W912DS22B0003 Amendment 0005.pdf
PDF 387 KB Posted
- Solicitation number
- W912DS22B0003
About this file
This amendment modifies the solicitation for the Port Monmouth Hurricane and Storm Damage Reduction Project in Middletown Township, Monmouth County, New Jersey. The Army Corps of Engineers issues Amendment 0005 to make changes to the plans and specifications. Revised drawings include updates to cut-off wall tip elevations, drainage features, hatch and ladder details. Added details show drainage structures, large penetrations through sheet piles, and pinned pile connections. Revised specifications include permit language corrections and clarifications to personnel assist unit scope and planting elevations. Bidders must acknowledge receipt of the amendment by the date specified in the solicitation.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
-- Make changes to the Plans (Draw ings) -- Make changes to the Specif ications
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0003
X 9B. DATED (SEE ITEM 11)
25-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2022
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
Hurricane and Storm Damage Reduction Project Phase II – Contract 5
Port Monmouth, New Jersey
AMENDMENT 0005 for Port Monmouth Contract 5 Port Monmouth, NJ
TO BIDDERS:
The following changes shall be made to the drawings and specifications.
DRAWINGS:
1. The following DRAWINGS have been REVISED and REISSUED:
a. G-002.
i. Cover Sheet has been revised to add two detail sheets.
b. C-101B.
i. Revised Tip elevation of cut off wall.
c. C-101C.
i. Added text calling out elliptical pipe size.
d. C-101G.
i. Drainage features have been added and revised.
ii. Centerline Profile View of levee dune tie in has added annotation.
e. C-102.
i. Drainage features have been added and revised.
f. C-201.
i. Revised Tip elevation of cut off wall.
g. C-203.
i. Drainage features have been added and revised.
ii. Added text calling out elliptical pipe size.
h. C-506.
i. Revised dimensions of Detail 2 – Precast Type B2 Catch Basin.
i. C-507.
i. Detail 5 - Utility Crossing Detail notes have been revised.
j. C-509.
i. Added gate, PZ, steps, and hatch door details.
k. C-510.
i. Added gate, PZ, steps, and hatch door details.
l. D-101.
i. Hatch and ladder quantity, location, sizes, and orientations revised.
m. D-102.
i. Hatch and ladder quantity, location, sizes, and orientations revised.
ii. Steel Bar grating added at SG-4.
n. D-301.
i. Hatch and ladder quantity, location, sizes, and orientations revised.
ii. Steel Bar grating added at SG-4.
iii. Gravy Chamber ‘B’ retaining loop details revised.
o. D-302.
i. Hatch and ladder quantity, location, sizes, and orientations revised.
ii. Gravy Chamber ‘B’ retaining loop details revised.
p. S-108.
i. Steel Bar grating added at SG-4 in coordination with D series drawings.
q. S-109.
i. Steel Bar grating added at SG-4 in coordination with D series drawings.
ii. Hatch locations and sizes adjusted in coordination with D series drawings.
r. S-202.
i. Steel Bar grating added at SG-4 in coordination with D series drawings.
ii. Hatch locations and sizes adjusted in coordination with D series drawings.
iii. Gravy Chamber ‘B’ retaining loop details revised.
s. S-303.
i. Detail 2, Large Penetrations through the Sheet Pile added.
t. S-509.
i. Detail 3, Pinned Pile Connection added.
u. M-603.
i. Slide Gate (Sluice Gate) Equipment Schedule revised in coordination with change in plans sheets.
2. The following DRAWINGS have been REVISED but NOT REISSUED:
a. None.
3. The following NEW DETAILS have been ADDED:
a. C-514
i. New drainage structure added.
b. C-515
i. New drainage structure added.
4. The following DRAWINGS have been DELETED:
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
a. 00 90 05.
i. The JCP&L bid package attachment was replaced in its entirety.
b. 01 11 00.
i. The final sentence of para 1.1.a, “No additional days will be added to the contract duration period” was removed.
c. 01 30 00.
i. Para 1.8.a.1 was relocated to a para 1.9 to clarify this scope as an Option.
d. 01 50 00.
i. Permit requirement language in para. 3.4 has been corrected.
e. 01 55 26.
i. Permit requirement language in para. 3.8 has been corrected.
f. 05 50 13.
i. Para 1.2 and 2.8 revised to clarify telescopic extension for personnel assist unit scope.
g. 32 93 00.
i. Planting elevations in para 2.1.1 was corrected.
h. 35 45 02.00 10.
i. Para 2.1.6.c NPSH and Propeller data revised.
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
(End of Summary of Changes)