Amendment 0006 20R0001.pdf
PDF 953 KB Posted
- Solicitation number
- W912EF20R0001
About this file
This federal contract opportunity notice seeks proposals for a construction contract to upgrade exciters, governors, and powerhouse controls at McNary Dam in Umatilla County, Oregon. Key details include upgrading digital governors and exciters on all 14 hydropower main generator units; replacing governor mechanical systems for each unit; upgrading exciter and governor controls networks; and modifying generator switchboards and control room switchboards. The work is estimated to cost between $25-100 million and must be completed by January 2025. Offerors must submit proposals in response to solicitation number W912EF20R0001.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV01338392
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the changes outlined below .
The proposal submission date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF20R0001
X 9B. DATED (SEE ITEM 11)
14-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2020
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF20R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
Summary of Changes for McNary Governors, Exciters and Powerhouse Controls Upgrades
Amendment 0006 Bid Schedule:
• Revised CLIN 0031 quantity from 1 to 2 each
Section 00 73 00:
• Updated Wage Determination Specifications:
00 01 15.00 28 INDEX OF DRAWINGS
• 1.2: Volume 1 Table updated to show drawings revised for this amendment
• 1.5: Volume 4 Table updated to show drawings revised for this amendment
• 1.6: FIO Table updated to show new drawings added.
01 11 00.00 26 SUMMARY OF WORK
• 1.3: Added paragraph to end of section to clarify requirements for GFE
01 22 00.00 28 MEASUREMENT AND PAYMENT
• 1.3.15: added item d to list to show where to include work/payment for Swing Panel and SC8
• 1.4.8: Revised quantity to 2 each
01 33 16.01 28 (OPTIONAL)ADVANCED MODELING REQUIREMENTS
• 1.1: Second paragraph added to clarify that the drawings being provided are 2D CAD in Bentley DGN format. Third paragraph added that Revit cannot be used to accomplish the work in this section.
• 1.4.4: Provided a 2nd link to the CAD/BIM website.
• 3.4.3: Subpart “Coordination” has been deleted
02 82 13.01 28 CLASS II ASBESTOS ABATEMENT
• 1.3: Revised item be to add “exciter” for type of circuit breakers
22 10 00.00 26 GOVERNOR OIL PUMPS
• 1.1: Info added to provide current turbine oil in use and oil temperature during normal operations.
• 2.2d: Revised hp for 4 of the pumps from 100 hp to 50 hp.
• 2.9 (SPARE PARTS AND SPECIAL TOOLS): Removed reference to SECTION 01 78 00.00 28.
22 11 00.00 26 MECHANICAL EQUIPMENT AND PIPING
• 1.1c and d: revised both to add “as shown on the Contract drawings”
• 3.4: Revised last sentence in 2nd paragraph to read: “Base material is not to be removed in excess of 0.01 inch.” Previously was 0.0001 inch.
• 3.5: Revised subpart to clarify how new piping components shall be installed.
22 15 26.00 26 GOVERNOR COMPRESSED AIR SYSTEM
• 2.3: Deleted requirement to provide 1 spare controller
• 2.3.2: Deleted requirement to provide one spare hour meter
• Added subpart 2.4.6.5 Gate Valves
• 2.5 (SPARE PARTS AND SPECIAL TOOLS): Removed reference to SECTION 01 78 00.00 28. Added requirement for 1 spare controller and 1 spare hour meter
26 05 36.00 26 CABLE TRAYS FOR ELECTRICAL SYSTEMS
• 2.2.5: Revised to clarify when cable cleats and ties shall be used
26 28 00.00 26 SWITCHBOARDS AND PANELBOARDS
• 1.2: Added references IEEE C37.21 and UL 508A
• 2.2.1: Revised standards for switchboard and labeling
• 2.2.3: Changed NEMA enclosure type from 3R to 12
41 67 13.12 26 CLEANING OF GOVERNOR OIL SYSTEMS
• 3.4.1: Revised subpart to state that “adjacent” units will continue to operate during cleaning.
• 3.4.2: Revised cleaning pig requirements
48 70 01.00 26 (OPTIONAL) NERC COMPLIANCE FOR HYDROGENERATOR
• 1.1: Information added to clarify how the CLINs will be exercised.
Drawings:
Volume 1:
• Revised G-012, E-102, and E-624. G-013 provided since when G-012 was modified to add new FIOs, some FIOs listed on G-012 moved to G-013.
Volume 4:
• Revised M-001, MD-604, M-604, and M-605:
FIOs:
• FIO 410-418 were added
• FIO-737: drawing switched to provide the correct drawing. Title in index for FIO-737 was correct.
Attachments for 01 33 16.01 28:
• USACE Minimum Modeling Matrix (M3)
• USACE Advanced Modeling Object Standard V1.0
• USACE Advanced Modeling PxP Submittal Review Checklist
• USACE Advanced Modeling PxP Template V4.0
• USACE Advanced Modeling Submittal Review Checklist
Walla Walla District Corps of Engineers McNary Exciters, Governors, and Powerhouse Controls Upgrades
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000
ITEM DESCRIPTION QUANTITY U/M U/P
AMOUNT
EXCITATION WORK BASE ITEMS
0001 Excitation System For Units 1 And 2 1 JOB XXXXX $________
0002 Excitation System For Units 3 And 4 1 JOB XXXXX $________
0003 Excitation System For Units 5 And 6 1 JOB XXXXX $________
0004 Excitation System For Units 7 And 8 1 JOB XXXXX $________
0005 Excitation System For Units 9 And 10 1 JOB XXXXX $________
0006 Excitation System For Units 11 And 12 1 JOB XXXXX $________
0007 Excitation System For Units 13 And 14 1 JOB XXXXX $________
0008 Excitation System Controller 1 JOB XXXXX $________
EXCITATION BASE ITEMS TOTAL $____________
POWERHOUSE CONTROLS BASE ITEMS
0009 Generator Switchboard For Units 1 and 2 1 JOB XXXXX $________
0010 Generator Switchboard For Units 3 and 4 1 JOB XXXXX $________
0011 Generator Switchboard For Units 5 and 6 1 JOB XXXXX $________
0012 Generator Switchboard For Units 7 and 8 1 JOB XXXXX $________
0013 Generator Switchboard For Units 9 and 10 1 JOB XXXXX $________
0014 Generator Switchboard For Units 11 and 12 1 JOB XXXXX $________
0015 Generator Switchboard For Units 13 and 14 1 JOB XXXXX $________
0016 Control Room Switchboard Panel SC7 For Units 1 and 2 1 JOB XXXXX $________
0017 Control Room Switchboard Panel SC6 For Units 3 and 4 1 JOB XXXXX $________
0018 Control Room Switchboard Panel SC5 For Units 5 and 6 1 JOB XXXXX $________
0019 Control Room Switchboard Panel SC4 For Units 7 and 8 1 JOB XXXXX $________
0020 Control Room Switchboard Panel SC3 For Units 9 and 10 1 JOB XXXXX $________
0021 Control Room Switchboard Panel SC2 For Units 11 and 12 1 JOB XXXXX $________
0022 Control Room Switchboard Panel SC1 For Units 13 and 14 1 JOB XXXXX $________
0023 Common Control Network and Communications System for Units 1 thru 14 1 JOB XXXXX $________
POWERHOUSE CONTROLS BASE ITEMS TOTAL $_____________
GOVERNOR WORK BASE ITEMS
0024 Governor Controls For Units 1 And 2 1 JOB XXXXX $________
0025 Governor Controls For Units 3 And 4 1 JOB XXXXX $________
0026 Governor Controls For Units 5 And 6 1 JOB XXXXX $________
0027 Governor Controls For Units 7 And 8 1 JOB XXXXX $________
0028 Governor Controls For Units 9 And 10 1 JOB XXXXX $________
0029 Governor Controls For Units 11 And 12 1 JOB XXXXX $________
0030 Governor Controls For Units 13 And 14 1 JOB XXXXX $________
0031 Governor Maintenance Tool 2 EA XXXXX $________
0032 Units 1 Through 4 Gate And Blade Distributing Valve Spare Parts 1 JOB XXXXX $________
0033 Units 5 Through 14 Gate And Blade Distributing Valve Spare Parts 1 JOB XXXXX $________
GOVERNOR BASE ITEMS TOTAL $__________
GOVERNOR MECHANICAL SYSTEM WORK BASE ITEMS
0034 Demolish and Remove Emergency Wicket Gate Closure System 1 JOB XXXXX $________
0035 Remove and replace the Compressed Air System 1 JOB XXXXX $________
0036 Remove and replace the Governor Oil Pumps, Units 1-2 1 JOB XXXXX $________
0037 Remove and replace the Governor Oil Pumps, Units 3-4 1 JOB XXXXX $________
0038 Governor Mechanical System for Units 1 and 2 1 JOB XXXXX $________
0039 Governor Mechanical System for Units 3 and 4 1 JOB XXXXX $________
0040 Governor Mechanical System for Units 5 and 6 1 JOB XXXXX $________
0041 Governor Mechanical System for Units 7 and 8 1 JOB XXXXX $________
0042 Governor Mechanical System for Units 9 and 10 1 JOB XXXXX $________
0043 Governor Mechanical System for Units 11 and 12 1 JOB XXXXX $________
0044 Governor Mechanical System for Units 13 and 14 1 JOB XXXXX $________
0045 Governor Mechanical System for Station Service Unit 1 1 JOB XXXXX $________
0046 Governor Mechanical System for Station Service Unit 2 1 JOB XXXXX $________
GOVERNOR MECHANICAL SYSTEM BASE ITEMS TOTAL $____________
ALL BASE ITEMS TOTAL $_____________
GOVERNOR WORK OPTIONAL ITEMS
0047 GATE DISTRIBUTING VALVE WORK FOR
UNITS 1 AND 2 (OPTIONAL)
0047AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0047AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0047AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0047AD Provide New Gate Distributing Valve Pilot Piston (Optional) 2 EA $_______ $________
0048 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 1 AND 2 (OPTIONAL)
0048AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0048AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0048AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0048AD Provide New Blade Distributing Valve Pilot
0049 GATE DISTRIBUTING VALVE WORK FOR
UNITS 3 AND 4 (OPTIONAL)
0049AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0049AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0049AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0049AD Provide New Gate Distributing Valve Pilot
0050 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 3 AND 4 (OPTIONAL)
0050AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0050AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0050AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0050AD Provide New Blade Distributing Valve Pilot
0051 GATE DISTRIBUTING VALVE WORK FOR
UNITS 5 AND 6 (OPTIONAL)
0051AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0051AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0051AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0051AD Provide New Gate Distributing Valve Pilot
0052 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 5 AND 6 (OPTIONAL)
0052AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0052AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0052AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0052AD Provide New Blade Distributing Valve Pilot
0053 GATE DISTRIBUTING VALVE WORK FOR
UNITS 7 AND 8 (OPTIONAL)
0053AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0053AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0053AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0053AD Provide New Gate Distributing Valve Pilot
0054 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 7 AND 8 (OPTIONAL)
0054AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0054AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0054AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0054AD Provide New Blade Distributing Valve Pilot
0055 GATE DISTRIBUTING VALVE WORK FOR
UNITS 9 AND 10 (OPTIONAL)
0055AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0055AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0055AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0055AD Provide New Gate Distributing Valve Pilot
0056 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 9 AND 10 (OPTIONAL)
0056AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0056AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0056AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0056AD Provide New Blade Distributing Valve Pilot
0057 GATE DISTRIBUTING VALVE WORK FOR
UNITS 11 AND 12 (OPTIONAL)
0057AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0057AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $_________
0057AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $_________
0057AD Provide New Gate Distributing Valve Pilot Piston (Optional) 2 EA $_______ $_________
0058 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 11 AND 12 (OPTIONAL)
0058AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0058AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0058AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0058AD Provide New Blade Distributing Valve Pilot
0059 GATE DISTRIBUTING VALVE WORK FOR
UNITS 13 AND 14 (OPTIONAL)
0059AA Provide New Gate Distributing Valve Plunger (Optional) 2 EA $_______ $________
0059AB Provide New Gate Distributing Valve Bushing (Optional) 2 EA $_______ $________
0059AC Provide New Gate Distributing Valve Stem (Optional) 2 EA $_______ $________
0059AD Provide New Gate Distributing Valve Pilot
0060 BLADE DISTRIBUTING VALVE WORK
FOR UNITS 13 AND 14 (OPTIONAL)
0060AA Provide New Blade Distributing Valve Plunger (Optional) 2 EA $_______ $________
0060AB Provide New Blade Distributing Valve Bushing (Optional) 2 EA $_______ $________
0060AC Provide New Blade Distributing Valve Stem (Optional) 2 EA $_______ $________
0060AD Provide New Blade Distributing Valve Pilot
GOVERNOR OPTIONAL ITEMS TOTAL $____________
COLLECTOR RING REFURBISHMENT OPTIONAL ITEMS
0061 COLLECTOR RING REFURBISHMENT
FOR UNITS 1 AND 2 (OPTIONAL)
0061AA Refurbishment Unit 1 (Optional) 1 JOB XXXXX $________ 0061AB Refurbishment Unit 2 (Optional) 1 JOB XXXXX $________
0062 COLLECTOR RING REFURBISHMENT
FOR UNITS 3 AND 4 (OPTIONAL)
0062AA Refurbishment Unit 3 (Optional) 1 JOB XXXXX $________ 0062AB Refurbishment Unit 4 (Optional) 1 JOB XXXXX $________
0063 COLLECTOR RING REFURBISHMENT
FOR UNITS 5 AND 6 (OPTIONAL)
0063AA Refurbishment Unit 5 (Optional) 1 JOB XXXXX $________ 0063AB Refurbishment Unit 6 (Optional) 1 JOB XXXXX $________
0064 COLLECTOR RING REFURBISHMENT
FOR UNITS 7 AND 8 (OPTIONAL)
0064AA Refurbishment Unit 7 (Optional) 1 JOB XXXXX $________ 0064AB Refurbishment Unit 8 (Optional) 1 JOB XXXXX $________
0065 COLLECTOR RING REFURBISHMENT
FOR UNITS 9 AND 10 (OPTIONAL)
0065AA Refurbishment Unit 9 (Optional) 1 JOB XXXXX $________ 0065AB Refurbishment Unit 10 (Optional) 1 JOB XXXXX $________
0066 COLLECTOR RING REFURBISHMENT
FOR UNITS 11 AND 12 (OPTIONAL)
0066AA Refurbishment Unit 11 (Optional) 1 JOB XXXXX $________ 0066AB Refurbishment Unit 12 (Optional) 1 JOB XXXXX $________
0067 COLLECTOR RING REFURBISHMENT
FOR UNITS 13 AND 14 (OPTIONAL)
0067AA Refurbishment Unit 13 (Optional) 1 JOB XXXXX $________ 0067AB Refurbishment Unit 14 (Optional) 1 JOB XXXXX $________
COLLECTOR RING OPTIONAL ITEMS TOTAL $____________
NERC COMPLIANCE OPTIONAL ITEMS
NERC Compliance Testing and Reporting For Units 1 and 2 (Optional)
0068AA NERC Compliance Unit 1 (Optional) 1 JOB XXXXX $________ 0068AB NERC Compliance Unit 2 (Optional) 1 JOB XXXXX $________
For Units 3 and 4 (Optional)
0069AA NERC Compliance Unit 3 (Optional) 1 JOB XXXXX $________ 0069AB NERC Compliance Unit 4 (Optional) 1 JOB XXXXX $________
For Units 5 and 6 (Optional)
0070AA NERC Compliance Unit 5 (Optional) 1 JOB XXXXX $________ 0070AB NERC Compliance Unit 6 (Optional) 1 JOB XXXXX $________
For Units 7 and 8 (Optional)
0071AA NERC Compliance Unit 7 (Optional) 1 JOB XXXXX $________ 0071AB NERC Compliance Unit 8 (Optional) 1 JOB XXXXX $________
For Units 9 and 10 (Optional)
0072AA NERC Compliance Unit 9 (Optional) 1 JOB XXXXX $________ 0072AB NERC Compliance Unit 10 (Optional) 1 JOB XXXXX $________
For Units 11 and 12 (Optional)
0073AA NERC Compliance Unit 11 (Optional) 1 JOB XXXXX $________ 0073AB NERC Compliance Unit 12 (Optional) 1 JOB XXXXX $________
For Units 13 and 14 (Optional)
0074AA NERC Compliance Unit 13 (Optional) 1 JOB XXXXX $________ 0074AB NERC Compliance Unit 14 (Optional) 1 JOB XXXXX $________
NERC COMPLIANCE OPTIONAL ITEMS TOTAL $____________
ADVANCED MODELING OPTIONAL ITEMS
0075 Advanced Modeling For Units 1 and 2 (Optional) 1 JOB XXXXX $________
0076 Advanced Modeling For Units 3 and 4
0077 Advanced Modeling For Units 5 and 6
0078 Advanced Modeling For Units 7 and 8
0079 Advanced Modeling For Units 9 and 10
0080 Advanced Modeling For Units 11 and 12
0081 Advanced Modeling For Units 13 and 14
0082 Advanced Modeling Project Execution Plan (PxP) (Optional) 1 JOB XXXXX $________
ADVANCED MODELING OPTIONAL ITEMS TOTAL $____________
ALL OPTIONAL ITEMS TOTAL $_____________
SCHEDULE TOTAL (BASE + OPTIONAL ITEMS)
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
General Decision Number: OR20200077 09/04/2020 Superseded General Decision Number:
OR20190077 State: Oregon Construction Type: Heavy County: Umatilla County in Oregon.
HEAVY CONSTRUCTION PROJECTS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis- Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/03/2020 1 03/06/2020 2 08/14/2020 3 09/04/2020 CARP0001-038 06/01/2019 Rates Fringes CARPENTER (Excluding Form Work)............................$ 40.32 16.87 MILLWRIGHT.......................$ 40.90 16.87 ---------------------------------------------------------------
- ELEC0112-004 06/01/2019 Rates Fringes ELECTRICIAN......................$ 46.05 21.06 ---------- ------------------------------------------------------ ENGI0701-040 01/01/2020 Rates Fringes POWER EQUIPMENT OPERATOR GROUP 1.....................$ 45.90 15.35 GROUP 1A....................$
48.06 15.35 GROUP 1B....................$ 50.22 15.35 GROUP 2.....................$ 43.99 15.35 GROUP 3.....................$ 42.84 15.35 GROUP 4.....................$ 41.01 15.35 GROUP 5.....................$ 39.77 15.35 GROUP 6.....................$ 36.55 15.35 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments; GROUP 1A:
HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over GROUP 2: CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); Rubber tired scraper with tandom scrapers; Loader 120,000 lbs and above; BLADE: Auto Grader; Blade Operator-Robotic; Bulldozer over 120,000 lbs and above; GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Loader 60,000 lbs and less than
120,000 lbs; Bulldozer over 70,000 lbs up to and including 120,000 lbs; GROUP 4: CRANE:
Hydraulic Crane Operator, under 50 tons; LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/BACKHOE-ROBOTIC: track and wheel type, up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade Operator;
Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Loaders 25,000 lbs and less than 60,000 lbs;
Bulldozer over 20,000 lbs and more than 100 horse up to 70,000 lbs; Screed; Compactor with blade; Mechanic GROUP 5: TRACKHOE/BACKHOE HYDRAULIC: Track type up to and including 20,000 lbs, Wheel type (Ford, John Deer, Case Type); Boom truck operator;
DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Loaders, rubber tired type , less than 25,00 lbs; Forklift over 5 ton, Bulldozer 20,000 lbs or 100 horses or less; Roller; Compactor without blade GROUP 6:
LOADERS: (less than 1 cu yd.); Oiler; Grade Checker; Crane oiler; Forklift; Roller (non-asphalt) Zone Differential (add to Zone 1 rates): Zone 2 - $3.00 Zone 3 - $6.00 For the following metropolitan counties: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON;
YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH
MODIFICATIONS AS INDICATED: All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens ""Blast Zone"" shall receive Zone I pay for all classifications. All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications. For the following cities:
ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS;
MEDFORD; ROSEBURG All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. ---------------------------------------------------------------- IRON0029-013 07/01/2020 Rates Fringes IRONWORKER (Reinforcing and Structural)......................$ 39.10
29.75 ---------------------------------------------------------------- LABO0737-005 06/01/2019 Rates Fringes Laborers: (Mason Tender-Cement/Concrete)..........$ 31.56 14.60 ---------------------------- ------------------------------------ LABO0737-031 06/01/2019 Rates Fringes Laborers: GROUP 1.....................$ 30.82 14.57 GROUP 2.....................$ 31.97 14.57 LABORER CLASSIFICATIONS GROUP 1: Asphalt Spreader GROUP 2: Grade Checker --------------------- ------------------------------------------- * PAIN0055-022 07/01/2020 Rates Fringes PAINTER BRUSH, ROLLER AND SPRAY.....$ 25.94 13.34 ------------------------------------------------------- --------- PLUM0598-007 06/01/2019 Rates Fringes Plumbers and Pipefitters.........$ 50.47 32.17 - --------------------------------------------------------------- SUOR2009-075 11/23/2009 Rates Fringes CARPENTER (Form Work Only).......$ 23.50 9.27 CEMENT MASON/CONCRETE
FINISHER...$ 21.13 8.90 LABORER: Common or General......$ 21.05 4.38 LABORER: Fence Erection.........$ 23.88 7.45 LABORER: Flagger................$ 19.31 5.31 LABORER:
Pipelayer..............$ 20.52 4.51 LINE CONSTRUCTION: Groundman....$ 31.36 7.27 OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 22.77 7.90 OPERATOR:
Broom/Sweeper.........$ 32.31 6.43 OPERATOR: Excavator.............$ 30.12 6.23 OPERATOR:
Paver (Asphalt, Aggregate, and Concrete).........$ 27.59 2.96 TRUCK DRIVER: Dump Truck........$ 23.79 5.95 TRUCK DRIVER: Off the Road Truck............................$ 31.81 6.33 TRUCK DRIVER: Water Truck.......$ 26.12 6.53 --------------------------------------------------------- ------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
================================================================ Note:
Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ----------------------------------------- ----------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.
Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ----------------------- ----------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.)
If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part
1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.
================================================================ END
OF GENERAL DECISION
(End of Summary of Changes)
McNary Exciters, Governors, and PH Controls Upgrade W912EF20R0001
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15.00 28 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 00.00 26 SUMMARY OF WORK
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 12 16.00 26 WORK SEQUENCE
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 20 00.00 28 PRICE AND PAYMENT PROCEDURES
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 32 01.00 28 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 16.01 28 (OPTIONAL)ADVANCED MODELING REQUIREMENTS
01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 54 19.10 28 CRANES
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 64 00.10 26 GOVERNMENT FURNISHED EQUIPMENT
01 78 00.00 28 CLOSEOUT SUBMITTALS
01 78 23.00 28 OPERATION AND MAINTENANCE DATA
01 79 00.00 28 DEMONSTRATION AND TRAINING
01 91 00.00 26 SYSTEMS TESTING AND COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 19.00 26 REMOVAL OF HYDRAULIC-MECHANICAL GOVERNOR AND WICKET GATE
EMERGENCY NITROGEN SYSTEM
02 82 13.01 28 CLASS II ASBESTOS ABATEMENT
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
MINOR EQUIPMENT FOUNDATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00.00 26 FIRESTOPPING
DIVISION 09 - FINISHES
09 90 00.01 26 PAINTS AND COATINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 22 - PLUMBING
PROJECT TABLE OF CONTENTS Page 1
22 05 48.00 26 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 10 00.00 26 GOVERNOR OIL PUMPS
22 11 00.00 26 MECHANICAL EQUIPMENT AND PIPING
22 15 26.00 26 GOVERNOR COMPRESSED AIR SYSTEM
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.00 26 CYBERSECURITY
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING
26 05 36.00 26 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 28 00.00 26 SWITCHBOARDS AND PANELBOARDS
DIVISION 27 - COMMUNICATIONS
27 21 10.00 28 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 33 - UTILITIES
33 56 53.00 26 PRESSURE VESSELS FOR STORAGE OF GOVERNOR OIL AND
COMPRESSED AIR
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 01.01 26 WELDING
40 95 00.00 26 PROCESS CONTROL
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 67 13.12 26 CLEANING OF GOVERNOR OIL SYSTEMS
DIVISION 48 - ELECTRICAL POWER GENERATION
48 19 01.00 26 GOVERNOR REPLACEMENT INSTALLATION
48 19 26.00 26 DIGITAL EXCITERS
48 70 01.00 26 (OPTIONAL) NERC COMPLIANCE FOR HYDROGENERATORS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 VOLUME 1 CONTRACT DRAWINGS
1.3 VOLUME 2 CONTRACT DRAWINGS
1.4 VOLUME 3 CONTRACT DRAWINGS
1.5 VOLUME 4 CONTRACT DRAWINGS
1.6 INFORMATION ONLY (FIO)
1.7 USE OF GOVERNMENT PREPARED CONTRACT CAD ELECTRONIC FILES
-- End of Section Table of Contents --
DOCUMENT 00 01 15.00 28 Page 1
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
Drawing sheets are organized into three volumes by "family" groups. Within the family groups main units are arranged into pairs, sister units, which connect to a common S-board and SC-board.
a. Volume 1 drawings apply to overall plant/powerhouse electrical systems including digital governor, digital exciter, and digital powerhouse controls. They apply equally to both families of main units.
b. Volume 2 drawings apply to main units 1 thru 4. Main units 1 - 4 governors were originally manufactured by the Allis-Chalmers company.
Electrical and mechanical drawings necessary for the removal of existing governor components and installation/integration of new GFE digital governors for main units 1 - 4 have been provided. Electrical drawings include schematics, wiring, interconnect and conduit/cable schedules.
c. Volume 3 drawings apply to main units 5 thru 14. Main units 5 thru 14 governors were originally manufactured by the Woodward company.
Electrical and mechanical drawings necessary for the removal of existing governor components and installation/integration of new GFE digital governors for main units 5, 6, 13, 14 have been provided.
Electrical drawings include schematics, wiring, interconnect and conduit/cable schedules. Electrical drawing include schematic, wiring, interconnect and conduit/cable schedules. The most current/up-to-date drawings available for main units 7 - 12 are provided and must be used by the Contractor to prepare removal and installation shop drawings for main units 7 - 12. Shop drawings must be submitted for approval.
d. Volume 4 drawings apply to overall governor mechanical systems and apply equally to both families of main units.
1.2 VOLUME 1 CONTRACT DRAWINGS
Volume 1 Contract drawings are as follows:
VOLUME 1
Sheet Number
File Number Description Revision Number
Date
GENERAL
G-001 MDP-1.52-0/1 PROJECT LOCATION - VICINITY
MAPS
DOCUMENT 00 01 15.00 28 Page 2
G-002 MDP-1.52-0/2 INDEX TO CONTRACT DRAWINGS
- VOLUME 1, SHEET 1
G-003 MDP-1.52-0/3 INDEX TO CONTRACT DRAWINGS
- VOLUME 1, SHEET 2
G-004 MDP-1.52-0/4 INDEX TO CONTRACT DRAWINGS
- VOLUME 2, SHEET 1
G-005 MDP-1.52-0/5 INDEX TO CONTRACT DRAWINGS
- VOLUME 2, SHEET 2
G-006 MDP-1.52-0/6 INDEX TO CONTRACT DRAWINGS
- VOLUME 3, SHEET 1
G-007 MDP-1.52-0/7 INDEX TO CONTRACT DRAWINGS
- VOLUME 3, SHEET 2
G-008 MDP-1.52_0/8 INDEX TO CONTRACT DRAWINGS
- VOLUME 3, SHEET 3
G-009 MDP-1.52-0/9 INDEX TO CONTRACT DRAWINGS
- VOLUME 4, SHEET 1
G-010 MDP-1.52-0/10 INDEX FOR INFORMATION ONLY
DRAWINGS - VOLUME 1, SHEET 1
G-011 MDP-1.52-0/11 INDEX FOR INFORMATION ONLY
DRAWINGS - VOLUME 1, SHEET 2
G-012 MDP-1.52-0/12 INDEX FOR INFORMATION ONLY
DRAWINGS - VOLUME 1 SHEET 3
1 9/9/20
G-013 MDP-1.52-0/13 INDEX FOR INFORMATION ONLY
DRAWINGS - VOLUME 1 SHEET 4
G-014 MDP-1.52-0/14 ELECTRICAL GENERAL NOTES -
AND LEGEND
G-015 MDP-1.52-0/15 ELECTRICAL ABBREVIATIONS -
AND CONTROL DEVICE -
NUMBERING
G-101 MDP-1.52-0/16 POWERHOUSE - KEY PLAN - SH 1
G-102 MDP-1.52-0/17 POWERHOUSE EQUIPMENT - PLAN
OVERVIEW - SH 2
G-103 MDP-1.52-0/18 GOV COMM NETWORK CONDUIT
PLAN - CONTROL ROOM &
GALLERY - EL. 305 & 287
G-104 MDP-1.52-0/19 TYPICAL FLOOR PLAN -
TURBINE AND GENERATOR
G-105 MDP-1.52-0/20 STATION SERVICE - SITE PLAN
G-106 MDP-1.52-0/21 STATION SERVICE SITE PLAN -
STAGING AREA (PH INTERIOR)
G-107 MDP-1.52-0/22 STAGING AREA SITE PLAN -
TURBINE STORAGE BUILDING
STRUCTURAL
DOCUMENT 00 01 15.00 28 Page 3
G4EDDMTJ
Line
S-501 MDP-1.52-5-5/1 STEEL CHANNEL EQUIP
FOUNDATION - INSTALL
MECHANICAL
M-101 MDP-1.52-3-10/1 MU5-14 GATE SERVOMOTOR XDCR
- FLOOR PLAN EL 268 -
INSTALL
M-102 MDP-1.52-3-10/2 MU5-14 GATE SERVOMOTOR XDCR
- FLOOR PLAN EL 287 -
INSTALL
M-401 MDP-1.52-3-10/3 MU1 - 14 GATE POSITION
SERVOMOTOR XDCR - INSTALL
M-402 MDP-1.52-3-10/4 MU1 - 4 BLADE SERVOMOTOR
POSITION - INSTALL
M-501 MDP-1.52-3-10/5 MU 1 - 14 GATE SERVOMOTOR -
POSITION TRANSDUCER DETAILS
- INSTALL
ELECTRICAL
ED101 MDP-1.52-6-1A0/1 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287
OVERVIEW - REMOVAL
ED102 MDP-1.52-6-1A0/2 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU 1
& 2 - REMOVAL
ED103 MDP-152-6- 1A0/3 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU 3
& 4 - REMOVAL
ED104 MDP-152-6- 1A0/4 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU 5
& 6 - REMOVAL
ED105 MDP-152-6-1A0/5 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU 7
& 8 - REMOVAL
ED106 MDP-152-6-1A0/6 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU 9
& 10 - REMOVAL
ED107 MDP-152-6-1A0/7 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU
11 & 12 - REMOVAL
ED108 MDP-152-6-1A0/8 POWERHOUSE LAYOUT -
EQUIPMENT PLAN EL 287 MU
13 & 14 - REMOVAL
ED201 MDP-1.52-6-1A0/2 EXCITER ELEVATION - REMOVAL
ED202 MDP-1.52-6-0A4/1 SC SWITCHBOARD - FRONT
ELEVATION - REMOVAL
DOCUMENT 00 01 15.00 28 Page 4
ED203 MDP-1.52-6-0A4/2 SWITCHBOARD S1 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED204 MDP-1.52-6-0A4/3 SWITCHBOARD S2 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED205 MDP-1.52-6-0A4/4 SWITCHBOARD S3 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED206 MDP-1.52-6-0A4/5 SWITCHBOARD S4 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED207 MDP-1.52-6-0A4/6 SWITCHBOARD S5 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED208 MDP-1.52-6-0A4/7 SWITCHBOARD S6 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED209 MDP-1.52-6-0A4/8 SWITCHBOARD S7 AND GOVERNOR
- CABINETS ARRANGEMENT -
REMOVAL
ED501 MDP-1.52-6-1A30/1 EXCITER BRUSH RIGGING -
UNITS 1 THRU 12 - REMOVAL
ED502 MDP-1.52-6-1A30/2 EXCITER BRUSH RIGGING -
UNITS 13 & 14 - REMOVAL
ED600 MDP-1.52-6-0A21/1 POWERHOUSE OVERVIEW - ONE
LINE DIAGRAM - REMOVAL
ED601 MDP-1.52-6-8A23/1 MU 1-4 FUNCTIONAL DIAG. -
REMOVAL
ED602 MDP-1.52-6-8A23/2 MU 5-14 FUNCTIONAL DIAG. -
REMOVAL
ED603 MDP-1.52-6-0A21/2 MU 1-14 & GSU XFMR 1-7 -
ONE LINE DIAGRAM - REMOVAL
ED604 MDP-1.52-6-0A22/1 THREE-LINE DIAGRAM - GEN
BKR & 15KV BUS - REMOVAL
ED605 MDP-1.52-6-8E22/1 UNITS 1 & 2 MAIN GEN
CONTROL - 3-LINE DIAG SH 1
ED606 MDP-1.52-6-8E22/2 UNITS 1 & 2 MAIN GEN
CONTROL - 3-LINE DIAG SH 2
ED607 MDP-1.52-6-8F22/1 UNITS 3 & 4 MAIN GEN
CONTROL - 3-LINE DIAG SH 1
ED608 MDP-1.52-6-8F22/2 UNITS 3 & 4 MAIN GEN
CONTROL - 3-LINE DIAG SH 2
REMOVALED609 MDP-1.52-6-8G22/1 UNITS 5 - 8 MAIN GEN
CONTROL - 3-LINE DIAG SH 1
DOCUMENT 00 01 15.00 28 Page 5
ED610 MDP-1.52-6-8G22/2 UNITS 5 - 8 MAIN GEN
CONTROL - 3-LINE DIAG SH 2
ED611 MDP-1.52-6-8I22/1 UNITS 9 - 14 MAIN GEN
CONTROL - 3-LINE DIAG SH 1
ED612 MDP-1.52-6-8I22/2 UNITS 9 - 14 MAIN GEN
CONTROL - 3-LINE DIAG SH 2
ED613 MDP-1.52-6-8A24/1 MAIN UNITS SYCHRONIZING
DIAGRAM - REMOVAL
ED620 MDP-1.52-6-8A24/2 MU 1-14 CONTROL SCHEMATIC
DIAG. - AUTO START/STOP SH1
- REMOVAL
ED621 MDP-1.52-6-8A24/3 MU 1-14 CONTROL SCHEMATIC
DIAG. - REMOTE SPEED &
SIREN SH2 - REMOVAL
ED622 MDP-1.52-6-8A24/4 MU 1-14 CONTROL SCHEMATIC -
GEN BRKR XJ1-SJ14 SH1 -
REMOVAL
ED623 MDP-1.52-6-8A24/5 MU 1-14 CONTROL SCHEMATIC -
GEN BRKR PWR & MTR CKTS SH2
- REMOVAL
ED624 MDP-1.52-6-8A24/6 MU 1-14 CONTROL SCHEMATIC -
PROT RELAYING, UNIT & LINE
- REMOVAL
ED625 MDP-1.52-6-8A55/1 MU 1-4 SPEED RELAY CONN -
SP SENSOR LOC - REMOVAL
ED626 MDP-1.52-6-8A55/2 MU 5-14 SPEED RELAY CONN -
SP SENSOR LOC - REMOVAL
ED627 MDP-1.52-6-8A24/7 MU 1-4 CONTROL SCHEM DIAG -
BEARING OIL PUMP CKTS SH3 -
REMOVAL
ED628 MDP-1.52-6-8A24/8 MU 5-14 CONTROL SCHEM DIAG
- BEARING OIL PUMP CKTS SH4
- REMOVAL
ED629 MDP-1.52-6-8A24/9 MU 1-14 CONTROL SCHEM DIAG
- OIL PUMP CONTROL SH5 -
REMOVAL
ED630 MDP-1.52-6-8A24/10 MU 1-14 CONTROL SCHEM DIAG
- GEN & XFMR COOLING CKTS
SH6 - REMOVAL
ED631 MDP-1.52-6-8A24/11 MU 1-14 CONTROL SCHEM DIAG
- GOV & OIL PUMPS SH7 -
ED632 MDP-1.52-6-8A24/12 MU 1-14 AUX EQUIP - STOP
NUT & PANEL INDICATION SH1
- REMOVAL
ED633 MDP-1.52-6-8A24/13 MU HEATER CONTROL SCHEMATIC
- REMOVAL
ED634 MDP-1.52-6-8A24/14 POWERHOUSE ELECTRICAL CO2 -
SCHEMATIC DIAGRAM - REMOVAL
DOCUMENT 00 01 15.00 28 Page 6
ED640 MDP-1.52-6-8E26/1 UNITS 1-2 - LINE 1 AND XFMR
1 RELAYING DIAGRAM - REMOVAL
ED641 MDP-1.52-6-8F26/1 UNITS 3-4 - LINE 2 AND XFMR
2 RELAYING DIAGRAM - REMOVAL
ED642 MDP-1.52-6-8G26/1 UNITS 5-8 - LINE 3 AND XFMR
3-4 RELAYING DIAGRAM -
REMOVAL
ED643 MDP-1.52-6-8I26/1 UNITS 9-12 - LINE 4 AND
XFMR 5-6 RELAYING DIAGRAM -
REMOVAL
ED644 MDP-1.52-6-8K26/1 UNITS 13-14 - LINE 5 AND
XFMR 7 RELAYING DIAGRAM -
REMOVAL
ED650 MDP-1.52-6-8A24/15 MU 1-14 ANNUNCIATOR CONTROL
- SCHEMATIC SHEET 1 -
REMOVAL
ED651 MDP-1.52-6-8A24/16 MU 1-14 ANNUNCIATION
CONTROL - SCHEMATIC SHEET 2
- REMOVAL
ED652 MDP-1.52-6-8A24/17 MU 1-14 ANNUNCIATION
CONTROL - SCHEMATIC SHEET 3
- REMOVAL
ED700 MDP-1.52-6-8A20/1 SYSTEM SCHEMATIC - WIRING
DIAGRAM SHEET 1 - REMOVAL
ED701 MDP-1.52-6-8A20/2 SYSTEM SCHEMATIC - WIRING
DIAGRAM SHEET 2 - REMOVAL
ED702 MDP-1.52-6-8A20/3 SYSTEM SCHEMATIC - WIRING
DIAGRAM SHEET 3 - REMOVAL
E-001 MDP-1.52-6-0E0/1 ELECTRICAL EQUIPMENT
CONNECTIONS TYPICAL DETAILS
SHEET 1
E-002 MDP-1.52-6-0E0/2 ELECTRICAL EQUIPMENT
CONNECTIONS TYPICAL DETAILS
SHEET 2
E-003 MDP-1.52-6-0E0/3 ELECTRICAL EQUIPMENT
CONNECTIONS TYPICAL DETAILS
SHEET 3
E-101 MDP-1.52-6-0A0/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL 287 - OVERVIEW
E-102 MDP-1.52-6-0E4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN- EL 287 - MAIN UNITS 1
& 2
1 9/9/20
E-103 MDP-1.52-6-0F4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL 287 - MAIN UNITS
3 & 4
E-104 MDP-1.52-6-0G4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL 287 - MAIN UNITS
5 & 6
DOCUMENT 00 01 15.00 28 Page 7
E-105 MDP-1.52-6-0H4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL 287 - MAIN UNITS
7 & 8
E-106 MDP-1.52-6-0I4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL 287 - MAIN UNITS
9 & 10
E-107 MDP-1.52-6-0J4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL 287 - MAIN UNITS
11 & 12
E-108 MDP-1.52-6-0K4/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN - EL. 287 - MAIN UNITS
13 & 14
E-109 MDP-1.52-6-0A0/2 POWERHOUSE LAYOUT - EL 305
CONTROL CABLE GALLERY- FO
CONDUIT INSTALL
E-110 MDP-1.52-6-0A0/3 POWERHOUSE LAYOUT - CNTRL.
RM. ARR EL 305 - FO CONDUIT
INSTALL
E-111 MDP-1.52-6-1A0/3 EXCITER PLAN VIEW- INSTALL
E-201A MDP-1.52-6-0A4/9 SC SWITCHBOARD- FRONT
ARRANGENET - INSTALL
E-201B MDP-1.52-6-0A4/10 SC-SWITCHBOARD - GOV & EXC
HMI LAYOUT & DETAILS -
INSTALL
E-202 MDP-1.52-6-0A4/11 S1-S2 SWITCHBOARD - FRONT
ARRANGEMENT - INSTALL
E-203 MDP-1.52-6-0A4/12 S3-S7 SWITCHBOARD- FRONT
ARRANGEMENT - INSTALL
E-204 MDP-1.52-6-0A44/1 RTU1-7 CABINET - INTERIOR
LAYOUT - INSTALL
E-205 MDP-1.52-6-0A44/2 RTU1-7 CABINET - EXTERIOR
LAYOUT - INSTALL
E-206 MDP-1.52-6-0A44/3 RTU0 FIBER OPTIC COMM -
COMM RM CABINET LAYOUT-
INSTALL
E-207 MDP-1.52-6-0A44/4 FIBER OPTIC COMM - HMI
BLOCK DIAGRAM - INSTALL
E-208 MDP-1.52-6-1A0/4 FIBER OPTIC COMM - FIBER
ROUTE - INSTALL
E-209 MDP-1.52-6-0A19/1 FIBER OPTIC COMM - GDACS
COMMON CONTROL NETWORK -
INSTALL
E-211 MDP-1.52-6-0A19/3 EXCITER EL VIEW - INSTALL
E-501 MDP-1.52-6-1A30/1 EXCITER BRUSH RIGGING -
UNITS 1-12 - INSTALL
E-502 MDP-1.52-6-1A30/2 EXCITER BRUSH RIGGING -
UNITS 13 & 14 - INSTALL
E-600 MDP-1.52-6-0A21/3 POWERHOUSE OVERVIEW - ONE
LINE DIAGRAM - INSTALL
DOCUMENT 00 01 15.00 28 Page 8
E-601 MDP-1.52-6-8A23/3 FUNCTIONAL DIAGRAM- MAIN
UNITS AND GSU TRANSFORMER -
INSTALL
E-602 MDP-1.52-6-8A21/1 ONE-LINE DIAGRAM - MAIN
UNITS AND GSU TRANSFORMER -
INSTALL
E-603 MDP-1.52-6-8A22/1 THREE-LINE DIAGRAM - GEN
BKR & 15KV BUS CT & PT
CONNECTIONS - INSTALL
E-604 MDP-1.52-6-8A22/2 THREE-LINE DIAGRAM - EVEN
UNITS - INSTALL
E-605 MDP-1.52-6-0A22/2 THREE-LINE DIAGRAM - GSU
TRANSFORMER - INSTALL
E-606 MDP-1.52-6-8A22/3 THREE-LINE DIAGRAM - ODD
UNITS - INSTALL
E-607 MDP-1.52-6-8A22/4 THREE-LINE DIAGRAM - GEN
MANUAL SYNCH CKT - INSTALL
E-608 MDP-1.52-6-8A22/5 THREE-LINE DIAGRAM - GEN
METERING & RELAYING -
INSTALL
E-609 MDP-1.52-6-1A4/1 THREE-LINE DIAGRAM -
INSTALL
E-610 MDP-1.52-6-0A9/1 125 VDC (CE_2)POWER
DISTRIBUTION PANELS -
INSTALL
E-611A MDP-1.52-6-0A10/ GOV PLC MODULE & RELAY
SUMMARY - SHEET 1- INSTALL
E-611B MDP-1.52-6-0A10/2 GOV PLC MODULE & RELAY
SUMMARY - SHEET 2 - INSTALL
E-612 MDP-1.52-6-0A24/1 GOVERNOR CONTROL SCHEDULE -
SHEET 1 - INSTALL
E-613 MDP-1.52-6-0A24/2 GOVERNOR CONTROL SCHEDULE -
SHEET 2 - INSTALL
E-614 MDP-1.52-6-0A24/3 GOVERNOR CONTROL SCHEDULE -
SHEET 3 - INSTALL
E-615A MDP-1.52-6-0A45/1 GOV CONTROL CABINET, LL
TERM STRIP -
INTERCONNECTION DIAGRAM -
INSTALL
E-615B MDP-1.52-6-0A45/2 GOV CONTROL CABINET, RR
TERM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .