Bid Abstract Form W912DS25BA005 Final.pdf

PDF 899 KB Posted

Attached to
Maintenance Dredging of Newark Bay, NJ – -50ft. , -45ft. , -40ft. , and -35ft. Reaches
Solicitation number
W912DS25BA005
Issued by

About this file

This document is an Abstract of Offers - Construction form for a maintenance dredging project in Newark Bay, New Jersey. The solicitation (W912DS25BA005) was issued by the U.S. Army Corps of Engineering, NY District on 8 May 2025, with offers opened on 10 Jun 2025. Three bidders submitted proposals: The Durant Group, Donjon Marine CO, INC., and Cashman Dredging & Marine Contracting Co., LLC.

The project involves dredging multiple areas with varying volumes, including basic work and optional dredging zones totaling approximately 336,645 cubic yards (CY). Bid prices range from $120 to $180.29 per CY, with total base bids ranging from $47,456,250 to $49,368,394.07 and total option bids from $13,114,500 to $27,067,426.15. The grand total bids span from $53,624,500 to $76,435,820.22. Additional line items include mobilization/demobilization and a Black Box Monitoring Unit. The solicitation indicates 9 amendments were issued, and each bidder acknowledged 3 amendments.

View the file

Other files

File Type Posted
W912DS-25-B-A005 Tech Specs_NB25_Revison 1.pdf PDF
Solicitation Amendment W912DS25BA0050003 SF 30 Jun 3 2025.pdf PDF
Solicitation Amendment W912DS25BA0050002 SF 30.pdf PDF
Solicitation Amendment W912DS25BA0050001 SF 30.pdf PDF
Newark Bay FY25_Technical Report.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part9.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part2.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part5.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part4.pdf PDF
Newark Bay FY25_State Analytes Tables.xlsx XLSX spreadsheet
J185280_1 Std_Tal_L4 Final Report_Part8.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part12.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part6.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part10.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part6.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part5.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part3.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part13.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part7.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part11.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part1.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part9.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part1.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part1.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part7.pdf PDF
180_185041_1_BattelleCorp (2).xls XLS spreadsheet
J185371_1 Std_Tal_L4 Final Report_Part8.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part7.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part8.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part10.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part11.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part3.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part2.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part3.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part14.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part4.pdf PDF
J185041_1 Std_Tal_L4 Final Report_Part4.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part5.pdf PDF
J185280_1 Std_Tal_L4 Final Report_Part6.pdf PDF
180_185371_1_BattelleCorp (2).xls XLS spreadsheet
J185041_1 Std_Tal_L4 Final Report_Part2.pdf PDF
J185371_1 Std_Tal_L4 Final Report_Part9.pdf PDF
180_185280_1_BattelleCorp (2).xls XLS spreadsheet
J185371_1 Std_Tal_L4 Final Report_Part10.pdf PDF
Attachment L_Newark Bay NJ Channel XYZ Data 8 May 2025.pdf PDF
Tech Spec W912DS-25-B-A005_NB25_R1 8 May 2025.pdf PDF
B.08.02_Solictation W912DS25BA005 8 May 2025.pdf PDF
Plans Newark Bay 2025 W912DS25BA005 8 May 2025.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGES

7A. ITEM

NO.

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

D. UNIT

PRICE

0001 1 Job $ 8,209,023.00 $ 8,209,023.00 $ 6,000,000.00 $ 10,000,000.00

0002 21,600 CY $ 180.29 $ 3,894,264.00 $ 175.00 $ 120.00

0003 Basic Work 2 - Dredging Area 136,395 CY $ 173.40 $ 23,650,893.00 $ 175.00 $ 120.00

0004 Basic Work 3 - Dredging Area 78,755 CY $ 171.62 $ 13,515,933.10 $ 175.00 $ 120.00

0005 Black Box Monitoring Unit 1 Job $ 98,280.97 $ 98,280.97 $ 25,000.00 $ 100,000.00

0006 Option 1 - Dredging Area 61,000 CY $ 178.73 $ 10,902,530.00 $ 160.00 $ 100.00

0007 Option 2 - Dredging Area 53,045 CY $ 179.07 $ 9,498,768.15 $ 160.00 $ 100.00

0008 Option 3 - Dredging Area 37,100 CY $ 179.68 $ 6,666,128.00 $ 160.00 $ 100.00

$ 49,368,394.07

$ 27,067,426.15

$ 76,435,820.22

TOTAL BASE BID

TOTAL OPTION BID

GRAND TOTAL

$ 38,510,000.00 $ 47,456,250.00

$ 23,869,125.00 $ 16,367,400.00

$ 13,782,125.00

$ 25,000.00

$ 9,760,000.00

$ 100,000.00

$ 9,450,600.00

$ 6,100,000.00

$ 8,487,200.00

$ 5,936,000.00

$ 5,304,500.00

$ 3,710,000.00

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

$ 71,639,450.00 $ 53,624,500.00

$ 24,183,200.00 $ 15,114,500.00

6. NUMBER OF AMENDMENTS ISSUED: 9 C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED 3 C. AMENDMENTS ACKNOWLEDGED 3

7B. DESCRIPTION OF OFFERED ITEM E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

Mobilization and Demobilization $ 6,000,000.00 $ 10,000,000.00

Basic Work 1 - Dredging Area $ 3,780,000.00 $ 2,592,000.00

5. PROJECT TITLE

MAINTENANCE DREDGING OF NEWARK BAY, NEW JERSEY, FEDERAL

NAVIGATION PROJECT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

The Durant Group

A. OFFEROR

Donjon Marine CO, INC.A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

W912DS25BA005

2. DATE ISSUED

8 MAY 2025

3. DATE OPENED

10 Jun 2025

4. ISSUING OFFICE

U.S. Army Corps of Engineering, NY District 26 Federal Plaza, Room 16-300 New York N.Y. 10278-0090

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Nicholas Emanuael, Contracting Officer

SIGNATURE DATE SIGNED

10 Jun 2025

PAGES

D. UNIT PRICE D. UNIT

PRICE

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 Job $ 9,000,000.00 $ -

0002 21,600 CY $ 160.00 $ -

0003 136,395 CY $ 160.00 $ -

0004 78,755 CY $ 160.00 $ -

0005 1 Job $ 229,396.00 $ -

0006 61,000 CY $ 140.00 $ -

0007 53,045 CY $ 140.00 $ -

0008 37,100 CY $ 140.00 $ -

TOTAL OPTION BID

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER

W912DS25A0005

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

MAINTENANCE DREDGING OF NEWARK

BAY, NEW JERSEY, FEDERAL

NAVIGATION PROJECT

4. OFFERS (Continued)

NO.: NO.: NO.: NO.:

A. OFFEROR

Cashman Dredging & Marine Contracting Co., LLC

A. OFFEROR

N/A

A. OFFEROR

N/A

A. OFFEROR N/A

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED 3 C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. ITEM

NO.

B. ESTIMATED

QUANTITY

C. UNIT

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT PRICE E. ESTIMATED

AMOUNT

$ 9,000,000.00 $ - $ -

$ 3,456,000.00 $ - $ -

$ 21,823,200.00 $ - $ -

$ 12,600,800.00 $ - $ -

$ 229,396.00 $ -

$ 8,540,000.00 $ -

$ 5,194,000.00 $ -

$ 7,426,300.00 $ -

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

$ 47,109,396.00

GRAND TOTAL $ 68,269,696.00 $ -

$ 21,160,300.00

TOTAL BASE BID

2025-06-11T07:48:44-0400
EMANUEL.NICHOLAS.1298804880