20R0001 Amendment 0002.pdf
PDF 2 MB Posted
- Solicitation number
- W912EF20R0001
About this file
This document provides details for a federal construction contract opportunity for the McNary Exciters, Governors and Powerhouse Controls Upgrade project. The work includes upgrading digital governors and exciters on all 14 hydropower main generator units at the McNary Dam hydroelectric power plant, located in Umatilla County, Oregon. It also involves modernizing air compressors, replacing governor oil pumps, upgrading fiber optic communication networks and control systems, and modifying generator switchboards and control rooms. The contract value is estimated between $25-100 million. The performance period is 730 calendar days to complete the work in coordinated outage windows by January 2025. A site visit is available and security clearance is required for foreign nationals to attend.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV01338392
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
CONSTRUCTION PROJECT: McNary Exciters, Governors, and Pow erhouse Controls Upgrade.
The purpose of this amendment is to incorporate the changes outlined below . The proposal submission date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF20R0001
X 9B. DATED (SEE ITEM 11)
14-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jun-2020
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF20R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Summary of Changes for McNary Governors, Exciters and Power House Controls Upgrades (McQuad) amendment
Specifications:
• No changes
Drawings:
• No changes
Attachment to SECTION 46 16 26.00 26 DIGITAL EXCITERS:
• McNary Unit 7 Generator Special Field Test Report
(End of Summary of Changes)
HCP-TR-201102 Summary HCP-TR-201102-Setup Unit Set up
HCP-TR-201102-A1 Deceleration - Windage and Friction HCP-TR-201102-A2 Deceleration - Open Circuit Core Losses HCP-TR-201102-A3 Deceleration - Short Circuit Core Losses
HCP-TR-201102-B Temperature Summary HCP-TR-201102-B1 No Load Run Data HCP-TR-201102-B2 Load Run Data (56 MW 0.87 pf) HCP-TR-201102-B3 Load Run Data (75 MW 0.96 pf)
HCP-TR-201102-C Ozone Tests HCP-TR-201102-D1-2 Characteristic Curves and Potier Calculations (Xdu & SCR)
HCP-TR-201102-D3 Zero Power Factor Test HCP-TR-201102-D4 Waveform, TIF and Harmonics
HCP-TR-201102-D5-6 Sudden Short Circuit Tests HCP-TR-201102-D7-8 Phase to Phase Short Circuit Tests
HCP-TR-201102-D9 Zero Sequence Test HCP-TR-201102-D12 Load Angle Test HCP-TR-201102-D13 Voltage Recovery Tests
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Table of Contents
HCP-TR-201102 Index.xls:TOC TOC
Summary Section Table Of Contents
Summary Part 1 Test Summary Summary Part 2 Test Summary (Determination Tests) Summary Part 3 Test Summary (Determination Tests)
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Test Summary
HCP-TR-201102-Report Summary.xls: TOC Summary
TEST DATA SHEET
Record Of: Test Summary
Customer Unit No. Serial Number Report Date U.S. Army Corps of Eng. 7 0600-118007 2011/08/23 McNary Dam, Oregon
Prepared by: Bruce Good
Contract 48 13 16.00 26 Clause 3.27.2 A Losses Tests
Losses (kW) 73,684 kVA 84,737 kVA 100,000 kVA Ref. Set up AC I2R Armature (75ºC) 182.5 241.3 336.1
Ref. Section B DC I2R Field (with 40ºC air) 310.2 361.5 454.1 Ref. Section A1 Windage and Frict Losses @ 40ºC 528.7 528.7 528.7 Ref. Section A2 Open Circuit Core Losses 597.8 597.8 597.8 Ref. Section A3 Stray Load Losses 164.7 218.2 304.3
B Temperature Rise (°C) With 40ºC Air
Condition 73,684 kVA 84,737 KVA 100,000 kVA Power Factor 0.95 0.95 0.95 Armature Winding (ºC) 36.8 43.6 54.6 Field Winding (ºC) 31.1 37.0 47.7
Maximum Bearing Temperatures Observed.
Load Condition No Load Run 56 MW @ 0.87 pf 75 MW @ .96 pf Thrust Bearing (ºC) 68.21 77.4 77.6 Upper Guide Bearing (ºC) 52.7 57.9 57.9 Lower Guide Bearing (ºC) 52.4 60.3 60.4 Turbine Bearing (ºC) 51 56.3 57.3
C Ozone Maximum Observed Ozone Level ppm 0.054
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Test Summary
The windage and friction noted above is for the turbine and generator.
HCP-TR-201102-Report Summary.xls: summary Summary-1
HCP-TR-201102 McNary Dam Project Test Report Unit 7
D Determination Tests
1) Open Circuit Saturaton Test (Refer to Section D1-2)
IFG 642.80 Amps IFNL 673.30 Amps
2) Short Circuit Saturaton Test (Refer to Section D1-2) IFSI 494.4 Amps
SCR 1.362
3) Zero Power Factor Test Refer to Section D-3
4) Waveform Deviation Factors Line to Line Variation (Phase C-A) 0.91% Line to Neutral Variation (Phase A-N) 4.28%
5) Direct Axis Transient Reactances Reference Section D5-6 X'du 0.414 p.u.
X'dv 0.373 p.u.
6) Direct Axis Sub-Transient Reactances Reference Section D5-6 X''du 0.355 p.u.
X''dv 0.239 p.u.
7) Quadrature Axis Sub-Transient Reactances Reference Section D7-8 X''q 0.339 p.u.
8) Unsaturated Negative Sequence Reactance Reference Section D7-8 X2 0.322 p.u.
9) Zero Sequence Reactance Reference Section D9 Calculated X0 0.156 p.u.
10) Telephone Infulence Factors Reference Section D4 Test Balanced 6.34% Line to Neutral 6.61% Residual 1.88%
HCP-TR-201102-Report Summary.xls: summary Summary-2
D Determination Tests (continued)
11) Direct Axis Sychronous Reactance
Reference Section D1-2 Xdu 0.769
12) Quadrature Axis Sychronous Reactance Reference Section D12 Xq 0.661
13) Direct Axis Open Circuit Transient Time Constant Reference Section D13 'do 4.83
14) Direct Axis Short Circuit Transient Time Constant Reference Section D5-6 'd 1.402
15) Direct Axis Short Circuit Sub-Transient Time Constant Reference Section D5-6 ''d 0.032
Winding Resistances (Refer to the Set up Section) Ohms @ 25° C Ohms @ 75° C
Armature L-L 0.01073 0.01280 Field 0.2934 0.3499
HCP-TR-201102-Report Summary.xls: summary Summary-3
Section Set UpTable Of Contents
Set Up-1 Set-Up and Thermocouple Location Details Set Up-2 Stator Winding Resistance EDR 030-0800-129 Set Up-3 Armature Losses (I2Ra Calculations) Set Up-4 Rotor Winding Resistance EDR 030-0800-128 Set Up-5 Thermocouple Location Details Set Up-6 Thermocouple Location Details Set Up-7 Generator Cross Section Thermocouple Location Diagram Set Up-8 Coolers 1 - 12 Test Thermocouple Location Diagram
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Set Up and Thermocouple Location Details
HCP-TR-201102 Set-Up Unit 7.xls:TOC Set Up
Record Of: Set-Up and Thermocouple Location Details
Customer Unit No. Serial Number Report Date U.S. Army Corps of Eng. 7 0600-118007 2011/08/19 McNary Dam, Oregon
Temperature thermocouples were installed in various locations around the generator including.
1)
2) On the stator frame as a reference temperature only.
Calibration certificates for the equipment used during the special field tests was included in the commissioning submittal 48 08 00.00 28 - 2.1.
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Set Up and Thermocouple Location Details
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
Installed in the outlet air of the SA Coolers in order to establish the average cold air temperature in the generator housing.
For other test set up details, please refer to the procedures documented in HCP-TP-201001.
Temperature labels were mounted on the collector rings to determine the maximum collector temperat
Stator Winding Temperatures were recorded using both the customer SCADA system and with an Omega DP80 Tool NO. # 416814 Serial Number 99100467.
Field Volts were recorded with Fluke 189 Tl # 416857 Field Current was recorded with a shunt ;located in the field leads and a Fluke 189 Tl # 416802.
HCP-TR-201102 Set-Up Unit 7.xls:Procedure Set-Up-1
Stator Winding Resistance EDR 030-0800-129
Per Contract Clause 3.21 a.
Installation and Commissioning
Quality Control Record
Revision # 00 Page
Winding Temperature (ºC)
Before After
Project: McNary Rewind Unit : 7
RTD # 1 20.3 20.3
RTD # 2 20.2 20.2 Resitance Readings (mohms)
RTD # 3 20.7 20.7 Line T1 - T2 10.53
10.54
RTD # 5 20.4 20.4 Line T1 - T3 10.54
RTD # 4 20.2 20.2 Line T2 - T3
RTD # 6 20.2 20.4 Average L-L Resistance (ohms)
RTD # 7 20.2 20.2 10.5367
RTD # 8 20.2 20.3
RTD # 9 20.3 20.3
RTD # 10 20.2 20.2 Average L-L Resistance (mohms
10.734
RTD # 12 20.1 20.1 75ºC 12.802
RTD # 11 19.9 20.0 25ºC
RTD # 13 20.2 20.1
RTD # 14 20.1 20.1
RTD # 15 20.1 20.1 Notes: This test was performed after the stator winding was painted, but before the completion of the neutral lead assembly. RTD # 17 was excluded from the averaging calculation.
RTD # 16 20.2 20.2
RTD # 17 25.5 25.5
RTD # 18 20.2 20.3
Average 20.23 dd-mmm-yyyy
Valhalla 4300B SN 32-963 Before: 21.9 Bruce Good 18-Feb-2011 Measurement Instruments T°C Measured by: Bobby Lemmon
Bruce Good 18-Feb-2011 RTD switch box 322724 Cust. Repres. Jim Hay 18-Feb-2011
Omega DP86 S.N. 99100467 After: 21.9 ANDRITZ Rep
HCP-TR-201102 Set-Up Unit 7.xlsStator Winding Resistance Set-Up-2
Record Of: Armature Losses(I2Ra Calculations)
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 2011/08/19 McNary Dam, Oregon
Based on the stator resistance noted, the I2Ra armature losses for varying loads can be determined
Load (kW) Current (Amps) Res L-L (ohms) I2Ra (kW) 73,684 3083 0.01280 182.5 84,737 3545 0.01280 241.3 100,000 4184 0.01280 336.1
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Set Up and Thermocouple Location Details
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
HCP-TR-201102 Set-Up Unit 7.xlsArmature Losses Set-Up-3
Rotor DC Resistance EDR 030-0800-128
Installation and Commissioning
Quality Control Record
Revision # 01 Page
Rotor Temperature (ºC)
Top
Project: McNary Unit : 7
Before After
Pole # 1 21.2 21.2
Pole # 21 21.5 21.4
Pole # 44 22.4 22.3
Pole # 65 22.2 22.0
Bottom
Pole # 1 20.7 20.7
Pole # 21 21.3 21.2
Pole # 44 22.2 22.1 mohms
DC Resistance Corrected to 25ºC 293.4
Pole # 65 21.8 21.7
Average Temperature 21.62
DC Resistance (as measured) 289.6 mohms
Value at 75ºC as noted in the contract. 347.0 mohms
DC Resistance Corrected to 75ºC 350.0 mohms
Measured by: Bobby Lemmon
Per contract 48 13 16.00 26 Clause 3.24 d.
Measurement Instruments T°© dd-mmm-yyyy
Bruce Good 19-Feb-2011ANDRITZ Rep Bruce Good 19-Feb-2011Agilent 34972A Before: 22
Valhalla 4300B SN 32-963 After: 22 Cust. Repres. Ryan Bliss 19-Feb-2011
HCP-TR-201102 Set-Up Unit 7.xlsRotor Resistance Set-Up-4
Record Of: Thermocouple Location Details
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 2011/08/19 McNary Dam, Oregon
Taken By: Bruce Good and Winston Crawford
Thermocouple Agilent 34972A
Card Position 1 101 2 102 3 103 4 104 5 105 6 106 7 107 8 108 9 109 10 110 11 111 12 112 13 113 14 114 15 115 16 116 17 117 18 118 19 119 20 120 21 201 22 202 23 203 24 204
SA Cooler # 8 Top SA Cooler # 7 Bottom
SA Cooler # 8 Middle
Card MY41123226 SA Cooler # 1 Top
SA Cooler # 1 Middle SA Cooler # 1 Bottom
SA Cooler # 2 Top
SA Cooler # 7 Middle
SA Cooler # 6 Middle
SA Cooler # 8 Bottom
SA Cooler # 4 Top SA Cooler # 4 Middle
SA Cooler # 6 Top
SA Cooler # 7 Top
SA Cooler # 4 Bottom SA Cooler # 5 Top
SA Cooler # 5 Middle SA Cooler # 5 Bottom
SA Cooler # 6 Bottom
SA Cooler # 2 Bottom SA Cooler # 3 Top
HCP-TR-201102 McNary Dam Project Test Report Unit 7 Set Up and Thermocouple Location Details
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
SA Cooler # 2 Middle
Location of TC
SA Cooler # 3 Middle SA Cooler # 3 Bottom
HCP-TR-201102 Set-Up Unit 7.xlsTC Location Details Set-Up-5
Thermocouple Card Position 25 205 26 206 27 207 28 208 29 209 30 210 31 211 32 212 33 213 34 214 35 215 36 216 37 217 38 218 39 219 40 220 41 301 42 302
SA Cooler # 12 Bottom Air Inlet to Top of Rotor II Side Center of Stator Frame II Side
SA Cooler # 11 Middle SA Cooler # 11 Bottom SA Cooler # 12 Top
SA Cooler # 12 Middle
Air Inlet to Bottom of Rotor I Side Center of Stator Frame I Side
Air Inlet to Bottom of Rotor II Side Air Inlet to Top of Rotor I Side
SA Cooler # 10 Top SA Cooler # 10 Middle SA Cooler # 10 Bottom
SA Cooler # 11 Top
SA Cooler # 9 Top SA Cooler # 9 Middle SA Cooler # 9 Bottom
Card MY41123227 and MY41123175
Thermocouples were installed in the SA cooler outlet air to determine the average air temperature in the generator housing area.
HCP-TR-201102 Set-Up Unit 7.xlsTC Location Details Set-Up-6
Record Of: Generator Cross Section Thermocouple Location Diagram
Customer Unit No. Serial Number Report Date U.S. Army Corps of Eng. 7 0600-118007 2011/08/19 McNary Dam, Oregon
Reference Drawing: 528E235
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
HCP-TR-201102 McNary Dam Project Test Report Unit 7
HCP-TR-201102 Set-Up Unit 7.xls:Cross Section Set-Up-7
Record Of: Coolers 1 - 12 Test Thermocouple Location Diagram
Customer Unit No. Serial Number Report Date U.S. Army Corps of Eng. 7 0600-118007 2011/08/19 McNary Dam, Oregon
Reference Drawing : Luvata 114280300
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
HCP-TR-201102 McNary Dam Project Test Report Unit 7
HCP-TR-201102 Set-Up Unit 7.xls:Coolers Set-Up-8
Section A1 Table of Contents
A1.1 Introduction A1.2 Mechanical Run 4 (39.8ºC Air) A1.3 Mechanical Run 4 (39.8ºC Air) A1.4 Mechanical Run 4 (39.8ºC Air) A1.5 Mechanical Run 4 (39.8ºC Air) A1.6 Mechanical Run 6 (23.7ºC Air) A1.7 Mechanical Run 6 (23.7ºC Air) A1.8 Mechanical Run 6 (23.7ºC Air) A1.9 Mechanical Run 6 (23.7ºC Air)
A1.10 Mechanical Run 8 (33.5ºC Air) A1.11 Mechanical Run 8 (33.5ºC Air) A1.12 Mechanical Run 8 (33.5ºC Air) A1.13 Mechanical Run 8 (33.5ºC Air) A1.14 Mechanical Run Summary A1.15 Mechanical Run Summary
Windage and Friction Loss by Deceleration Test HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7
Record Of: Introduction
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.2 and 4.4.9.3
234,535,000 lb.ft2 (WR2)
9,883,343 kg.m2 (GR2)
For this test, Unit # 7 was electrically connected to Unit # 8 and brought up to rated speed. After stabilizing for a period of 1 hour, the unit was taken to an overspeed condition and allowed to coast through rated speed. The time per each revolution was then recorded and the rate of deceleration determined as noted in the attached file.
Since it was not practical to uncouple, the turbine from the generator, the turbine losses are included in the data in this report. No effort has been made to separate the turbine losses from the generator losses that relate to windage and friction.
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 -3/60
Windage and Friction Loss by Deceleration Test
The Retardation method for losses was done in accordance with IEEE Std 115-1995, Section 4.4. The retardation rate was measured using an electronic counter as detailed in IEEE Standard 115-1995, Paragraph 4.4.9.3. Method 3.
Moment of Inertia
As the rotating exciter was removed from the turbine generator assembly, its moment of inertia (153,000 ft-lb2 as found in 1956 documents) was removed from the wk2 value of
234,688,000 lb-ft2 noted in the contract.
The windage losses in the unit are known to vary as a function of the air temperature.
As a result, efforts were made to vary the ambient air temperature in the generator housing to determine the relationship of housing air temperatures to the overall windage and friction losses.
For purposes of brevity, the detailed data from 3 runs is included here. The final results of all of the 8 mechanical (windage) runs is included in the summary section as a reference.
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsIntroduction A1-1
Record Of: Mechanical Run 4 (39.8ºC Air)
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.2 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
39.80 ˚C Time Interval Speed Deceleration
(Seconds) (Seconds) (RPM) (RPM/Second) 25.54775
26.2145 0.66675
26.88154 0.66704 89.9490 0.059636
27.54888 0.66734
28.21652 0.66764 89.8688 0.060485
28.88446 0.66794
29.55271 0.66825 89.7881 0.060322
30.22125 0.66854
30.8901 0.66885 89.7082 0.059158
31.55923 0.66913
32.22869 0.66946 89.6272 0.061998
32.89844 0.66975
33.56848 0.67004 89.5456 0.059834
34.23883 0.67035
34.90948 0.67065 89.4648 0.060667
35.58044 0.67096
36.25171 0.67127 89.3855 0.057530
36.92325 0.67154
37.59512 0.67187 89.3050 0.062321
38.26729 0.67217
38.93975 0.67246 89.2220 0.061161
39.61254 0.67279
40.2856 0.67306 89.1418 0.058045
40.95898 0.67338
41.63267 0.67369 89.0618 0.060832
Ambient Air - Temperature
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 -3/60
Windage and Friction Loss by Deceleration Test
4Mechanical Run Number
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 4 A1-2
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
42.30667 0.674
42.98096 0.67429 88.9812 0.058710
43.65556 0.6746
44.33046 0.6749 88.9014 0.059528
45.00567 0.67521
45.68119 0.67552 88.8218 0.058395
46.357 0.67581
47.03315 0.67615 88.7430 0.058240
47.70956 0.67641
48.38631 0.67675 88.6623 0.060985
49.06335 0.67704
49.74071 0.67736 88.5818 0.057923
50.41835 0.67764
51.09633 0.67798 88.5015 0.060654
51.7746 0.67827
52.45319 0.67859 88.4213 0.057609
53.13206 0.67887
53.81127 0.67921 88.3412 0.060325
54.49077 0.6795
55.17058 0.67981 88.2593 0.060157
55.85071 0.68013
56.53112 0.68041 88.1783 0.059040
57.21187 0.68075
57.89292 0.68105 88.0993 0.056982
58.57427 0.68135
59.25594 0.68167 88.0211 0.057777
59.9379 0.68196
60.62019 0.68229 87.9417 0.058566
61.30277 0.68258
61.98569 0.68292 87.8613 0.059347
62.6689 0.68321
63.35242 0.68352 87.7809 0.058245
64.03625 0.68383
64.7204 0.68415 87.7014 0.058087
65.40485 0.68445
66.08962 0.68477 87.6220 0.057929
66.77469 0.68507
67.46008 0.68539 87.5414 0.059633
68.14579 0.68571
68.83179 0.686 87.4610 0.057611
69.51812 0.68633
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 4 A1-3
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
70.20475 0.68663 87.3814 0.058380
70.89171 0.68696
71.57898 0.68727 87.3032 0.055451
72.26654 0.68756
72.95444 0.6879 87.2258 0.057147
73.64262 0.68818
74.33115 0.68853 87.1454 0.059747
75.01998 0.68883
75.70912 0.68914 87.0644 0.057747
76.39858 0.68946
77.08835 0.68977 86.9849 0.057589
77.77844 0.69009
78.46883 0.69039 86.9049 0.058342
79.15956 0.69073
79.85058 0.69102 86.8250 0.057272
80.54194 0.69136
81.23358 0.69164 86.7466 0.056210
81.92556 0.69198
82.61785 0.69229 86.6670 0.058768
83.31048 0.69263
84.0034 0.69292 86.5876 0.055902
84.69665 0.69325
85.39019 0.69354 86.5102 0.055752
86.08406 0.69387
86.77827 0.69421 86.4323 0.056498
87.47277 0.6945
88.1676 0.69483 86.3527 0.058131
88.86275 0.69515
89.55821 0.69546 86.2726 0.057078
90.254 0.69579
90.9501 0.6961 86.1939 0.056032
91.64652 0.69642
92.34327 0.69675 86.1154 0.056766
93.04033 0.69706
93.73771 0.69738 86.0369 0.055727
94.4354 0.69769
95.13342 0.69802 85.9587 0.056457
95.83175 0.69833
96.53042 0.69867 85.8793 0.057180
97.2294 0.69898
97.92871 0.69931 85.8013 0.054393
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 4 A1-4
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
98.62831 0.6996
99.32827 0.69996 85.7247 0.055122
100.0285 0.70023
100.7291 0.7006 85.6452 0.058459
101.43 0.7009
102.1313 0.7013 85.5676 0.052209
102.8328 0.7015
103.5347 0.7019 85.4884 0.060742
104.2369 0.7022
104.9394 0.7025 85.4032 0.060560
105.6423 0.7029
106.3454 0.7031 85.3242 0.051765
107.0489 0.7035
107.7527 0.7038 85.2455 0.060225
108.4569 0.7042
109.1613 0.7044 85.1668 0.051479
109.8661 0.7048
110.5712 0.7051 85.0943 0.051348
111.2766 0.7054
111.9824 0.7058 85.0160 0.059740
112.6885 0.7061
113.3949 0.7064 84.9377 0.051065
114.1016 0.7067
114.8087 0.7071 84.8596 0.059411
115.5161 0.7074
116.2238 0.7077 84.7757 0.059235
116.9319 0.7081
117.6402 0.7083 84.6979 0.050633
118.3489 0.7087
0.055944 519.716283
Linear regression was applied to the speed and deceleration data to calculate the best fitting line. The deceleration at rated speed was obtained from this line, and the windage and friction loss was calculated from
Equation (4-2)
Deceleration at Rated Speed (RPM/Second) Windage and Friction Loss (kW)
Reference IEEE Std 115-1995 t nnJπ d d kilowattsin Loss
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 4 A1-5
Record Of: Mechanical Run 6 (23.7ºC Air)
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.2 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
23.70 ˚C Time Interval Speed Deceleration
(Seconds) (Seconds) (RPM) (RPM/Second) 22.45365
23.12046 0.66681
23.78758 0.66712 89.9382 0.063656
24.45502 0.66744
25.12277 0.66775 89.8540 0.062470
25.79083 0.66806
26.45919 0.66836 89.7700 0.063300
27.12788 0.66869
27.79685 0.66897 89.6854 0.063121
28.46617 0.66932
29.13579 0.66962 89.6017 0.061945
29.80573 0.66994
30.47596 0.67023 89.5189 0.061774
31.14652 0.67056
31.8174 0.67088 89.4361 0.061602
32.48858 0.67118
33.16008 0.6715 89.3522 0.063411
33.8319 0.67182
34.50402 0.67212 89.2685 0.061257
35.17646 0.67244
35.84923 0.67277 89.1849 0.063055
36.52231 0.67308
37.19569 0.67338 89.1008 0.061895
37.8694 0.67371
38.54344 0.67404 89.0181 0.060743
Ambient Air - Temperature
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 -3/60
Windage and Friction Loss by Deceleration Test
6Mechanical Run Number
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 6 A1-6
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
39.21777 0.67433
39.89242 0.67465 88.9344 0.063502
40.5674 0.67498
41.24269 0.67529 88.8507 0.060401
41.91829 0.6756
42.59421 0.67592 88.7673 0.063145
43.27046 0.67625
43.94702 0.67656 88.6833 0.061029
44.6239 0.67688
45.30108 0.67718 88.6014 0.059894
45.97858 0.6775
46.65642 0.67784 88.5191 0.061654
47.33456 0.67814
48.01302 0.67846 88.4362 0.060520
48.69179 0.67877
49.3709 0.67911 88.3536 0.061308
50.05031 0.67941
50.73006 0.67975 88.2697 0.062089
51.41012 0.68006
52.0905 0.68038 88.1867 0.060009
52.77119 0.68069
53.45221 0.68102 88.1045 0.060791
54.13354 0.68133
54.81521 0.68167 88.0211 0.061566
55.49719 0.68198
56.17948 0.68229 87.9379 0.060447
56.8621 0.68262
57.54504 0.68294 87.8548 0.061218
58.22831 0.68327
58.9119 0.68359 87.7732 0.058230
59.59579 0.68389
60.28002 0.68423 87.6918 0.060878
60.96456 0.68454
61.64944 0.68488 87.6072 0.062569
62.33465 0.68521
63.02017 0.68552 87.5248 0.057737
63.706 0.68583
64.39217 0.68617 87.4425 0.062217
65.07867 0.6865
65.76548 0.68681 87.3592 0.059261
66.45262 0.68714
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 6 A1-7
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
67.14008 0.68746 87.2772 0.060018
67.82787 0.68779
68.51598 0.68811 87.1947 0.059848
69.20442 0.68844
69.89319 0.68877 87.1131 0.058762
70.58227 0.68908
71.27169 0.68942 87.0316 0.059513
71.96142 0.68973
72.65148 0.69006 86.9490 0.060257
73.34187 0.69039
74.0326 0.69073 86.8659 0.060084
74.72365 0.69105
75.41502 0.69137 86.7830 0.059912
76.10673 0.69171
76.79875 0.69202 86.7002 0.059741
77.49112 0.69237
78.18379 0.69267 86.6182 0.058669
78.87681 0.69302
79.57017 0.69336 86.5376 0.057605
80.26383 0.69366
80.95783 0.694 86.4554 0.061031
81.65217 0.69434
82.34681 0.69464 86.3732 0.057278
83.04179 0.69498
83.73713 0.69534 86.2925 0.058902
84.43277 0.69564
85.12873 0.69596 86.2100 0.059623
85.82504 0.69631
86.52169 0.69665 86.1283 0.057679
87.21865 0.69696
87.91594 0.69729 86.0474 0.058402
88.61356 0.69762
89.31152 0.69796 85.9654 0.059117
90.00981 0.69829
90.70844 0.69863 85.8830 0.058947
91.4074 0.69896
92.10669 0.69929 85.8013 0.057902
92.80631 0.69962
93.50625 0.69994 85.7198 0.058612
94.20654 0.70029
94.90717 0.70063 85.6397 0.055831
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 6 A1-8
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
95.6081 0.70093
96.3094 0.7013 85.5585 0.060021
97.01102 0.70162
97.71296 0.70194 85.4756 0.058112
98.41525 0.70229
99.11788 0.70263 85.3947 0.057083
99.82083 0.70295
100.5241 0.70327 85.3091 0.064672
101.2278 0.7037
101.9317 0.7039 85.2273 0.051589
102.636 0.7043
103.3406 0.7046 85.1487 0.060020
104.0456 0.705
104.7509 0.7053 85.0642 0.059842
105.4566 0.7057
106.1625 0.7059 84.9798 0.059664
106.8689 0.7064
107.5755 0.7066 84.9017 0.051000
108.2825 0.707
108.9898 0.7073 84.8237 0.059336
109.6975 0.7077
110.4055 0.708 84.7458 0.050719
111.1138 0.7083
111.8225 0.7087 84.6681 0.059010
112.5315 0.709
113.2409 0.7094 84.5845 0.058835
113.9506 0.7097
114.6606 0.71 84.5011 0.058661
115.371 0.7104
0.057895 537.839598
Linear regression was applied to the speed and deceleration data to calculate the best fitting line. The deceleration at rated speed was obtained from this line, and the windage and friction loss was calculated from
Equation (4-2)
Deceleration at Rated Speed (RPM/Second) Windage and Friction Loss (kW)
Reference IEEE Std 115-1995 t nnJπ d d
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 6 A1-9
Record Of: Mechanical Run 8 (33.5ºC Air)
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.2 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
33.50 ˚C Time Interval Speed Deceleration
(Seconds) (Seconds) (RPM) (RPM/Second) 32.00815
32.67692 0.66877
33.346 0.66908 89.6761 0.061098
34.01538 0.66938
34.68506 0.66968 89.5937 0.061929
35.35506 0.67
36.02538 0.67032 89.5122 0.059767
36.69598 0.6706
37.3669 0.67092 89.4308 0.061591
38.03812 0.67122
38.70967 0.67155 89.3476 0.062410
39.38152 0.67185
40.05367 0.67215 89.2658 0.059275
40.72612 0.67245
41.3989 0.67278 89.1842 0.062069
42.07198 0.67308
42.74537 0.67339 89.1021 0.059932
43.41906 0.67369
44.09308 0.67402 89.0201 0.061727
44.7674 0.67432
45.44202 0.67462 88.9363 0.062530
46.11698 0.67496
46.79223 0.67525 88.8547 0.058460
47.46779 0.67556
48.14365 0.67586 88.7745 0.060245
Ambient Air - Temperature
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 -3/60
Windage and Friction Loss by Deceleration Test
8Mechanical Run Number
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 8 A1-10
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
48.81983 0.67618
49.49633 0.6765 88.6918 0.062015
50.17315 0.67682
50.85027 0.67712 88.6106 0.057980
51.52769 0.67742
52.20544 0.67775 88.5295 0.061675
52.8835 0.67806
53.56187 0.67837 88.4480 0.058622
54.24054 0.67867
54.91954 0.679 88.3666 0.061335
55.59885 0.67931
56.27848 0.67963 88.2840 0.060208
56.95842 0.67994
57.63867 0.68025 88.2029 0.059089
58.31923 0.68056
59.0001 0.68087 88.1206 0.061775
59.68131 0.68121
60.36281 0.6815 88.0398 0.056866
61.04462 0.68181
61.72677 0.68215 87.9604 0.059548
62.40921 0.68244
63.09198 0.68277 87.8786 0.060325
63.77506 0.68308
64.45846 0.6834 87.7970 0.059217
65.14217 0.68371
65.82621 0.68404 87.7168 0.058117
66.51054 0.68433
67.19521 0.68467 87.6354 0.060760
67.88019 0.68498
68.5655 0.68531 87.5542 0.057795
69.2511 0.6856
69.93704 0.68594 87.4731 0.060423
70.62329 0.68625
71.30985 0.68656 87.3916 0.058401
71.99673 0.68688
72.68394 0.68721 87.3108 0.059163
73.37146 0.68752
74.05929 0.68783 87.2290 0.059919
74.74746 0.68817
75.43594 0.68848 87.1485 0.056995
76.12473 0.68879
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 8 A1-11
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
76.81385 0.68912 87.0682 0.059588
77.50329 0.68944
78.19304 0.68975 86.9868 0.058507
78.88312 0.69008
79.57352 0.6904 86.9055 0.059255
80.26425 0.69073
80.95529 0.69104 86.8250 0.057272
81.64665 0.69136
82.33833 0.69168 86.7453 0.058021
83.03033 0.692
83.72267 0.69234 86.6651 0.057860
84.41531 0.69264
85.10827 0.69296 86.5845 0.058600
85.80156 0.69329
86.49519 0.69363 86.5033 0.058436
87.18913 0.69394
87.88338 0.69425 86.4230 0.057377
88.57796 0.69458
89.27288 0.69492 86.3434 0.057218
89.9681 0.69522
90.66365 0.69555 86.2633 0.057951
91.35952 0.69587
92.05573 0.69621 86.1828 0.057789
92.75225 0.69652
93.4491 0.69685 86.1011 0.059398
94.14629 0.69719
94.84379 0.6975 86.0215 0.054813
95.5416 0.69781
96.23977 0.69817 85.9433 0.057308
96.93823 0.69846
97.63704 0.69881 85.8621 0.058904
98.33617 0.69913
99.03563 0.69946 85.7805 0.057860
99.73542 0.69979
100.4355 0.70008 85.6966 0.062061
101.136 0.7005
101.8367 0.7007 85.6165 0.052299
102.5378 0.7011
103.2392 0.7014 85.5371 0.060846
103.941 0.7018
104.6431 0.7021 85.4579 0.052009
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 8 A1-12
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
105.3455 0.7024
106.0482 0.7027 85.3789 0.060509
106.7513 0.7031
107.4547 0.7034 85.3000 0.051721
108.1584 0.7037
108.8624 0.704 85.2212 0.060174
109.5668 0.7044
110.2715 0.7047 85.1366 0.059995
110.9766 0.7051
111.6819 0.7053 85.0581 0.051282
112.3876 0.7057
113.0937 0.7061 84.9859 0.051152
113.8 0.7063
114.5068 0.7068 84.9077 0.059512
115.2138 0.707
115.9211 0.7073 84.8237 0.059336
116.6288 0.7077
117.3369 0.7081 84.7458 0.050719
118.0452 0.7083
118.7539 0.7087 84.6681 0.059010
119.4629 0.709
120.1723 0.7094 84.5845 0.058835
120.882 0.7097
121.592 0.71 84.5011 0.058661
122.3024 0.7104
123.013 0.7106 84.4179 0.058488
123.7241 0.7111
124.4354 0.7113 84.3408 0.049996
125.1471 0.7117
0.057174 531.143096
Linear regression was applied to the speed and deceleration data to calculate the best fitting line. The deceleration at rated speed was obtained from this line, and the windage and friction loss was calculated from
Equation (4-2)
Deceleration at Rated Speed (RPM/Second) Windage and Friction Loss (kW)
Reference IEEE Std 115-1995 t nnJπ d d
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsMechanical Run 8 A1-13
Record Of: Mechanical Run Summary
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Run #1 Run #2 Run #3 Run #4
30.00 31.50 36.10 39.80
545.23 542.64 535.97 519.72
Run #5 Run #6 Run #7 Run #8
24.3 23.7 23.4 33.5
537.81 537.84 536.95 531.14
The unit inertia is somewhat reduced (decreasing the calculated losses).
Windage and Friction Loss at Rated Speed (kW)
Linear regression was applied to the above data to calculate the best fitting line.
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 -3/60
Windage and Friction Loss by Deceleration Test
Ambient Air - Temp (˚C)
Ambient Air - Temp (˚C) Windage and Friction Loss at Rated Speed (kW)
Bearing clearances are likely relaxed a bit from the historical data.
The oil grade used in the bearings may have changed.
The windage losses in this report are lower than those reported in the contract portion in Section 48 13 16.00 26. Factors that can affect the windage and friction losses include:
The historical runs do not appear to be temperature compensated, and they were clearly done with lower ambient and water temperatures. Bearing losses and generator windage losses as well as the windage losses in the runner would have been higher as a result.
The rotating exciter was removed eliminating that windage loss source. While not directly affecting the windage losses, the source of the excitation is now external to the unit, which would not have been the case during the early testing.
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsSummary A1-14
Record Of: Mechanical Run Summary
HCP-TR-201102-A1 McNary Dam Project Test Report Unit 7 Windage and Friction Loss by Deceleration Test
Windage and Friction Loss vs. Ambient Air Temperature y = -0.7411x + 558.36
400.0
450.0
500.0
550.0
600.0
650.0
10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0
Ambient Air Temperature (˚C)
W in da ge a nd
F ri ct io n L os s
(k W
Windage Runs
83.7
84.2
84.7
85.2
85.7
86.2
86.7
87.2
87.7
60 70 80 90 100 110
Time Arbitrary (seconds)
S p ee d
R
P M
Run # 4 (39.8 C Air) Run # 6 (23.7 C Air) Run # 8 (33.5 C Air)
HCP-TR-201102 A1 McNary U 7 Deceleration - Windage and Friction.xlsSummary A1-15
Section A2 Table of Contents
A2.1 Introduction A2.2 Open Circuit Run - 85% Rated Voltage A2.3 Open Circuit Run - 85% Rated Voltage A2.4 Open Circuit Run - 85% Rated Voltage A2.5 Open Circuit Run - 85% Rated Voltage A2.6 Open Circuit Run - 98% Rated Voltage A2.7 Open Circuit Run - 98% Rated Voltage A2.8 Open Circuit Run - 98% Rated Voltage A2.9 Open Circuit Run - 80% Rated Voltage
A2.10 Open Circuit Run - 80% Rated Voltage A2.11 Open Circuit Run - 80% Rated Voltage A2.12 Open Circuit Run - 80% Rated Voltage A2.13 Open Circuit Run - 99% Rated Voltage A2.14 Open Circuit Run - 99% Rated Voltage A2.15 Open Circuit Run - 99% Rated Voltage A2.16 Open Circuit Run - 99% Rated Voltage A2.17 Open Circuit Run - 105% Voltage A2.18 Open Circuit Run - 105% Voltage A2.19 Open Circuit Run - 105% Voltage A2.20 Open Circuit Run - 105% Voltage A2.21 Open Circuit Run - 110% Rated Voltage A2.22 Open Circuit Run - 110% Rated Voltage A2.23 Open Circuit Run - 110% Rated Voltage A2.24 Open Circuit Run - 110% Rated Voltage A2.25 Open Circuit Run Summary A2.26 Open Circuit Run Summary
Open Circuit Core Loss by Deceleration Test HCP-TR-201102-A2 McNary Dam Test Report Unit 7
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsTOC A2
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.2 and 4.4.9.3
For this test, Unit # 7 was electrically connected to Unit # 8 and brought up to rated speed. After stabilizing for a period of 1 hour, the unit was taken to an overspeed condition and allowed to coast through rated speed. The time per each revolution was then recorded and the rate of deceleration determined as noted in the attached file.
For the open circuit portion of the test, the unit voltage was increased to the specified values and allowed tro stay at those values during the deceleration.
The losses related to the open circuit condition are determined from the total losses, less the windage losses at the related air temperature and less the rotor field losses at that point in time.
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 -3/60
The Retardation method for losses was done in accordance with IEEE Std 115-1995, Section 4.4. The retardation rate was measured using an electronic counter as detailed in IEEE Standard 115-1995, Paragraph 4.4.9.3. Method 3.
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsIntroduction A2-1
Record Of: Open Circuit Run - 85% Rated Voltage
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Winston Crawford and Bruce Good
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.3 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
11693 V
34.10 ˚C
Time Interval Speed Deceleration (Seconds) (Seconds) (RPM) (RPM/Second) 0.4378958
1.095917 0.6580212
1.754458 0.658541 91.1465 0.107234
2.4135 0.659042
3.073042 0.659542 91.0067 0.104463
3.733083 0.660041
4.393625 0.660542 90.8690 0.106274
5.054687 0.661062
5.71625 0.661563 90.7287 0.105783
6.378333 0.662083
7.040917 0.662584 90.5888 0.105295
7.704021 0.663104
8.367625 0.663604 90.4495 0.104809
9.03175 0.664125
9.696375 0.664625 90.3105 0.104225
10.36152 0.665145
11.02719 0.66567 90.1703 0.106283
11.69338 0.66619
12.36006 0.66668 90.0313 0.103260
Averrage L-L Voltage Ambient Air - Temperature
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
85%Open Circuit Run
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 85% A2-2
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
13.02727 0.66721
13.695 0.66773 89.8917 0.104798
14.36325 0.66825
15.03202 0.66877 89.7518 0.102308
15.70129 0.66927
16.3711 0.66981 89.6138 0.106822
17.04144 0.67034
17.71229 0.67085 89.4728 0.103338
18.38367 0.67138
19.05556 0.67189 89.3342 0.102859
19.72798 0.67242
20.40092 0.67294 89.1955 0.104347
21.0744 0.67348
21.7484 0.674 89.0551 0.101900
22.42292 0.67452
23.09798 0.67506 88.9166 0.103376
23.77356 0.67558
24.44967 0.67611 88.7778 0.102891
25.12631 0.67664
25.8035 0.67719 88.6374 0.103372
26.48121 0.67771
27.15946 0.67825 88.4982 0.101924
27.83823 0.67877
28.51754 0.67931 88.3601 0.104312
29.1974 0.67986
29.87777 0.68037 88.2204 0.100961
30.55869 0.68092
31.24015 0.68146 88.0812 0.102382
31.92215 0.682
32.60469 0.68254 87.9417 0.100014
33.28775 0.68306
33.97138 0.68363 87.8034 0.103297
34.65554 0.68416
35.34023 0.68469 87.6648 0.101868
36.02548 0.68525
36.71127 0.68579 87.5248 0.100455
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 85% A2-3
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
37.3976 0.68633
38.08448 0.68688 87.3865 0.102753
38.77192 0.68744
39.4599 0.68798 87.2461 0.099499
40.14842 0.68852
40.8375 0.68908 87.1080 0.099032
41.5271 0.6896
42.21729 0.69019 86.9698 0.103120
42.90802 0.69073
43.59929 0.69127 86.8307 0.099897
44.29112 0.69183
44.98352 0.6924 86.6908 0.100323
45.67646 0.69294
46.36996 0.6935 86.5526 0.100740
47.06402 0.69406
47.75862 0.6946 86.4143 0.101146
48.45381 0.69519
49.14954 0.69573 86.2738 0.097988
49.84583 0.69629
50.54269 0.69686 86.1357 0.099294
51.2401 0.69741
51.93808 0.69798 85.9975 0.099697
52.63662 0.69854
53.33573 0.69911 85.8584 0.099214
54.0354 0.69967
54.73565 0.70025 85.7192 0.099606
55.43646 0.70081
56.13783 0.70137 85.5810 0.098254
56.83977 0.70194
57.54229 0.70252 85.4421 0.098644
58.24537 0.70308
58.94902 0.70365 85.3042 0.099024
59.65325 0.70423
60.35804 0.70479 85.1656 0.098540
61.06342 0.70538
61.76937 0.70595 85.0262 0.098059
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 85% A2-4
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
62.4759 0.70653
63.183 0.7071 84.8879 0.098428
63.89069 0.70769
64.59894 0.70825 84.7494 0.096261
65.30777 0.70883
66.01719 0.70942 84.6113 0.098312
66.72719 0.71
67.43777 0.71058 84.4726 0.097827
68.14894 0.71117
68.86069 0.71175 84.3336
0.0990 920.06
533.09 @ 34.1ºC 386.97OCCL (kW)
OCCL = Total Loss - Windage and Friction Loss
Deceleration at Rated Speed (RPM/Second) Total Loss (kW)
Windage and Friction Loss (kW)
Linear regression was applied to the speed and deceleration data to calculate the best fitting line. The deceleration rate at rated speed was obtained from this line, and the total loss was calculated.
Reference IEEE Std 115-1995
Equation (4-2)
The windage and friction loss was obtained from the Windage and Friction Loss vs.
Ambient Air Temperature curve in the summary of Section A1 t nnJπ d d
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 85% A2-5
Record Of: Open Circuit Run - 98% Rated Voltage
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.3 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
13484 V
34.20 ˚C
Time Interval Speed Deceleration (Seconds) (Seconds) (RPM) (RPM/Second) 0.5680625
1.226021 0.6579585
1.884583 0.658562 91.1076 0.126934
2.54375 0.659167
3.203479 0.659729 90.9422 0.123998
3.863833 0.660354
4.524771 0.660938 90.7788 0.123331
5.186312 0.661541
5.848437 0.662125 90.6160 0.122875
6.511167 0.66273
7.1745 0.663333 90.4523 0.124060
7.838437 0.663937
8.502979 0.664542 90.2893 0.121449
9.168104 0.665125
9.833854 0.66575 90.1253 0.125160
10.50021 0.666356
11.16717 0.66696 89.9608 0.121745
11.83473 0.66756
12.5029 0.66817 89.7983 0.121690
Average L-L Voltage Ambient Air - Temperature
HCP-TR-201102-A2 McNary Dam Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
Open Circuit Core Loss by Deceleration Test
98% RatedOpen Circuit Run
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 98% A2-6
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
13.17167 0.66877
13.84106 0.66939 89.6333 0.125021
14.51108 0.67002
15.18169 0.67061 89.4689 0.120356
15.85292 0.67123
16.52477 0.67185 89.3064 0.121680
17.19723 0.67246
17.87031 0.67308 89.1419 0.122976
18.54402 0.67371
19.21833 0.67431 88.9779 0.120342
19.89327 0.67494
20.56883 0.67556 88.8146 0.121627
21.24502 0.67619
21.92183 0.67681 88.6506 0.120954
22.59927 0.67744
23.27733 0.67806 88.4872 0.120287
23.95602 0.67869
24.63533 0.67931 88.3230 0.121533
25.31529 0.67996
25.99588 0.68059 88.1602 0.118006
26.67708 0.6812
27.35894 0.68186 87.9973 0.121139
28.04142 0.68248
28.72452 0.6831 87.8330 0.119521
29.40827 0.68375
30.09267 0.6844 87.6687 0.120723
30.77771 0.68504
31.46338 0.68567 87.5051 0.118187
32.14969 0.68631
32.83665 0.68696 87.3420 0.119379
33.52425 0.6876
34.2125 0.68825 87.1790 0.117791
34.90138 0.68888
35.59092 0.68954 87.0159 0.118961
36.2811 0.69018
36.97196 0.69086 86.8521 0.118291
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 98% A2-7
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
37.66344 0.69148
38.35558 0.69214 86.6884 0.118528
39.04837 0.69279
39.74183 0.69346 86.5240 0.118755
40.43594 0.69411
41.13071 0.69477 86.3608 0.116295
41.82612 0.69541
42.52221 0.69609 86.1971 0.119193
43.21896 0.69675
43.91635 0.69739 86.0315 0.118507
44.61444 0.69809
45.31317 0.69873 85.8689 0.114319
46.01256 0.69939
46.71265 0.70009
0.1156 1073.48
533.01 @ 34.2ºC 540.47
Equation (4-2)
The windage and friction loss was obtained from the Windage and Friction Loss vs.
Ambient Air Temperature curve in the summary of Section A1
OCCL = Total Loss - Windage and Friction Loss
Linear regression was applied to the speed and deceleration data to calculate the best fitting line. The deceleration rate at rated speed was obtained from this line, and the total loss was calculated.
Reference IEEE Std 115-
Deceleration at Rated Speed (RPM/Second)
OCCL (kW) Windage and Friction Loss (kW)
Total Loss (kW) t nnJπ d d
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 98% A2-8
Record Of: Open Circuit Run - 80% Rated Voltage
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.3 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
10978 V
36.00 ˚C
Time Interval Speed Deceleration (Seconds) (Seconds) (RPM) (RPM/Second) 0.4566042
1.11425 0.6576458
1.772354 0.658104 91.1682 0.100845
2.430958 0.658604
3.090021 0.659063 91.0356 0.100385
3.749583 0.659562
4.409625 0.660042 90.9049 0.097866
5.070125 0.6605
5.731125 0.661 90.7730 0.101700
6.392604 0.661479
7.054562 0.661958 90.6387 0.101353
7.717021 0.662459
8.379937 0.662916 90.5062 0.098643
9.043354 0.663417
9.70725 0.663896 90.3739 0.100774
10.37165 0.6644
11.03652 0.66487 90.2419 0.097986
11.70188 0.66536
12.36773 0.66585 90.1111 0.098577
HCP-TR-201102-A2 McNary Dam Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
Open Circuit Core Loss by Deceleration Test
80% RatedOpen Circuit Run Average L-L Voltage
Ambient Air - Temperature
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 80% A2-9
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
13.03406 0.66633
13.7009 0.66684 89.9794 0.099157
14.36821 0.66731
15.036 0.66779 89.8473 0.098721
15.70429 0.66829
16.37308 0.66879 89.7136 0.101289
17.04238 0.6693
17.71215 0.66977 89.5824 0.094855
18.3824 0.67025
19.05317 0.67077 89.4522 0.099412
19.72442 0.67125
20.39617 0.67175 89.3190 0.098969
21.06842 0.67225
21.74117 0.67275 89.1875 0.096562
22.4144 0.67323
23.08815 0.67375 89.0552 0.100056
23.7624 0.67425
24.43713 0.67473 88.9238 0.094731
25.11235 0.67522
25.7881 0.67575 88.7923 0.100145
26.46435 0.67625
27.14108 0.67673 88.6591 0.096791
27.81833 0.67725
28.49608 0.67775 88.5283 0.096364
29.17433 0.67825
29.8531 0.67877 88.3959 0.098810
30.53238 0.67928
31.21215 0.67977 88.2645 0.094550
31.89242 0.68027
32.57321 0.68079 88.1342 0.096984
33.2545 0.68129
33.93629 0.68179 88.0024 0.096550
34.6186 0.68231
35.30144 0.68284 87.8709 0.096118
35.98477 0.68333
36.66863 0.68386 87.7399 0.095688
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 80% A2-10
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
37.35298 0.68435
38.03785 0.68487 87.6073 0.098057
38.72325 0.6854
39.40915 0.6859 87.4757 0.093897
40.09556 0.68641
40.7825 0.68694 87.3446 0.097177
41.46996 0.68746
42.15794 0.68798 87.2132 0.093975
42.84642 0.68848
43.53544 0.68902 87.0828 0.095389
44.22496 0.68952
44.915 0.69004 86.9503 0.096780
45.60558 0.69058
46.29667 0.69109 86.8182 0.094522
46.98829 0.69162
47.68044 0.69215 86.6877 0.094096
48.3731 0.69266
49.06629 0.69319 86.5558 0.096369
49.76002 0.69373
50.45427 0.69425 86.4242 0.093241
51.14904 0.69477
51.84435 0.69531 86.2944 0.093714
52.54017 0.69582
53.23654 0.69637 86.1636 0.094177
53.93342 0.69688
54.63085 0.69743 86.0314 0.095513
55.32881 0.69796
56.02729 0.69848 85.8996 0.093314
56.72631 0.69902
57.42587 0.69956 85.7689 0.093765
58.12596 0.70009
58.82658 0.70062 85.6373 0.094206
59.52775 0.70117
60.22944 0.70169 85.5055 0.093772
60.93169 0.70225
61.63446 0.70277 85.3753 0.091616
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 80% A2-11
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
62.33777 0.70331
63.04162 0.70385 85.2449 0.093777
63.74602 0.7044
64.45096 0.70494 85.1137 0.092489
65.15644 0.70548
65.86246 0.70602 84.9823 0.093766
66.56904 0.70658
67.27615 0.70711 84.8513 0.091636
67.98381 0.70766
68.69202 0.70821 84.7213 0.092060
69.40077 0.70875
70.11006 0.70929 84.5899 0.093314
70.81992 0.70986
71.53031 0.71039 84.4583 0.092042
72.24127 0.71096
72.95277 0.7115 84.3289 0.089954
73.66481 0.71204
0.092988 863.85
531.68 @ 36.0ºC
332.175
Equation (4-2)
The windage and friction loss was obtained from the Windage and Friction Loss vs.
Ambient Air Temperature curve in the summary of Section A1
OCCL = Total Loss - Windage and Friction Loss
Deceleration at Rated Speed (RPM/Second) Total Loss (kW)
Windage and Friction Loss (kW) OCCL (kW)
Linear regression was applied to the speed and deceleration data to calculate the best fitting line. The deceleration rate at rated speed was obtained from this line, and the total loss was calculated.
Reference IEEE Std 115-t nnJπ d d
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 80% A2-12
Record Of: Open Circuit Run - 99% Rated Voltage
Customer Unit No. Serial Number Test Date U.S. Army Corps of Eng. 7 0600-118007 16-Jul-11 McNary Dam, Oregon
Taken by: Bruce Good and Winston Crawford
Test Reference: IEEE Std 115-1995 Clause 4.4.1, 4.4.2 and 4.4.9.3
GR2 9.8833 × 106 kg m2 Rev/Interval 1 ( r )
13602 V
37.70 ˚C
Time Interval Speed Deceleration (Seconds) (Seconds) (RPM) (RPM/Second) 0.5680625
1.226021 0.6579585
1.884583 0.658562 91.1076 0.126934
2.54375 0.659167
3.203479 0.659729 90.9422 0.123998
3.863833 0.660354
4.524771 0.660938 90.7788 0.123331
5.186312 0.661541
5.848437 0.662125 90.6160 0.122875
6.511167 0.66273
7.1745 0.663333 90.4523 0.124060
7.838437 0.663937
8.502979 0.664542 90.2893 0.121449
9.168104 0.665125
9.833854 0.66575 90.1253 0.125160
10.50021 0.666356
11.16717 0.66696 89.9608 0.121745
11.83473 0.66756
12.5029 0.66817 89.7983 0.121690
Ambient Air - Temperature
HCP-TR-201102-A2 McNary Dam Test Report Unit 7
Rating: 84 poles - 100000 kVA - 0.95 pf - 13.8 kV - 85.7 - 3/60
Open Circuit Core Loss by Deceleration Test
99% Rated Open Circuit Run Average L-L Voltage
HCP-TR-201102 A2 McNary U 7 Deceleration - OCCL.xlsOpen Circuit 99% A2-13
HCP-TR-201102-A2 McNary Dam Test Report Unit 7 Open Circuit Core Loss by Deceleration Test
13.17167 0.66877
13.84106 0.66939 89.6333 0.125021
14.51108 0.67002
15.18169 0.67061 89.4689 0.120356
15.85292 0.67123
16.52477 0.67185 89.3064 0.121680
17.19723 0.67246
17.87031 0.67308 89.1419 0.122976
18.54402 0.67371
19.21833 0.67431 88.9779 0.120342
19.89327 0.67494
20.56883 0.67556…
This is the start of the file's text. The full file is on GovTribe.