Attachment 20 - Replacement Drawing CU101 UTILITIES PLAN in Attachment 2.pdf
PDF 2 MB Posted
- Attached to
- Repairs to McChord Bridge – Barnes Blvd
- Solicitation number
- W912DW24B0Y1Y
About this file
This document appears to be an attachment, titled "Attachment 20 - Replacement Drawing CU101 UTILITIES PLAN", that contains a detailed utility plan drawing and related notes for a construction project. The drawing shows the locations of existing and new utilities such as natural gas pipelines, telephone lines, power lines, and conduits that will need to be protected, abandoned, or installed as part of this project. The construction sequencing notes outline the general order in which the various utility relocation and installation tasks are to be performed. This drawing is likely part of the bid documents for the federal contract opportunity titled "Repairs to McChord Bridge – Barnes Blvd", which is an Invitation for Bid (IFB) issued by the U.S. Army Corps of Engineers for a construction project with an estimated value between $7,500,000 and $15,000,000. The contract is set aside for small businesses, specifically 8(a) firms, under NAICS code 237310 - Highway, Street, and Bridge Construction.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
E
D
C
B
A
------.OS /OS OS
-.0.:1- ----¾£).:1-
,8
--"';o:4 4. o.t---.
-00 11+00
J
LHO HO
0 SHEET KEYNOTES
1. 6" NATURAL GAS PIPELINE TO BE PROTECTED.
2. 4" NATURAL GAS PIPELINE TO BE ABANDONED BY
OTHERS.
3. 2" NATURAL GAS PIPELINE TO BE PROTECTED.
4. 2" NATURAL GAS PIPELINE TO BE ABANDONED BY
OTHERS.
5. 8" NATURAL GAS PIPELINE BY OTHERS.
6. 4" NATURAL GAS PIPELINE BY OTHERS.
7. 2" NATURAL GAS PIPELINE BY OTHERS.
8. CONNECT TO EXISTING GAS PIPELINE BY OTHERS.
9. EXISTING BURIED TELEPHONE TO BE PROTECTED.
10. EXISTING BURIED TELEPHONE TO BE REMOVED.
11. BURIED TELEPHONE BY OTHERS.
Reduced to approximate ha� size.
I
OS
12. TELEPHONE VAULT BY OTHERS
13. 2-4" TELEPHONE CONDUIT FOR TELEPHONE.
14. UTILITY POLE TO BE REMOVED BY OTHERS.
15. UTILITY POLE TO BE PROTECTED.
16. UTILITY POLE BY OTHERS.
17. OVERHEAD LINE(S) TO BE REMOVED BY OTHERS.
18. EXISTING STEAM SYSTEM TO BE PROTECTED IN
PLACE. SEE C105 FOR PLAN AND C107 FOR DETAIL.
19. INSTALL FOUR NEW 4" CONDUITS FOR NEC.
20. INSTALL NEW ACCESS VAULTS FOR NEC.
21. CONNECT TO EXISTING VAULT.
22. EXISTING UNDERGROUND POWER TO BE
PROTECTED.
23. EXISTING POWER VAULT TO BE PROTECTED.
4 5 tlli
I
UTILITY BRIDGE
SEE UB-101
I
PLAN
SCALE: 1 "=30'
30'
I ii I I I I /11111 111 k1 J 111111 1 1 /@I \ 1 r 1 1/ 1/1 // I//$ II ) I 111////11 ';/Iii/Ill; 1 1 1// 1/// )11111 1 I k l ll/ll//1 .111/1/ 1 '"(___ .J,/117'/ii/, /1�11
60'
B
MH207@
CONSTRUCTION SEQUENCING NOTES
THIS IS A GENERAL SEQUENCING PLAN. CONTRACTOR TO DEVELOP DETAILED
PLAN WITH INPUT FROM UTILITY OWNERS.
1. NEW UTILITY POLES AND OVERHEAD POWER INSTALLED.
2. COMCAST CCTV RELOCATED TO NEW UTILITY POLES.
3. EXISTING UTILITY POLES AND OVERHEAD LINES REMOVED.
4. UTILITY BRIDGE CONSTRUCTION.
5. PSE RELOCATES GAS LINES.
6. CONTRACTOR INSTALLS VAULTS AND CONDUITS FOR NEC OUTSIDE
PLANT.
7. CONTRACTOR INSTALLS CONDUITS FOR LUMEN.
8. CONTRACTOR CONVERTS NEC TELECOMS TO NEW VAULTS AND
CONDUITS.
9. LUMEN INSTALLS NEW TELEPHONE.
10. ALL ABANDONED UTILITIES REMOVED BY CONTRACTOR AS NECESSARY
FOR BRIDGE AND ROADWAY CONSTRUCTION.
9 10
GENERAL NOTES
1. CONTRACTOR TO COORDINATE RELOCATION OF
ALL UTILITIES.
2. EXISTING LUMEN BURIED TELECOMS TO BE
RELOCATED BY LUMEN DURING THE PROJECT.
3. EXISTING DISTRIBUTION POWER SYSTEM TO BE
RELOCATED BY CITY LIGHT AND POWER PRIOR TO
CONSTRUCTION.
4. EXISTING OVERHEAD COMCAST SYSTEM TO BE
RELOCATED BY COMCAST.
5. NATURAL GAS LINES TO BE RELOCATED BY PUGET
SOUND ENERGY (PSE) AFTER CONSTRUCTION OF
THE UTILITY BRIDGE. GAS LINES ARE TO BE
PROTECTED IN PLACE UNTIL PSE RELOCATIONS
ARE COMPLETE.
US Army Corps of Engineers• w
1'.=
SHEET ID
CU101
SHEET 25 OF 76
z
"' w
ISSUED FOR CONSTRUCTION
SEE LUMEN DRAWINGS IN
CONTRACT ATTACHMENT #1.
COORDINATE LUMEN TELEPHONE
LINE DECOMMISSIONING. NEW
PHONE LINES, PHONE CONDUIT AND
PHONE VAULT(S) WILL NOT BE
INSTALLED. EXISTING PHONE LINE
TERMINATION THROUGH THE SITE IS
PLANNED BY LUMEN. SHEET
KEYNOTES 12 & 13 DO NOT APPLY.
CONSTRUCTION SEQUENCE NOTES 7
& 9 DO NOT APPLY.