JA -Monaco Fire Alarm - Bartlett Hall 4th Fl_mj Legal_Concur.pdf

PDF 399 KB Posted

Attached to
Bartlett Hall - USMA
Solicitation number
W912DS25RA007
Issued by

About this file

This Justification and Approval (J&A) document supports a sole-source procurement for a Monaco Fire Alarm and Mass Notification System at Bartlett Hall, United States Military Academy (USMA) at West Point, NY. The total project cost is estimated at $16,244,908, with the specific fire alarm system component valued at $145,000. The procurement is justified by the need for post-wide compatibility, as all new construction and renovation projects at West Point are now required to use the latest version of the Monaco Fire Alarm Control Panel, which provides point reporting up to 1,584 addressable device points via proprietary UHF radio signal to the West Point Fire Department Dispatch.

The J&A is authorized under 10 U.S.C. § 3204(a)(1) for a brand-name requirement, with the U.S. Army Corps of Engineers (USACE), New York District managing the acquisition. A Notice of Intent published on 25 February 2025 received no responses, confirming the lack of alternative systems that can guarantee operational effectiveness. The fire alarm system must integrate with existing infrastructure, provide mass notification capabilities per DoD Unified Facilities Criteria, and enable remote activation of in-building messaging systems. The project's period of performance is 600 calendar days, with the solicitation (W912DS25RA0007) covering comprehensive renovation of Bartlett Hall's fourth floor and associated exterior repairs.

View the file

Other files

File Type Posted
Solicitation Amendment W912DS25RA0070006 SF 30 Cancellation Amendment.pdf PDF
Notice of Cancellation W912DS25RA007.pdf PDF
2025-09-09-083263-ELEC ADDENDUM 4 (Signed).pdf PDF
JA - Square D brand Electrical Panels and Breakers - Bartlett Hall 4th Fl Redacted_Redacted.pdf PDF
Solicitation Amendment W912DS25RA0070004 SF 30.pdf PDF
Solicitation Amendment W912DS25RA0070003 SF 30.pdf PDF
Conformed Solicitation Amendment - W912DS25RA0070002.pdf PDF
07 22 00.pdf PDF
07 52 00.pdf PDF
01 11 00.pdf PDF
Solicitation Amendment W912DS25RA0070002 SF 30.pdf PDF
Solicitation Amendment W912DS25RA0070001 SF 30.pdf PDF
Bartlett Hall Contractor Site Walk - 20250730 (002).pdf PDF
Evaluation Factors.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA SUBMISSION DRAWINGS VOLUME 3.pdf PDF
JA - Tridium Niagara LON Works DDC- Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
JA - Lutron Quantum Lighting Controls - Bartlett Hall 4th Fl.pdf PDF
JA -Distributed Antenna System C Squared systems - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
B.08.02 Solicitation - W912DS25RA007.pdf PDF
JA - E Shark 200 Meters - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
JA -Best Hardware Lock Cylinders and Cores - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
W912DS25RA0007-BARTLETT-FFE_RTA_SUBMISSION.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA SUBMISSION DRAWINGS VOLUME 1.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA Specifications.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA SUBMISSION DRAWINGS VOLUME 2.pdf PDF
W912DS25RA0007-BARTLETT-SID-RTA_SUBMISSION.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No. TBD

JUSTIFICATION REVIEW DOCUMENT FOR OTHER THAN FULL AND OPEN COMPETITION

CONTROL NO.

PROJECT/EQUIPMENT: Bartlett Hall 4th Floor Conversion, Courtyard Wall & Roof Repair, USMA, West Point, NY / Monaco Fire Alarm System AUTHORITY: 10 U.S.C. § 3204(a)(1) AMOUNT: $145,000

Prepared By:

NAME/TITLE: Margaret Jedros, Technical Manager

TELEPHONE: 917- 790-8295

DATE:

Contracting Officer

NAME/TITLE: Nicholas Emanuel, Contracting Officer

TELEPHONE: 917-790-8069

Requirements

NAME/TITLE: Michael Ruppert, Project Manager

TELEPHONE: 845-322-0240

SIGNATURES ARE REQUIRED BELOW

I have reviewed this J&A and find the justification adequate to support other than full and open competition.

District Small Business Specialist

NAME: Zachery Bernard

TELEPHONE: 917-533-4785

SIGNATURE

Project Manager

NAME: Michael Ruppert, Project Manager

TELEPHONE: 845-322-240

Office of Counsel

NAME: Barbara Hebel

TELEPHONE: 347-843-2058

DCC/CCC Contracting Chief

NAME: Francis Cashman

TELEPHONE: 917-790-8173

Control No. TBD

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

FOR:

Monaco Fire Alarm and Mass Notification System

Bartlett Hall 4th Floor Conversion, Courtyard Wall & Roof Repair, USMA, West Point, NY Solicitation No. W912DS25RA0007

16 May 2025

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

1. CONTRACTING ACTIVITY:

The U.S. Army Corps of Engineers (USACE), New York District (NAN), Contracting (CT), 26 Federal Plaza, New York, NY 10278.

2. DESCRIPTION OF ACTION:

This Justification and Approval (J&A) supports the use of brand name components in an upcoming construction project. The government will not purchase the components directly, but rather will require that offerors include the Monaco Fire Alarm and Mass Notification System as part of proposals submitted in response to a design-bid-build solicitation that will lead to the award of a new firm-fixed-price (FFP) construction contract. USACE is responsible for the acquisition and administration of a construction contract for Bartlett Hall 4th Floor Conversion, Courtyard Wall & Roof Repair, Solicitation No.

W912DS25RA0007. Funding for this acquisition will be FY25 Facilities Operations and Maintenance (OMA) appropriations. The FFP construction will be solicited and awarded as a best value trade-off (BVTO) procurement in accordance with FAR Part 15.

3. DESCRIPTION OF SUPPLIES/SERVICES:

The requirement is to provide the Monaco Fire Alarm and Mass Notification System in Bartlett Hall. The Monaco Analog Addressable Panel (MAAP) Plus Analog Addressable Integrated Radio Transceiver and Fire Alarm Control Panel is capable of point reporting up to 1584 addressable device points via proprietary UHF radio signal to the Monaco D-21 Enhanced Central Radio Control Alarm receiving system at West Point Fire Department Dispatch. New Fire Alarm installations include Mass Notification Systems (MNS) in accordance with DoD Unified Facilities Criteria (UFC) 4-021-01. The existing radio frequency (RF) infrastructure provided by Monaco supports the UFC requirements for primary MNS communications. The Monaco Fire Alarm and integrated MNS system has the capability to remotely activate the in-building MNS messaging system and provide live-voice announcements directly from the D-21 Central Station at West Point Fire Dispatch.

Each Fire Alarm System (FAS) and Mass Notification System (MNS) shall be a complete, supervised, non-coded, analog-addressable system, installed in class A configuration per NFPA

72. The FAS/MNS shall provide point reporting to the Fire Alarm Control Panel (FACP). The FACP shall in turn provide point reporting to the Monaco D- 21 Central Receiving Station at United States Military Academy (USMA) West Point Fire Department Dispatch. Point reporting, also known as point to point reporting, is the capability to relay the status of each addressable device and certain system components such as Signaling Line Circuits (SLC) to the D-21 Central Receiving Station in real time. The FAS/MNS shall be tested and perform as a critical life-safety system. The FAS/MNS shall be compatible with and shall communicate seamlessly with the D-21 Central Receiving Station, without impairing operational function or reliability of any existing FAS or MNS. Use of interfacing relays between the FACP and communications transceiver to provide point or zonal alarm trouble status shall not be permitted.

The estimated total cost for the construction portion of this project is $15,037,468 base and $1,207,440 in options for a total of $16,244,908. The estimated cost of the requested brand-name requirement for the Monaco Fire Alarm and Mass Notification System in Bartlett Hall Building – Bartlett Hall 4th floor Conversion, Courtyard Wall & Roof Repair is estimated at $145,000. The period of performance of the entire project is 600 calendar days.

4. AUTHORITY CITED:

10 U.S.C. § 3204(a)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements, as implemented by FAR 6.302-1(c), Application for Brand Name Descriptions. In accordance with FAR 6.302-1(c), the Contracting Officer will specify that all offerors be required to procure an item particular to one supplier (brand-name item).

5. REASON FOR AUTHORITY CITED:

A. Background:

Due to post wide compatibility issues and based on the capabilities described below of a Monaco Fire Alarm system, all new construction and renovation projects at the United States Military Academy (USMA), West Point are now featuring the latest version of the Monaco Fire Alarm Control Panel. The MAAP Plus Analog Addressable Integrated Radio Transceiver and Fire Alarm Control Panel is capable of point reporting up to 1584 addressable device points via proprietary UHF radio signal to the Monaco D-21 Enhanced Central Radio Control Alarm receiving system at West Point Fire Department Dispatch. New Fire Alarm installations include Mass Notification Systems (MNS) in accordance with DoD Unified Facilities Criteria (UFC) 4- 021-01. The existing RF infrastructure provided by Monaco supports the UFC requirements for primary MNS communications. The Monaco Fire Alarm and integrated MNS system has the capability to remotely activate the inbuilding MNS messaging system and provide live-voice announcements directly from the D-21 Central Station at West Point Fire Dispatch.

B. Justification:

The United States Military Academy, West Point Fire Department uses Monaco Fire Alarm systems across the installation. All new construction and renovation project are required to be compatible with the Monaco Fire alarm control panels as described in the previous paragraph.

There can be no substitutions to ensure point to point compatibility with voice, lighting, and alarm signals.

C. Alternatives:

No viable alternatives will be acceptable to meet the mission requirements of an integrated Mass Notification System due to compatibility issues of the Monaco Fire Alarm System with equipment from other manufacturers, any fire alarm system other than a Monaco Fire Alarm System will not be able to guarantee operational effectiveness of the Mass Notification System to Bartlett Hall during an emergency.

The only alternative action to ensure compatibility of a different manufacturer’s Fire Alarm and Mass Notification Systems with the systems used throughout United States Military Academy (USMA), West Point would be to remove and replace the Fire Alarm and Mass Notification Systems in every building in United States Military Academy (USMA), West Point with the same system used in Bartlett Hall, West Point NY. This would be a very cost prohibitive effort.

D. Impact:

If the J&A is not approved and a different Fire Alarm System is installed in Bartlett Hall Building, the fire alarm system would fail the mission requirement to provide an integrated fire alarm system with a mass notification system. During an emergency situation this could lead to confusion, injury, and even loss of life that could have been avoided if Bartlett Hall, were integrated into the Monaco Fire Alarm System that is used in other new fire alarm installations at United States Military Academy (USMA), West Point.

6. EFFORTS TO OBTAIN COMPETITION:

The brand name product has been published as required by FAR 5.201, a Notice of Intent (NOI) to determine sources for this system was synopsized on 25 February 2025. No responses were received for the Notice of Intent. The brand name justification and approval will be posted with the solicitation. As stated in paragraph 5 above, Monaco Fire Alarm and Mass Notification System is the only brand available to ensure compatibility within the West Point existing system.

Monaco Fire Alarm and Mass Notification System is available on the open market for purchase and installation by all offerors.

7. ACTIONS TO INCREASE COMPETITION:

This J&A supports a discrete requirement that will end when the project is complete. Therefore, there are no planned actions to increase competition for the requirement covered by this J&A.

8. MARKET RESEARCH:

A Notice of Intent (NOI) to determine sources for this system was synopsized on 25 February 2025. The NOI was published for the required 15 days in SAM.gov.

9. INTERESTED SOURCES:

There were no responses to the NOI posting. The solicitation will be synopsized in accordance with FAR 5.201 and responses will be evaluated per FAR Part 15.

10. OTHER FACTS:

All pertinent facts are included above.

11. TECHNICAL CERTIFICATION:

“I certify that the supporting data under my cognizance which are included in the justification and approval are accurate and complete to the best of my knowledge.”

Name: Margaret Jedros Date:

Title: Technical Manager

12. REQUIREMENTS CERTIFICATION:

“I certify that the supporting data under my cognizance which are included in the justification and approval are accurate and complete to the best of my knowledge.”

Name: Michael Ruppert Date:

Title: Project Manager

13. FAIR AND REASONABLE COST DETERMINATION:

“I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable. This determination is based on the Independent Government Cost Estimate, the items being procured, and historical data.”

Name: Nicholas Emanuel Date:

Title: Contracting Officer

14. CONTRACTING OFFICER CERTIFICATION:

“I certify that this J&A is accurate and complete to the best of my knowledge and belief.”

Name: Nicholas Emanuel Date:

Title: Contracting Officer

APPROVAL

Based on the foregoing justification, I hereby approve the brand name requirement for Monaco Fire Alarm, estimated at $145,000.00 in support of the Bartlett Hall 4th Floor Conversion, Courtyard Wall and Roof Repair project at West Point, NY as authorized by 10 U.S.C. § 3204(a)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements, and as implemented by FAR 6.302-1(c), Application for Brand Name Descriptions, subject to availability of funds and provided that the product herein described has otherwise been authorized for this acquisition.

Date: Signature:

Nicholas Emanuel

Contracting Officer

JUSTIFICATION AND APPROVAL
Monaco Fire Alarm and Mass Notification System
JUSTIFICATION AND APPROVAL
2. DESCRIPTION OF ACTION:
3. DESCRIPTION OF SUPPLIES/SERVICES:
4. AUTHORITY CITED:
5. REASON FOR AUTHORITY CITED:
6. EFFORTS TO OBTAIN COMPETITION:
7. ACTIONS TO INCREASE COMPETITION:
8. MARKET RESEARCH:
9. INTERESTED SOURCES:
10. OTHER FACTS:
12. REQUIREMENTS CERTIFICATION:
13. Fair and Reasonable Cost Determination:
APPROVAL
2025-05-20T10:08:35-0400
RUPPERT.MICHAEL.SCOTT.1175777527
2025-05-21T12:39:52-0400
BERNARD.ZACHERY.ALAN.1265671230
2025-05-21T15:48:37-0400
JEDROS.MALGORZATA.BARBARA.1613912092
2025-05-21T16:14:51-0400
RUPPERT.MICHAEL.SCOTT.1175777527
2025-05-22T08:00:08-0400
HEBEL.BARBARA.N.1228746874
2025-06-06T15:00:27-0400
CASHMAN.FRANCIS.1386668368
2025-06-06T15:01:08-0400
CASHMAN.FRANCIS.1386668368
2025-06-06T15:01:31-0400
CASHMAN.FRANCIS.1386668368
2025-06-06T15:01:51-0400
CASHMAN.FRANCIS.1386668368

File details come from the government source that posted it. Updated .