USACE_ADVANCED_MODELING_SUBMITTAL_REVIEW_CHECKLIST_V2.0-202004.pdf

PDF 2 MB Posted

Attached to
McNary Exciters, Governors and Powerhouse Controls Upgrade
Solicitation number
W912EF20R0001
Issued by

About this file

This document provides details for a federal construction contract solicitation for upgrades to generators, governors, controls and related equipment at the McNary Dam hydroelectric power plant. The solicitation requires upgrading digital governors and exciters on all 14 main generator units, replacing governor air compressors and oil pumps, upgrading control networks and communications, and modifying electrical equipment. The upgrades must be completed within a 730 calendar day period to coordinate with planned power generation outages. Offerors must have the capacity for multiple work shifts and a 24/7 work schedule to meet the construction timeline. A site visit is available approximately two weeks after solicitation posting. The contract value is estimated between $25-100 million and has sustainability requirements. The award will be a fixed price contract following a best value tradeoff evaluation. The response due date is in the solicitation.

View the file

Other files

File Type Posted
Amendment 0010 W912EF20R0001.pdf PDF
Plans_20R0001_McQuad_amd0009_8Oct20.pdf PDF
Amendment 0009 W912EF20R0001.pdf PDF
20R0001 Amendment 0008.pdf PDF
MCN Allis Chalmers Governor Cabinet.zip ZIP file
MCN Control Room.zip ZIP file
Forebay-tailwater transducer locations.zip ZIP file
Units 1-12 Brush Rigging pics.zip ZIP file
MCN SCR-Boards Front.zip ZIP file
MCN Ops Desk and Server Rm.zip ZIP file
Units 13-14 Brush Rigging pics.zip ZIP file
20R0001 Amendment 0007 McQuad.pdf PDF
MCN Unit 2 Collector Ring and Brushes.zip ZIP file
MCN SC-Boards.zip ZIP file
20R0001 Plans_amd0006_9Sep20.pdf PDF
USACE_M3_v1.3_20140919.xlsx XLSX spreadsheet
USACE_Advanced_Modeling_Object_Standard_FINAL_v1.0.pdf PDF
USACE_Advanced_Modeling_PxP_Submittal_Review_Checklist_v4.0-202004.pdf PDF
Amendment 0006 20R0001.pdf PDF
USACE_ADVANCED_MODELING_PXP_TEMPLATE_V4.0-202004.docx DOCX document
Site Visit Registration List McN Exciters Governors Powerhouse Controls.pdf PDF
Amendment 0005.pdf PDF
CDC and WA COVID 19 Active Screen Questionairre.pdf PDF
20R0001 Amendment 0004.pdf PDF
20R0001 Amendment 0003.pdf PDF
20R0001 Amendment 0002.pdf PDF
4_20R0001_Vol4.pdf PDF
8_20R0001_FIO_4.pdf PDF
11_20R0001_FIO_7.pdf PDF
2_20R0001_Vol2.pdf PDF
17_20R0001_FIO_13.pdf PDF
14_20R0001_FIO_10.pdf PDF
13_20R0001_FIO_9.pdf PDF
W912EF20R0001McNary Exciters Governors and Powerhouse Controls Upgrade.pdf PDF
3_20R0001_Vol3_3.pdf PDF
7_20R0001_FIO_3.pdf PDF
9_20R0001_FIO_5.pdf PDF
10_20R0001_FIO_6.pdf PDF
6_20R0001_FIO_2.pdf PDF
1_20R0001_Vol1.pdf PDF
12_20R0001_FIO_8.pdf PDF
15_20R0001_FIO_11.pdf PDF
16_20R0001_FIO_12.pdf PDF
20R0001 Amendment 0001 Site Visit Date Change.pdf PDF
5_20R0001_FIO_1.pdf PDF
3_20R0001_Vol3_1.pdf PDF
3_20R0001_Vol3_2.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 1

ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) V2.0

DATE

CONTRACT NO. TRANSMITTAL NO. ITEM NO(s). SUBMITTAL PHASE

PROJECT TITLE AND LOCATION

SUBMITTER: See APPENDIX C, SUBMITTER INSTRUCTIONS, then complete SUBMITTER QC column.

REVIEWER See APPENDIX C, REVIEWER INSTRUCTIONS, review SUBMITTER QC column and QCC comments, then complete REVIEWER QA column.

STAGE 1 – PREREQUISITES SUBMITTER QC REVIEWER QA

1.1. The PxP was approved.

1.2. The PxP Demonstration was approved.

STOP! BEFORE YOU CONTINUE!

SUBMITTER: If you answered ‘NO’ to any check in Stage 1, DO NOT CONTINUE. You must have an approved PxP and PxP Demonstration before going on to Stage 2.

REVIEWER: If you evaluate ‘FAIL’ for any check in Stage 1, DO NOT CONTINUE. The Submitter must resubmit.

STAGE 2 - CONTENT INVENTORY SUBMITTER QC REVIEWER QA

2.1. All required electronic files were provided.

1 The Submitted Files List was submitted.

2 All files identified in the Submitted Files List were provided.

3 All files identified in the approved PxP - Section 11: Project Deliverables were provided.

One CAD sheet file (.dwg or .dgn) and one PDF sheet file exists for each sheet of the drawing set.

STOP! BEFORE YOU CONTINUE!

SUBMITTER: If you answered ‘NO’ or ‘VARIANCE’, provide details under SUBMITTER QCC on Page 3.

REVIEWER: If you evaluate a check as ‘FAIL’, DO NOT CONTINUE, and provide details under REVIEWER QAR on Page 3. The Submitter must resubmit.

STAGE 3 - CONTENT VERIFICATION SUBMITTER QC REVIEWER QA

3.1. Files are in required software formats and versions, and contain appropriate content.

1 BIM Files

2 CIM Files

3 GIS Files

4 CAD Files

5 3D Interactive Review Model

6 Industry Foundation Class (IFC) Coordination View

3.2. Quality Control Report contains required content.

1 Model Standards Report (CHX)

2 A/E/C CAD Standard Report (CHX Appendix A)

3 A/E/C Graphics Standard Report (CHX Appendix B)

4 Interference Management (3D Coordination) Report

STOP! BEFORE YOU CONTINUE!

SUBMITTER: If you answered ‘NO’ or ‘VARIANCE’, provide details under SUBMITTER QCC on Page 3.

REVIEWER: If you evaluate a check as ‘FAIL’, provide details under REVIEWER QAR on Page 3.

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 2

STAGE 4 - CONTENT VALIDATION SUBMITTER QC REVIEWER QA

4.1. BIM Files – See Reviewer Instruction R1.c.

1 No errors when opening.

2 No broken Links, References, or X-References.

3 No unloaded Links, References, or X-Reference.

4 Minimized extraneous information.

5 Content uses the Coordinate System defined in the approved PxP.

6 Models share a common alignment point.

7 Compressed/purged.

8 Applicable Models include Space/Room data.

9 Schedules were produced from the Models, in accordance with the approved PxP.

4.2. CIM Files – See Reviewer Instruction R1.c.

1 No errors when opening.

2 No broken Links, References, or X-References.

3 No unloaded Links, References, or X-References.

4 Minimized extraneous information.

5 Content uses the Coordinate System defined in the approved PxP.

6 Models share a common alignment point.

7 Compressed/purged.

4.3. CAD Files – See Reviewer Instruction R1.c.

1 No errors when opening.

2 No broken Links, References, or X-References.

3 Minimized extraneous information.

4 Compliant with the A/E/C CAD Standard. See APPENDIX A Checklist

5 Compressed/purged.

4.4. PDF Drawings – See Reviewer Instruction R1.c.

All drawings were derived from the Advanced Modeling content, with the exception of Details and Enlarged Sections as specified in the contract.

2 Compliant with the A/E/C Graphics Standard. See APPENDIX B Checklist

4.5. 3D Interactive Review Model – See Reviewer Instruction R1.c.

1 No errors when opening.

2 Content exists for each discipline identified in the approved PxP.

3 Models share a common alignment point.

4.6. Industry Foundation Class (IFC) Coordination View – See Reviewer Instruction R1.c.

1 No errors when opening.

2 Minimized extraneous information.

3 Content exists for each discipline identified in the approved PxP.

STOP! BEFORE YOU CONTINUE!

SUBMITTER: If you answered ‘NO’ or ‘VARIANCE’, provide details in the SUBMITTER QCC block on Page 3.

REVIEWER: If you evaluate a check as ‘PWC’ or ‘FAIL’, provide details in the REVIEWER QAR block on Page 3.

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 3

SUBMITTER QUALITY CONTROL CERTIFICATION (QCC) - Attach additional sheets as necessary

COMMENTS (Prefix detailed comments with the relevant Check Number, i.e. 4.1.1: Variance, justification…)

I certify that I am a qualified quality control representative for the submitting party and the preceding QC evaluation is true and correct.

x Date signed Submitter Quality Control Representative signature

REVIEWER QUALITY ASSURANCE REVIEW (QAR) - Attach additional sheets as necessary

RECOMMENDED ACTION CODES TO BE INSERTED IN ENG FORM 4025-R, SECTION I, COLUMN i (attach additional sheets, when required)

ITEM NO. (Taken from ENG FORM 4025-R)

ACTION CODE RECOMMENDED (See Note R4) [ABCE] [ABCE] [ABCE] [ABCE] [ABCE] [ABCE] [ABCE] [ABCE] [ABCE]

COMMENTS (Prefix detailed comments with the relevant Check Number, i.e. 4.1.1 - PWC: Comments…)

I certify that I am a qualified quality assurance representative for the Government and the preceding QA evaluation is true and correct.

x Date signed Reviewer signature

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 4

APPENDIX A - A/E/C CAD STANDARD REVIEW CHECKLIST

DATE

CONTRACT NO. TRANSMITTAL NO. ITEM NO(s). SUBMITTAL PHASE

PROJECT TITLE AND LOCATION

APPLICABILITY: This CHECKLIST applies only to the A/E/C CAD Standard, and to CAD files NOT extracted from Autodesk Revit. Each check is preceded by the referenced Section Number.

SUBMITTER: See APPENDIX C, SUBMITTER INSTRUCTIONS, then complete SUBMITTER QC column.

REVIEWER: See APPENDIX C, REVIEWER INSTRUCTIONS, review SUBMITTER QC column and SUBMITTER COMMENTS, then complete REVIEWER QA column.

PREREQUISITES SUBMITTER QC

REVIEWER QA

1. CAD file format complies with the approved PxP.

STOP! BEFORE YOU CONTINUE!

SUBMITTER: If you answered ‘NO’ to Check 1. above, DO NOT CONTINUE.

REVIEWER: If you evaluate ‘FAIL’ for Check 1. above, DO NOT CONTINUE. The Submitter must resubmit.

DRAWING FILE ORGANIZATION

NOTE: CAD files extracted from Autodesk Revit are exempt from Checks with the Submitter QC option ‘NA’.

SUBMITTER QC REVIEWER QA

2. Section 2.2 – Design, Drawing, and Sheet Models

1 Model files and Sheet files are used.

2 The sheet border is in a separate file referenced by all disciplines to create sheet files.

3 Sheet files contain references to Models and allowed raster files.

3. Section 2.3 – Drawing Sheet Assembly

1 Border Sheet is referenced 1:1 in the Sheet files.

2 Sheet files reference the Drawing Model scaled to fit into the Sheet Model.

4. Section 2.4 – Electronic Drawing File Naming Conventions

1 File names comply with examples listed in the approved PxP.

2 Sheet Content complies with Sheet Type Designators.

5. Section 2.5 – Coordination Between Sheet File Name and Sheet Identifier

1 Sheet identifiers coordinate with the name assigned to the electronic Sheet file.

GRAPHIC CONCEPTS SUBMITTER QC REVIEWER QA

6. Section 3.1 – Presentation Graphics

1 Correct line widths are used

2 Correct line types/styles are used

7. Section – 3.2 Text

1 Only Arial TrueType font is used

LEVEL/LAYER ASSIGNMENTS

NOTE: CAD files extracted from Autodesk Revit are exempt from Checks with the Submitter QC option ‘NA’.

SUBMITTER QC REVIEWER QA

8. Section 4.1 – Level/Layer Assignments

1 Level/Layer names are compliant.

9. Section 4.2 – Model Files

1 G-ANN0-**** general levels/layers are used by all disciplines

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 5

SUBMITTER COMMENTS - Attach additional sheets as necessary

(Prefix detailed comments with the relevant Check Number, i.e. 6.1 Scales: Variance, justification…)

REVIEWER COMMENTS - Attach additional sheets as necessary

(Prefix detailed comments with the relevant Check Number, i.e. 6.1 Scales - PWC: Comments…)

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 6

APPENDIX B - A/E/C GRAPHICS STANDARD REVIEW CHECKLIST

DATE

CONTRACT NO. TRANSMITTAL NO. ITEM NO(s). SUBMITTAL PHASE

PROJECT TITLE AND LOCATION

APPLICABILITY: This CHECKLIST applies only to the A/E/C Graphics Standard, and each check is preceded by the referenced Section Number.

SUBMITTER: See APPENDIX C, SUBMITTER INSTRUCTIONS, then complete SUBMITTER QC column.

REVIEWER: See APPENDIX C, REVIEWER INSTRUCTIONS, review SUBMITTER QC column and SUBMITTER COMMENTS, then complete REVIEWER QA column.

BORDER/COVER SHEETS SUBMITTER QC REVIEWER QA

1. Section 2.1 – Border Sheets

1 Border sheet is the current version from the CAD/BIM Technology Center.

2 For more than one building in the project the BLDG ID field is used.

The status field located in the bottom right corner of the sheet border is completed with the current status.

2. Section 2.2 – Cover Sheets

1 Cover sheet contains the sheet border and has a sheet identifier of G-001.

Owner/designer information is shown on the cover sheet starting in the upper left corner.

Project/contract information on the cover sheet matches the information in the border sheet.

The design agency signature block has been added to the cover (in lieu of signing every sheet).

ORIENTATION SUBMITTER QC REVIEWER QA

3. Section 3.1 – Common

1 Views oriented on the sheet so that elevations and features are aligned.

When multiple plans appear on the same drawing the orientation conforms to one another and their relative position.

4. Section 3.2 – Horizontal

1 The coordinate system/datum for the project is denoted on maps (civil plans).

Northings and Eastings are shown along the edges of the plan view boundary at the beginning of the plan set or on every sheet.

3 The grid system used is described in the general notes.

4 Civil works maps are oriented so that plan north is either towards the top or left.

General plans, elevations and sections of roadways and other structures are oriented so that north is toward the top or to the right of the sheet.

6 Stationing is from west to east or south to north.

7 Cross sections are shown looking up station.

5. Section 3.3 – Vertical

The structural column grid system has numbered designators across the top of the vertical grid lines from left to right.

The structural column grid system has alphabetical designators on the right side of the horizontal grid lines from bottom to top.

The structural column grid system alphabetical designators on the right side of the horizontal grid lines do not use the letters ‘O’ or ‘I’.

4 The ground floor is designated as the first floor.

All floor plans (except structural) show room identifiers (the first number should correspond to the floor number).

6 Door numbers correspond to the secure side room number

7 All window types have a unique identifier with correct Window Identifier Symbol.

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 7

DRAWING SYMBOLOGY SUBMITTER QC REVIEWER QA

6. Section 4.2 – Symbols

1 Scales appear with each drawing area title either in words and/or figures.

North arrow is provided on all sheet files where a plan or partial plan is being shown and placed in the lower right-hand corner of the drawing area.

The elevation/section/detail callouts have both the ID (top) and the sheet on which it is located (bottom).

The section indicator symbols (or callouts) have the shaded arrow to indicate the direction of the section on both ends for a building section or a directional tick mark for a partial building section.

7. Section 4.3 – Linework

1 Specific types of lines comply with line weights designated.

2 Plan views of new work and demolition work are not combined.

3 Existing work is screened (including text) so that new work will stand out.

DRAWING ANNOTATION SUBMITTER QC REVIEWER QA

8. Section 5.1 – Text

1 General notes are placed in the far right column of the drawing area of the sheet.

2 Abbreviations follow NCS UDS Module 5 – Terms and Abbreviations.

3 Text height is a minimum of 3/32”.

9. Section 5.2 – Dimensions

1 Dimension graphics are compliant.

SCHEDULES SUBMITTER QC REVIEWER QA

10. Section 6. – Schedules

Schedules contain at a minimum: a heading, mark, item description, and distinguishing feature.

2 Schedule graphics are compliant.

3 Imported Excel schedules are compliant.

DRAWING REVISIONS SUBMITTER QC REVIEWER QA

11. Section 7.2 – Revision Graphics

Revision issue marks use equilateral triangles for both amendments (numbers) and modifications (capital letters).

2 Revisions and modifications are flagged by the revision symbol.

3 Revision symbols are positioned adjacent to the revision.

The revision contains sequential numbers for amendments and sequential capital letters for modifications.

12. Section 7.3 – Revision (Issue) Block

The Revision (Issue) Block contains the mark (without revision triangles), description, and date information.

The first Amendment or Modification character is placed on the lowest line of the Revision (Issue) Block and subsequent entries are made above it.

3 Sheets requiring more than 8 revisions comply with Option 1 or 2.

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 8

SUBMITTER COMMENTS - Attach additional sheets as necessary

(Prefix detailed comments with the relevant Check Number, i.e. 6.1 Scales: Variance, justification…)

REVIEWER COMMENTS - Attach additional sheets as necessary

(Prefix detailed comments with the relevant Check Number, i.e. 6.1 Scales - PWC: Comments…)

USACE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) - Version 2.0 PAGE 9

APPENDIX C: INSTRUCTIONS

SUBMITTER

S1. The Submitter (Contractor or in-house Government design team) is responsible for completing the SUBMITTER QC (Quality Control) column of the Checklist.

a. The Submitter will respond to each check with ‘YES’ or ‘NO’, indicating compliance with the requirements.

b. If a submittal item intentionally varies from the approved PXP, indicate a ‘VARIANCE’ (VAR) in the SUBMITTER

QC column.

c. The Submitter will provide comments corresponding to any ‘VAR’ response in the COMMENTS portion of the

SUBMITTER QCC block, with a detailed justification for the deficiency or variation. Prefix comments with a relevant Check Number.

S2. The Submitter must sign the SUBMITTER QCC block for the approving authority to accept the Checklist.

S3. The Submitter must include a completed version of this form with all Advanced Modeling submittals.

S4. Approval of items does not relieve the Submitter from complying with all Contract requirements.

REVIEWER

R1. The Reviewer is responsible for completing the REVIEWER QA (Quality Assurance) column of the Checklist.

a. An authorized technical specialist, typically the District BIM/CIM Manager or delegate, will conduct the review.

b. The Reviewer will evaluate each Check as applicable. Checks in Interim Submittals may receive a ‘PASS’, ‘FAIL’, or ‘PASS WITH COMMENT’ (PWC) evaluation.

c. IMPORTANT: For Design Complete (Specification 01 33 16.00 10) and Final Record (Specification 01 78 00) submittals, ‘PASS’ or ‘FAIL’ are the ONLY applicable Reviewer responses in ALL Stage 4 Checks.

R2. REVIEWER QAR: Each Item Number will be taken from the ENG FORM 4025-R, ‘Item No. (a.)’.

R3. The Reviewer will supply comments for the Submitter corresponding to any ‘PWC’ or ‘FAIL’ evaluation in the

COMMENTS portion of the REVIEWER QAR block. Prefix comments with a relevant Check Number. For each submittal item, the Reviewer will assign an Action Code in the REVIEWER QAR block.

R4. The Action Codes applicable to Advanced Modeling Submittal Reviews are:

‘A’ – Approved as submitted.

‘B’ – Approved, except as noted in comments. Resubmission not required.

‘C’ – Approved, except as noted in comments. Resubmission required.

‘E’ – Disapproved. Refer to comments.

R5. Submittal items should receive an Action Code based on the Reviewer evaluation of checks in the Checklist.

a. Use Code ‘A’ when all checks receive a ‘PASS’ with no comments.

b. Use Code ‘B’ when some checks receive a ‘PWC’ on non-critical deficiencies or deficiencies that are not contractually required at the current submittal phase, but will be at a later phase.

c. Use Code ‘C’ when checks receive a ‘PWC’ or ‘FAIL’ on critical deficiencies.

d. Use Code ‘E’ when:

i. Any of the checks in the STAGE 1 - PREREQUISITES block receives a ‘FAIL’, or;

ii. A significant amount of checks on remaining Stages receive a ‘FAIL’ or the deficiencies are critical enough that a completion of the submittal review is impractical.

R6. The Reviewer must sign the REVIEWER QAR block prior to returning comments and recommended Action Code(s) to the submittal approving authority.

Points of Contact

Please submit all comments and questions relating to this document to:

Justin Jameson ..............206-764-3800 justin.l.jameson@usace.army.mil Steve Hutsell .................206-316-3965 steve.hutsell@usace.army.mil

ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX)
SUBMITTER: Complete SUBMITTER QC column. See SUBMITTER INSTRUCTIONS on Page 4.
REVIEWER QA (See Note 6)
1.1.
SUBMITTER QC (See Note 1)
STAGE 1 – PREREQUISITE
REVIEWER QA (See Note 6)
1
2
3
4
SUBMITTER QC (See Note 1)
STAGE 2 - CONTENT INVENTORY
REVIEWER QA (See Note 6)
1
2
3
4
5
6
1
2
3
4
SUBMITTER QC (See Note 1)
STAGE 3 - CONTENT VERIFICATION
REVIEWER QA (See Note 6)
1
No errors when opening.
2
No broken Links, References, or X-References.
3
Minimized extraneous information.
4
Content uses the Coordinate System defined in the approved PxP.
5
Models share a common alignment point.
6
No unloaded Links, References, or X-Reference.
7
Compressed/purged.
8
Applicable Models include Space/Room data.
9
Schedules were produced from the Models, in accordance with the approved PxP.
CIM Files – See Reviewer Instruction 5.b
1
No errors when opening.
2
No broken Links, References, or X-References.
3
Minimized extraneous information.
4
Content uses the Coordinate System defined in the approved PxP.
5
Models share a common alignment point.
6
No unloaded Links, References, or X-Reference.
7
Compressed/purged.
CAD Files – See Reviewer Instruction 5.b
1
No errors when opening.
2
No broken Links, References, or X-References.
3
Minimized extraneous information.
4
Compliant with the A/E/C Graphic Standard.
5
Compliant with the A/E/C CAD Standard.
6
Compressed/purged.
PDF Electronic Drawing Files – See Reviewer Instruction 5.b.
1
All files were derived from the Advanced Modeling content, in accordance with the approved PxP.
3D Interactive Review Model – See Reviewer Instruction 5.b
1
No errors when opening.
2
Content uses the Coordinate System defined in the approved PxP.
3
Content exists for each discipline identified in the approved PxP.
4
Models share a common alignment point.
Industry Foundation Class (IFC) Coordination View – See Reviewer Instruction 5.b
1
No errors when opening.
2
Minimized extraneous information.
3
Content exists for each discipline identified in the approved PxP.
SUBMITTER QUALITY CONTROL CERTIFICATION (QCC) - Attach additional sheets as necessary
REVIEWER QUALITY ASSURANCE REVIEW (QAR) - Attach additional sheets as necessary
SUBMITTER QC (See Note 1)
STAGE 4 - CONTENT VALIDATION
SUBMITTER INSTRUCTIONS
REVIEWER INSTRUCTIONS
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
QC 1:
1: [ ]
2: [ ]
QC 2:
1:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QA 1:
1: [ ]
2: [ ]
QA 2:
1:
3: [ ]
2: [ ]
1: [ ]
4: [ ]
QC 3:
1:
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
1: [ ]
2:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QA 3:
1:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
2:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QC 4:
1:
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
7: [ ]
8: [ ]
9: [ ]
1: [ ]
2:
2: [ ]
3: [ ]
4: [ ]
6: [ ]
7: [ ]
1: [ ]
5: [ ]
3:
2: [ ]
3: [ ]
4: [ ]
5: [ ]
1: [ ]
4:
1: [ ]
2: [ ]
5:
2: [ ]
3: [ ]
1: [ ]
6:
1: [ ]
2: [ ]
3: [ ]
QA 4:
1:
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
7: [ ]
8: [ ]
9: [ ]
1: [ ]
2:
2: [ ]
3: [ ]
4: [ ]
1: [ ]
5: [ ]
7: [ ]
6: [ ]
3:
2: [ ]
3: [ ]
4: [ ]
5: [ ]
1: [ ]
4:
1: [ ]
2: [ ]
5:
2: [ ]
3: [ ]
1: [ ]
6:
1: [ ]
2: [ ]
3: [ ]
QA_ACTION CODE 1: [ ]
QA_ACTION CODE 2: [ ]
QA_ACTION CODE 3: [ ]
QA_ACTION CODE 4: [ ]
QA_ACTION CODE 5: [ ]
QA_ACTION CODE 6: [ ]
QA_ACTION CODE 7: [ ]
QA_ACTION CODE 8: [ ]
QA_ACTION CODE 9: [ ]
QA_SUBMITTAL ITEM NO 1:
QA_SUBMITTAL ITEM NO 2:
QA_SUBMITTAL ITEM NO 3:
QA_SUBMITTAL ITEM NO 4:
QA_SUBMITTAL ITEM NO 5:
QA_SUBMITTAL ITEM NO 6:
QA_SUBMITTAL ITEM NO 7:
QA_SUBMITTAL ITEM NO 8:
QA_SUBMITTAL ITEM NO 9:
QC AA 1: [ ]
QA AA 1: [ ]
QC AA 2:
2: [ ]
3: [ ]
1: [ ]
QA AA 2:
1: [ ]
2: [ ]
3: [ ]
QC AA 3:
1: [ ]
2: [ ]
QA AA 3:
1: [ ]
2: [ ]
QC AA 4:
1: [ ]
2: [ ]
QA AA 4:
1: [ ]
2: [ ]
QC AA 5:
1: [ ]
QA AA 5:
1: [ ]
Date1_af_date:
SUBMITTAL PHASE: []
PROJECT TITLE AND LOCATION:
SUBMITTAL ITEM NO:
TRANSMITTAL NO:
CONTRACT NO:
QCC COMMENTS:
QAR_Comments:
QCC_Date signed:
QAR_Date Signed:
QC AA 6:
1: [ ]
2: [ ]
QA AA 9:
1: [ ]
QA AA 6:
1: [ ]
2: [ ]
QC AA 7:
1: [ ]
QA AA 7:
1: [ ]
QC AA 8:
1: [ ]
QA AA 8:
1: [ ]
QC AA 9:
1: [ ]
APPENDIX A QCC COMMENTS:
APPENDIX A QAR_Comments:
QA AB 1_3: [ ]
QC AB 1_1: [ ]
QA AB 1_1: [ ]
QC AB 1_2: [ ]
QA AB 1_2: [ ]
QC AB 1_3: [ ]
QA AB 5:
7: [ ]
1: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
2: [ ]
QC AB 2:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QA AB 2:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QC AB 3:
2: [ ]
1: [ ]
QA AB 3:
2: [ ]
1: [ ]
QC AB 4:
1: [ ]
2: [ ]
5: [ ]
6: [ ]
7: [ ]
4: [ ]
3: [ ]
QA AB 4:
1: [ ]
2: [ ]
5: [ ]
6: [ ]
7: [ ]
4: [ ]
3: [ ]
QC AB 5:
1: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
7: [ ]
2: [ ]
QC AB 6:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QA AB 12:
6: [ ]
2: [ ]
4: [ ]
QA AB 6:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QC AB 7:
1: [ ]
2: [ ]
3: [ ]
QA AB 7:
1: [ ]
2: [ ]
3: [ ]
QC AB 8:
1: [ ]
2: [ ]
4: [ ]
QA AB 8:
1: [ ]
3: [ ]
5: [ ]
QC AB 9:
1: [ ]
QA AB 9:
1: [ ]
QC AB 10:
1: [ ]
2: [ ]
3: [ ]
QA AB 10:
1: [ ]
2: [ ]
3: [ ]
QC AB 11:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
QA AB 11:
1: [ ]
2: [ ]
3: [ ]
5: [ ]
QC AB 12:
1: [ ]
3: [ ]
5: [ ]
APPENDIX B QCC COMMENTS:
APPENDIX B QAR_Comments: