This is a solicitation document for a construction project at the United States Military Academy (USMA) at West Point, New York. The project, titled "Bartlett Hall 4th Floor Conversion, Courtyard Wall & Roof Repair," involves comprehensive renovation work with multiple contract line items (CLINs) including interior renovation of the 4th floor, roof repair and replacement, courtyard wall repairs, lightning protection system installation, and a green wall installation. The total project is valued between $10-25 million, with a full and open competition using a HUBZone price evaluation preference.

Key details include a proposal due date of 15 September 2025 at 2:00 PM EST, a contract performance period of 600 calendar days, and multiple optional line items that can be exercised within 150 calendar days of the Notice to Proceed. The project is solicited by the U.S. Army Corps of Engineers New York District, with NAICS code 236220 and a size standard of $45 million. The solicitation includes base bid CLINs for renovation work and optional CLINs for additional scope such as elastomeric coating, exterior granite stair reconstruction, roof drain replacements, and various technology infrastructure installations like wireless access points, cellular distributed antenna system, and telecommunications cabling.

View the file

Other files

File Type Posted
Solicitation Amendment W912DS25RA0070006 SF 30 Cancellation Amendment.pdf PDF
Notice of Cancellation W912DS25RA007.pdf PDF
2025-09-09-083263-ELEC ADDENDUM 4 (Signed).pdf PDF
Solicitation Amendment W912DS25RA0070004 SF 30.pdf PDF
JA - Square D brand Electrical Panels and Breakers - Bartlett Hall 4th Fl Redacted_Redacted.pdf PDF
Solicitation Amendment W912DS25RA0070003 SF 30.pdf PDF
07 22 00.pdf PDF
Solicitation Amendment W912DS25RA0070002 SF 30.pdf PDF
07 52 00.pdf PDF
01 11 00.pdf PDF
Solicitation Amendment W912DS25RA0070001 SF 30.pdf PDF
Bartlett Hall Contractor Site Walk - 20250730 (002).pdf PDF
Evaluation Factors.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA SUBMISSION DRAWINGS VOLUME 3.pdf PDF
JA - Tridium Niagara LON Works DDC- Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
JA -Monaco Fire Alarm - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
JA -Best Hardware Lock Cylinders and Cores - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
B.08.02 Solicitation - W912DS25RA007.pdf PDF
JA - E Shark 200 Meters - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
JA - Lutron Quantum Lighting Controls - Bartlett Hall 4th Fl.pdf PDF
JA -Distributed Antenna System C Squared systems - Bartlett Hall 4th Fl_mj Legal_Concur.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA Specifications.pdf PDF
W912DS25RA0007-BARTLETT-SID-RTA_SUBMISSION.pdf PDF
W912DS25RA0007-BARTLETT-FFE_RTA_SUBMISSION.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA SUBMISSION DRAWINGS VOLUME 1.pdf PDF
W912DS25RA0007-BARTLETT 100pct RTA SUBMISSION DRAWINGS VOLUME 2.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Section 00 00 00 - Procurement and Contracting Requirements

FY24 Bartlett Hall 4th Floor Conversion, Courtyard Wall & Roof Repair United States Military Academy, West Point, NY

W912DS25RA0070002

Section 00 01 15 - List of Drawing Sheets

Identifier Attachment Name

Attachment Description Reference Identifier

Date Line Item

# Of Pages

Provided Under Separate Cover

Evaluation Factors

EVALUATION FACTORS

EVALUATIO

N FACTORS

May

23 No

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

All work associated with the renovation of the 4th Floor of Bartlett Hall, as per plans and specifications including pathways for all the following IT systems;

excluding the CLINs below.

Product Service Code: Y1AA Pricing Arrangement: Firm Fixed Price

1 Job

All work associated with the roof repair and replacement.

Pricing Arrangement: Firm Fixed Price

1 Job

All work associated with the Courtyard wall repairs

Pricing Arrangement: Firm Fixed Price

1 Job

All work associated with the addition of a lightning protection system in accordance with plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

All work associated with a new “green wall” in accordance with plans and specifications.

Pricing Arrangement: Firm Fixed Price

1 Job

Turnover of O/M manuals and as-builts. The contractor is to turn over all O/M manuals and as-built drawings as directed by the COR at the conclusion of construction. (Pre priced CLIN).

CLIN 0006 is pre-priced at $75,000.00 and should not change.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #1: Provide elastomeric coating at the following roof areas:

A-3, A-5, B-1, B-2, B-4, B-5, C-1, E-1 and E-2.

Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #2: Provide Exterior Granite Stair reconstruction.

Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #3: Replace roof drain clamping rings and strainers.

Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #4 Replace complete Yankee gutter liner.

Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #5 Remove existing standing seam panels where indicated. provide standing seam panels to replace panels to be removed where indicated.

Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #6: Replace standing seam Roof underlayment where indicated to be removed and salvaged. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #7: Provide new Flat Seam Lead Coated Copper Cladding in lieu of salvaging and reinstalling existing lead coated copper flat seam cladding at buttresses where indicated. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #8: Replace (2) existing Roof Drain Assemblies in their entirety. Optional Item may be exercised within 150 calendar days 1 Job from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

Option Line Item

Bid Option #9: Wireless Access Points (WAP) - Provide and install as per the plans and specifications all cabling in support of the WAP system in accordance with the plans and specifications. All equipment will be GFGI. Note rough-in, pathways and conduit are included in CLIN 0001 and excluded here.

Inventory and turn over existing equipment to the COR. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #10: Cellular Distributed Antenna System (DAS) - Provide a complete C-DAS system as per plans and specifications. This work is sole sourced to C -Squared, to provide and install a complete operational system. Note rough-in, pathways and conduit are included in CLIN 0001 and excluded here.

Inventory and turn over any existing equipment to the COR. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #11: Audio Visual (A/V) Provide and install cabling in support of all A/V up to the required room in accordance with the contract documents. All equipment and internal room controls will be GFGI. Note rough- in, pathways and conduit are included in CLIN 0001 and excluded here. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Bid Option #12: Telecom cables, all voice and data (NIPR/WREN) - Provide and install cabling in support of all voice and data systems in accordance with the contract documents. All equipment will be GFGI. Note rough-in, pathways and conduit are included in CLIN 0001 and excluded here. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

1 Job

Pricing Arrangement: Firm Fixed Price

Option Line Item

Bid Option #13: Vegetative Wall/Greenwall @ Collaboration 400;

Removal of Base Bid Moss Wall (Plant- 804) @ Collaboration Room 400.

Provide and install Vegetative Wall plants, planters and irrigation system installation including grow lights, mounting unit and plumbing (watering, draining, and automatic controls unit). Infrastructure for plumbing (drains, supply lines) and lighting (junction boxes) to be provided in base scope. Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed.

Pricing Arrangement: Firm Fixed Price

1 Job

0020 Cybersecurity.

Pricing Arrangement: Firm Fixed Price

1 Job

Section 00 20 00 - Instructions for Procurements

Totals & Notes

TOTAL BASE BID (CLIN 0001 THRU 0006 AND 0020) $ __________________________

TOTAL OPTION BID (CLIN 0007 THRU 0019) $__________________________

TOTAL BID (CLIN 0001 THRU 0020) $___________________________

(1) Optional Item may be exercised within 150 calendar days from issuance of Notice to Proceed. The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order.

(2) CLIN 0006 is pre-priced and should not change.

(3) Total Bid shall include all costs associated with each base item number and optional item number including all bonding, overhead and profit.

(4) Offeror must submit a price for every CLIN. Failure to do so may result in Offer being unacceptable.

(5) .Offers are to be valid for 173 calendar days after the date offers are due

(6) Period of performance (PoP - total contract duration) for the base and optional scopes is 600 days (20 months) total from NTP (Notice to Proceed). The PoP is for the base and optional work in total and will not change if any/all of the optional line items are exercised.

BIDDER/OFFEROR INQUIRIES: Please submit technical inquiries and questions relating to this solicitation via email to Michael.L.McCue@usace.army.mil. Submission of inquires will close 2 September 2025 2:00 PM EST. The Government reserves the right to decline addressing questions received after this date. If an Offeror believes that the requirements in this solicitation contains an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this contract based on the initial proposal, as received, without discussions.

Section 00 21 00 - Instructions

CPARS- The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI)be collected on DoD contracts. The Contractor Performance Assessment Reporting System (CPARS) is a web enabled application the supports the completion, distribution and retrieval of all contract performance evaluations. Contractor Representative are responsible for reviewing and commenting on evaluations submitted on the Contractor Performance Assessment Reporting System (CPARS) website at. https://www.cpars.gov/index.htm

BONDS-The Standard Forms(SF24, SF25, and SF25A) for these bonds have been revised as of October2023,when including your proposal/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your proposal/offer nonresponsive.

EVERIFY- "The Contractor must pre-screen Candidates using the E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that Proposals are submitted so as to reach the designated recipient and designated location. Offerors are responsible for allowing sufficient time for the proposals to be received in accordance with the instructions provided.

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.204-7 System for Award Management. Nov 2024 52.204-16 Commercial and Government Entity Code Reporting. Aug 2020 52.204-22 Alternative Line Item Proposal. Jan 2017 52.214-34 Submission of Offers in the English Language. Apr 1991 52.214-35 Submission of Offers in U.S. Currency. Apr 1991 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. May 2014 52.225-12 Notice of Buy American Requirement-Construction Materials Under Trade Agreements. May 2014 52.232-28 Invitation to Propose Performance-Based Payments. Mar 2000

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.204-7024 Notice on the Use of the Supplier Performance Risk System. Mar 2023 252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors. Jan 2023 252.215-7016 Notification to Offerors-Postaward Debriefings. Dec 2022

FAR Clauses Incorporated by Full Text

52.215-1 Instructions to Offerors-Competitive Acquisition. (Nov 2021)

Instructions to Offerors-Competitive Acquisition (Nov 2021)

(a) Definitions. As used in this provision-

Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

In writing, "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

Proposal modification is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.

(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show-

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)

(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government's interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether sourceselection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

52.216-1 Type of Contract. (Apr 1984)

Type of Contract (Apr 1984)

The Government contemplates award of a FIRM FIXED PRICE[Contracting Officer insert specific type of contract] contract resulting from this solicitation.

(End of provision)

52.228-1 Bid Guarantee. (Sep 1996)

Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.233-2 Service of Protest. (Sep 2006)

Service of Protest (Sept 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Francis Cashman Francis.Cashman@usace.army.mil Chief of Contracting 26 Federal Plaza Room 16-300 New York, NY10278________________. [Contracting Officer designate the official or location where a protest may be served on the Contracting

Officer.]

(b) The copy of any protest shall be received in the office designated above within oneday of filing a protest with the GAO.

(End of provision)

52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995) Alternate I (Feb 1995)

Alternate I . If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of (Feb 1995) the basic provision:

(a) The clauses at 52.236-2, Differing Site Conditions, and52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

A site visit will be held on 30 July 2025 at EST.0900-1300hrs

Email all requests to attend the site visit to Michael Ruppert, site visit POC's:

POC: Michael Ruppert, Project Manager Email: michael.s.ruppert@usace.army.mil Office Phone: (845) 322-0240

All requests to attend the site visit must be received NLT 10:00am EDT Tuesday, 29 July 2025.

Location to meet is at the intersection of Cullum Road and Jefferson Place (There is a bus stop at this location). All personnel coming to West Point must go to the visitor's center to receive access to the installation, 2107 New South Post Road in Highland Falls. Upon entry to West Point, parking is at Buffalo Soldier Field. There is a bus that can shuttle people to the link up point, or they can walk the mile long route up Thayer road to the link up. POC will provide a map of location.

52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)

Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/content/regulations________[Insert one or more Internet addresses]

(End of provision)

52.252-3 Alterations in Solicitation. (Apr 1984)

Alterations in Solicitation (Apr 1984)

Portions of this solicitation are altered as follows:

(End of clause)

52.252-5 Authorized Deviations in Provisions. (Nov 2020)

Authorized Deviations in Provisions (Nov 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Acquisition Regulation[insert regulation name](48 CFR Chapter2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

DFARS Clauses Incorporated by Full Text

252.215-7008 Only One Offer. (Dec 2022)

ONLY ONE OFFER (DEC 2022)

(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to-

(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable (10 U.S.C. 3705) or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 3702 and FAR 15.403-3); and

(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.

(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:

(1) Profit rate or fee (as applicable).

(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).

(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable ____[U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].

(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.

(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

(End of provision)

Section 00 21 16 - Instructions to Proposers

See attached evaluation factors

Section 00 22 00 - Supplementary Instructions

FAR Clauses Incorporated by Full Text

52.217-5 Evaluation of Options. (Jul 1990)

Evaluation of Options (July 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

Section 00 22 13 - Supplementary Instructions to Bidders

Bartlett Hall 4th Floor Conversion, Courtyard Wall and Roof Repair

USMA West Point, New York

W912DS25RA007

Amendment 0002

TO BIDDERS:

Offer due date is 1400, 15 Sep 25.

RFI suspense NLT 2 Sep 25. The Government reserves the right to not reply to those submitted after this date.

General RFI responses

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the bidders "For Information Only" and do not revise the solicitation, plans or specifications.)

1. Please confirm if the Davis Bacon wages provided in the RFP are locked for the duration of the project or do we need to factor in wage rate escalations (which may be issued through new modification numbers after the bid due date) in our bid.

a. If a project wage determination expires before contract award, the contracting officer shall request a new wage determination from the department of labor and amend the solicitation (before award). Wage rates will not change for subsequent modifications after award.

2. In light of the Labor Day Holiday on Sept. 1st / week we are kindly requesting a x(1) week bid date extension to Sept. 9th. Many offices are close Labor Day week in observance of the holiday. We feel it would be in the owners best interest to extend the bid date to allow for optimal time to receive the most competitive bid pricing.

a. Proposal due date pushed to 15 SEP (Amendment 1).

3. Please advise if any MC Cables are allowed in the walls as part of the project electrical roughing work.

a. Division 26 Specification Section 26 20 00, Sub-Section 2.5.5 states that Metal-Clad Cable is an approved Cabling use for this project. However, the contractor should follow the installation methods for wiring/cabling that are performed in other areas of the facility.

4. Spec section 01 30 00 part 1.7.6 a.; (2). indicates that if the Contractor subcontracts more that 70% of the contract value, two superintendent must be provided. Please advise if the 2 assistant superintendents required per part 1.7 [ of spec section 01 30 00] can replace the requirement for the additional superintendent. If not, please advise if the 2 superintendents must be present full time at the site for the duration of the project."

a. Spec section 01 30 00, Para 1.7.6 has been deleted from the contract.

5. Please advise as to when the anticipated NTP date will be.

a. NTP is targeted at 30 days after award.

6. Please confirm all loose FFE in the building shall be removed by the owner.

a. IAW Spec section 02 41 00, Para 3.2.1. "Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, become the property of the Contractor and must be removed from Government property."

b. A note will be added to the conformed demolition drawings in volume 3 indicating any FFE not removed will be the responsibility of the contractor to dispose of.

c. Contractor can expect to dispose of the following equipment left behind

i. Compact and Static shelving ranges

ii. Spare / uninstalled shelves

iii. 12 each 5-drawer metal map cases 54" wide (arranged in 3 stacks)

iv. 1 each large metal map case (on legs) 79.25" x 52" x 36"

v. 10 each 5-drawer metal filing cabinets (legal size)

vi. 6 each spare 54" map case tops and bases

vii. 1 each 24" x 24" x 65" wardrobe/locker

viii. 4 each metal L-shaped desks with overheads (unless removed before NTP)

7. On the mechanical and plumbing schedules no make or model is given for the equipment's or fixtures. Please provide.

a. Government regulations do not permit specifying brand name or equal components without special approval."

8. Please confirm that the building shall be occupied during construction.

a. Yes, the three floors below and all adjacent spaces outside the limits of construction will be occupied.

9. Are J- Hooks permittable?

a. Building Telecommunication Cabling Systems will adhere to the following UFC reference and is hereby added to Specification 27 10 00 Paragraph 1.1: UFC 3-580-01 (dtd 21 November 2024). Specifically addressing this RFI, UFC 3-580-01, Paragraph 2-3.2.3.3 page 22 of this document covers where non-continuous cable supports (J-hooks) are not permitted. When using non-continuous cable supports, comply with TIA-569. Supports must not exceed 20 cables or 50 percent of the fill capacity, whichever is less.

10. Typically ""Pressure testing an air barrier system for air tightness"" is a specification and requirement on this type of project. There was no reference in the TOC/ Specifications. Please confirm that this will not be a requirement of the project."

a. Not Required

11. Have demolition permits been filed?

a. Not Required

12. Please advise if work indicated on AD-200 & A-205 should be included as part of CLIN0001 or CLIN0003.

a. Work on AD-200 & A-205 are associated with CLIN 0003.

13. Please confirm that the General Contractor is responsible for carrying the pre negotiated value of $321,400 for Tridium Niagara LON Works Direct Digital Control (DDC) System in their bid per the J&A issued with the documents.

a. The estimates from the J&As are not locked or pre-priced. The GC will negotiate for the Tridium Niagara LON Works.

14. Section 00 10 00 Bid Form: CLIN- 0004 All work associated with a new ""greenwall"" per plans and specs & CLIN- 0005 All work associated with a new ""greenwall"" per plans and specs are written exactly the same. We feel that this is an error and or duplicate item. Please advise.

a. CLIN Item No. 0004 has been updated to accurately reflect all work associated with the addition of a lightning protection system in accordance with plans and specifications.

15. Section 01 11 00 Summary of work is different than Section 00 10 00 Solicitation, Contract Line Item Number (CLIN) Schedule Bid Form. Please revise.

a. Solicitation Sections 00 10 00 & 00 20 00 and Specification Section 01 11 00 - Summary of Work have been reissued for consistency in this amendment 2.

16. Is there a bidders checklist that can be provided. Past projects have a specific spec section for a checklist of items to be submitted with the bid.

a. Price proposals should use the CLIN Schedule found in Solicitation Section 00 10 00.

17. Please confirm not asbestos abatement work is required on the project.

a. There is an asbestos report attached to the specifications for roofing work (appendix "A"). Interior Asbestos Items were abated in the 2010 Building renovation.

18. E-150 above rooms 417/419 shows what appears to be a distribution transformer but does not show rating. Please confirm this is a distribution transformer, and please advise on rating.

a. There is no actual transformer in that location. This symbol will be removed from Dwg. E-150 in the conformed drawing set.

19. Can FA cable in installed free air above 8'.

a. Dwg. FA-001, FIRE ALARM NOTES - Note 5 states "WIRING FOR FIRE ALARM DEVICES IN FINISHED CEILING SPACES SHALL BE INSTALLED IN EMT CONDUIT UP TO 8'-0" AFF AND THEN IN FIRE ALARM PLENUM RATED CABLE ABOVE 8'-0" AFF".

20. Equipment shown on C7/E-150, can you confirm if these is on the roof and we need to run circuits in GRC or is this inside and EMT acceptable.

a. We believe that the drawing # referenced in the RFI comment (E-150) is incorrect; it should be Dwg. E-151 where Partial Plan C7 is indicated. All equipment shown is inside in the two (2) Mechanical Room spaces; none of this equipment is outside on the roof. Circuit loads in Mechanical spaces are recommended to be run in GRC, they should not be run in EMT.

21. 6 gang floor box shown on 4th floor does not call a model number, please provide.

a. Government regulations do not permit specifying brand name or equal components without A general description for the combination floor box with the essential parameters is indicated on Dwg. E-001.special approval.

22. FA-150 E4 shows what appears to be new devices, but with (E) next to them. Please confirm if these are new devices or if (e) means existing devices.

a. This is to confirm that all Fire Alarm and Mass Notification devices indicated on this Partial Plan E4 are existing devices with an ( E ); there are no new devices. The purpose of showing these is to indicate that there were devices in place and that the area had adequate coverage.

23. Mandatory Staffing 01 30 00- Key Mgmt Personal Section 1.7.1 calls for a full time Cybersecurity Representative. There is an OPTIONAL CLIN- 0020-Cybersecurity. Is the Cybersecurity Representative to be carried in the Base Bid Cost CLIN0001 or OPTIONAL CLIN- 0020?

a. CLIN 20 is part of the base bid and not an option.

24. Page 14, d. of CUI (Evaluation Factors) states that "two separate volumes" should be sent and "e" of that same page states; "Offerors should submit the Price Schecdule in Volume II", BUT page 15, 4. 3 of the CUI states "VOLUME III: PRICE FACTOR". PLEASE CLARIFY.

a. Yes, 3 volumes are required.

b. Para 3.6.d. Proposals must be sent in three separate volumes.

c. Para 3.6.e. Offerors shall submit the price Schedule in Volume III.

25. Can Small Businesses submit non-federal performance info?

a. YES, for similar size, scope, and complexity.

26. Is the information requested Under 5.5 Tab D required at the time of the bid proposal due date?

a. Yes.

27. Can the Government extend RFI due date?

a. RFIs will be accepted through 2 Sep 25.

28. The Bid call out a qty of 20 AC05 task lights under Ancillary but on the Installation List quantity by room number it equal 22. So we just need to know if there are 20 or 22.

a. Count of fixtures is 22.

29. Will there be another site visit?

a. There will NOT be another site visit.

30. Can we extend proposal due date to 15 SEP?

a. Yes, See Amendment 1.

31. Please provide the manufacturer information for the existing circuit breakers and panel boards for the following panels: DP5A, DPSBA, and RDP3 on page E-600. Additionally, please confirm whether the new panel RP4C is required to match the manufacturer of the existing equipment.

a. All existing electrical Distribution Panelboards, Switchgear and Panelboards for the building are manufactured by Square D. For any new electrical loads, new matching type circuit breakers shall be provided as indicated in the Panel Schedules on Dwgs. E-612 & E-613.

32. Per the construction documents, drawing E-140 indicates the locations of floor boxes; however, the specifications do not identify the manufacturer or model number for these devices. To ensure accurate procurement and installation, please provide: Manufacturer name for the floor boxes shown on E-140; Model number (or approved equivalent) for each floor box type; Any applicable finish, cover plate style, or accessories required for the installation.

a. Government regulations do not permit specifying brand name or equal components without A general description for the combination floor box with the essential parameters is indicated on Dwg. E-001. The finish is special approval.

to be selected by the architect.

33. We require clarification on the exact location of Panel RDP3 and ELEC. RM. A-300. Since a feeder is being routed from RDP3 to Panel RP4C, knowing the precise location of RDP3 is necessary to determine the accurate length of the feeder. Please provide the exact location or updated drawings showing Panel RDP3.

a. A Partial Plan for Electric Rm. A-300 (Location: 3rd Floor) indicating existing Panel RDP3 will be completed, and this and other associated revisions will be reflected in an upcoming Addendum, TBD.

34. Please confirm if this project is required to comply with Buy American clauses.'

a. Yes. FAR Clause for Buy American is part of the contract.

35. Provide a spec. for the specified "Elastomeric Coating" per my e-mail below.

a. Specification for the Elastomeric Coating is issued via Addendum. See Specification 07 52 00, Para 2.15.

36. Provide information on the existing steel dunnage / mechanical platforms that are located throughout the roof areas: Provide photos of ex.

dunnage conditions; Provide cross-sections showing the distance between the bottom of the various dunnage structures to the roof surface. We need to know if the underlying roofing is accessible for replacement.

a. Cross sections and heights of the equipment platforms have been included within the construction documents on the A-200 series drawings along with the photos noted above.

37. Per note #6 in D6/A-102 what is the specified "custom color finish" for the replacement metal roofing & trim panels?

a. Custom color finish must match the existing panel colors which is similar to an aged green copper patina.

38. Is a vapor barrier or retarder required within each roof assembly at each deck type?

a. A vapor retarder is required to be provided at each roof assembly and is separate from the specified 3-ply SBS system. See issued addendum including Specifications 07 22 00 and 07 52 00.

39. Are the vapor barriers and vapor retarders interchangeable and can one or the other be used at all locations as per the roofing manufacturer's assemblies.

a. Negative. A vapor retarder is required at each roof assembly. See issued addendum including Specifications 07 22 00 and 07 52 00.

40. Regarding venting - is this due to existing excess moisture content at the concrete decks? Otherwise venting would not be typical at any of the deck types. Additionally, although possible over the coverboard, venting is typically provided by the membrane at the deck level, usually due to deck moisture content (as with light weight structural or light weight insulating concrete) or some other interior situation.

a. Negative. Excessive moisture is not anticipated from the concrete decks. A venting base ply, typically used to minimize blistering, is not required since cover boards are specified. See issued addendum including Specifications 07 22 00 and 07 52 00.

41. Can the venting base be substituted for an additional ASTM…