RTA Submittal Design Specifications - Vol. 01 Binder - Rev. 1.pdf

PDF 6 MB Posted

Attached to
8-Bed Level 1 Confinement Facility, Joint Base-MDL (McGuire AFB), New Jersey
Solicitation number
W912DS22B0021
Issued by

About this file

This is a pre-solicitation notice for a firm-fixed-price construction contract to build an 8-bed Level 1 confinement facility at McGuire Air Force Base in New Jersey. The project includes construction of a 4,607 square foot single-story building with security fencing, lighting, and a secured outdoor recreation area. Site work and a parking lot are also required. The facility will house pre-trial detainees and include an administrative area, visitation room, training room, waiting room, day room, and all necessary utilities, communications, electrical, mechanical, and fire protection systems. The solicitation will be issued on or around mid-July 2022 as a small business set-aside, with bids due approximately 30 days later. The period of performance is 540 calendar days from notice to proceed. The estimated value is between $5-10 million. The U.S. Army Corps of Engineers, New York District will issue and administer the contract.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construct 8 Bed Level 1 Confinement Facility

Joint Base McGuire-Dix-Lakehurst, New Jersey

U

Specifications – Vol. 01

Project Number: 2795/PTFL186000

24 June 2022

W912DS-19-D-0011

TO: W912DS21F0109

BMcD PN 138107

US Army Corps Of Engineers® New York District

138107 USCOE – JB MDL Construct 8 Bed Level 1 Confinement Facility

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 00 01 05/22 COVER SHEET

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/15 SUMMARY OF WORK

01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS

01 22 00.00 10 08/15 PRICE AND PAYMENT PROCEDURES

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 33 00 08/18 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 11/16 QUALITY CONTROL

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 20.00 18 NY Dist. July 2018 TESTING FOR MECHANICAL AND ELECTRICAL

SYSTEMS

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19 PROJECT IDENTIFICATION

01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 05/19, CHG 2: 08/20 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 05/10, CHG 2: 02/19 DEMOLITION AND DECONSTRUCTION

DI VI SI ON 03 - CONCRETE

03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL PANELS

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 13 73 02/11 SLIDING METAL DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 34 63 05/11 DETENTION HOLLOW METAL FRAMES, DOORS,

AND DOOR FRAMES

08 56 63 04/06 DETENTION AND SECURITY WINDOWS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 71 63 04/06 DETENTION HARDWARE

08 71 63.10 02/21 ELECTRICAL LOCKING CONTROL FOR BRIGS

08 88 53 05/11 DETENTION AND SECURITY GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 05/09, CHG 1: 11/13 SCHEDULES FOR FINISHES

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 67 23.13 11/19 STANDARD RESINOUS SYSTEMS

09 90 00 02/21 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

DI VI SI ON 12 - FURNI SHI NGS

12 55 00 04/06 DETENTION FURNITURE AND ACCESSORIES

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DI VI SI ON 22 - PLUMBI NG

PROJECT TABLE OF CONTENTS Page 2

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20 HVAC AIR DISTRIBUTION

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 74 33.00 40 05/17 PACKAGED, OUTDOOR, HEATING AND COOLING

MAKEUP AIR-CONDITIONERS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS LOW IMPACT HVAC

CONTROL SYSTEMS

25 05 11.02 05/21 CYBERSECURITY FOR FIRE ALARM/MASS

NOTIFICATION SYSTEM

DI VI SI ON 26 - ELECTRI CAL

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

AND ARC FLASH RISK ASSESSMENT

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 51 23 11/21 INTERCOMMUNICATION SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

PROJECT TABLE OF CONTENTS Page 3

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 08/08 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 08/17 GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES AND GATES

32 92 19 10/06 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 04/08 SANITARY SEWERS

33 40 00 11/21 STORMWATER UTILITIES

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION 00 00 01

COVER SHEET

05/22

PART 1 GENERAL

NEW YORK DI STRI CT

CORPS OF ENGI NEERS

NEW YORK, NEW YORK 10278- 0090

I NVI TATI ON FOR BI DS

FOR

8 Bed - Level 1 Conf i nement Faci l i t y Joi nt Base McGui r e- Di x- Lakehur st , McGui r e, New Jer sey

1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-XX-X-XXXX

2. BIDS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS TO BIDDERS (Section 00 21 13).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of this IFB).

5. REPRESENTATIONS AND CERTIFICATIONS - SECTION 00 45 00 Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

6. GENERAL CONDITIONS - SECTION 00 72 00, note in particular the PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause.

7. Please review all bonds and accompanying documents required to be submitted. Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures and/or seals generated as part of a document, as opposed to being affixed to the document after its generation, will not be accepted. Submission of such documents may render the bid or offer non-responsive and ineligible for award.

PART 2 PRODUCTS

Not Used

DOCUMENT 00 00 01 Page 1

PART 3 EXECUTION

Not Used

-- End of Section --

DOCUMENT 00 00 01 Page 2

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor must be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and

(iii) complete the entire work ready for use, not later than 541 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion must include final cleanup of the premises(FAR 52.212-3).

b. The Contractor must furnish all labor, materials, equipment, and services for the following work covered under this contract.

c. All work must be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan; G , RO

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

The work includes construct a new a single story, Level I Regional Confinement Facility to accommodate an eight-cell requirement in accordance with Air Force Instruction 31-205, Air Force Corrections System.

The project will also include fire suppression system, utilities, communications, site improvement, and associated supporting facilities.

1.3.2 Location

The new facility would be located at the southwest corner of the intersections of West Tuskegee Airman Ave. and Vandenberg Ave., to the north of Building 2301 and south of an existing asphalt parking lot.The site of the work is on a military reservation and all rules and regulations issued by the Commanding Officer covering general safety, security, and sanitary requirements, etc., shall be observed by the

SECTION 01 11 00 Page 1

Contractor.

1.4 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS

This project is estimated between $5,000,000 and $10,000,000.

1.5 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

c. The responsibility for damage to the permanent work must be as set forth in the article of the contract clause entitled "PERMITS AND RESPONSIBILITIES". However, if in the judgment of the Contracting Officer, the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, severe coastal storm or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor must make the repairs as ordered by the Contracting Officer and full compensation for repairs will be made at the applicable Contract unit or lump-sum prices as fixed and established in the Contract. If, in the opinion of the Contracting Officer, there are no Contract unit or lump sum prices applicable to the work, an equitable adjustment, pursuant to Contract Clause entitled CHANGES, will be made as full compensation for the repairs of that part of the permanent work for which there are not applicable Contract unit or lump-sum prices. Except as herein provided, damage to all work, utilities, materials, equipment, and plant, including temporary construction and utilities, pavements, and other property along the routes used by the Contractor's pipelines and/or land vehicles, must be repaired to the satisfaction of the Contracting Officer, the State of New York, and the utilities companies, at the Contractor's expense regardless of the cause of such damage.

1.6 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING

Do not inflict damage upon land and properties outside the authorized construction area by unwarranted entry upon, passage through, damage to, or disposal of, material on such land or property. The Contractor may make a separate agreement with any other party, regarding the use of, or right to, land or facilities outside the contract area. If such an agreement is made, it must be in writing and a copy must be provided to the Contracting Officer. The Contractor must hold and save the Government, its officers, and agents free from liability arising from trespassing or damage occasioned by his operations.

1.7 Base Civil Engineering Work Clearance Request, AF Form 103

In accordance with JB MDL Regulations, prior to commencing construction

SECTION 01 11 00 Page 2 work, or whenever the ground surface is to be disturbed deeper than three inches or when erecting structures or operating equipment near overhead lines, the Contractor performing work is responsible for calling the CALL-BEFORE-YOU-DIG 800 number and contact DPW at 609-562-6021 and having in their possession at all times while digging, an approved AF Form 103.

1.7.1 AF Form 103

The AF Form 103 shall be completed and processed by the Contractor, through the applicable McGuire JB MDL Civil Engineering Offices noted on the form, prior to the actual start of excavation or the erection operation, and will remain valid for 30 days. The written request shall include details and methods to be used for the excavation.

The Contractor shall contact the applicable McGuire JB MDL Civil Engineer's office in writing a minimum of five working days prior to each expiration date and notify them of the need to revalidate the form.

1.7.2 Air Quality Permit

The Contractor is responsible for coordinating with JB MDL Environmental for the inclusion of any new equipment that could affect the existing Air Quality Permit currently in effect.

1.8 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Verify existing utility locations indicated on contract drawings, within area of work.

1.8.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.9 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the storage area.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 11 00 Page 3

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 11 00 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

11/ 11, CHG 14: 02/ 22

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G RO

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. Permission to interrupt any Activity roads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.Roads must only be closed one lane at a time, and vehicular traffic must be allowed to pass through the construction area. Work on or near roadways must be flagged in accordance with the safety requirements in EM 385-1-1 . Work located along the alert force route shall not cause blockage, and the Contractor shall maintain unobstructed access for alert force traffic at all times.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.

Refer to the APPENDIX 4 TO ANNEX C TO JB MDL JIDP - CONTRACTOR SECURITY APPENDIX at the end of this section.

SECTION 01 14 00 Page 1

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel in accordance with ATTACHMENT 2 TO APPENDIX 4 TO ANNEX C TO JB MDL JIDP - Contractor Entry Authority List (EAL) Requirements found at the end of this section.

1.4.1.2 Site And Building Security And Vehicle Identification

a. The Contractor shall be responsible for the security of the areas within the contract limits. When the Government takes possession of certain areas, the Contractor shall be responsible for the areas remaining under Contractor control.

b. The Contract must maintain continual base security with personnel security guard and temporary fences. Wherever there are fence disruptions due to the construction of this project, the Contractor shall continually monitor and maintain the fence.

c. The Contractor shall be responsible for furnishing an identification required by JB MDL to each employee in accordance with paragraph titled IDENTIFICATION OF EMPLOYEES.

d. The Contractor shall be responsible for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employees. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.

e. The Contractor and subcontractors shall register all company and private vehicles that will be used in the execution of this contract with the Installation Provost Marshall's office prior to start of work by the Contractor/subcontractor. Entry to the installation requires the following prior coordination with the Contracting Officer or designated representative; current vehicle registration, proof of insurance, valid driver's license for the vehicle driver, and procure identification for other personnel. Contractors/Subcontractors and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The government will not be responsible for damages due to delay/stoppages caused by failure to comply.

f. All vehicles and personnel are subject to search and seizure of contraband and/or unauthorized government property. Contractor vehicles (Contractor-owned and personal), contractor personnel, and their personal property shall be subject to searches upon entering or leaving the installation. The search and seizure provisions of AR 190-22 shall apply to contractor personnel entering or leaving JB MDL

1.4.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

SECTION 01 14 00 Page 2

1.4.2 Working Hours

Regular working hours will consist of an 10 hour period , between 7:00 a.m. and 5:00 p.m., Monday through Friday, excluding Government holidays.

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer and Base approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.4.4 Exclusionary Period

No work may be performed during the government holidays, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract.

1.4.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four hours. This time limit includes time for deactivation and reactivation.

1.5 Working Conditions

Comply with paragraph Fatigue Management Plan (FMP) of EM 385-1-1 .

(1) Open trenches or road restrictions will not be permitted without the approval of the Contracting Officer.

(2) Access ways must be fully usable.

(3) All cost for conformance with the above stated requirements must be included with the lump sum contract amount and no claim for extra cost must be considered.

SECTION 01 14 00 Page 3

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 4

FOR OFFICIAL USE ONLY

HQ 87 ABW (AMC)

JB MDL, NJ 08641-5002

10 Jun 15

APPENDIX 4 TO ANNEX C TO JB MDL JIDP

CONTRACTOR SECURITY APPENDIX

1. SITUATION. This annex provides the 87th Security Forces Squadron (SFS) appendix to all statements of work for JB MDL.

1.1. Enemy. Refer to Basic Plan.

1.2. Friendly. Refer to Basic Plan.

1.3. Assumptions. Refer to Annex C of this plan.

1.4. Limiting Factors. Not all members listed below will be monitoring the radio.

2. MISSION. To provide Installation entry control procedures for all contractors. The following appendix provides information from Air Force Instruction 31-101, AFMAN 31-113 and local supplements on requirements for entering and conducting business while on Joint Base McGuire-Dix- Lakehurst (JB MDL), New Jersey.

3. EXECUTION

3.1. Contract Award. JB MDL requires all visitors/contractors/vendors to conduct a criminal history background check and Wants/Warrants check prior to being issued an Installation Access Pass/Card.

This check is done at no expense to the contractor and will be accomplished at the Visitor Control

Center or Commercial Vehicle Inspection Area. This will be completed prior to any access credential for JB MDL being issued to the contractor personnel.

3.1.1 All personnel requesting an installation visitor pass must complete the JB MDL request for criminal history form at the Visitor Control Center or Commercial Vehicle Inspection facility. Failure to provide all required information may result in access to the installation being denied.

3.1.2 If the contractor requires access to the installation for more than 60 days and up to three years, Visitor Control Center personnel will conduct a QWA Person Inquiry and criminal record check prior to issuing a card. Prior to issuing another Pass/Card another QWA Person Inquiry and criminal record check will be conducted.

3.1.3 If the contractor requires access for less than a 60 day period, a QWA Person Inquiry and criminal history check will be conducted prior to the contractor/vendor being issued an Installation

Access Pass. Any subsequent request for entry will require another QWA Person Inquiry and criminal history background check to be accomplished.

3.1.4. The Visitor Control Center will conduct the required background checks, review the results and determine whether personnel will be authorized to enter JB MDL. The Visitor Control Center will forward any derogatory/disqualifying information to 87 SFS/S5R for debarment initiation. If no derogatory/disqualifying information is identified, any printed QWA Person Inquiries or criminal background checks will be destroyed immediately.

3.1.5. The Visitor Control Center will also notify the appropriate Administrative Contracting Office or unit POC of those personnel who are being denied access to the installation due to derogatory information identified in the individual’s criminal background investigation. The disposition date (date the charges were finalized in court) is the date used to determine time frames. The below criminal history findings will automatically disqualify the person in question from being granted access to the installation:

3.1.5.1. There is a reasonable basis to believe based on an individual's criminal or dishonest history, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.2. Wanted by Federal or civil law enforcement authorities, regardless of offense or violation.

3.1.5.3. Immigration status is in question or cannot be verified.

3.1.5.4. US Citizenship or Social Security Account Number cannot be verified.

3.1.5.5. There is a reasonable basis to believe the individual has submitted fraudulent information concerning his or her identity.

3.1.5.6. There is a reasonable basis to believe the individual will attempt to gain unauthorized access to classified documents, information protected by the Privacy Act, information that is proprietary in nature, or other sensitive or protected information.

3.1.5.7. There is a reasonable basis to believe the individual will unlawfully or inappropriately use an access credential outside the workplace.

3.1.5.8. Barred from entry/access to any Federal installation or facility.

3.1.5.9. Wanted by federal or civil law enforcement authorities, regardless offense/violation.

3.1.5.10. Any conviction of firearms or explosives violation within the last 10 years.

3.1.5.11. Incarcerated for 12 months or longer within the past three years, regardless of the offense/violation. This can be a single incarceration or several combined which total 12 months.

3.1.5.12. Any conviction of espionage, sabotage, treason, terrorism or murder.

3.1.5.13. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

3.1.5.14. The individual’s name appears on any Federal or State agency’s “watch list” or “hit list" for criminal behavior or terrorist activity.

3.1.5.15. The individual has been convicted of DUI manslaughter or involuntary manslaughter in the past 10 years.

3.1.5.16. The individual has been convicted of sexual assault, armed robbery, rape, child molestation, child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

3.1.5.17. Any Felony conviction within the last 10 years

3.1.5.18. Any conviction of drug possession, or drug manufacture within the past 5 years, reviewable on a case-by-case basis.

3.1.5.19. There is a reasonable basis to believe, based on the individual's material, intentional false statement, deception, or fraud in connection with Federal or contract employment, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.20. There is a reasonable basis to believe, based on the nature or duration of the individual's alcohol abuse without evidence of substantial rehabilitation, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.21. There is a reasonable basis to believe, based on the nature or duration of the individual's illegal use of narcotics, drugs, or other controlled substances without evidence of substantial rehabilitation, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.22. A statutory or regulatory bar prevents the individual's contract employment; or would prevent

Federal employment under circumstances that furnish a reasonable basis to believe that issuance of a access credential poses an unacceptable risk to the installation/mission.

3.1.5.23. The individual has knowingly and willfully engaged in acts or activities designed to overthrow the U.S. Government by force.

3.1.5.24. Any person with a pending court resolution will be denied access for any offense listed above.

The disposition date (defined as the date the charges were finalized in court) is used to determine the d e barment period.

3.1.5.25. Any person with a pending court resolution for an offense not listed above will be issued a pass for two weeks at a time until the case is finalized in court. If the charges are dismissed the person will be considered to have a favorable criminal history.

3.1.6. The contractor will provide an Entry Authority List (EAL) (see attachment 5 for EAL requirements) to the administrative contracting office or installation Point of Contact (POC) (i.e. 87

CONS, US Army Corps of Engineers (USACE), 87 CES, etc.). The contracting office will provide a copy of the initial EAL to the 87 SFS/Visitor Control Center. The contracting office will maintain any required documentation until the contract has been completed or terminated for any reason.

3.1.6.1. The administrative contracting office or installation POC will authenticate and forward the

EAL to the 87 SFS Visitor Control Center, NLT 72 hours prior to contract start date.

3.1.6.2. If EALs are not accurate or contain fraudulent information, contractor identification badges will not be issued.

3.1.6.3. Pen and ink changes for deletion purposes may be made to an EAL.

3.1.6.4. Pen and ink additions to an EAL will not be accepted. All additions must be made by initiating a new EAL.

3.1.6.5. The Master EAL will be resubmitted with the additions included. Individual letters for long term employees will not be accepted if the contract exceeds 60 days.

3.1.6.6. The Visitor Control Center will maintain a copy of the documents for 90 days after expiration for future reference.

3.1.6.7. Contractor/vendor Criminal History Record and Background Checks will be valid for a period not to exceed 3 years.

3.1.6.8. At the 3 year mark, the contractor/vendor is required to complete a new check for each individual still employed and working at JB MDL.

3.1.6.9. Background checks older than 3 years will be updated by accomplishing a new JB MDL

Criminal History Request Form. Records older than three years on file will be destroyed.

3.1.6.10. Holders of other federal credentials must have a validated need for installation access and will not be granted unlimited or unrestrained access to JB MDL. Therefore, identification credentials/tokens issued by other Federal departments, such as the Transportation Workers Identification Credential

(TWIC) [produced in accordance with the Maritime Transportation Security Act of 2002 and Security and Accountability for Every (SAFE) Port Act of 2006] or other Federal credentials, may be used as identity proofing only and the person must be vetted and issued an Installation Access Pass/Card. .

3.1.7. Contractor Visitor Passes for Entry to JB MDL. Contractors and vendors will be issued a computer generated or hand written Visitor Pass, or Defense Biometrics Identification System (DBIDS) card identifying them as a contractor authorized access to JB MDL.

3.1.7.1. A criminal history check will be conducted prior to issuing any pass or card, if a criminal history check has not been completed within the last 3 years.

3.1.7.2. Contractor and vendor visitor passes will be issued at a Visitor Control Center or the

Commercial Vehicle Inspection facility for all contractors or vendors who require access to the installation for less than 60 days in a year.

3.1.7.3. Visitor passes will be issued to contractors or vendors who do not access the installation at least three days per week.

3.1.7.4. Contractors and vendors who access the installation less than three days per week, but will access the installation for longer than one month will be included on an EAL with the date the contract expires. These personnel must stop at the Visitor Control Center each time they are needed to perform work. They will be issued a Visitor Pass each time they need to enter the installation. These personnel will be identified on the EAL as requiring periodic access.

3.1.7.5. DBIDS Installation Access Cards will be only be issued to contractors or vendors requiring access at least 3 days a week for more than 30 days in a year. Personnel will only be issued an

Installation Access Card after all required Criminal History Checks are completed. Installation Access

Passes will only be issued at any of the Visitor Control Centers or Commercial Vehicle Inspection facilities for the entire JB MDL. These personnel will be identified on the EAL as requiring daily access.

3.1.7.5.1. Contractor passes will be updated annually at the Visitor Control Center or Checkpoint 9 for contracts lasting over 1 year.

3.1.7.5.2. Contractor passes will be issued for the duration of the contract, or the length of the option period not to exceed 3 years, whichever is less.

3.1.7.5.3. NON U.S. CITIZENS: All non-U.S. citizens must provide a Work Permit Visa or Alien

Registration Card with immigration number when requesting entry onto JB MDL. Upon completion of an approved Alien Immigration background check, the foreign national will be permitted to be sponsored onto the installation.

3.1.7.5.4. Foreign nationals requesting access onto Lakehurst must be initially authorize access and then be escorted to and from the required location.

3.1.7.5.5. Sponsors must meet their Foreign National visitor at the Lakehurst Visitor Control Center.

3.1.7.5.6. Non US citizens will not be issued an Installation Access Card for longer than their Work

Permit Visa is valid.

3.1.7.5.7. Those contractors working under the AF Industrial Security program will provide an EAL to the Visitor Control Center.

3.1.7.5.8. Those contractors under the AF Industrial Security program requiring access to the AF computer network may be issued a Common Access Card (CAC) in lieu of the normal contractor visitor pass.

3.1.7.5.9. Those contractors under the AF Industrial Security program who have not been issued a

CAC will be issued a contractor visitor pass if they will be on the installation less than 60 days. These

Contractors will be issued an Installation Access Card if they will be on the installation longer than 60 days.

3.1.7.5.10. Those contractors under the AF Industrial Security Program who maintain an active DoD security clearance shall provide a Joint Personnel Adjudication System (JPAS) printout in lieu of the required background checks.

3.1.7.6. Installation Access Cards or temporary visitor / vehicle passes are issued for a specific purpose.

It is not intended to allow unrestricted installation access and is to be used only when access is required for the stated purpose. Access Cards are the property of the government and must be returned to the issuing office when no longer authorized (termination, retirement, end of contract, expired, etc) or required. The misuse of an Access Card or a temporary pass may be cause for confiscation and barment from the installation. All visitors and contractors will be advised that the acceptance of an Access Card and or temporary pass will be considered implied consent to inspect passenger(s) and vehicle at any time while on the installation. When an Access Card, visitor or vehicle pass has expired, renewal is not automatic. The sponsor or requesting individual must resubmit required information.

3.2. Contractor Vehicle Passes for Entry to JB MDL. Contractor vehicle passes will be issued at any

Visitor Control Center or Commercial Vehicle Inspection Area .

3.2.1. All vehicles and drivers must have the following documentation prior to being issued a Visitor

Pass/Card and being granted access to JB MDL:

3.2.1.1. Valid state driver's license with photo.

3.2.1.2. Valid state driver’s license without photo with another government/state issued form of identification with photo.

3.2.1.3. Valid vehicle insurance.

3.2.1.4. Valid vehicle registration.

3.2.1.5. Bill of Lading (if available).

3.2.1.6. A JB MDL point of contact with a phone number.

3.2.1.7. Contractors will be issued Visitor Pass/Card for entry to JB MDL provided the required documentation listed in 3.2 is valid.

3.2.1.8. Commercial vehicles identified in Appendix 4 and issued a Visitor Pass/Card must enter the installation through a Commercial Vehicle Inspection Area

3.3. Contractor, Commercial and Oversized Vehicles. All contractors, commercial and oversized vehicles must enter JB MDL Main Base through Checkpoint-9 located on Saylor’s Pond Road.

3.3.1. All contractors, commercial and oversized vehicles must enter JB MDL Lakehurst through the

Commercial Vehicle Inspection (CVI) gate located on CR 547.

3.3.2. The following are considered “commercial and oversized” vehicles at JB MDL and these vehicles can only enter the installation IAW paragraph 3.3.1. & 3.3.2..

3.3.3. All vehicles registered and licensed for commercial purposes with “commercial” license plates, regardless of state of issue.

3.3.4. All vehicles, regardless of type, license plate, or size, having more than two (2) axles.

3.3.5. All vehicles used to carry tools, machinery, equipment, or other commercial related equipment onto the installation.

3.3.6. All vehicles displaying a commercial plaque, logo or emblem carrying tools, machinery, equipment, or other commercial related equipment onto the installation.

3.3.7. Pick-up trucks which have not been equipped with storage containers and are not loaded with material in the bed of truck may enter JB MDL through any gate.

3.4. Contractor vehicle and personnel processing requirements. Checkpoint - 9 is open for personnel and vehicle processing from 0600-1600 hours Monday through Friday and 0600-1400 hours Saturday, Closed on Sunday and some Holidays.

3.4.1. Contractor/Commercial vehicles requesting JB MDL Main Base entry from 1600-

0600 will not be allowed entry. Unusual circumstances will be handled on a case by case basis. Contact the Emergency Communication Center (ECC) at (609) 754-6001.

3.5. Lakehurst CVI is open for personnel and vehicle processing from 0700-1600 hours Monday through Friday.

3.5.1. Contractor/Commercial vehicles requesting JB MDL Lakehurst entry from 1600- 0700 or on weekends must be coordinated with the Operations Emergency Communication Center (ECC and

BDOC) at (609) 754-6001/2001 /2002.

3.6. Sub-Contractors. All subcontractors are required to follow the same instructions listed above for their subcontractor personnel.

3.6.1. Contractors with an immediate access requirement for a short-term subcontractor must coordinate with their Contracting Officer prior to authorization of access without following the normal procedures.

3.6.2. Short term Subcontractors will be issued a pass not to exceed 1 week.

3.7. Contractors. Contractors working in USAF Restricted Areas will comply with the following:

3.7.1. All contractors meeting the standard of visitor groups IAW AFI 31-501 will be issued line badges for working on the flight line and restricted areas. Those contractors must be working 90 or more consecutive days. All other contractors will require escort.

3.7.2. Each individual contractor (person) will be required to complete a Standard Form

85P - Questionnaire for Public Trust Position before accessing the Restricted Area. This is an investigation to determine the trustworthiness of the individual requiring access to the Restricted Area.

This is not the same type of investigation as the NJ or other state background checks required to be conducted to access JB MDL.

3.7.3. Each individual will work with the unit security manager the contractor is supporting to complete the SF 85P.

3.7.4. Upon completion, the contractor will submit to the unit security manager for review.

3.7.4.1. If the 85P package contains errors, the individual will work with the security manager to correct.

3.7.4.2. If unable to correct, the individual will not be allowed access to the restricted area and may be asked to leave the installation.

3.7.5. If the SF 85P package contains no errors, the unit security manager will complete an AF Form

2586 - Unescorted Entry Authorization Certificate for accessing the restricted area.

3.7.6. The unit security manager will make an appointment with 87 ABW/IPP Personnel Security office for contractor processing and turn-in AF Form 2586.

3.7.7. The contractor will meet 87 ABW/IPP personnel and submit the completed SF 85P. 87

ABW/IPP will review SF 85P for accuracy and completion. If the 85P package contains errors, the individual will work with the personnel security office to correct.

3.7.7.1. If unable to correct, the individual will not be allowed access to the restricted area and may be asked to leave the installation.

3.7.7.2. If no issues with 85P, the 87 SFS Reports and Analysis will conduct a local files check on the individual.

3.7.8. Upon local files check completion (no issues), contractor will be directed to the Pass &

Registration (Bldg 1738) where a restricted area badge can be issued on an interim basis based on submission of the 2586 to S-5B.

3.7.8.1. S-5B will review AF Form 2586 for accuracy and completion.

3.7.8.2. If there are no errors, then an AF Form 1199 - Restricted Area Badge will be produced for the contractor.

3.7.8.3. If there are errors on the AF Form 2586, the contractor will be directed to return to the unit security manager for re-accomplishment of the form.

3.7.9. If potential disqualifying information is discovered the file is forwarded to the 87th ABW IPP office. The IPP office will coordinate with the unit and appropriate wing to determine an appropriate status for the contractor. If the determination is unfavorable the IPP office will notify the 87th SFS and unescorted entry privileges to restricted areas and the flightline will be withdrawn automatically.

3.8. Any work on or near the flightline will be coordinated through the 87 SFS/S5 office. The S5

Resource Protection section (Bldg. 6049 / Room 8) and Plans Manager (Bldg. 6049 / Room 7) must review prior to start of any work in or around a Controlled/Restricted Area.

3.8.1. The S5 Resource Protection section will verify the need to access the restricted area and determine if a Free Zone must be established.

3.8.2. The S5 Plans Manager needs to review all Statements of Work, Blueprints, and Contracts to ensure all JB MDL Force Protection needs are met and any police support is identified.

3.9. Flightline Driving. Only authorized contracted or privately owned vehicles with colored cones/placards are authorized on the flightline and/or flightline road unless driving a government vehicle or under authorized escort.

3.9.1. Contractor personnel who are authorized to drive on the flightline will be issued a colored cone/placard from Airfield Management.

3.9.2. Cones/placards must be visible during operations of the vehicle when driving on the flightline and when parked on the flightline.

3.9.3. The cone/placard must be secured (put away) upon departure from the flightline.

3.10. Restricted Areas: Defined as an area delineated by ropes, red lines or barriers that contain

Protection Level resources (i.e. aircraft or equipment).

3.10.1. These areas require a certain level of protection, and entry is only allowed by authorized personnel wearing a restricted area badge or personnel under authorized escort.

3.10.2. Aircraft hangars are restricted areas when aircraft are present.

3.10.3. Signs are posted every 100 feet on the exterior of restricted area boundaries stating; "Deadly

Force is Authorized."

3.10.4. Contractors will never enter restricted areas unless properly escorted or authorized by the installation commander or designee through the issuance of a restricted area badge.

3.10.5. If the Security Forces or a military member detains a contractor or contract employee at any time or for any reason, the contractor will comply with their request and will not become combative or argumentative.

3.11. Miscellaneous Requirements. All requests for additional contractor personnel must meet the same requirements listed in para A1 above before Installation Access Passes will be issued.

3.11.1. The administrative contracting office will be notified when personnel leave the contractor company for any reason and provide that information to the Visitor Control Center.

3.11.2. The contractor company is responsible for the return of all contractor identification badges at the end of the contract or when personnel depart for any reason. All badges and passes will be returned to the Visitor Control Center.

3.11.3. During increased Force Protection Conditions (FPCONs) there may be limited entry to the installation.

3.11.4. Retired military or government personnel may be allowed to enter the installation through any gate providing the vehicle operator has a current and valid base entry ID card.

3.11.5. Retired military or government personnel must be listed on the company EAL.

3.11.6. All retired military or government personnel will complete all Criminal History Record

Information/Background Check regardless of their military/government retired status.

3.11.7. All contractor vehicles entering must be registered at the Visitor Control Center or Commercial

Vehicle Inspection Facility.

3.11.8. Personnel authorized to receive a long term Access Pass will not be issued a vehicle pass. The vehicle information will be included in the bar code of the pass. Personnel entering JB MDL who do not qualify for a long term pass or are using a vehicle temporarily, will be issued an AF Form 75, Vehicle Pass.

3.12. Contractors are NOT normally authorized to Sponsor any personnel to enter JB MDL.

3.12.1. Exceptions to this rule will be addressed on an as needed basis through the Contracting Officer and the 87 SFS Visitor Control Center Supervisor.

3.12.1.1. The contractor must work through the Contracting Officer who in turn will contact the Visitor

Control Center Supervisor.

3.12.1.2. In the event the Visitor Control Center Supervisor is unavailable, the following personnel in the order listed may approve the contractor sponsorship authority:

3.12.1.2.1. 87 SFS Deputy Air Provost, Operations Officer, Operations Superintendent, or the on- duty flight chief as necessary.

3.12.1.2.2. Sponsoring personnel onto the installation is a limited privilege for emergent requirements only and cannot be used as a routine method to get subcontractors onto the installation.

3.12.1.2.3. Contractors granted sponsorship privileges may only sponsor a visitor pass a maximum of 7 calendar days. If the person being sponsored onto the installation requires a longer pass, the responsible contracting officer or base POC must submit the person on an EAL.

3.12.1.2.4. Contractors with Installation Access Sponsoring authority must contact the

Visitor Control Center Supervisor or Senior Clerk to coordinate each emergent requirement.

3.12.1.2.5. The sponsoring Contractor will be responsible for all individuals they sponsor onto the installation.

3.12.1.2.6. Contractor sponsorship privileges will be revoked if is determined the contractor is attempting to supersede normal installation access requirements.

3.12.1.2.7. No more than three personnel per prime contract EAL will be granted sponsorship privileges.

3.12.1.2.8. The Contracting Office or JB MDL point of contact will ensure this privilege is only granted to prime contractors who will not know in advance which personnel will be reporting for work.

3.12.1.2.9. Personnel granted sponsorship authority must have…