Units 1-12 Brush Rigging pics.zip
ZIP file 4 MB Posted
- Solicitation number
- W912EF20R0001
About this file
This solicitation seeks a construction contract to upgrade the exciters, governors, and powerhouse controls at the McNary Dam hydroelectric power plant. Work includes replacing analog governors and static exciters on all 14 main generator units with digital systems, upgrading control networks, and modifying generator switchboards. Bidders must complete upgrades within a 730-day period in coordinated outage windows of 16 to 20 weeks for each pair of units. The estimated value is between $25-100 million. The award type is fixed price, with performance and payment bonds required. The response due date will be in the solicitation. The small business size standard is $16.5 million in average annual receipts. A site visit is available approximately two weeks after posting. Only foreign nationals with proper documentation and security clearance obtained at least four weeks in advance will be granted site access.
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .