USACE_Advanced_Modeling_PxP_Submittal_Review_Checklist_v4.0-202004.pdf
PDF 2 MB Posted
- Solicitation number
- W912EF20R0001
About this file
This solicitation is for a construction contract to perform upgrades at the McNary Dam hydroelectric power plant located in Umatilla County, Oregon. The upgrades include installing new digital governors on all 14 main generator units, replacing exciters on all 14 units with digital static excitation systems, upgrading governor and exciter controls through fiber optic networks, and modernizing associated mechanical, electrical and control systems. The work must be completed within a 730 calendar day period to coordinate with power generation outages. A performance and payment bond will be required. The contract value is estimated between $25-100 million. The source selection will use best value tradeoff. Proposals are due on the date specified in the solicitation or amendments. The small business size standard is $16.5 million in average annual receipts. A site visit will be offered approximately two weeks after posting. The solicitation number is W912EF20R0001 and is being competed unrestricted on beta.sam.gov by the Department of the Army Corps of Engineers Walla Walla District.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVANCED MODELING PxP SUBMITTAL REVIEW CHECKLIST (PxP CHX) - VERSION 4.0 PAGE 1
ADVANCED MODELING PxP - V4.0
SUBMITTAL REVIEW CHECKLIST (PxP CHX)
DATE
CONTRACT NO. TRANSMITTAL NO. ITEM NO. PROJECT PHASE
PROJECT TITLE AND LOCATION
SUBMITTER: See SUBMITTER INSTRUCTIONS, then complete SUBMITTER QC column.
REVIEWER: See REVIEWER INSTRUCTIONS, review SUBMITTER QC column and QCC comments, then complete REVIEWER QA column.
COVER PAGE AND SECTION 1: PROJECT INFORMATION SUBMITTER QC REVIEWER QA
1.1.
Verify Project Information on the Cover Page and in Section 1 is correct and consistent with the Awarded Contract information and submitted ENG FORM 4025-R a ‘TRANSMITTAL NO’ on the Cover Page matches ‘TRANSMITTAL NO.’ on ENG FORM 4025-R b ‘FACILITY OWNER’ on the Cover Page matches information on Awarded Contract c ‘PROJECT TITLE’ on the Cover Page matches ‘PROJECT TITLE’ on ENG FORM 4025-R d ‘PROJECT LOCATION’ on the Cover Page matches ‘LOCATION’ on ENG FORM 4025-R e ‘USACE CONTRACT NUMBER’ on the Cover Page matches ‘CONTRACT NO.’ on ENG
FORM 4025-R
f As applicable, ‘PROJECT NUMBER (PN)’ on the Cover Page matches information in ‘CONTRACT NO.’/ ‘PROJECT TITLE AND LOCATION’ on ENG FORM 4025-R g As applicable, ‘OTHER AGENCY PROJECT CODE(S)’ on the Cover Page matches information from USACE h A ‘SUBMITTAL DATE’ is provided on the Cover Page. It must coincide with the ‘TRANSMITTAL DATE’ if the PxP is submitted with an ENG FORM 4025-R i ‘PROJECT CONTRACTOR’ on the Cover Page matches ‘FROM’ on ENG FORM 4025-R j The correct ‘CONTRACT DELIVERY METHOD’ is provided, e.g. DESIGN-BUILD, DESIGN- BID-BUILD, CONSTRUCTION, etc.
SECTION 2: KEY PROJECT CONTACTS SUBMITTER QC REVIEWER QA
2.1. USACE/Agent Contacts
a PROJECT MANAGER(S) contact information is provided b DISTRICT BIM/CIM MANAGER contact information is provided
2.2. Contractor Contacts for Advanced Modeling Activities
a PROJECT MANAGER(S) contact information is provided b BIM/CIM MANAGER(S) contact information is provided c Discipline Advanced Modeling Leads are assigned and information is provided for each Discipline identified in Section 6.1, ‘M3: Attachment 3, Tab 3’ as being included in the project. Additional Disciplines may have been included.
SECTION 3: PROJECT MODEL USES SUBMITTER QC REVIEWER QA
3.1. Mandatory Model Uses – this Section Check is covered under Check 3.3 below
3.2.
Elective Model Uses. Any Elective Model Use content provided is considered non-contractual in nature and will not be negatively evaluated or critiqued by USACE, but MUST be properly addressed in Checks throughout specific to Project or Elective Model Uses a Each Elective Model Use has ‘Process Description and Added-Value’ content b Each Elective Model Use is identified with an (E) in the Section 3.3 Project Model Uses Table in the Design and Construct columns only
3.3. Mandatory Model Uses – See PxP Section 3.3 Project Model Uses Table for Checks 3.1.a and b.
a Design Column: Mandatory Model Uses ‘Design Authoring’, ‘Progress Reviews’, and ‘Interference Management (3D Coordination)’ are marked with an (X) and shaded in red b Construct Column: Mandatory Model Uses ‘Interference Management (3D Coordination)’ and ‘Record Modeling’ are marked with an (X) and shaded in red
ADVANCED MODELING PxP SUBMITTAL REVIEW CHECKLIST (PxP CHX) - VERSION 4.0 PAGE 2
SECTION 3: PROJECT MODEL USES (continued) SUBMITTER QC REVIEWER QA
3.4. Integration Of Project Model Uses In Other Sections
a Project Model Uses information is included in the following Sections as applicable
4.1 4.2 5.1 5.2 8.2 9.1 9.2 11.2
SECTION 4: ORGANIZATIONAL ROLES/STAFFING SUBMITTER QC REVIEWER QA
4.1. Design Phase Project Model Uses Table
a Each Mandatory Model Use is shaded in red and information is provided b Each Elective Model Use identified in Section 3.3 has information provided
4.2. Construction Phase Project Model Uses Table
a Each Mandatory Model Use is shaded in red and information is provided b Each Elective Model Use identified in Section 3.3 has information provided
SECTION 5: ADVANCED MODELING PROCESS DESIGN SUBMITTER QC REVIEWER QA
5.1. Level One (L1) – Process Overview Map: Attachment 1
a Each Project Model Use is included in the L1 – Process Overview Map b Each Discipline identified in Section 2.2 as being included in the project has been incorporated
5.2. Level Two (L2) - Detailed Process Maps: Attachment 2
a Each Project Model Use has an L2 - Detailed Process Map b Each Discipline in Section 2.2 identified as being included in the project has been incorporated
SECTION 6: MINIMUM MODELING AND DATA REQUIREMENTS SUBMITTER QC REVIEWER QA
6.1. Minimum Modeling Matrix (M3): Attachment 3
a An M3 has been submitted in Excel and PDF file formats b Column ‘F’ on Tab ‘03. Scope-LOD-Grade’ has been completed per instructions c ‘NOTES’ column is clear of variances concerning the Modeling Requirements and the Scope-LOD-Grade minimum specification
6.2. Modeling Enhancements (Optional)
a Included enhancements exceed minimum requirements of the M3
SECTION 7: COLLABORATION PROCEDURES SUBMITTER QC REVIEWER QA
7.1. Collaboration Strategy
a ‘Collaboration Strategy’ concisely describes how the Team will collaborate
7.2. Collaboration Activities
a ‘Collaboration Activities’ are completely identified and described in the table
SECTION 8: QUALITY CONTROL SUBMITTER QC REVIEWER QA
8.1. Strategy for Quality Control
a ‘Strategy For Quality Control’ is concisely described
8.2. Quality Control Checks
a All Quality Control Checks identified in the Contract are included and content has been provided
ADVANCED MODELING PxP SUBMITTAL REVIEW CHECKLIST (PxP CHX) - VERSION 4.0 PAGE 3
SECTION 8: QUALITY CONTROL (continued) SUBMITTER QC REVIEWER QA
8.3 Interference Management Coordination
a ‘Interference Management Coordination’ process is concisely described b Applicable Disciplines or Trades identified in Section 2.2 are included c ‘Color Coding Schemes’ for the Coordination Model have been defined d Identified ‘Acceptable Clash Types’ and ‘Justification’ have been provided e An example of the Clash Test Naming Convention has been provided
SECTION 9: TECHNOLOGICAL INFRASTRUCTURE NEEDS SUBMITTER QC REVIEWER QA
9.1. Design Phase Software for Project Model Uses
a Each Mandatory Model Use is shaded in red b Each Mandatory Model Use, and each associated ‘Discipline User’ identified in Section 2.2, has applicable ‘Software’ and ‘Version’ information provided c ‘Design Authoring ‘Software’ and ‘Version’ comply with Contract requirements d Each Elective Model Use, and each associated ‘Discipline User’ identified in Section 2.2, has applicable ‘Software’ and ‘Version’ information provided e Model Use rows that are not applicable have been removed
9.2 Construction Phase Software for Project Model Uses
a Each Mandatory Model Use is shaded in red b Each Mandatory Model Use, and each associated ‘Discipline User’ identified in Section 2.2, has applicable ‘Software’ and ‘Version’ information provided c Record Modeling ‘Software’ and ‘Version’ comply with Contract requirements d Each Elective Model Use, and each associated ‘Discipline User’ identified in Section 2.2, has applicable ‘Software’ and ‘Version’ information provided e Model Use rows that are not applicable have been removed
9.3. Advanced Modeling Standards
a ‘Versions’ match Contract requirements
SECTION 10: ADVANCED MODELING ORGANIZATION SUBMITTER QC REVIEWER QA
10.1. Model Structure
a Model Structure has been described b Model Structure has been diagrammed
10.2. File Naming Standards
a Example ‘BIM’ file names are provided for each Discipline identified in Section 2.2 as being included in the project b Example ‘CIM’ file names are provided for each Discipline identified in Section 2.2 as being included in the project c Example ‘GIS’ file name(s) is provided d Example ‘CAD’ file names are provided for each Discipline identified in Section 2.2 as being included in the project, and must comply with the ‘Electronic drawing file naming conventions’ Section of the latest A/E/C CAD Standard e Example ‘COORDINATION MODEL’ file name(s) is provided
10.3. Coordinate and Measurement Systems
a Project Coordinate and Measurement System information matches Contract requirements
ADVANCED MODELING PxP SUBMITTAL REVIEW CHECKLIST (PxP CHX) - VERSION 4.0 PAGE 4
SECTION 11: PROJECT DELIVERABLES SUBMITTER QC REVIEWER QA
11.1. Contractual Project Deliverables
a All Contractual deliverables have the Submittal Frequency and Format information provided
11.2. Project Deliverables For Elective Model Uses
a EACH Elective Model Use added to the table has the Submittal Item, Frequency and Format information provided
SUBMITTER: If you answered ‘No’, provide details in the SUBMITTER QCC block on Page 5.
REVIEWER: If you evaluated a check as ‘PWC’ or ‘Fail’, provide details in the REVIEWER QAR block on Page 5
ADVANCED MODELING PxP SUBMITTAL REVIEW CHECKLIST (PxP CHX) - VERSION 4.0 PAGE 5
SUBMITTER QUALITY CONTROL CERTIFICATION (QCC) - Attach additional sheets as necessary
COMMENTS (Prefix detailed comments with the relevant Check Number, i.e. 5.1.a: Explanation…)
I certify that I am a qualified quality control representative for the submitting party and the preceding QC evaluation is true and correct.
x Date signed Submitter Quality Control Representative signature
REVIEWER QUALITY ASSURANCE REVIEW (QAR) - Attach additional sheets as necessary
RECOMMENDED ACTION CODES TO BE INSERTED IN ENG FORM 4025-R , SECTION I, COLUMN i (attach additional sheets, when required)
ITEM NO. (Taken from ENG FORM 4025-R)
ACTION CODE RECOMMENDED (See Note R4) [ABCE]
COMMENTS (Prefix detailed comments with the relevant Check Number, i.e. 5.1.a – PWC: comment…)
I certify that I am a qualified quality assurance representative for the Government and the preceding QA evaluation is true and correct.
x Date signed Reviewer signature
INSTRUCTIONS
ADVANCED MODELING PxP SUBMITTAL REVIEW CHECKLIST (PxP CHX) - VERSION 4.0 PAGE 6
SUBMITTER
S1. The Submitter (Contractor or in-house Government design team) is responsible for completing the SUBMITTER QC (Quality Control) column of the Checklist.
a. The Submitter will respond to each check with ‘YES’ or ‘NO’, indicating compliance with the requirements.
S2. The Submitter must sign the SUBMITTER QCC block for the approving authority to accept the Checklist.
S3. The Submitter must include a completed version of this form with all PxP submittals.
S4. Approval of items does not relieve the Submitter from complying with all Contract requirements.
REVIEWER
R1. The Reviewer is responsible for completing the REVIEWER QA (Quality Assurance) column of the Checklist.
a. An authorized technical specialist, typically the District BIM/CIM Manager or delegate, will conduct the review.
b. The Reviewer will evaluate each Check as applicable and apply a ‘PASS’, ‘FAIL’, ‘PASS WITH COMMENT’ (PWC) or ‘NOT APPLICABLE’ (NA) evaluation.
R2. REVIEWER QAR: The Item Number will be taken from the ENG FORM 4025-R, ‘Item No. (a.)’.
R3. The Reviewer will supply comments for the Submitter corresponding to any ‘PWC’ or ‘FAIL’ evaluation in the COMMENTS portion of the REVIEWER QAR block. Prefix comments with a relevant Check Number.
R4. The Action Codes applicable to PxP Submittal Reviews are:
‘A’ – Approved as submitted.
‘B’ – Approved, except as noted in comments. Resubmission not required.
‘C’ – Approved, except as noted in comments. Resubmission required.
‘E’ – Disapproved. Refer to comments.
R5. The Submittal should receive an Action Code based on the Reviewer evaluation of checks in the Checklist.
a. Use Code ‘A’ when all checks receive a ‘PASS’ with no comments.
b. Use Code ‘B’ when some checks receive ‘PWC’ on non-critical deficiencies.
c. Use Code ‘C’ when checks receive a ‘PWC’ or ‘FAIL’ on critical deficiencies.
d. Use Code ‘E’ when a significant amount of checks receive a ‘FAIL’ or the deficiencies are critical enough that a completion of the submittal review is impractical.
R6. The Reviewer must sign the REVIEWER QAR block prior to returning comments and recommended Action Code to the submittal approving authority.
Points of Contact
Please submit all comments and questions relating to this document to:
Justin Jameson ..............206-764-3800 justin.l.jameson@usace.army.mil Steve Hutsell .................206-316-3965 steve.hutsell@usace.army.mil
| ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) |
| SUBMITTER: Complete SUBMITTER QC column. See SUBMITTER INSTRUCTIONS on Page 4. |
| REVIEWER QA (See Note 6) |
| 1.1. |
| SUBMITTER QC (See Note 1) |
| STAGE 1 – PREREQUISITE |
| REVIEWER QA (See Note 6) |
| 1 |
| 2 |
| 3 |
| 4 |
| SUBMITTER QC (See Note 1) |
| STAGE 2 - CONTENT INVENTORY |
| REVIEWER QA (See Note 6) |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 1 |
| 2 |
| 3 |
| 4 |
| SUBMITTER QC (See Note 1) |
| STAGE 3 - CONTENT VERIFICATION |
| REVIEWER QA (See Note 6) |
| 1 |
| No errors when opening. |
| 2 |
| No broken Links, References, or X-References. |
| 3 |
| Minimized extraneous information. |
| 4 |
| Content uses the Coordinate System defined in the approved PxP. |
| 5 |
| Models share a common alignment point. |
| 6 |
| No unloaded Links, References, or X-Reference. |
| 7 |
| Compressed/purged. |
| 8 |
| Applicable Models include Space/Room data. |
| 9 |
| Schedules were produced from the Models, in accordance with the approved PxP. |
| CIM Files – See Reviewer Instruction 5.b |
| 1 |
| No errors when opening. |
| 2 |
| No broken Links, References, or X-References. |
| 3 |
| Minimized extraneous information. |
| 4 |
| Content uses the Coordinate System defined in the approved PxP. |
| 5 |
| Models share a common alignment point. |
| 6 |
| No unloaded Links, References, or X-Reference. |
| 7 |
| Compressed/purged. |
| CAD Files – See Reviewer Instruction 5.b |
| 1 |
| No errors when opening. |
| 2 |
| No broken Links, References, or X-References. |
| 3 |
| Minimized extraneous information. |
| 4 |
| Compliant with the A/E/C Graphic Standard. |
| 5 |
| Compliant with the A/E/C CAD Standard. |
| 6 |
| Compressed/purged. |
| PDF Electronic Drawing Files – See Reviewer Instruction 5.b. |
| 1 |
| All files were derived from the Advanced Modeling content, in accordance with the approved PxP. |
| 3D Interactive Review Model – See Reviewer Instruction 5.b |
| 1 |
| No errors when opening. |
| 2 |
| Content uses the Coordinate System defined in the approved PxP. |
| 3 |
| Content exists for each discipline identified in the approved PxP. |
| 4 |
| Models share a common alignment point. |
| Industry Foundation Class (IFC) Coordination View – See Reviewer Instruction 5.b |
| 1 |
| No errors when opening. |
| 2 |
| Minimized extraneous information. |
| 3 |
| Content exists for each discipline identified in the approved PxP. |
| SUBMITTER QUALITY CONTROL CERTIFICATION (QCC) - Attach additional sheets as necessary |
| REVIEWER QUALITY ASSURANCE REVIEW (QAR) - Attach additional sheets as necessary |
| SUBMITTER QC (See Note 1) |
| STAGE 4 - CONTENT VALIDATION |
| SUBMITTER INSTRUCTIONS |
| REVIEWER INSTRUCTIONS |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| QC 4: |
| 2: |
| b: [ ] |
| 1: |
| a: [ ] |
| b: [ ] |
| PROJECT TITLE AND LOCATION: |
| SUBMITTAL ITEM NO: |
| TRANSMITTAL NO: |
| CONTRACT NO: |
| APPENDIX A QCC COMMENTS: |
| APPENDIX A QAR_Comments: |
| QC 1: |
| 1: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| f: [ ] |
| g: [ ] |
| h: [ ] |
| i: [ ] |
| j: [ ] |
| QA 1: |
| 1: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| f: [ ] |
| g: [ ] |
| h: [ ] |
| i: [ ] |
| j: [ ] |
| QC 2: |
| 1: |
| b: [ ] |
| a: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| QA 2: |
| 1b: [ ] |
| 1: [ ] |
| 2: |
| b: [ ] |
| c: [ ] |
1a: [ ]
| Date: |
| QC 3: |
| 4-4: |
| 1: [ ] |
| 2: [ ] |
| 4-5: |
| 1: [ ] |
| 2: [ ] |
| 4-8: |
| 2: [ ] |
| 4-9: |
| 1: [ ] |
| 2: [ ] |
| 4-11: |
| 2: [ ] |
| 3: |
| a: [ ] |
| b: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| QA 3: |
| 4: |
| a: [ ] |
| 4-4: |
| 1: [ ] |
| 2: [ ] |
| 4-5: |
| 1: [ ] |
| 2: [ ] |
| 4-8: |
| 2: [ ] |
| 4-9: |
| 1: [ ] |
| 2: [ ] |
| 4-11: |
| 2: [ ] |
| 3: |
| a: [ ] |
| b: [ ] |
| 2: |
| b: [ ] |
| a: [ ] |
| QA 4: |
| 1: |
| a: [ ] |
| b: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| QC 4: |
| 2: |
| a: [ ] |
| QC 5: |
| 1: |
| b: [ ] |
| a: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| QA 5: |
| 1: |
| b: [ ] |
| a: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| QC 6: |
| 1: |
| b: [ ] |
| c: [ ] |
| a: [ ] |
| 2: |
| a: [ ] |
| QA 6: |
| 1: |
| b: [ ] |
| c: [ ] |
| a: [ ] |
| 2: |
| a: [ ] |
| QC 8: |
| 3: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| 1: |
| a: [ ] |
| 2: |
| a: [ ] |
| QA 8: |
| 3: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| 2: |
| a: [ ] |
| 1: |
| a: [ ] |
| QC 9: |
| 1: |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| a: [ ] |
| 2: |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| a: [ ] |
| 3: |
| a: [ ] |
| QA 9: |
| 1: |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| a: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| 3: |
| a: [ ] |
| QC 10: |
| 1: |
| a: [ ] |
| b: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| 3: |
| a: [ ] |
| QA 10: |
| 1: |
| a: [ ] |
| b: [ ] |
| 2: |
| a: [ ] |
| b: [ ] |
| c: [ ] |
| d: [ ] |
| e: [ ] |
| 3: |
| a: [ ] |
| QC 11: |
| 1: |
| a: [ ] |
| 2: |
| a: [ ] |
| QA 11: |
| 1: |
| a: [ ] |
| 2: |
| a: [ ] |
| QC 7: |
| 1: |
| a: [ ] |
| 2: |
| a: [ ] |
| QA 7: |
| 2: |
| a: [ ] |
| 1: |
| a: [ ] |
| QC Sign Date: |
| QA Sign Date: |
| PROJECT PHASE: |