (Optional) 1 JOB XXXXX $________ 0074AB NERC Compliance Unit 14 (Optional) 1 JOB XXXXX $________
NERC COMPLIANCE OPTIONAL ITEMS TOTAL $____________
ADVANCED MODELING OPTIONAL ITEMS
0075 Advanced Modeling For Units 1 and 2 (Optional) 1 JOB XXXXX $________
0076 Advanced Modeling For Units 3 and 4
0077 Advanced Modeling For Units 5 and 6
0078 Advanced Modeling For Units 7 and 8
0079 Advanced Modeling For Units 9 and 10
0080 Advanced Modeling For Units 11 and 12
0081 Advanced Modeling For Units 13 and 14
0082 Advanced Modeling Project Execution Plan (PxP) (Optional) 1 JOB XXXXX $________
ADVANCED MODELING OPTIONAL ITEMS TOTAL $____________
ALL OPTIONAL ITEMS TOTAL $_____________
SCHEDULE TOTAL (BASE + OPTIONAL ITEMS)
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
A. BASIS FOR AWARD
The award will be made based on the best overall (i.e., best value subjective tradeoff) proposal that is determined to be the most beneficial to the Government based on an integrated assessment with appropriate consideration given to the four (4) evaluation factors: Technical; Past Performance; Small Business Participation Plan; and Price.
All sub-factors of Factor 1, Technical, are equal in importance. Factor 1, Technical is equal in importance to Factor 2, Past Performance. Factors 1 and 2 individually, are more important than Factor 3, Small Business Participation.
When combined, the non-price factors (Factors 1, 2 and 3) are significantly more important than Factor 4, Price.
Contract award will be made as a whole to one offeror.
The following paragraphs B through E cover the Factors and Sub-Factors to be evaluated, the evaluation approach for each Factor and Sub-Factor to include factor rating tables, Proposal Submission requirements, and discussion guidance.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors and sub-factors will be used to evaluate each proposal.
FACTOR 1: Technical - The technical evaluation will be comprised of three (3) Sub-Factors. Information provided by the offeror in support of each sub-factor will be evaluated based on its relevance to the Scope of Work. An overall rating for Factor 1 Technical will be based on the merits of each sub-factor. There is not a specified page limit for the technical Sub-Factors, but offerors are encouraged to be clear and concise in providing the information requested.
Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor or sub-factor ratings. Risk assesses the degree to which the offerors proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section. During evaluation of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.
• Sub-factor 1A – Fabrication and Design Experience
• Sub-factor 1B – Installation and Commissioning Experience
• Sub-factor 1C – Schedule
FACTOR 2: Past Performance - Each offeror’s past performance will be reviewed to determine recency, relevancy, and quality.
FACTOR 3: Small Business Participation – The extent of Small Business Participation will be evaluated for unrestricted acquisitions.
FACTOR 4: Price - The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.
C. EVALUATION APPROACH
All proposals will be evaluated by the Source Selection Evaluation Board (SSEB). The following sections define the information to be provided and describe how the information for each factor and sub-factor will be evaluated and rated.
1. The overarching evaluation approach for all factors and sub-factors is as follows:
a. Adequacy of Response. The proposal will be evaluated to determine whether the offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP. Marginal levels of overall detail could indicate a lack of understanding concerning the requirements and may result in the entire factor receiving an unfavorable rating and/or being eliminated from the competitive range.
2. Factor 1 Technical - This factor is comprised of the following sub-factors:
a. Sub-factor 1A: Fabrication and Design Experience
Offerors shall submit the following for Sub-factor 1A:
Proposals will be evaluated to determine experience with the fabrication and design of equipment relevant with the scope and complexity required in the solicitation.
Offerors shall clearly identify the fabrication and design firm(s) that will be utilized during performance of the contract to supply the exciter, and electrical control boards and systems. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.
If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.
If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the firms working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.
Offerors must demonstrate fabrication and design experience by submitting up to a maximum of six (6) projects that collectively include digital exciters, electrical control boards, and systems completed within the last seven (7) years that meet all of the relevancy requirements defined below:
Relevant exciter fabrication and design experience for this sub-factor is defined as projects including all of the following:
a. Project examples must be at least 75% complete at the time of proposal submission.
b. Designed and fabricated static excitation systems for hydroelectric generators rated at a minimum of 100 MVA.
Relevant electrical control boards and systems fabrication and design experience for this sub-factor is defined as projects including all of the following:
a. Project examples must be at least 75% complete at the time of proposal submission.
b. Designed and fabricated electrical control boards and systems for hydroelectric generators.
Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant fabrication experience. Project experience shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
b. Sub-factor 1B: Installation and Commissioning Experience
Offerors shall submit the following for Sub-factor 1B:
Proposals will be evaluated to determine experience with the installation and commissioning of equipment relevant with the scope and complexity required in the solicitation.
Each reference project used to demonstrate installation and commissioning experience must include relevant scope of work but is not required to include installation of static exciters, digital governors, and powerhouse controls all in one project. Multiple projects may be submitted to demonstrate installation experience meeting the relevant definition below.
Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract to perform the removal, installation, and commissioning, of electrical equipment. If the prime contractor proposes to self-perform the removal, installation, and commissioning of the electrical equipment, ensure the proposal is clear that the Offeror will be performing this function. If the prime contractor proposes to use a subcontractor for the removal, installation, and commissioning of the electrical equipment, the offeror must submit a signed Letter of Commitment from the subcontractor with the proposal.
If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.
If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the firms working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.
Offerors must demonstrate Digital Governors, Digital Exciters, and Control Systems installation and commissioning experience by submitting a maximum of six (6) projects completed within the last seven
(7) years that collectively meet all of the relevancy requirements defined in this sub-factor. Not all of the relevancy requirements must be met in a single project; however over the span of projects submitted, all relevancy factors must be demonstrated.
Relevant Installation and Commissioning Experience for this sub-factor is defined as projects including the following:
• Experience installing and commissioning digital governors for hydraulic actuators of hydroelectric generators.
• Experience installing and commissioning digital static exciters for hydroelectric generators.
• Experience installing and commissioning hydroelectric generator and generator step-up transformer controls.
• Experience installing and commissioning fiber optic (FO) communication networks for powerhouse control systems.
• Completed within 7 years from the date of the proposal submission. For projects that are ongoing, the on-site construction must be at least 75% complete at the date of the proposal submission.
Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant installation and commissioning experience. Project experience should include adequate detail such as equipment types, ratings, capacities, and configuration to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
c. Sub-Factor 1C: Schedule
Proposals should include an overall project schedule to verify the offerors experience in understanding the project scope, preconstruction activities, preliminary and main unit outage requirements, submittal schedules, equipment procurement and delivery, on-site work schedule, training requirements, unit outage coordination, installation, Contractor commissioning and testing, Government commissioning and testing, key milestones, and contract required schedule constraints. The schedule shall depict and display the sequence and interdependence of the work, task durations, Government review times for submittals where applicable, and start and finish milestones. The offerors schedule shall consist of a maximum of seven (7) 11 X 17 page Network Diagram with Gantt chart and identical electronic copy that includes the description of the activity, duration of the activity, and logic flow arrows for the complete network diagram. This proposed schedule shall demonstrate the offerors understanding of the requirements of this solicitation.
The schedule shall include the completion of all base-bid items of work and depict activities necessary to complete each phase of work as described in the specification and correspond to the offerors discussion of management approach detailed below. This proposed schedule shall be the basis for the contractor’s schedule submission and comply with SECTION 01 32 01.00 28 PROJECT SCHEDULE.
The contractor shall also submit a five (5) page maximum narrative that details the offerors schedule management approach to ensure successful completion of the project and compliance with the requirements of the solicitation. Primavera P6 Enterprise Project Portfolio Management software is the only accepted format for the schedule included in the offerors proposal. The narrative shall include necessary, extra, or unusual efficiencies that will be required to meet the schedule. The maximum allowable schedule shall not exceed the stated duration specified in Contract Clause, FAR 52.211-10 Commencement, Prosecution, and Completion of Work.
For proposal purposes only, the offeror should use the arbitrary, non-binding Notice to Proceed:
Notice to Proceed (NTP) date of December 4, 2020
The schedule shall be task oriented, indicating the number of calendar days, after the NTP date, by which milestones are to be achieved. At a minimum, the schedule must address the following:
• Mobilization and preparatory work
• Long lead fabrication and procurement items (i.e. Exciters )
• On-site work schedule (days per week, shifts per day, hours per shift)
• Testing and commissioning activities
• Training of Government personnel
• Close-out submittals
The Government will evaluate the schedule to assess the offerors understanding of the scope and complexity, and the offerors capability to execute the project.
Technical Factor Ratings: Ratings outlined below focus on strengths, deficiencies, weaknesses, risks and uncertainties of the offerors proposal. The rating depicts how well the offerors proposal meets the Technical subfactor requirements.
Technical Factor Ratings
Rating Definition
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is non-awardable.
3. Factor 2 - Past Performance
There are three aspects to the past performance evaluation: Recency, Relevancy (including context of data) and Quality (including general trends in the contractor performance and source of information).
a. The Government will focus its inquiries on the offerors (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of sub-contractors. Major sub-contractors are defined as members of an offerors overall team who are expected to perform ten (10) percent or more of the proposed effort.
Offerors are reminded to include the most recent and relevant efforts (within the past seven years) in their proposal. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State, or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System (NAICS) 238210, Electrical Contractors and Other Wiring Installation Contractors. Data submitted by the offeror or gathered from other sources by the government in conducting performance risk assessments shall not extend past seven years prior to the date of proposal submission, but may include performance data generated during the past seven years without regard to the contract award date. Contractor Performance Assessment Reporting System (CPARS) data is limited to the past six (6) years. Offerors should provide additional performance data for projects beyond six (6) years.
b. Offerors shall submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past seven years, from the issue date of this request for proposal, which are relevant to the efforts required by this solicitation.
c. RECENCY: The Government will evaluate recency by examining the offerors record of past performance and to assess the time period during which the offerors past performance is considered relevant.
d. RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the offerors current and past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the offerors submitted subcontracting plan for this project and the offerors record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.
Past Performance Relevancy Ratings
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
e. QUALITY: The third aspect of the past performance evaluation is to establish the overall quality of the offerors past performance. The quality past performance evaluations conducted gathers information from offerors customers to determine how well the offeror performed those past contracts. This quality assessment will be reflected in the overall confidence assessment described below.
PERFORMANCE CONFIDENCE ASSESSMENT: The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror. Because this source selection requires a greater level of discrimination with the past performance evaluation, evaluators shall use the ratings in the chart below.
This rating considers the assessed quality of the relevant/current efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment). Ensure the rationale for the conclusions reached are included.
Performance Confidence Assessments
Substantial Confidence Based on the offerors recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offerors recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offerors performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offerors recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offerors recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
4. Factor 3 – Small Business Participation
All offerors (both large and small businesses) will be evaluated on the level of proposed participation of small business concerns in performance of this acquisition (as small business prime offerors or small business sub-contractors) relative to the objectives and goals established herein. The government will evaluate:
a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
b. The extent of commitment to use such firms. The proposal will be rated more favorably under this sub-factor if it contains an enforceable commitment in the form of a signed letter of commitment (LOC);
c. Identification of the complexity and variety of the work small firms are to perform;
d. The extent past performance is in compliance with FAR 52.219-8 “Utilization of Small Business” and maximizing opportunities for U.S. Small Business Subcontractors.
e. The extent to which the offeror meets or exceeds the goals. The goals for this procurement are:
• Total Small Business (any type of small business) 5% of the total contract value (the sum of all CLINs);
• Subcategory Small Business o Small Disadvantaged Business (SDB) 2 % of the total contract value;
o Woman-Owned Small Business (WOSB) 1% of the total contract value;
o Historically Underutilized Business Zone (HUBZone) 1% of the total contract value;
o Veteran Owned Small Business (VOSB) 1% of the total contract value;
o Service Disabled Veteran Owned Small Business (SDVOSB) 1% of the total contract value;
Small Business Participation Factor Rating Definitions:
Small Business Participation Factor Ratings
Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.
Good Proposal indicates a thorough approach and understanding of the small business objectives.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.
Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.
Unacceptable Proposal does not meet small business objectives. Proposal is non-awardable.
5. Factor 4 – Price
Offerors must submit completed Contract Line Item Numbers (CLINs) with unit price, quantity, and extended price.
All extensions of the unit prices shown will be subject to verification by the Government. In case of discrepancy between the unit price and the extended price, the unit price will govern. For the purpose of evaluating proposals, the following will be used to resolve arithmetic discrepancies found on the face of the pricing schedule as submitted by the offeror:
a. Obviously misplaced decimal points will be corrected;
b. In a discrepancy between unit price and extended rice, the unit price will govern;
c. Calculation errors in extension of unit prices will be corrected;
d. Calculation errors in the addition of lump-sum and extended prices will be corrected.
An evaluation will be performed on the proposed prices. The evaluation will not be assigned an adjectival rating.
However, it will be evaluated for completeness and reasonableness as follows:
a. Completeness - To be complete, the offeror must provide all data that is requested and necessary to evaluate the price. The Government will assess the extent to which the proposed prices comply with the content and format requirements set forth in this solicitation.
b. Reasonableness - The offerors proposal is evaluated through price analysis techniques as described in FAR
Subpart 15.305(a) (1) and 15.404-1(b). For price to be reasonable, it must represent a price that provides best value to the Government when consideration is given to prices in the market, (market conditions may be evidenced by other competitive proposals), and technical and functional capabilities of the offeror. The offerors price will be evaluated to determine if any are unreasonably high in relation to the anticipated work under the contract, as well as with current industry standards.
D. PROPOSAL SUBMISSION
1. Introduction. The offerors proposal shall be submitted in hard copy, with accompanying digital copies as set forth below. The solicitation shall provide the Government address and receipt date for proposal submission. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. The electronic files shall contain identical information to the hard copies.
The offerors proposal shall consist of two (2) volumes. The Volumes are:
Volume I – Technical, Past Performance Volume II – Small Business Participation Plan, Price, Solicitation, Offer and Award Documents and Certifications/Representations.
Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.
Proprietary information shall be clearly marked.
2. Proposal Submission Requirements.
a. Each volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated.
b. Printing shall be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
c. The following volumes of material shall be submitted:
VOLUME TITLE PRINTED COPIES ELECTRONIC COPIES
Volume I Original + 8 1 Volume II Original + 1 1
d. Proposals shall conform to the solicitation requirements to include all stated terms, conditions, representations, certifications, and all other information required of this solicitation.
3. Proposal Files.
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. All files created in MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
NOTE: 11 X 17 folded pages are acceptable for tables/graphic representations. The following additional restrictions apply:
a. File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aid in the Price evaluation shall be submitted in Microsoft Office Excel Read/Write format. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable.
**The electronic files shall contain identical information to the hard copy files.
b . Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked.
(i) VOLUME I, TAB 1 -Technical. The volume shall be organized into the following sections:
(1) Section 1 – Subfactor A: Fabrication and Design Experience
(2) Section 2 – Subfactor B: Installation and Commissioning Experience
(3) Section 3 – Subfactor C: Schedule
(ii) VOLUME I, TAB 2 – Past Performance. This tab shall contain current and past performance information regarding similar contracts. Offerors shall submit Government and/or commercial contracts for the prime offeror and each major contract currently in performance or awarded during the past seven
(7) years, from the issue date of this solicitation, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort required by the RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror.
In addition, signed letters of commitment shall be included for all major subcontractors and fabricators for their past performance to be considered. This tab shall be organized into the following sections:
1. Section 1 – Contract Descriptions. This section shall include the following information in the following format. Ensure all information is current and accurate.
(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).
(b) Government contracting activity, (or private firm) and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.
(c) Technical representative/COR and current email address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officer’s name, current e-mail address, telephone and fax number.
(e) Government contract administration activity’s Pre-Award point of contact name, and current e-mail address, telephone and fax numbers.
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order/Task Order Numbers.
(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement
(CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
(h) Awarded price.
(i) Final or projected final price.
(j) Original delivery schedule, including dates of start and completion or work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
2. Section 2 – Performance.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .