Attachment 14 - Replacement Drawing CU102 NEC Profile Details in Attachment 2 (Rev 1).pdf
PDF 358 KB Posted
- Attached to
- Repairs to McChord Bridge – Barnes Blvd
- Solicitation number
- W912DW24B0Y1Y
About this file
This document appears to be Attachment 14 - Replacement Drawing CU102 NEC Profile Details, which is part of a larger federal contract opportunity. The drawing shows details for a new 6x20x6 access vault, utility bridge, and the relocation of existing buried telecommunications, power, and gas lines as part of the "Repairs to McChord Bridge – Barnes Blvd" project.
The associated federal contract opportunity, solicitation number W912DW24B0Y1Y, is an Invitation for Bid (IFB) for the project to repair the Barnes Blvd. Bridge on Joint Base Lewis-McChord in Washington. The contract is a 100% Small Business set-aside, restricted to 8(a) firms, with a construction magnitude estimated between $7,500,000 and $15,000,000. The work includes furnishing all labor, equipment, materials, and transportation to perform the tasks within the Statement of Work. The NAICS code is 237310 - Highway, Street, and Bridge Construction.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 3 4 5
G
NEW 6x20x6 ACCESS VAULT
RIM EL.- 278.3 FT.
CONNECT TO EXISTING MH205
F
E
�-""'"""'ffi'�
� l'-- l I I \ I q I �
I
I I
3 FT. MIN.
r, I I
�_t:::< �
� �y-
� UTILITY BRIDGE
SEE UB-101
CONDUITS JOIN HERE TO
CROSS BRIDGE
D 260
., � .., � ., � "' � ., :e'" � '" '" .,; � � ;!: � � ::;; N ::;; ::;; ::;; N N N
0+50 1+00 1+50 2+00 2+50
C
PROFILE
SCALE: SHOWN
B
A
Reduced to approximate ha� size.
6 7 B
I
- BURIED TELEPHONE
CONDUITS JOIN HERE TO
CROSS BRIDGE
RIM EL.-278.3 FT.
NEW6x20x6ACCESS VAULT
I /_ /' i.-- -- I I
3 FT. MIN. I I
I I
1/ :7 I
-r cffi,=,mm�,= J e; .,; � � ::;; N
3+00 3+50
4+00
9 10
NOTES:
1. EXISTING LUMEN BURIED TELECOMS TO BE RELOCATED BY LUMEN
DURING THE PROJECT.
2. EXISTING DISTRIBUTION POWER SYSTEM TO BE RELOCATED
PRIOR TO CONSTRUCTION.
3. EXISTING OVERHEAD COMCAST SYSTEM TO BE RELOCATED BY
COMCAST.
4. NATURAL GAS LINES TO BE RELOCATED BY PSE AFTER
CONSTRUCTION OF THE UTILITY BRIDGE.
w f-� w :, <fl !!l
US Army Corps of Engineers•
"d .. 0 w z d"'7 <D z " zO :, Q f-cl, z
;:;� t;
(.) �g f-N � z- oo
0"' "'" <fl c.,:;: o.!!l
� <D
� 0 0 w w enw 0
;: 0 el
0 � (.) " en ci!" w <D �� � ol::; :,:o iil:'i (.)<D w ..J en.:
C/J Cl !!! Cl t::z cc!«:
f-
SHEET ID
CU102
SHEET 26 OF 76
ISSUED FOR CONSTRUCTION
SEE DRAWING PAGE TO- 04FOR DUCT TRENCH DETAIL. REFER TO TO
TELECOMMUNICATION DRAWINGS TO-XX FOR ADDITIONAL INFORMATION.
ALL OUTSIDE PLANT (OSP) TELECOMMUNICATIONS INFRASTRUCTURE
DESIGNS AND INSTALLATION SHALL COMPLY WITH THE CRITERIA
SPECIFIED IN THE I3A .
JSTARLIN
Rectangle
JSTARLIN
Rectangle
JSTARLIN
PolyLine
JSTARLIN
PolyLine
JSTARLIN
PolyLine
JSTARLIN
PolyLine
JSTARLIN
Text Box 38Y-612
JSTARLIN
Pen
JSTARLIN
Pen
JSTARLIN
Text Box 38Y-612
JSTARLIN
Text Box S-134
JSTARLIN
PolyLine
JSTARLIN
PolyLine
JSTARLIN
PolyLine
JSTARLIN
PolyLine
JSTARLIN
Callout
REVISED PROFILE BASED ON STRUCTURE DEPTH.
g3cdjsrh Pencil g3cdjsrh Inserted Text t