Submittal Register - Barnes Blvd. Bridge Repairs.xlsx
XLSX spreadsheet 52 KB Posted
- Attached to
- Repairs to McChord Bridge – Barnes Blvd
- Solicitation number
- W912DW24B0Y1Y
About this file
This document contains a submittal register and related federal contract opportunity. The submittal register outlines 444 line items of submittals required for the "Repairs to Barnes Blvd. Bridge" project on Joint Base Lewis-McChord in Washington. Required submittals include plans, schedules, qualifications, product data, shop drawings, test reports, certificates, operation and maintenance manuals, and closeout documents.
The related federal contract opportunity is solicitation number W912DW24B0Y1Y for repairs to the McChord Bridge on Barnes Boulevard. The estimated value of the construction contract is between $7.5 million and $15 million. The solicitation is a 100% small business set-aside restricted to 8(a) firms only. The North American Industry Classification System code is 237310 for highway, street, and bridge construction. The contracting agency is the Department of the Army Corps of Engineers in Seattle.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFGS4288
| TITLE: | Barnes Bridge Construction - Draft Submittal Register | SUBMITTAL REGISTER | ||||||||||||||||
| JOB NAME: | ||||||||||||||||||
| LOCATION: | ||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Transmittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Reviewer | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 30 00 | 1 | Preconstruction Submittals | View Location Map | 1.3 | |||||||||||||||
| 2 | 01 30 00 | 1 | Preconstruction Submittals | Progress and Completion Pictures | 1.4 | |||||||||||||||
| 3 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Preliminary Project Schedule | 3.4.1 | G | ||||||||||||||
| 4 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | ||||||||||||||
| 5 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Periodic Schedule Update | 3.6.2 | G | ||||||||||||||
| 6 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Project Scheduler Qualifications | 1.3 | |||||||||||||||
| 7 | 01 33 00 | 1 | Preconstruction Submittals | Submittal Register | 1.7 | G | ||||||||||||||
| 8 | 01 35 26 | 1 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||
| 9 | 01 35 26 | 1 | Preconstruction Submittals | Activity Hazard Analysis (AHA) | 1.8 | G | ||||||||||||||
| 10 | 01 35 26 | 1 | Preconstruction Submittals | Utility Coordination and Protection Plan | 1.17 | G | ||||||||||||||
| 11 | 01 35 26 | 1 | Preconstruction Submittals | Crane Critical Lift Plan | 1.7.2 | G | ||||||||||||||
| 12 | 01 35 26 | 6 | Test Reports | Notifications and Reports | 1.12 | |||||||||||||||
| 13 | 01 35 26 | 6 | Test Reports | LHE Inspection Reports | 1.12.3 | |||||||||||||||
| 14 | 01 35 26 | 6 | Test Reports | Accident Reports | 1.12.2 | G | ||||||||||||||
| 15 | 01 35 26 | 6 | Test Reports | Monthly Exposure Reports | 1.4 | |||||||||||||||
| 16 | 01 35 26 | 7 | Certificates | Confined Space Entry Permit | 1.9.1 | |||||||||||||||
| 17 | 01 35 26 | 7 | Certificates | Hot Work Permit | 1.9.1 | |||||||||||||||
| 18 | 01 45 00.00 10 | 1 | Preconstruction Submittals | Contractor Quality Control (CQC) Plan | 3.2 | G | ||||||||||||||
| 19 | 01 45 00.00 10 | 1 | Preconstruction Submittals | Verification Statement | 3.9.2 | |||||||||||||||
| 20 | 01 45 35 | 1 | Preconstruction Submittals | SIOR Letter of Acceptance | 3.1.1 | G | ||||||||||||||
| 21 | 01 45 35 | 1 | Preconstruction Submittals | Project Manual | 3.1.1 | G | ||||||||||||||
| 22 | 01 45 35 | 1 | Preconstruction Submittals | Project Manual | 3.1.1 | G | ||||||||||||||
| 23 | 01 45 35 | 1 | Preconstruction Submittals | Written Practices | 3.1.1 | |||||||||||||||
| 24 | 01 45 35 | 1 | Preconstruction Submittals | Written Practices | 3.1.3 | |||||||||||||||
| 25 | 01 45 35 | 1 | Preconstruction Submittals | NDT Procedures and Equipment Calibration Records | 3.1.1 | |||||||||||||||
| 26 | 01 45 35 | 1 | Preconstruction Submittals | NDT Procedures and Equipment Calibration Records | 3.1.3 | |||||||||||||||
| 27 | 01 45 35 | 6 | Test Reports | Daily Reports | 3.1.1 | |||||||||||||||
| 28 | 01 45 35 | 6 | Test Reports | Daily Reports | 3.1.3 | |||||||||||||||
| 29 | 01 45 35 | 6 | Test Reports | Daily Reports | 3.1.3 | |||||||||||||||
| 30 | 01 45 35 | 6 | Test Reports | Biweekly Reports | 3.1.1 | |||||||||||||||
| 31 | 01 45 35 | 6 | Test Reports | Biweekly Reports | 3.1.2 | |||||||||||||||
| 32 | 01 45 35 | 7 | Certificates | AISC Certified Steel Fabricator | 2.1 | |||||||||||||||
| 33 | 01 45 35 | 7 | Certificates | Steel Truss Plant | 2.1 | |||||||||||||||
| 34 | 01 45 35 | 7 | Certificates | Certified Plant | 2.1 | |||||||||||||||
| 35 | 01 45 35 | 7 | Certificates | Certificate of Compliance | 2.1 | |||||||||||||||
| 36 | 01 45 35 | 7 | Certificates | Special Inspector of Record | 1.5.10 | G | ||||||||||||||
| 37 | 01 45 35 | 7 | Certificates | Special Inspector | 1.5 | G | ||||||||||||||
| 38 | 01 45 35 | 7 | Certificates | Qualification Records | 3.1.1 | |||||||||||||||
| 39 | 01 45 35 | 7 | Certificates | Qualification Records | 3.1.3 | |||||||||||||||
| 40 | 01 45 35 | 11 | Closeout Submittals | Interim Final Report | 3.1.1 | G | ||||||||||||||
| 41 | 01 45 35 | 11 | Closeout Submittals | Interim Final Report | 3.1.3 | G | ||||||||||||||
| 42 | 01 45 35 | 11 | Closeout Submittals | Comprehensive Final Report | 3.1.1 | G | ||||||||||||||
| 43 | 01 45 35 | 11 | Closeout Submittals | Comprehensive Final Report | 3.1.3 | G | ||||||||||||||
| 44 | 01 50 00 | 1 | Preconstruction Submittals | Construction Site Plan | 1.3 | G | ||||||||||||||
| 45 | 01 50 00 | 1 | Preconstruction Submittals | Traffic Control Plan | 3.4.1 | G | ||||||||||||||
| 46 | 01 56 00 | 1 | Preconstruction Submittals | Care and Diversion Work Plan | 1.5 | G | ||||||||||||||
| 47 | 01 56 00 | 1 | Preconstruction Submittals | In-Water Safety Plan | 1.7 | |||||||||||||||
| 48 | 01 56 00 | 2 | Shop Drawings | Shop Drawings | 1.8 | G | ||||||||||||||
| 49 | 01 56 00 | 5 | Design Data | Design Calculations | 1.9 | G | ||||||||||||||
| 50 | 01 57 19 | 1 | Preconstruction Submittals | Preconstruction Survey | 1.6.1 | |||||||||||||||
| 51 | 01 57 19 | 1 | Preconstruction Submittals | Regulatory Notifications | 1.6.2 | G | ||||||||||||||
| 52 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Protection Plan | 1.7 | G | ||||||||||||||
| 53 | 01 57 19 | 1 | Preconstruction Submittals | Stormwater Pollution Prevention Plan | 3.2.1.1 | G | ||||||||||||||
| 54 | 01 57 19 | 1 | Preconstruction Submittals | Stormwater Notice of Intent | 3.2.1.2 | G | ||||||||||||||
| 55 | 01 57 19 | 1 | Preconstruction Submittals | Employee Training Records | 1.6.5 | G | ||||||||||||||
| 56 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Manager Qualifications | 1.6.4 | G | ||||||||||||||
| 57 | 01 57 19 | 1 | Preconstruction Submittals | Waste Determination Documentation | 3.7.1 | |||||||||||||||
| 58 | 01 57 19 | 1 | Preconstruction Submittals | Hazardous Waste/Debris Management | 3.7.3.1 | |||||||||||||||
| 59 | 01 57 19 | 6 | Test Reports | Inspection Reports | 3.2.1.3 | |||||||||||||||
| 60 | 01 57 19 | 6 | Test Reports | Disposal Documentation for Hazardous and Regulated Waste | 3.7.3.6 | |||||||||||||||
| 61 | 01 57 19 | 6 | Test Reports | Contractor Hazardous Material Inventory Log | 3.8.1 | |||||||||||||||
| 62 | 01 57 19 | 6 | Test Reports | PFAS Test Results | 3.21 | |||||||||||||||
| 63 | 01 57 19 | 7 | Certificates | Employee Training Records | 1.6.5 | G | ||||||||||||||
| 64 | 01 57 19 | 7 | Certificates | ECATTS Certificate Of Completion | 1.4.1.2 | G | ||||||||||||||
| 65 | 01 57 19 | 7 | Certificates | Certificate of Competency | 1.6.5.1 | |||||||||||||||
| 66 | 01 57 19 | 7 | Certificates | Erosion and Sediment Control Inspector | 1.6.5 | |||||||||||||||
| 67 | 01 57 19 | 11 | Closeout Submittals | Stormwater Pollution Prevention Plan Compliance Notebook | 3.2.1.4 | G | ||||||||||||||
| 68 | 01 57 19 | 11 | Closeout Submittals | Stormwater Notice of Termination | 3.2.1.5 | G | ||||||||||||||
| 69 | 01 57 19 | 11 | Closeout Submittals | Assembled Employee Training Records | 1.6.5 | G | ||||||||||||||
| 70 | 01 57 19 | 11 | Closeout Submittals | Regulatory Notifications | 1.6.2 | G | ||||||||||||||
| 71 | 01 57 19 | 11 | Closeout Submittals | As-Built Topographic Survey | 3.2.1.5 | |||||||||||||||
| 72 | 01 74 19 | 1 | Preconstruction Submittals | Construction Waste Management Plan | 1.7 | G | ||||||||||||||
| 73 | 01 74 19 | 6 | Test Reports | Quarterly Reports | 1.9.2 | |||||||||||||||
| 74 | 01 74 19 | 6 | Test Reports | Annual Report | 1.9.3 | |||||||||||||||
| 75 | 01 74 19 | 11 | Closeout Submittals | Final Construction Waste Diversion Report | 1.1 | |||||||||||||||
| 76 | 01 78 00 | 3 | Product Data | Warranty Management Plan | 1.10.1 | |||||||||||||||
| 77 | 01 78 00 | 3 | Product Data | Warranty Tags | 1.10.5 | |||||||||||||||
| 78 | 01 78 00 | 3 | Product Data | Spare Parts Data | 1.7 | |||||||||||||||
| 79 | 01 78 00 | 8 | Manufacturer's Instructions | Instructions | 1.10.1 | |||||||||||||||
| 80 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.7 | G | ||||||||||||||
| 81 | 01 78 00 | 11 | Closeout Submittals | As-Built Drawings | 3.1 | G | ||||||||||||||
| 82 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 3.3 | G | ||||||||||||||
| 83 | 01 78 00 | 11 | Closeout Submittals | As-Built Record of Equipment and Materials | 1.10.1 | |||||||||||||||
| 84 | 01 78 00 | 11 | Closeout Submittals | As-Built Record of Equipment and Materials | 3.6 | |||||||||||||||
| 85 | 01 78 00 | 11 | Closeout Submittals | Final Approved Shop Drawings | 3.4 | G | ||||||||||||||
| 86 | 01 78 00 | 11 | Closeout Submittals | Bridge Inspection and Load Rating Analysis | 2.2 | G | ||||||||||||||
| 87 | 01 78 00 | 11 | Closeout Submittals | Interim DD FORM 1354 | 3.9.1 | G | ||||||||||||||
| 88 | 01 78 00 | 11 | Closeout Submittals | Final DD FORM 1354 | 3.9.2 | G | ||||||||||||||
| 89 | 01 78 00 | 11 | Closeout Submittals | Checklist for DD FORM 1354 | 3.9.2 | G | ||||||||||||||
| 90 | 01 78 00 | 11 | Closeout Submittals | Construction Contract Specifications | 3.5 | G | ||||||||||||||
| 91 | 01 78 23 | 10 | Operation and Maintenance Data | O&M Database | 1.4 | G | ||||||||||||||
| 92 | 02 41 00 | 1 | Preconstruction Submittals | Demolition Plan | 1.2.2 | G | ||||||||||||||
| 93 | 02 41 00 | 1 | Preconstruction Submittals | Deconstruction Plan | 1.2.2 | G | ||||||||||||||
| 94 | 02 41 00 | 7 | Certificates | Notification | 1.6 | G | ||||||||||||||
| 95 | 03 01 00 | 1 | Preconstruction Submittals | Qualifications | 1.5.3 | G | ||||||||||||||
| 96 | 03 01 00 | 1 | Preconstruction Submittals | Work Plan | 1.5.5 | G | ||||||||||||||
| 97 | 03 01 00 | 1 | Preconstruction Submittals | Work Plan | 1.6.1 | G | ||||||||||||||
| 98 | 03 01 00 | 1 | Preconstruction Submittals | Quality Control Plan | 1.5.2 | G | ||||||||||||||
| 99 | 03 01 00 | 3 | Product Data | Conventional Concrete | 2.5 | |||||||||||||||
| 100 | 03 01 00 | 3 | Product Data | Polymers | 2.6 | |||||||||||||||
| 101 | 03 01 00 | 3 | Product Data | Miscellaneous Materials And Equipment | 2.7 | |||||||||||||||
| 102 | 03 01 00 | 5 | Design Data | Formwork And Shoring | 3.1.3 | G | ||||||||||||||
| 103 | 03 01 00 | 5 | Design Data | Repair Procedures | 1.5.1 | G | ||||||||||||||
| 104 | 03 01 00 | 5 | Design Data | Mixture Proportioning | 2.8 | G | ||||||||||||||
| 105 | 03 01 00 | 6 | Test Reports | Mixture Proportioning | 2.8 | |||||||||||||||
| 106 | 03 01 00 | 6 | Test Reports | Quality Control | 3.1.5 | |||||||||||||||
| 107 | 03 01 00 | 6 | Test Reports | Quality Control | 3.2.3 | |||||||||||||||
| 108 | 03 01 00 | 6 | Test Reports | Quality Control | 3.3.3 | |||||||||||||||
| 109 | 03 01 00 | 7 | Certificates | Qualifications | 1.5.3 | |||||||||||||||
| 110 | 03 01 00 | 7 | Certificates | Reinforcement And Reinforcement Supports | 2.4 | |||||||||||||||
| 111 | 03 45 33 | 2 | Shop Drawings | Drawings of Precast Members | 2.1.1.2 | G | ||||||||||||||
| 112 | 03 45 33 | 2 | Shop Drawings | Drawings of Precast Prestressed Concrete Members | 2.1.1.2 | G | ||||||||||||||
| 113 | 03 45 33 | 5 | Design Data | Design Calculations | 2.1.1.2 | G | ||||||||||||||
| 114 | 03 45 33 | 5 | Design Data | Concrete Mix Design | 1.4.3 | G | ||||||||||||||
| 115 | 03 45 33 | 6 | Test Reports | Concrete Mix Design | 1.4.3 | G | ||||||||||||||
| 116 | 03 45 33 | 7 | Certificates | Construction Records | 3.12 | G | ||||||||||||||
| 117 | 03 45 33 | 7 | Certificates | Erector's Post Audit Declaration | 1.4.1.3 | |||||||||||||||
| 118 | 03 45 33 | 11 | Closeout Submittals | Batch Ticket | 1.4.4 | |||||||||||||||
| 119 | 03 45 33 | 11 | Closeout Submittals | Recycled Content for Silica Fume | 2.2.1 | |||||||||||||||
| 120 | 03 45 33 | 11 | Closeout Submittals | Recycled Content for Fly Ash and Pozzolan | 2.2.1 | |||||||||||||||
| 121 | 03 45 33 | 11 | Closeout Submittals | Recycled Content for Ground Iron Blast-Furnace Slag | 2.2.1 | |||||||||||||||
| 122 | 03 70 00 | 3 | Product Data | Curing and Protection | 3.2 | G | ||||||||||||||
| 123 | 05 05 20.00 27 | 1 | Preconstruction Submittals | Installer Qualifications | 1.5.1.1 | G | ||||||||||||||
| 124 | 05 05 20.00 27 | 1 | Preconstruction Submittals | Post-Installed Anchor Special Inspector Qualifications | 1.5.1.2 | G | ||||||||||||||
| 125 | 05 05 20.00 27 | 3 | Product Data | Mechanical Anchors in Concrete | 2.1.1.3 | G | ||||||||||||||
| 126 | 05 05 20.00 27 | 3 | Product Data | Adhesive Anchor System in Concrete | 2.1.1.4 | G | ||||||||||||||
| 127 | 05 05 20.00 27 | 3 | Product Data | Non-Shrink, Non-Metallic Grout | 3.1.3 | G | ||||||||||||||
| 128 | 05 05 20.00 27 | 6 | Test Reports | Post-Installed Anchor Special Inspections Report | 3.3.4 | G | ||||||||||||||
| 129 | 05 05 20.00 27 | 7 | Certificates | Post-Installed Anchor Certification | 2.1.1.1 | G | ||||||||||||||
| 130 | 05 05 20.00 27 | 8 | Manufacturer's Instructions | Manufacturer's Printed Installation Instructions | 2.1.1.2 | G | ||||||||||||||
| 131 | 05 05 20.00 27 | 8 | Manufacturer's Instructions | Non-Shrink, Non-Metallic Grout | 3.1.3 | G | ||||||||||||||
| 132 | 05 05 20.00 27 | 8 | Manufacturer's Instructions | Manufacturer's Material Safety Data Sheets | 1.5 | |||||||||||||||
| 133 | 05 05 23.16 | 3 | Product Data | Welding Procedure Qualifications | 1.3 | G | ||||||||||||||
| 134 | 05 05 23.16 | 3 | Product Data | Welder, Welding Operator, and Tacker Qualification | 1.3.4 | |||||||||||||||
| 135 | 05 05 23.16 | 3 | Product Data | Previous Qualifications | 1.3.2 | |||||||||||||||
| 136 | 05 05 23.16 | 3 | Product Data | Pre-Qualified Procedures | 1.3.3 | G | ||||||||||||||
| 137 | 05 05 23.16 | 3 | Product Data | Welding Electrodes and Rods | 2.2 | |||||||||||||||
| 138 | 05 05 23.16 | 6 | Test Reports | Nondestructive Testing | 3.3 | |||||||||||||||
| 139 | 05 05 23.16 | 7 | Certificates | Certified Welding Procedure Specifications (WPS) | 1.3.1 | |||||||||||||||
| 140 | 05 05 23.16 | 7 | Certificates | Certified Brazing Procedure Specifications (BPS) | 1.3.1 | |||||||||||||||
| 141 | 05 05 23.16 | 7 | Certificates | Certified Procedure Qualification Records (PQR) | 1.3.1 | |||||||||||||||
| 142 | 05 05 23.16 | 7 | Certificates | Certified Welder Performance Qualifications (WPQ) | 1.3.1 | |||||||||||||||
| 143 | 05 05 23.16 | 7 | Certificates | Certified Brazer Performance Qualifications (BPQ) | 1.3.1 | |||||||||||||||
| 144 | 05 05 23.16 | 7 | Certificates | Certified Welding Inspector | 1.3.5 | |||||||||||||||
| 145 | 05 05 23.16 | 7 | Certificates | Nondestructive Testing Personnel | 1.3.5 | |||||||||||||||
| 146 | 05 12 00 | 1 | Preconstruction Submittals | Erection and Erection Bracing Drawings | 1.5.1.1 | G | ||||||||||||||
| 147 | 05 12 00 | 2 | Shop Drawings | Fabrication Drawings | 1.5.2 | G | ||||||||||||||
| 148 | 05 12 00 | 3 | Product Data | Shop Primer | 2.6.2 | |||||||||||||||
| 149 | 05 12 00 | 3 | Product Data | Welding Electrodes and Rods | 2.4.1 | |||||||||||||||
| 150 | 05 12 00 | 3 | Product Data | Non-Shrink Grout | 2.4.2 | |||||||||||||||
| 151 | 05 12 00 | 3 | Product Data | Recycled Content for Structural Steel | 2.2.1 | S | ||||||||||||||
| 152 | 05 12 00 | 3 | Product Data | Recycled Content for Structural Steel Tubing | 2.2.2 | S | ||||||||||||||
| 153 | 05 12 00 | 3 | Product Data | Recycled Content for Steel Pipe | 2.2.3 | S | ||||||||||||||
| 154 | 05 12 00 | 5 | Design Data | Design Calculations for Steel Connections | 1.5.3 | G | ||||||||||||||
| 155 | 05 12 00 | 5 | Design Data | Shoring and Temporary Bracing | 1.5.2 | G | ||||||||||||||
| 156 | 05 12 00 | 6 | Test Reports | Class B Coating | 2.6.2 | |||||||||||||||
| 157 | 05 12 00 | 6 | Test Reports | Bolts, Nuts, and Washers | 2.3 | |||||||||||||||
| 158 | 05 12 00 | 6 | Test Reports | Bolt Testing Reports | 3.7.2.1 | |||||||||||||||
| 159 | 05 12 00 | 6 | Test Reports | Embrittlement Test Reports | 3.7.3 | |||||||||||||||
| 160 | 05 12 00 | 7 | Certificates | Steel | 2.2 | |||||||||||||||
| 161 | 05 12 00 | 7 | Certificates | Bolts, Nuts, and Washers | 2.3 | |||||||||||||||
| 162 | 05 12 00 | 7 | Certificates | Galvanizing | 2.5 | |||||||||||||||
| 163 | 05 12 00 | 7 | Certificates | AISC Structural Steel Fabricator Quality Certification | 1.3 | |||||||||||||||
| 164 | 05 12 00 | 7 | Certificates | AISC Structural Steel Erector Quality Certification | 1.3 | |||||||||||||||
| 165 | 05 12 00 | 7 | Certificates | Welding Procedures and Qualifications | 1.5.4.1 | |||||||||||||||
| 166 | 05 12 00 | 7 | Certificates | Welding Electrodes and Rods | 2.4.1 | |||||||||||||||
| 167 | 05 12 00 | 7 | Certificates | Certified Welding Inspector | 3.7.1.1 | |||||||||||||||
| 168 | 05 12 00 | 7 | Certificates | Welding Procedure Specifications (WPS) | 3.4 | |||||||||||||||
| 169 | 05 50 14 | 2 | Shop Drawings | Detail Drawings | 1.3.1 | G | ||||||||||||||
| 170 | 05 50 14 | 2 | Shop Drawings | Welding Procedures | 2.1.2.1.1 | G | ||||||||||||||
| 171 | 05 50 14 | 2 | Shop Drawings | Welding Repair Plan | 2.2.3 | |||||||||||||||
| 172 | 05 50 14 | 3 | Product Data | Filler Metal | 2.1.2.1.3.1 | |||||||||||||||
| 173 | 05 50 14 | 6 | Test Reports | Tests, Inspections, and Verifications | 2.2 | |||||||||||||||
| 174 | 05 50 14 | 7 | Certificates | Welding Qualifications | 1.3.2 | |||||||||||||||
| 175 | 05 50 14 | 7 | Certificates | Application Qualification for Steel Studs | 2.1.2.3.1 | G | ||||||||||||||
| 176 | 05 50 14 | 7 | Certificates | Welding of Aluminum | 2.1.2.4 | |||||||||||||||
| 177 | 05 50 14 | 7 | Certificates | Weld Inspection Log | 2.2.2.1 | |||||||||||||||
| 178 | 05 50 14 | 7 | Certificates | Certified Welding Inspector | 2.2.2.1 | |||||||||||||||
| 179 | 05 50 14 | 7 | Certificates | Nondestructive Testing Personnel | 2.2.2.2.1 | |||||||||||||||
| 180 | 05 50 16 | 1 | Preconstruction Submittals | Erection and Erection Bracing Drawings | 1.7.1 | G | ||||||||||||||
| 181 | 05 50 16 | 1 | Preconstruction Submittals | Welding Quality Assurance Plan | 1.7.5 | G | ||||||||||||||
| 182 | 05 50 16 | 1 | Preconstruction Submittals | Welding Procedure Qualifications | 1.7.5 | G | ||||||||||||||
| 183 | 05 50 16 | 2 | Shop Drawings | Detail Drawings | 1.7.1 | G | ||||||||||||||
| 184 | 05 50 16 | 2 | Shop Drawings | Bridge Fabrication Drawings | 1.7.2 | G | ||||||||||||||
| 185 | 05 50 16 | 2 | Shop Drawings | Stair Fabrication Drawings | 1.7.1 | G | ||||||||||||||
| 186 | 05 50 16 | 2 | Shop Drawings | Welding Repair Plan | 1.7.5 | |||||||||||||||
| 187 | 05 50 16 | 2 | Shop Drawings | Installation Plan | 1.7.4 | G | ||||||||||||||
| 188 | 05 50 16 | 2 | Shop Drawings | Bridge As-Built Drawings | 1.7.7 | G | ||||||||||||||
| 189 | 05 50 16 | 2 | Shop Drawings | Bridge As-Built Drawings | 1.7.7 | G | ||||||||||||||
| 190 | 05 50 16 | 6 | Test Reports | Tests, Inspections, Verifications, Product Data, and Qualifications | 1.7.6 | |||||||||||||||
| 191 | 05 50 16 | 6 | Test Reports | Bolts, Nuts, and Washers | 2.4 | |||||||||||||||
| 192 | 05 50 16 | 7 | Certificates | Steel | 2.3 | |||||||||||||||
| 193 | 05 50 16 | 7 | Certificates | Bolts, Nuts, and Washers | 2.4 | |||||||||||||||
| 194 | 05 50 16 | 7 | Certificates | Welding Procedures and Qualifications | 1.7.5 | |||||||||||||||
| 195 | 05 52 00 | 2 | Shop Drawings | Fabrication Drawings | 1.2.1 | G | ||||||||||||||
| 196 | 05 52 00 | 2 | Shop Drawings | Iron and Steel Hardware | 3.2 | G | ||||||||||||||
| 197 | 05 52 00 | 2 | Shop Drawings | Steel Shapes, Plates, Bars and Strips | 3.2 | G | ||||||||||||||
| 198 | 05 52 00 | 3 | Product Data | Structural-Steel Plates, Shapes, and Bars | 2.2.1 | G | ||||||||||||||
| 199 | 05 52 00 | 3 | Product Data | Structural-Steel Tubing | 2.2.2 | G | ||||||||||||||
| 200 | 05 52 00 | 3 | Product Data | Cold-Finished Steel Bars | 2.2.4 | G | ||||||||||||||
| 201 | 05 52 00 | 3 | Product Data | Hot-Rolled Carbon Steel Bars | 2.2.3 | G | ||||||||||||||
| 202 | 05 52 00 | 3 | Product Data | Cold-Drawn Steel Tubing | 2.2.5 | G | ||||||||||||||
| 203 | 05 52 00 | 3 | Product Data | Concrete Inserts | 2.2.7 | G | ||||||||||||||
| 204 | 05 52 00 | 3 | Product Data | Protective Coating | 2.1.3 | G | ||||||||||||||
| 205 | 05 52 00 | 3 | Product Data | Steel Railings and Handrails | 2.2.9 | G | ||||||||||||||
| 206 | 05 52 00 | 3 | Product Data | Aluminum Railings and Handrails | 2.2.10 | G | ||||||||||||||
| 207 | 05 52 00 | 3 | Product Data | Anchorage and Fastening Systems | 1.2.1 | G | ||||||||||||||
| 208 | 05 52 00 | 7 | Certificates | Welding Procedures | 1.4.1 | G | ||||||||||||||
| 209 | 05 52 00 | 7 | Certificates | Welder Qualification | 1.4.2 | G | ||||||||||||||
| 210 | 05 52 00 | 8 | Manufacturer's Instructions | Installation Instructions | 3.2 | |||||||||||||||
| 211 | 10 14 53 | 3 | Product Data | Traffic Sign Posts | 2.1 | |||||||||||||||
| 212 | 10 14 53 | 3 | Product Data | Traffic Sign Retroreflective Sheeting | 2.4 | |||||||||||||||
| 213 | 10 14 53 | 4 | Samples | Flexible Posts | 2.6.2 | |||||||||||||||
| 214 | 25 05 11.01 | 1 | Preconstruction Submittals | Device Account Lock Exception Request | 3.3.2 | G | ||||||||||||||
| 215 | 25 05 11.01 | 1 | Preconstruction Submittals | Qualifications | 1.7.1 | G | ||||||||||||||
| 216 | 25 05 11.01 | 1 | Preconstruction Submittals | Contractor Computer Cybersecurity Compliance Statements | 1.10.1.6 | G | ||||||||||||||
| 217 | 25 05 11.01 | 1 | Preconstruction Submittals | Contractor Temporary Network Cybersecurity Compliance Statements | 1.10.5 | G | ||||||||||||||
| 218 | 25 05 11.01 | 1 | Preconstruction Submittals | Proposed STIG and SRG Applicability Report | 1.8.1 | G | ||||||||||||||
| 219 | 25 05 11.01 | 2 | Shop Drawings | Network Communication Report | 1.8.2 | G | ||||||||||||||
| 220 | 25 05 11.01 | 2 | Shop Drawings | Cybersecurity Riser Diagram | 1.8.5 | G | ||||||||||||||
| 221 | 25 05 11.01 | 3 | Product Data | Control System Cybersecurity Documentation | 1.8.7 | G | ||||||||||||||
| 222 | 25 05 11.01 | 6 | Test Reports | Control System Cybersecurity Testing Procedures | 3.14.1 | G | ||||||||||||||
| 223 | 25 05 11.01 | 6 | Test Reports | Control System Cybersecurity Testing Report | 3.14.3 | G | ||||||||||||||
| 224 | 25 05 11.01 | 7 | Certificates | Software Licenses | 1.9 | G | ||||||||||||||
| 225 | 25 05 11.01 | 11 | Closeout Submittals | Confidential Password Report | 3.4.4.4 | G | ||||||||||||||
| 226 | 25 05 11.01 | 11 | Closeout Submittals | Enclosure Keys | 3.3.5 | G | ||||||||||||||
| 227 | 25 05 11.01 | 11 | Closeout Submittals | Software and Configuration Backups | 1.8.4 | G | ||||||||||||||
| 228 | 25 05 11.01 | 11 | Closeout Submittals | System Maintenance Tool Software | 3.9 | G | ||||||||||||||
| 229 | 25 05 11.01 | 11 | Closeout Submittals | Control System Scanning Tools | 3.11.2 | G | ||||||||||||||
| 230 | 25 05 11.01 | 11 | Closeout Submittals | STIG, SRG and Vendor Guide Compliance Result Report | 1.8.6 | G | ||||||||||||||
| 231 | 25 05 11.01 | 11 | Closeout Submittals | Control System Inventory Report | 1.8.3 | G | ||||||||||||||
| 232 | 26 60 14 | 3 | Product Data | Catalog Cut Sheets and Shop Drawings | 1.6 | G | ||||||||||||||
| 233 | 31 00 00 | 1 | Preconstruction Submittals | Shoring | 3.3 | G | ||||||||||||||
| 234 | 31 00 00 | 1 | Preconstruction Submittals | Dewatering Work Plan | 1.6.3 | G | ||||||||||||||
| 235 | 31 00 00 | 3 | Product Data | Utilization of Excavated Materials | 3.7 | G | ||||||||||||||
| 236 | 31 00 00 | 3 | Product Data | Rock Excavation | 1.6.1.2 | |||||||||||||||
| 237 | 31 00 00 | 3 | Product Data | Opening of any Excavation or Borrow Pit | 3.2 | |||||||||||||||
| 238 | 31 00 00 | 3 | Product Data | Shoulder Construction | 3.13 | |||||||||||||||
| 239 | 31 00 00 | 6 | Test Reports | Testing | 3.15 | |||||||||||||||
| 240 | 31 00 00 | 7 | Certificates | Testing | 3.15 | |||||||||||||||
| 241 | 31 11 00 | 3 | Product Data | Tree Removal Plan | 1.3 | G | ||||||||||||||
| 242 | 31 43 13.13 | 3 | Product Data | Drilling Equipment | 3.1.2 | |||||||||||||||
| 243 | 31 43 13.13 | 3 | Product Data | Grouting Equipment | 3.1.3 | |||||||||||||||
| 244 | 31 43 13.13 | 3 | Product Data | Grout Plant | 3.1.3 | G | ||||||||||||||
| 245 | 31 62 23.13 | 2 | Shop Drawings | Installation Plan | 3.1 | |||||||||||||||
| 246 | 31 62 23.13 | 3 | Product Data | Driving Pile Casings | 3.1.1 | |||||||||||||||
| 247 | 31 62 23.13 | 3 | Product Data | Equipment | 1.3.2 | |||||||||||||||
| 248 | 31 62 23.13 | 6 | Test Reports | Test Piles | 3.2.1 | |||||||||||||||
| 249 | 31 63 16 | 1 | Preconstruction Submittals | Installation Procedures | 1.7.2 | G | ||||||||||||||
| 250 | 31 63 16 | 1 | Preconstruction Submittals | Load Test Procedures | 1.7.1 | G | ||||||||||||||
| 251 | 31 63 16 | 1 | Preconstruction Submittals | Concrete Mix Design | 1.7.3 | G | ||||||||||||||
| 252 | 31 63 16 | 1 | Preconstruction Submittals | Field Quality Control Procedures | 1.7.1 | G | ||||||||||||||
| 253 | 31 63 16 | 3 | Product Data | Concrete Pump | 1.4.2 | |||||||||||||||
| 254 | 31 63 16 | 3 | Product Data | Materials | 2.1 | |||||||||||||||
| 255 | 31 63 16 | 11 | Closeout Submittals | Pile Records | 3.6 | |||||||||||||||
| 256 | 32 05 33 | 1 | Preconstruction Submittals | Integrated Pest Management Plan | 2.4 | G | ||||||||||||||
| 257 | 32 05 33 | 3 | Product Data | Fertilizer | 2.1 | G | ||||||||||||||
| 258 | 32 05 33 | 3 | Product Data | Mulch | 2.3 | G | ||||||||||||||
| 259 | 32 05 33 | 3 | Product Data | Organic Mulch Materials | 2.3.1 | |||||||||||||||
| 260 | 32 05 33 | 7 | Certificates | Maintenance Inspection Report | 3.5.1 | |||||||||||||||
| 261 | 32 05 33 | 7 | Certificates | Plant Quantities | 3.5.2 | G | ||||||||||||||
| 262 | 32 05 33 | 11 | Closeout Submittals | Tree Staking and Guying Removal | 3.5.3 | |||||||||||||||
| 263 | 32 11 23 | 3 | Product Data | Plant, Equipment, and Tools | 1.4 | G | ||||||||||||||
| 264 | 32 11 23 | 6 | Test Reports | Initial Tests | 2.3.1 | G | ||||||||||||||
| 265 | 32 11 23 | 6 | Test Reports | In-Place Tests | 3.13.1 | G | ||||||||||||||
| 266 | 32 12 13 | 6 | Test Reports | Sampling and Testing | 3.7 | |||||||||||||||
| 267 | 32 12 16.16 | 2 | Shop Drawings | Placement Plan | 2.1 | G | ||||||||||||||
| 268 | 32 12 16.16 | 3 | Product Data | Diamond Grinding Plan | 2.1.6 | G | ||||||||||||||
| 269 | 32 12 16.16 | 3 | Product Data | Mix Design | 2.4 | G | ||||||||||||||
| 270 | 32 12 16.16 | 3 | Product Data | Contractor Quality Control | 3.1 | G | ||||||||||||||
| 271 | 32 12 16.16 | 4 | Samples | Aggregates | 2.2 | |||||||||||||||
| 272 | 32 12 16.16 | 4 | Samples | Asphalt Cement Binder | 2.3 | |||||||||||||||
| 273 | 32 12 16.16 | 6 | Test Reports | Aggregates | 2.2 | G | ||||||||||||||
| 274 | 32 12 16.16 | 6 | Test Reports | QC Monitoring | 3.1.3.9 | |||||||||||||||
| 275 | 32 12 16.16 | 7 | Certificates | Asphalt Cement Binder | 2.3 | G | ||||||||||||||
| 276 | 32 12 16.16 | 7 | Certificates | Laboratory Accreditation and Validation | 1.3.11 | |||||||||||||||
| 277 | 32 15 00 | 3 | Product Data | Plant, Equipment, and Tools | 1.4 | G | ||||||||||||||
| 278 | 32 15 00 | 6 | Test Reports | Initial Tests | 2.3.1 | G | ||||||||||||||
| 279 | 32 15 00 | 6 | Test Reports | In-Place Tests | 3.11.1 | G | ||||||||||||||
| 280 | 32 16 19 | 3 | Product Data | Concrete | 2.1 | |||||||||||||||
| 281 | 32 16 19 | 3 | Product Data | Biodegradable Form Release Agent | 2.6.5 | |||||||||||||||
| 282 | 32 16 19 | 3 | Product Data | Biodegradable Form Release Agent | 3.2 | |||||||||||||||
| 283 | 32 16 19 | 6 | Test Reports | Field Quality Control | 3.8 | |||||||||||||||
| 284 | 32 17 23 | 3 | Product Data | Surface Preparation Equipment List | 2.1.1.1 | G | ||||||||||||||
| 285 | 32 17 23 | 3 | Product Data | Application Equipment List | 2.1.2 | G | ||||||||||||||
| 286 | 32 17 23 | 3 | Product Data | Exterior Surface Preparation | 3.2 | |||||||||||||||
| 287 | 32 17 23 | 3 | Product Data | Safety Data Sheets | 1.3.1 | G | ||||||||||||||
| 288 | 32 17 23 | 6 | Test Reports | Test Reports | 3.4.1 | |||||||||||||||
| 289 | 32 17 23 | 7 | Certificates | Qualifications | 1.3.2 | G | ||||||||||||||
| 290 | 32 17 23 | 7 | Certificates | Volatile Organic Compound | 1.3.1 | G | ||||||||||||||
| 291 | 32 31 13.53 | 2 | Shop Drawings | Fence Installation Drawings | 3.2.1 | G | ||||||||||||||
| 292 | 32 31 13.53 | 3 | Product Data | Fabric | 2.1.1.1 | |||||||||||||||
| 293 | 32 31 13.53 | 3 | Product Data | Posts | 2.1.2 | |||||||||||||||
| 294 | 32 31 13.53 | 3 | Product Data | Post Caps | 2.1.2.2 | |||||||||||||||
| 295 | 32 31 13.53 | 3 | Product Data | Chain Link Braces | 2.1.3 | |||||||||||||||
| 296 | 32 31 13.53 | 3 | Product Data | Sleeves | 3.2.3.2 | |||||||||||||||
| 297 | 32 31 13.53 | 3 | Product Data | Tension Wire | 2.1.2.2 | |||||||||||||||
| 298 | 32 31 13.53 | 3 | Product Data | Barbed Wire | 2.2.1.2 | |||||||||||||||
| 299 | 32 31 13.53 | 3 | Product Data | Barbed Wire Supporting Arms | 2.1.2.2 | |||||||||||||||
| 300 | 32 31 13.53 | 3 | Product Data | Latches | 2.1.4.3 | |||||||||||||||
| 301 | 32 31 13.53 | 3 | Product Data | Hinges | 2.1.4.3 | |||||||||||||||
| 302 | 32 31 13.53 | 3 | Product Data | Stops | 2.1.4.3 | |||||||||||||||
| 303 | 32 31 13.53 | 3 | Product Data | Keepers | 2.1.4.3 | |||||||||||||||
| 304 | 32 31 13.53 | 3 | Product Data | Rollers | 2.1.4.3 | |||||||||||||||
| 305 | 32 31 13.53 | 3 | Product Data | Padlocks | 2.1.5 | |||||||||||||||
| 306 | 32 31 13.53 | 3 | Product Data | Wire Ties | 2.2.1.1 | |||||||||||||||
| 307 | 32 31 13.53 | 3 | Product Data | Fence Fabric Reinforcement | 2.3 | |||||||||||||||
| 308 | 32 31 13.53 | 7 | Certificates | Chain Link Fence | 2.1.2.1 | |||||||||||||||
| 309 | 32 31 13.53 | 7 | Certificates | Fabric | 2.1.1.1 | |||||||||||||||
| 310 | 32 31 13.53 | 7 | Certificates | Barbed Wire | 2.2.1.2 | |||||||||||||||
| 311 | 32 31 13.53 | 7 | Certificates | Gate Hardware and Accessories | 3.2.1 | |||||||||||||||
| 312 | 32 31 13.53 | 7 | Certificates | Concrete | 2.2.2 | |||||||||||||||
| 313 | 32 31 13.53 | 7 | Certificates | Gate Operator | 2.1.6 | |||||||||||||||
| 314 | 32 31 13.53 | 10 | Operation and Maintenance Data | Gate Operator | 2.1.6 | |||||||||||||||
| 315 | 32 31 13.53 | 10 | Operation and Maintenance Data | Operating and maintenance instructions | 3.2.7 | |||||||||||||||
| 316 | 32 32 23.13 | 2 | Shop Drawings | Shop Drawings | 2.1.3 | G | ||||||||||||||
| 317 | 32 32 23.13 | 3 | Product Data | Segmental Concrete Units | 2.2.1 | |||||||||||||||
| 318 | 32 32 23.13 | 5 | Design Data | Survey And Grade Results | 3.3.1 | G | ||||||||||||||
| 319 | 32 32 23.13 | 6 | Test Reports | Soil Testing | 3.4.1 | G | ||||||||||||||
| 320 | 32 84 24 | 2 | Shop Drawings | Irrigation Sprinkler System | 1.3 | |||||||||||||||
| 321 | 32 84 24 | 3 | Product Data | Piping Materials | 2.1 | |||||||||||||||
| 322 | 32 84 24 | 3 | Product Data | Valves | 2.3 | |||||||||||||||
| 323 | 32 84 24 | 3 | Product Data | Heads | 2.2 | |||||||||||||||
| 324 | 32 84 24 | 3 | Product Data | Backflow Preventers | 2.3.6 | |||||||||||||||
| 325 | 32 84 24 | 3 | Product Data | Automatic Controller | 2.5 | |||||||||||||||
| 326 | 32 84 24 | 3 | Product Data | Controller Enclosure | 2.5.2 | |||||||||||||||
| 327 | 32 84 24 | 3 | Product Data | Solvent Cement | 2.1.4 | |||||||||||||||
| 328 | 32 84 24 | 3 | Product Data | Control Wiring | 2.6.1 | |||||||||||||||
| 329 | 32 84 24 | 3 | Product Data | Drip Irrigation | 2.1.7 | |||||||||||||||
| 330 | 32 84 24 | 3 | Product Data | Water Hammer Arresters | 2.4.4.2 | |||||||||||||||
| 331 | 32 84 24 | 3 | Product Data | Water Meter | 2.4.2 | |||||||||||||||
| 332 | 32 84 24 | 3 | Product Data | Rain Shut-Off Device | 2.4.5.1 | |||||||||||||||
| 333 | 32 84 24 | 3 | Product Data | Freeze Shut-Off Device | 2.4.5.2 | |||||||||||||||
| 334 | 32 84 24 | 3 | Product Data | Soil Moisture Sensor | 2.4.5.3 | |||||||||||||||
| 335 | 32 84 24 | 3 | Product Data | Tapping Tee | 2.4.1 | |||||||||||||||
| 336 | 32 84 24 | 3 | Product Data | Valve Boxes and Lids | 3.1.7.3 | |||||||||||||||
| 337 | 32 84 24 | 3 | Product Data | Drip Head Accessories | 2.4.3 | |||||||||||||||
| 338 | 32 84 24 | 6 | Test Reports | Tests | 1.7.1 | |||||||||||||||
| 339 | 32 84 24 | 6 | Test Reports | Backflow Preventers | 2.3.6 | |||||||||||||||
| 340 | 32 84 24 | 6 | Test Reports | Pressure Test | 3.2.1 | |||||||||||||||
| 341 | 32 84 24 | 6 | Test Reports | Operation Test | 3.2.2 | |||||||||||||||
| 342 | 32 84 24 | 7 | Certificates | Backflow Preventers | 2.3.6 | |||||||||||||||
| 343 | 32 84 24 | 8 | Manufacturer's Instructions | Automatic Controller | 2.5 | |||||||||||||||
| 344 | 32 84 24 | 8 | Manufacturer's Instructions | Heads | 2.2 | |||||||||||||||
| 345 | 32 84 24 | 8 | Manufacturer's Instructions | Piping Materials | 2.1 | |||||||||||||||
| 346 | 32 84 24 | 8 | Manufacturer's Instructions | Backflow Preventers | 2.3.6 | |||||||||||||||
| 347 | 32 84 24 | 8 | Manufacturer's Instructions | Valves | 2.3 | |||||||||||||||
| 348 | 32 84 24 | 8 | Manufacturer's Instructions | Solvent Cement | 2.1.4 | |||||||||||||||
| 349 | 32 84 24 | 8 | Manufacturer's Instructions | Control Wiring | 2.6.1 | |||||||||||||||
| 350 | 32 84 24 | 8 | Manufacturer's Instructions | Drip Irrigation | 2.1.7 | |||||||||||||||
| 351 | 32 84 24 | 8 | Manufacturer's Instructions | Water Hammer Arresters | 2.4.4.2 | |||||||||||||||
| 352 | 32 84 24 | 8 | Manufacturer's Instructions | Water Meter | 2.4.2 | |||||||||||||||
| 353 | 32 84 24 | 8 | Manufacturer's Instructions | Rain Shut-Off Device | 2.4.5.1 | |||||||||||||||
| 354 | 32 84 24 | 8 | Manufacturer's Instructions | Freeze Shut-Off Device | 2.4.5.2 | |||||||||||||||
| 355 | 32 84 24 | 8 | Manufacturer's Instructions | Soil Moisture Sensor | 2.4.5.3 | |||||||||||||||
| 356 | 32 84 24 | 10 | Operation and Maintenance Data | Piping Materials | 2.1 | G | ||||||||||||||
| 357 | 32 84 24 | 10 | Operation and Maintenance Data | Heads | 2.2 | G | ||||||||||||||
| 358 | 32 84 24 | 10 | Operation and Maintenance Data | Backflow Preventers | 2.3.6 | G | ||||||||||||||
| 359 | 32 84 24 | 10 | Operation and Maintenance Data | Valves | 2.3 | G | ||||||||||||||
| 360 | 32 84 24 | 10 | Operation and Maintenance Data | Automatic Controller | 2.5 | G | ||||||||||||||
| 361 | 32 84 24 | 10 | Operation and Maintenance Data | Drip Irrigation | 2.1.7 | G | ||||||||||||||
| 362 | 32 84 24 | 10 | Operation and Maintenance Data | Water Hammer Arresters | 2.4.4.2 | G | ||||||||||||||
| 363 | 32 84 24 | 10 | Operation and Maintenance Data | Water Meter | 2.4.2 | G | ||||||||||||||
| 364 | 32 84 24 | 10 | Operation and Maintenance Data | Rain Shut-Off Device | 2.4.5.1 | G | ||||||||||||||
| 365 | 32 84 24 | 10 | Operation and Maintenance Data | Freeze Shut-Off Device | 2.4.5.2 | G | ||||||||||||||
| 366 | 32 84 24 | 10 | Operation and Maintenance Data | Soil Moisture Sensor | 2.4.5.3 | G | ||||||||||||||
| 367 | 32 84 24 | 11 | Closeout Submittals | Controller Charts | 3.2.3 | |||||||||||||||
| 368 | 32 92 19 | 3 | Product Data | Hydraulic Mulch | 2.5.1 | G | ||||||||||||||
| 369 | 32 92 19 | 3 | Product Data | Fertilizer | 2.4 | |||||||||||||||
| 370 | 32 92 19 | 6 | Test Reports | Topsoil Composition Tests | 2.2.3 | |||||||||||||||
| 371 | 32 92 19 | 7 | Certificates | Seed | 2.1 | |||||||||||||||
| 372 | 32 92 19 | 8 | Manufacturer's Instructions | Erosion Control Materials | 2.7 | |||||||||||||||
| 373 | 32 93 00 | 1 | Preconstruction Submittals | State Landscape Contractor's License | 1.4.3 | |||||||||||||||
| 374 | 32 93 00 | 1 | Preconstruction Submittals | Time Restrictions and Planting Conditions | 1.6 | |||||||||||||||
| 375 | 32 93 00 | 3 | Product Data | Peat | 2.3.5 | |||||||||||||||
| 376 | 32 93 00 | 3 | Product Data | Compost | 2.3.8 | |||||||||||||||
| 377 | 32 93 00 | 3 | Product Data | Organic Mulch Materials | 2.7.1 | |||||||||||||||
| 378 | 32 93 00 | 3 | Product Data | Gypsum | 2.3.9 | |||||||||||||||
| 379 | 32 93 00 | 3 | Product Data | Mulch | 2.7 | G | ||||||||||||||
| 380 | 32 93 00 | 3 | Product Data | Ground Stakes | 2.8.1.1 | |||||||||||||||
| 381 | 32 93 00 | 3 | Product Data | Recycled Plastic Edging | 2.9.1 | |||||||||||||||
| 382 | 32 93 00 | 3 | Product Data | Fertilizer | 2.5 | |||||||||||||||
| 383 | 32 93 00 | 3 | Product Data | Weed Control Fabric | 2.6 | G | ||||||||||||||
| 384 | 32 93 00 | 3 | Product Data | Root Control Barrier | 2.12 | G | ||||||||||||||
| 385 | 32 93 00 | 3 | Product Data | Staking Material | 2.8.1 | |||||||||||||||
| 386 | 32 93 00 | 3 | Product Data | Antidesiccants | 2.1 | |||||||||||||||
| 387 | 32 93 00 | 3 | Product Data | Erosion Control Materials | 2.11 | |||||||||||||||
| 388 | 32 93 00 | 3 | Product Data | Photographs | 1.4.4 | G | ||||||||||||||
| 389 | 32 93 00 | 4 | Samples | Mulch | 2.7 | G | ||||||||||||||
| 390 | 32 93 00 | 6 | Test Reports | Topsoil Composition Tests | 2.2.4 | |||||||||||||||
| 391 | 32 93 00 | 6 | Test Reports | Percolation Test | 1.4.5 | |||||||||||||||
| 392 | 32 93 00 | 10 | Operation and Maintenance Data | Plastic Identification | 1.8 | |||||||||||||||
| 393 | 33 40 00 | 7 | Certificates | Determination of Density | 3.7.1.3 | |||||||||||||||
| 394 | 33 40 00 | 11 | Closeout Submittals | Post-Installation Inspection Report | 3.7.2.1.3 | G | ||||||||||||||
| 395 | 33 71 02 | 2 | Shop Drawings | Aluminum Conductors | 1.5.1 | G | ||||||||||||||
| 396 | 33 71 02 | 2 | Shop Drawings | Precast Underground Structures | 1.5.1 | G | ||||||||||||||
| 397 | 33 71 02 | 2 | Shop Drawings | Raceway Design on Utility Bridge | 1.5.1 | |||||||||||||||
| 398 | 33 71 02 | 3 | Product Data | Live End Caps | 2.6 | G | ||||||||||||||
| 399 | 33 71 02 | 3 | Product Data | Precast Concrete Structures | 2.10.1.1 | G | ||||||||||||||
| 400 | 33 71 02 | 3 | Product Data | Sealing Material | 2.10.1.4 | |||||||||||||||
| 401 | 33 71 02 | 3 | Product Data | Pulling-In Irons | 3.4.2 | |||||||||||||||
| 402 | 33 71 02 | 3 | Product Data | Manhole Frames and Covers | 2.10.2 | G | ||||||||||||||
| 403 | 33 71 02 | 3 | Product Data | Handhole Frames and Covers | 2.10.3 | G | ||||||||||||||
| 404 | 33 71 02 | 3 | Product Data | Frames and Covers for Airfield Facilities | 2.10.4 | G | ||||||||||||||
| 405 | 33 71 02 | 3 | Product Data | Ductile Iron Frames and Covers for Airfield Facilities | 2.10.5 | G | ||||||||||||||
| 406 | 33 71 02 | 3 | Product Data | Cable Supports | 2.11 | G | ||||||||||||||
| 407 | 33 71 02 | 6 | Test Reports | Field Acceptance Checks and Tests | 3.17.1 | G | ||||||||||||||
| 408 | 33 71 02 | 6 | Test Reports | Arc-proofing Test | 3.17.2 | G | ||||||||||||||
| 409 | 33 71 02 | 6 | Test Reports | Cable Installation Plan and Procedure | 3.3 | G | ||||||||||||||
| 410 | 33 71 02 | 7 | Certificates | Cable splicer/terminator | 1.5.2 | G | ||||||||||||||
| 411 | 33 71 02 | 7 | Certificates | Cable Installer Qualifications | 1.5.3 | G | ||||||||||||||
| 412 | 33 71 02 | 7 | Certificates | Certificate of Conformance | 1.5.4 | G | ||||||||||||||
| 413 | 33 82 00 | 2 | Shop Drawings | Telecommunications Outside Plant | 1.6.1.1 | G | ||||||||||||||
| 414 | 33 82 00 | 3 | Product Data | Wire and cable | 2.6 | G | ||||||||||||||
| 415 | 33 82 00 | 3 | Product Data | Cable splices, and connectors | 2.3 | G | ||||||||||||||
| 416 | 33 82 00 | 3 | Product Data | Closures | 2.2 | G | ||||||||||||||
| 417 | 33 82 00 | 6 | Test Reports | Pre-installation tests | 3.3.1 | G | ||||||||||||||
| 418 | 33 82 00 | 6 | Test Reports | Acceptance tests | 3.3.2 | G | ||||||||||||||
| 419 | 33 82 00 | 6 | Test Reports | Outside Plant Test Plan | 1.6.3 | G | ||||||||||||||
| 420 | 33 82 00 | 7 | Certificates | Telecommunications Contractor | 1.6.2.1 | G | ||||||||||||||
| 421 | 33 82 00 | 7 | Certificates | Key Personnel | 1.6.2.2 | G | ||||||||||||||
| 422 | 33 82 00 | 7 | Certificates | Manufacturer's Qualifications | 1.6.2.3 | G | ||||||||||||||
| 423 | 33 82 00 | 8 | Manufacturer's Instructions | Cable tensions | 3.1.5.1 | G | ||||||||||||||
| 424 | 33 82 00 | 8 | Manufacturer's Instructions | Fiber Optic Splices | 3.1.6.2 | G | ||||||||||||||
| 425 | 33 82 00 | 9 | Manufacturer's Field Reports | Factory Reel Test Data | 2.10.1 | G | ||||||||||||||
| 426 | 33 82 00 | 10 | Operation and Maintenance Data | Telecommunications outside plant (OSP) | 1.6.1.1 | G | ||||||||||||||
| 427 | 33 82 00 | 11 | Closeout Submittals | Record Documentation | 1.8.1 | G | ||||||||||||||
| 428 | 34 71 13.16 | 3 | Product Data | FHWA Acceptance Letter | 2.1.3 | |||||||||||||||
| 429 | 34 71 13.16 | 3 | Product Data | FHWA Acceptance Letter | 2.5 | |||||||||||||||
| 430 | 34 71 13.16 | 8 | Manufacturer's Instructions | End Anchorage | 3.4 | |||||||||||||||
| 431 | 35 20 16.55 | 2 | Shop Drawings | Detail Drawings | 2.3.1 | G | ||||||||||||||
| 432 | 35 20 16.55 | 3 | Product Data | Materials | 2.1 | G | ||||||||||||||
| 433 | 35 20 16.55 | 3 | Product Data | Materials | 2.1 | G | ||||||||||||||
| 434 | 35 20 16.55 | 3 | Product Data | Welding | 2.3.2.1 | G | ||||||||||||||
| 435 | 35 20 16.55 | 6 | Test Reports | Tests, Inspections, and Verifications | 2.4 | |||||||||||||||
| 436 | 35 20 16.55 | 6 | Test Reports | Acceptance Trial Operation and Test | 3.2 | |||||||||||||||
| 437 | 35 31 19.20 | 2 | Shop Drawings | Block Installation | 3.3 | G | ||||||||||||||
| 438 | 35 31 19.20 | 2 | Shop Drawings | Geotextile Installation | 3.2 | G | ||||||||||||||
| 439 | 35 31 19.20 | 2 | Shop Drawings | Anchor and Cable Installation | 3.4 | G | ||||||||||||||
| 440 | 35 31 19.20 | 3 | Product Data | Articulating Concrete Block | 2.1 | G | ||||||||||||||
| 441 | 35 31 19.20 | 3 | Product Data | Geotextile | 2.2 | G | ||||||||||||||
| 442 | 35 31 19.20 | 3 | Product Data | Anchors | 2.3 | G | ||||||||||||||
| 443 | 35 31 19.20 | 4 | Samples | Articulating Concrete Block | 2.1 | |||||||||||||||
| 444 | 35 31 19.20 | 6 | Test Reports | Flume Test | 2.1.2.1 |