Attachment 7 - Barnes Blvd Temporary Bridge Detour Requirements and Details (Rev 1).pdf
PDF 3 MB Posted
- Attached to
- Repairs to McChord Bridge – Barnes Blvd
- Solicitation number
- W912DW24B0Y1Y
About this file
This document package includes drawings and details for a temporary bridge detour route as well as the associated federal contract opportunity solicitation. The drawings provide three sheets showing turning movements and proposed temporary modifications for detouring traffic around the Barnes Boulevard bridge during repairs. Details include placing a bond breaker and 2 inches of asphalt over 3 inches of crushed surfacing base course for temporary curb wedges and paving. The solicitation is an Invitation for Bid for repairs to the Barnes Boulevard bridge on Joint Base Lewis-McChord in Washington with an estimated value between $7.5-15 million. The work includes furnishing all labor, equipment, materials and supervision to perform the tasks in the statement of work. The acquisition is set aside as an 8(a) small business opportunity within NAICS code 237310 for highway, street and bridge construction.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
WB-67 - Interstate Semi-Trailer
WB-6
7 - In tersta te Se mi-Tr ailer
1st ST
BA
R
N
ES
B
LV
D
S
T
DATE:
WORK ORDER:
DRAWING TITLE:
DRAWING NO.:
ESTIMATOR:
FILE NO.:
PROJECT TITLE:
DETOUR ROUTE
CMM
LEWIS-McCHORD
WASHINGTON
UBLIC
ORKSPW
JOINT BASE
REPAIR BARNES BRIDGE
DER181498J
9/5/2022
US Army Corps of Engineers
1st STREET TURNING MOVEMENTS
ADD TEMPORARY HMA CURB
WEDGE AND PAVING
ADD TEMPORARY
STOP SIGN AND BAR
ROAD CLOSED
TWO-WAY
TRAFFIC
TW
O
-W
AY
TR
AFFIC
Sheets and Views
1st ST
WB-6
7 - In tersta te Se mi-Tr ailer
7th ST
LEVITOW TURNING MOVEMENTS
AF
FI
C
ONE-WAY
SCALE: 1" = 40'
Sheets and Views
7TH
8th ST
8th ST TURNING MOVEMENTS
Sheets and Views
8TH
1.00' VARIES PER PLAN
PLACE BOND BREAKER BETWEEN EXISTING CURB/PAVEMENT TO
FACILITATE REMOVAL WHEN DETOUR IS COMPLETE
PROVIDE 2" COMPACTED HMA OVER 3" CSBC
1. CLEAR AND GRUB TURF AREA TO RECEIVE TEMPORARY HMA
2. AT THE COMPLETION OF THE DETOUR, ALL HMA AND CSBC SHALL BE REMOVED AND AREA RESTORED WITH TOPSOIL/SEED.
CONTRACTOR SHALL ENSURE TURF ESTABLISHMENT.
3. GRADE HMA TO SHED WATER AWAY FROM STREET.
EXISTING PAVEMENT
EXISTING CURB
TEMPORARY HMA CURB WEDGE AND PAVING DETAIL
SCALE: 1" = 1'
Sheets and Views detail
WB-67 - Interstate Semi-TrailerWB-67 - Interstate Semi-TrailerB
LEVITOW BLVD
2n d
LEVITOW TURNING MOVEMENTS
AD
LO
SE
E- W
E- W
Sheets and Views
Levitow
BARNES BRIDGE REPAIR
File details come from the government source that posted it. Updated .