Attachment 18 - Replacement Drawing TO-01 TELECOM LEGEND in Attachment 2.pdf
PDF 315 KB Posted
- Attached to
- Repairs to McChord Bridge – Barnes Blvd
- Solicitation number
- W912DW24B0Y1Y
About this file
This document appears to be Attachment 18 - Replacement Drawing TO-01 TELECOM LEGEND, which provides legend information and general notes for a telecommunications infrastructure project at Joint Base Lewis-McChord (JBLM) in Washington.
The key details include:
- Telecommunications abbreviations, symbols, and standards references
- General notes for the project, including requirements for telecommunications manholes, ductbanks, cabling, labeling, testing, and phasing
- The project involves installing new outside plant (OSP) telecommunications pathways and cables, and transitioning existing cables to the new alignment
The related federal contract opportunity is Solicitation Number W912DW24B0Y1Y for the "Repair Barnes Blvd. Bridge (J84004)" project at JBLM. This is an Invitation for Bid (IFB) set aside for 8(a) small businesses, with a NAICS code of 237310 - Highway, Street, and Bridge Construction. The estimated contract value is between $7,500,000 and $15,000,000.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
ABBREVIATION
AFC
AFF
AHJ
ANSI
APPROX
ARCH
AWG
BB
BC
BET
BLDG
C
CAT
CFCI
CFGI
CLG
- CMP
CMR
co
COL
COMM
CONN
cu
F
E
DB
DED
DET
DIA
DIM
DN
DPW
DWG
EA
EF
EIA
ELEC
EMT
ENCL
ER
EXIST OR (E)
EXT
FLR
FT
FUT
GorGND
GC
GFCI
GFGI
GFI
HH
HT
HVAC
13A
IDS
- IN
D
C
JB orJBOX
LAN
M
MATL
MAX
MBPS
MCC
MECH
MFR
MH
MHZ
MIN
MISC
MM
MTD
N.E.C.
NEC
NEMA
NIC
NO.
oc
OPNG
PDS
PNL
PR
PVC
PWR
QTY
RCDD
REG
REQD
REV
RG
RGB
RM
RTU
- SCHED
SECT
SIPRNET
SM
B
SP
SPECS
SQ
ss
STD
STL
STRUCT
SVC
SYS
TBB
TEBC
TEL
TEMP
TGB
TIA
TMGB
TR
TTB
TTC
TV
TVSS
TYP
A UF
UG
UL
UON
UTP
WAN
WM
WP
I
TELECOMMUNICATIONS ABBREVIATIONS
DESCRIPTION
ABOVE FINISHED COUNTER
ABOVE FINISHED FLOOR
AUTHORITIES HAVING JURISDICTION
AMERICAN NATIONAL STANDARDS INSTITUTE
APPROXIMATELY
ARCHITECTURAL
AMERICAN WIRE GAUGE
BACKBONE
BONDING CONDUCTOR
BUILDING ENTRANCE PROTECTOR
BUILDING
CONDUIT
CATALOG
CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CONTRACTOR FURNISHED, GOVERNMENT INSTALLED
CEILING
COMMUNICATIONS PLENUM
COMMUNICATIONS RISER
CONDUIT ONLY WITH PULL STRING
COLUMN
COMMUNICATIONS
CONNECT or CONNECTION
COPPER
DECIBEL
DEDICATED
DETAIL
DIAMETER
DIMENSION
DOWN
DIRECTORATE OF PUBLIC WORKS
DRAWING
EACH
ENTRANCE FACILITY
ELECTRONIC INDUSTRY ALLIANCE
ELECTRICAL
ELECTRICAL METALLIC TUBING
ENCLOSURE
EQUIPMENT ROOM
EXISTING
EXTERIOR
FLOOR
FOOT or FEET
FUTURE
GROUND
GENERAL CONTRACTOR
GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
GOVERNMENT FURNISHED, GOVERNMENT INSTALLED
GROUND FAULT CIRCUIT INTERRUPTER
HANDHOLE
HEIGHT
HEATING, VENTILATION AND AIR CONDITIONING
INSTALLATION INFORMATION INFRASTRUCTURE ARCHITECTl RE
INTRUSION DETECTION SYSTEM
INCH or INCHES
JUNCTION BOX
LOCAL AREA NETWORK
METER
MATERIAL
MAXIMUM
MEGABITS PER SECOND
MAIN CROSS CONNECT
MECHANICAL
MANUFACTURER
MANHOLE
MEGAHERTZ
MINIMUM
MISCELLANEOUS
MULTI-MODE
MOUNTED
NATIONAL ELECTRICAL CODE
NETWORK ENTERPRISE CENTER
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NOT IN CONTRACT
NUMBER
ON-CENTER
OPENING
PROTECTIVE DISTRIBUTION SYSTEM
PANEL
PAIR
POLYVINYL CHLORIDE
POWER
QUANTITY
REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNER
RECEPTACLE
REQUIRED
REVISION
RADIO GUIDE (COAXIAL CABLE)
RED, GREEN, BLUE
ROOM
REMOTE TERMINAL UNIT
SCHEDULE
SECTION
SECURE INTERNET PROTOCOL ROUTER NETWORK
SINGLE-MODE
SERVICE PROVIDER
SPECIFICATIONS
SQUARE
STAINLESS STEEL
STANDARD
STEEL
STRUCTURAL
SERVICE
SYSTEM
TELECOMMUNICATIONS BONDING BACKBONE
TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR
TELEPHONE
TEMPERATURE or TEMPORARY
TELECOMMUNICATIONS GROUNDING BUS BAR
TELECOMMUNICATIONS INDUSTRY ASSOCIATION
TELECOMMUNICATIONS MAIN GROUNDING BUS BAR
TELECOMMUNICATIONS ROOM
TELEPHONE TERMINAL BOARD
TELEPHONE TERMINAL CABINET
TELEVISION
TRANSIENT VOLTAGE SURGE SUPPRESSOR
TYPICAL
UNDER-FLOOR
UNDERGROUND
UNDERWRITER LABO RA TORIES
UNLESS OTHERWISE NOTED
UNSHIELDED TWISTED PAIR
WIDE AREA NETWORK
WALL-MOUNTED
WEATHERPROOF
I
I
I
I
I
I
I r-o_s_ P _ S_Y _M _B _OL_ L_E _G _EN_ D ________________ ___, TELECOMMUNICATIONS STANDARDS REFERENCE r-_
_ s
Y_ M� B�O�L���
-----------D_ E_S_ C _R_IP _T_IO _N ______________ ----i JBLM NEC - SPECIFICATION 33 82 00 "TELECOMMUNICATIONS OUTSIDE PLANT (OSP)"
EXISTING CABLE (AERIAL OR IN DUCT) - LIGHT LINEWEIGHT
·ssHSSSSHSHSSSSS
--UG/T-
--OH/T-
I I I I I I I I
D [iiB] t:t
I�
I� t:lQ-�1RAND§:
NEW WORK - HEAVY LINEWEIGHT
EXISTING TO BE REMOVED (CROSSHATCHED)
PROPOSED UNDERGROUND TELECOMMUNICATIONS CONDUIT OR DUCT BANK
PROPOSED OVERHEAD CABLE
EXISTING CONDUIT
PROPOSED CONDUIT
EXISTING TELECOM MAINTENANCE HOLE
PROPOSED TELECOM MAINTENANCE HOLE
EXISTING HAND HOLE
PROPOSED SPLICE SYMBOL (ONE SYMBOL= ALL SPLICE CASES)
ROAD CROSSING WITH CUT
EXISTING POLE
EXISTING JOINT USE POLE
RISER POLE
NEW POLE
WORK LOCATION NUMBER
EXISTING ISP UNPROTECTED TERMINAL
ISP PROTECTED ENTRANCE TERMINAL
OSP PROTECTED ENTRANCE TERMINAL
OSP UNPROTECTED ENTRANCE TERMINAL
PEDESTAL PROTECTED ENTRANCE TERMINAL
PROPOSED FIBER DISTRIBUTION PANEL (LIU)
EXISTING PULLBOX
-T - EXISTING DIRECT BURY TELEPHONE CABLE (TO DRAWINGS ONLY)
�W- WATER UTILITIES (TO DRAWINGS ONLY)
---E --- ELECTRICAL UTILITIES (TO DRAWINGS ONLY)
--$$-- SEWER (TO DRAWINGS ONLY)
-SD--- STORM DRAIN (TO DRAWINGS ONLY)
---ST-- STEAM LINE (TO DRAWINGS ONLY)
USAISEC - TECHNICAL CRITERIA FOR THE INSTALLATION INFORMATION INFRASTRUCTURE ARCHITECTURE, NOV. 2017 (I3A) USAISEC - REFER TO THE CURRENT VERSION OF EACH PUBLICATION CITED IN APPENDIX D OF THE I3A
GENERAL NOTES
1. SYMBOLS SHOWN IN THE LEGEND ARE TYPICAL. NOT ALL SYMBOLS MAY APPLY TO THIS PROJECT.
2. CONDITIONS SHOWN ON DOCUMENTS WERE TAKEN FROM AVAILABLE RECORD DOCUMENT INFORMATION AND FIELD INVESTIGATION. THE CONTRACTOR
SHALL LOCATE AND VERIFY ALL TELECOM SYSTEMS WITHIN THE IDENTIFIED AREAS PRIOR TO STARTING ANY WORK. ANY DISCREPANCIES BETWEEN INFORMATION SHOWN AND ACTUAL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.
3. PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. MATERIALS AND WORKMANSHIP SHALL FULLY COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE ARMY TECHNICAL CRITERIA FOR INSTALLATION INFORMATION INFRASTRUCTURE ARCHITECTURE (I3A), JOINT BASE LEWIS-MCCHORD NETWORK ENTERPRISE CENTER (NEC) STANDARDS, AND TIA STANDARDS.
4. ALL TELECOMMUNICATIONS WORK SHALL BE COORDINATED WITH NEC, MR. CHRIS SMITH AT 253-967-3870.
5. POINT OF CONTACT FOR COMCAST COMMERCIAL CABLE TELEVISION SERVICE IS MR. ANDREW MARTIN AT 253-999-0187.
6. POINT OF CONTACT FOR CENTURYLINK COMMERCIAL TELEPHONE SERVICE IS ROB BAIR AT 253-393-5384.
7. SPLICE CASES SHALL BE PRE-FORMED STAINLESS STEEL. STRETCH TYPE CASES ARE NOT ALLOWED. ENCAPSULATING COMPOUNDS SHALL NOT BE USED.
FLASH TEST SPLICE CASES USING DRY NITROGEN GAS TO ENSURE DRY AND AIRTIGHT SEAL.
8. ALL AREAS IN THIS PROJECT ARE WITHIN THE CANTONMENT AREA OF JBLM.
9. TELECOM MANHOLES SHALL BE UTILITY VAULT OR APPROVED EQUAL AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS AND IN ACCORDANCE WITH THE I3A AND TIA STANDARDS. MANHOLES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 7000 PSI AT 28-DAYS, MEET AASHTO H-20 LOADING, INCLUDE GALVANIZED EMBEDDED PULLING IRONS IN EACH CORNER, TOP AND BOTTOM, INCLUDE FOUR GALVANIZED C-CHANNELS ON EACH LONGITUDINAL SIDE, AND SHALL BE EQUIPPED WITH PVC DUCT TERMINATIONS AT ALL POINTS OF ENTRY. PROVIDE GROUNDING AND BONDING PER I3A CRITERIA. NOTIFY NEC 48-HOURS PRIOR TD INSTALLATION OF MANHOLES TO OBTAIN APPROVAL ON ORIENTATION.
10. INSTALL DUCTS IN MANHOLES AT THE LOWEST AVAILABLE DUCT POSITIONS TO ALLOW DUCTS TO BE PLACED ON TOP IF REQUIRED IN THE FUTURE.
COORDINATE WITH POWER DUCT BANK INSTALLATION AND AVOID PLACEMENT OF DUCTS THAT WOULD PREVENT THE ABILITY TO INSTALL FUTURE DUCTS. TRANSITION DUCT BANKS FROM TRENCH DEPTH TO LOWER DUCT WINDOWS IN NO LESS THAN 30-LINEAR FEET TO MAINTAIN MINIMUM BEND RADIUS. COORDINATE WITH NEC FOR INSPECTION OF DUCT BANK INSTALLATION PRIOR TO ENCASING IN 3000 PSI REINFORCED CONCRETE. CONCRETE ENCASEMENT SHALL SURROUND DUCTS WITH NO VOIDS. DUCTS SHALL BE TESTED WITH A 12-INCH NON-FLEXIBLE MANDREL WITH A DIAMETER THAT IS 1/2" LESS THAN THE DUCT INSIDE DIAMETER IN ALL MAIN RUNS. ALL DUCTS. SUB-DUCTS AND INNERDUCTS SHALL BE PLUGGED USING UNIVERSAL
SCREW-TYPE DUCT PLUGS IN MANHOLES.
11. PROVIDE NYLON MULE-TAPE AND THREE CELL MAXCELL MULTICELL INNERDUCTS IN ALL DUCTBANK CONDUIT THAT WILL BE UTILIZED FOR FIBER CABLING.
12. LABELING SHALL BE IN ACCORDANCE WITH THE MOST CURRENT I3A, TIA-606 AND NEC STANDARDS. LABELS ON ISP HORIZONTAL CABLING SHALL BE
MACHINE PRINTED; 1/8" FONT MINIMUM HEIGHT WITH BLACK LETTERS ON A WHITE BACKGROUND AND SHALL BE LOCATED WITHIN 4" OF CABLE
TERMINATIONS. HANDWRITTEN LABELS ARE NOT ACCEPTABLE.
13. CABLE QUANTITIES AND TYPES ARE TAKEN FROM RECORD DOCUMENTS. CONTRACTOR TO FIELD VERIFY CONDITIONS PRIOR TO BID. REFLECT VERIFIED
CONDITIONS IN SUBMITTALS AND SHOP DRAWINGS.
14. PROVIDE 20' SERVICE LOOP IN EACH FIBER OPTIC CABLE WITHIN MANHOLE 206A AND 206B.
15. PROVIDE 50' SERVICE LOOP IN EACH EXISTING AND NEW FIBER OPTIC CABLE ON EACH SIDE OF SPLICE CLOSURES IN MH205 AND MH207.
16. SERVICE LOOPS NOT REQUIRED FOR OSP COPPER.
17. EMPTY CONDUITS WILL BE SUPPLIED WITH METERED PULL CORD.
18. NEW DUCTBANKS WILL CONSIST OF FOUR 4" CONDUITS. TWO CONDUITS WILL BE SUPPLIED WITH THREE EACH 3-CELL FABRIC INNERDUCTS, TOTAL OF
NINE CELLS. PROVIDE METERED PULL TAPE IN CONDUIT AND WITHIN EACH EMPTY INNERDUCT CELL. TWO CONDUITS WILL BE EMPTY AND SUPPLIED WITH
METERED PULL TAPE.
19. CONDUITS WILL BE MANDRELED PRIOR TO USE, REFER TO I3A FOR REQUIREMENTS.
20. INNERDUCTS WILL BE FABRIC-MESH 3-CELL 3". INNERDUCT WILL BE CUT OFF IN EACH MANHOLE AND EXTEND AT LEAST 2' INTO THE MANHOLE.
21. PULL TAPE WILL BE RATED NOT LESS THAN 200LB TENSILE STRENGTH. LEAVE MINIMUM 5' OF PULL TAPE EXPOSED IN MANHOLES. COIL AND SECURE IN
EACH MANHOLE TO PREVENT PULL TAPE FROM BEING PULLED BACK INTO CONDUIT/INNERDUCT.
�------�-----------------------------� 22. OUTAGES WILL BE LIMITED TO OFF-DUTY HOURS. COORDINATE WITH CO AND NEC PRIOR SCHEDULING ANY OUTAGES.
REFERENCE SYMBOL LEGEND
SYMBOL DESCRIPTION
---0
DETAIL SYMBOL
A-IDENTIFYING NUMBER
NORTH
SECTION OR ELEVATION SYMBOL
A-IDENTIFYING NUMBER
B-SHEET WHERE SECTION IS SHOWN OR TAKEN
NORTH ARROW
PROJECT NORTH
SHEET REFERENCE NOTE SYMBOL
A-NOTE NUMBER
REVISION SYMBOL
OSP DUCT BANK SYMBOLS LEGEND
EXISTING DUCT WITH
PROPOSED FABRIC MESH
EXISTING DUCT
INNERDUCT WITH 1 CABLE
WITH THREE
EACH THREE
CELL FABRIC �--.
MESH INNERDUCT
� �1-----EXISTING VACANT
DUCT
VACANT DUCT DUCT WITH EXISTING--------------
1 ...___EXISTING
W/ PULLSTRING Q Q :��R���T
KNOCKOUT \_
EXISTING DUCT WITH
COPPER CABLE
EXISTING DUCT WITH ONE EXISTING
AND ONE PROPOSED COPPER CABLE
23. PHASING:
a. NEW OSP PATHWAY, AND NEW OSP CABLES, WILL BE INSTALLED, SPLICED, AND TESTED, PRIOR TO ANY DUCTBANK DEMOLITION.
b. EXISTING CABLES WILL BE CUT AND SPLICED TO NEW CABLES ONE AT A TIME TO LIMIT DOWNTIME AND RISK. ALL FIBER SPLICES WILL BE FUSION TYPE.
OSP CABLE WILL BE TESTED RIGHT AFTER SPLICING.
c. ALL OUTAGES WILL BE SCHEDULED AT LEAST TWO WEEKS IN ADVANCE WITH THE COMM SQUADRON AND CONTRACTING OFFICER. OUT AGES WILL
OCCUR AFTER DUTY HOURS UNLESS APPROVED IN ADVANCE.
d. AFTER ALL CABLES ARE TRANSITIONED TO THE NEW ALIGNMENT THE DUCTBANK BETWEEN MH206 AND MH207 MAY BE DISCONNECTED AND REMOVED.
24. TESTING
a. CONTRACTOR WILL TEST OSP CABLING TO BE MODIFIED BEFORE WORK COMMENCES AND SUBMIT TEST REPORTS TO THE CONTRACTING OFFICER.
FAILED CABLING MAY BE REQUESTED TO BE REPLACED, AT AN ADDITIONAL COST, OR ACCEPTED AT GOVERNMENTS DISCRETION.
b. CONTRACTOR WILL RETEST MODIFIED OSP CABLING AT THE COMPLETION OF CONSTRUCTION. ALL CABLES WHICH FAIL FINAL TESTING, UNLESS
PREVIOUSLY ACCEPTED BY THE GOVERNMENT, WILL BE REPLACED/REPAIRED AT NO ADDITIONAL COST TO THE GOVERNMENT.
25. LABELING
a. CONTRACTOR TO FIELD VERIFY ACCURACY OF EXISTING CSP CABLE TAGS PRIOR TO COMMENCING WORK.
b. CONTRACTOR TO BRING ANY LABELING DISCREPANCIES TO THE ATTENTION OF NEC, PRIOR TO WORK, FOR CLARIFICATION / DIRECTION.
c. CONTRACTOR TO LABEL ALL NEW CABLING USING THE SAME MATERIALS, METHODS, AND NAMES, AS EXISTING CABLES BEING SPLICED, UNLESS
OTHERWISE DIRECTED BY NEC.
I w :, "' !!l m US Army Corps of Engineers•
Cl LU zf LU Cl (!)Z
LU _J
_J �
� LU
Oz
(.) LU
LU Cl f- z
SHEET ID
T0-01
SHEET 31 OF 76
ISSUED FOR CONSTRUCTION
File details come from the government source that posted it. Updated .