Technical Exhibit 8 – Preventative Maintenance Checklist.pdf
PDF 229 KB Posted
- Solicitation number
- W912DW20Q0009
About this file
This document contains a preventative maintenance checklist and related federal contract opportunity. The preventative maintenance checklist outlines routine inspection and maintenance procedures for various building systems including boilers, oil burners, furnaces, water heaters, pumps, and winterization of boiler systems. It specifies inspection frequencies and tasks for ensuring proper operation and identifying needed repairs.
The related federal contract opportunity is a solicitation seeking preventative maintenance and repair services for World War II-era and relocatable facilities at Joint Base Lewis-McChord in Washington. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and is seeking maintenance and repair of building mechanical systems, including those outlined in the preventative maintenance checklist. The combined synopsis/solicitation provides opportunity details but no response date or pricing terms.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-11-1
TECHNICAL EXHIBIT 8
PREVENTATIVE MAINTENANCE CHECKLIST
GENERAL:
A. Frequency Legend:
W = Weekly M = Monthly
Q = Quarterly S = Semi-Annually
A = Annually 2 = Every 2 Years
3 = Every 3 years 4 = Every 4 Years
5 = Every 5 years
E-11-2
PREVENTATIVE MAINTENANCE
BOILER
FIXED ITEMS - BUILDINGS ON 5 YEAR DEMOLITION LIST
(SEE BURNER PM SHEETS ALSO)
DESCRIPTION
FREQUENCY
A. BOILER FIRE TUBES/TUBE SHEETS/PRESSURE VESSEL
1. Check tubes and pressure vessel for water leaks.
2. Inspect for excess soot or scale that would result in a failure prior to the next inspection.
3. Rod/Wire brush clean boiler fire tubes and vacuum out soot and scale.
4. Inspect turbulators for metal fatigue/damage.
5. Clean turbulators.
6. Drain boiler and wash/clean boiler internals (include LWCO, feeder, and etcetera).
A
A
A
B. BREECHING/CHIMNEY
1. Inspect for sign of leakage.
2. Inspection for excess soot, scale, or other abnormality that presents a hazard or would result in a failure prior to the next inspection.
3. Verify proper barometric damper operation (as applicable).
4. Check condition of breeching supports, chimney brick foundation, and overall structural integrity of entire assembly.
5. Vacuum clean soot from breeching and chimney.
S
C. FIRE TUBE INSPECTION DOOR
1. Check overall condition.
2. Inspect for signs of damage/leakage or other deficiency that presents a health or safety hazard or would result in a failure prior to the next inspection.
D. BOILER CONTROLS
1. High Limit: Check for proper operation.
2. Operating Control: Check for proper operation.
3. Low-water cut put: Check for proper operation. Verify boiler shuts down upon low water.
4. Check operation of all controls IAW service manual.
M
E. TEMPERATURE/WATER PRESSURE GAUGE
1. Check boiler and system temperature gauges for proper readings; date and record.
2. Check pressure gauge for proper reading. Verify it is consistent with past recorded pressures, and is safe amount away from boiler pressure rating; date and record.
F. OTHER
1. Relief Valve: Check for proper operation.
2. Make-up Water: Verify proper pressure setting on pressure reducing valve (or feeder control) and verify adequate flow into the boiler/system.
3. Strainers: Blow-down strains at make-up water assembly.
4. Expansion Tank: Verify proper expansion tank level (or air pressure for diaphragm type).
5. Review overall condition of entire system (piping connection, valves, boiler room, supports, etcetera) to detect any items requiring maintenance or are likely to fail.
6. Inspect combustion air openings and clean of debris or obstructions.
7. Operate all boiler valves.
E-11-3
OIL BURNER
A. BURNER OIL NOZZLE
1. Remove oil nozzle.
2. Check for the correct nozzle size for the firing rate of the unit.
3. Replace/Reinstall as appropriate.
B. BURNER OIL NOZZLE ADAPTER
1. Check condition of threads.
2. Check if oil nozzle has cut into adapter.
3. Replace if needed.
A
C. BURNER IGNITION ELECTRODES
1. Disassemble.
2. Check porcelain for cracks.
3. Check electrode tips.
4. Replace if needed.
5. Reassemble.
6. Adjust electrode gap to burner specifications.
D. BURNER TUBE
1. Check for:
a. Blockage
b. Bent tube
2. Replace if needed.
A
E. OIL FILTER
1. Replace.
2. Check housing for leaks, rust, or damage/deficiencies.
F. BURNER IGNITION TRANSFORMER
1. Check for leakage.
2. Check input and output voltage.
3. Check for cracked transformer wire leads.
4. Replace if needed.
A
A
G. BURNER IGNITION WIRE LEADS
1. Check for cracks.
2. Check wire lead connectors.
A
H. BURNER DIFFUSER
1. Check for carbon build-up.
2. Soot cone.
3. Burn away.
E-11-4
4. Correct size for firing rate.
5. Clean
6. Replace if needed.
I. BURNER BLAST TUBE
1. Check for metal fatigue.
2. Replace if needed.
3. Set Up Burner using combustion analyzer IAW service manual.
4. Perform smoke test IAW service manual.
J. BURNER PUMP COOLING
1. Check for cracks.
2. Check for worn drive ends pump, burner motor.
A
K. BURNER BLOWER WHEEL
1. Clean debris from blower wheel.
2. Check condition of blower for being balanced.
A
L. BURNER MOTOR
1. Check motor amperage.
2. Check motor wire leads for cracks or breaks.
3. Check motor for worn shaft.
4. Oil motor ... 3 drops.
5. Clean.
6. Replace if needed.
S
S
S
S
M. CAD CELL
1. Clean.
2. Check wire leads for cracks.
3. Check mounting bracket.
4. Replace if needed.
A
A
N. BURNER OIL PUMP
1. Replace pump strainer and gasket.
2. Check pump P.S.I. to burner specifications.
3. Check suction vacuum. NOTE: No more than fifteen inches of vacuum.
4. Check pump seal for leaks.
5. Replace if needed.
E-11-5
O. BURNER HOUSING
1. Clean combustion air intake.
2. Check for cracks in burner housing.
P. PRIMARY CONTROL
1. Check wire leads for cracks or breaks.
2. Check wire connections.
3. Check control safety lockout.
4. Check control relay.
5. Replace if needed.
A
A
A
Q. COMBUSTION CHAMBER
1. Check for broken tile/exposed pressure vessel (as applicable).
OIL FIRED FURNACE
A. FAN AND LIMIT CONTROL
1. Check temperature settings.
2. Check control wires.
A
B. FURNACE FAN MOTOR
1. Check motor amperage.
2. Check wire leads for cracks or breaks.
3. Check motor for worn shaft.
4. Check fan motor pulley.
5. Oil motor ... 3 drops.
6. Clean.
7. Replace if needed.
A
A
A
A
A
C. FURNACE BLOWER
1. Check fan belt.
2. Check fan bearings.
a. Oil or grease.
3. Check fan for debris in fan blades.
4. Check blower shaft.
5. Check blower pulley.
6. Clean
7. Replace if needed.
A
A
A
A
A
A
D. COLD AIR RETURN
1. Check for air restrictions/air volume/ductwork.
2. Check condition of plenum/ductwork
3. Replace air filter if required.
4. Vacuum ductwork if needed.
A
A
E. HOT AIR PLENUM
1. Check for air leaks/furnace/seal if needed.
2. Check air registers.
E-11-6
3. Check for air restrictions/air volume/ductwork.
4. Vacuum ductwork if needed.
A
A
F. FURNACE COMBUSTION CHAMBER
1. Check fire pot liner.
2. Check fire pot for metal fatigue.
3. Check heat exchanger for combustion leaks.
4. Check for flue blockage.
5. Vacuum if needed.
A
A
A
G. SMOKE PIPE
1. Check condition of pipe/horizontal
a. Soot
b. Draft regulator
2. Repair or replace as needed.
3. Vacuum if needed.
A
H. CHIMNEY
1. Check condition of chimney brick.
2. Check clean out door.
3. Check condition of chimney stabilizer bars/straps.
4. Check for soot build-up.
5. Vacuum if needed.
A
A
A
I. PROGRAMMABLE THERMOSTAT
1. Check battery.
2. Check operation of program.
3. Check condition of thermostat wire.
4. Check thermostat relay (mr 1,000)
5. Check thermostat sensor in return air duct.
6. Check thermostat for calibration.
7. Repair or replace if needed.
A
A
A
A
A
J. BURNER EFFICIENCY
1. Fire burner.
2. Adjust oil burner to fire at top efficiency not to exceed a number two smoke.
3. Set up burner using combustion analyzer IAW service manual.
FUEL OIL PIPING SYSTEM
A. FUEL OIL LINES
1. Check all piping, fittings, and connections for leaks.
2. Check for bent, broken, or otherwise damaged oil lines replace as needed.
3. Checks for signs of blockage.
4. Inspect valves for proper operation; operate all valves.
E-11-7
B. FUEL OIL TANK UNDERGROUND
1. Check condition of fill pipe/cap
2. Check condition of vent pipe/cap
3. Check fuel oil level; date and record.
4. Verify reading of tank level gauge (as applicable).
5. Check for water in tank.
S
S
S
C. FUEL OIL TANK ABOVEGROUND
1. Check for oil leaks from fuel tank (visually).
2. Check condition of fill pipe/cap
3 Check condition of vent pipe/cap
4. Check condition of tank legs and blocks.
5. Check for water in tank.
A
A
NOTE: REPORT ALL OIL LEAKS - SEE FL REG 200-1 FOR PROCEDURES
HOT WATER HEATER
A. TANK
1. Check for signs of leakage.
2. Check anode condition.
3. Drain and flush out tank.
4. De-lime tank.
A
B. BREECHING/CHIMNEY
1. Inspect for sign of leakage.
2. Inspection for excess soot, scale, or other abnormality that presents a hazard or would result in a failure prior to the next inspection.
3. Verify proper barometric damper operation (as applicable).
4. Check condition of breeching supports, chimney brick foundation, and overall structural integrity of entire assembly.
5. Vacuum clean soot from breeching and chimney.
C. CONTROLS/GAUGES
1. Check tank temperature; adjust operating controls for proper temperature as necessary (120 degrees F maximum).
2. Check high limit setting and operation (130 degrees F maximum).
3. Check temperature gauge for proper reading; date and record.
D. OTHER
1. Check relief valve for proper operation.
2. Operate all valves.
3. Review overall condition of the water heater and connected components for any items requiring maintenance or are likely to fail.
4. Set up burner using combustion analyzer IAW service manual.
E-11-8
CONDENSATE PUMP
A. TANK
2. Inspect for rust, scale, or other abnormality that presents a hazard or indicates that a failure may occur prior to next inspection.
3. Note tank temperature.
B. PUMP
1. Check for signs of leakage.
2. Inspect for rust, scale, or other abnormality that presents a hazard or indicates that a failure may occur prior to next inspection.
3. Lubricate pump per manufacturer’s directions.
4. Check pump controls for proper pump operation (and second pump operation on duplex units).
5. Operate all valves.
PUMPS
A. PUMP
2. Inspect for rust, scale, or other abnormality that presents a hazard or indicates that a failure may occur prior to next inspection.
3. Lubricate pump per manufacturer’s directions.
4. Check pump controls for proper pump operation (and second pump operation on duplex units).
B. CONTROLS/GAUGES
1. Check that pump operates when system calls for heat or required by low outside temperature.
2. Verify proper pressure gauge readings; record and date.
C. OTHER
1. Blow down strainers associated with pump.
2. Check motor amperage; record and date.
3. Operate all valves.
4. Clean pump for proper cooling.
E-11-9
WINTERIZING BOILER SYSTEM
1. Drain boiler of all water.
2. Tag and close all valves to boiler.
3. Keep control circuit of boiler energized to prevent rust.
4. Thoroughly clean fireside of boiler.
5. Thoroughly clean waterside of boiler.
6. Completely dry fireside and waterside of boiler to prevent corrosion.
7. Coat fireside surfaces with an anti-corrosive material to prevent rust.
8. Place moisture absorbing material in boiler to prevent condensation.
9. Close all manholes, handholds tight.
10. Close all dampers, air inlets, vents, etcetera to boiler.
11. Periodically inspect boiler to verify no condensation or corrosion has occurred. Review absorption materials.