This solicitation is for a construction project to improve hurricane and storm damage reduction in Port Monmouth, New Jersey. The U.S. Army Corps of Engineers is seeking bids for work including building an earthen levee, floodwall, generator and pump stations, and installing piles. The total project value ranges from $10-25 million. Bids are due by April 26, 2022. The contract is for a base scope of work with 12 optional line items that can be awarded within 18 months of the notice to proceed. The contractor must complete all work within 570 calendar days of receiving the notice and is subject to liquidated damages of $3,948 per day for delays.

View the file

Other files

File Type Posted
Bid Abstract 2022 08 09.pdf PDF
W912DS22B0003 Amendment 0012.pdf PDF
S-004.pdf PDF
Note to Bidders.pdf PDF
S-510.pdf PDF
C-101G.pdf PDF
W912DS22B0003 Amendment 0011.docx DOCX document
Amend 0010 Plans and Specs.pdf PDF
W912DS22B0003 Amendment 0010.pdf PDF
W912DS22B0003 Amendment 0009.pdf PDF
Bid Schedule attachment 1.pdf PDF
Plans and Specs - Amend 0009.pdf PDF
W912DS22B0003 Amendment 0008.pdf PDF
C-203.pdf PDF
C-511.pdf PDF
StandConstDetails 38.pdf PDF
C-203.pdf PDF
01 20 00.pdf PDF
01 50 00.pdf PDF
33 30 00.pdf PDF
01 14 00.pdf PDF
01 55 26.pdf PDF
W912DS22B0003-0007 Port Monmouth.pdf PDF
W912DS22B0003 Amendment 0006.pdf PDF
Amendment 0005 Plans and Specs.pdf PDF
W912DS22B0003 Amendment 0005.pdf PDF
W912DS22B0003 Amendment 0004.pdf PDF
Amendment 0003 Attachment.pdf PDF
W912DS22B0003 Amendment 0003.pdf PDF
W912DS22B0003 Amendment 0002.pdf PDF
W912DS22B0003 Amendment 0001.pdf PDF
PRMT C5100 Submission 02182022.pdf PDF
Port Monmouth Contract 5 -RTA SPECS 2022-03-22.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Title: Port Monmouth Hurricane and Storm Damage Reduction Project in Middletow n Tow nship, Monmouth County, New Jersey

1. Full and Open (Unrestricted) Invitation for Bids (IFB) w ith Hubzone Price Evaluation Preference

2. NAICS Code 237990, Size Standard $39,500,000.00

3. Project Magnitude Range: Range betw een $10,000,000.00 and $25,000,000.00

4. Contract Specialist is Ivan Damaso: ivan.v.damaso2@usace.army.mil; 917-790-8176

5. Submit Bids no later than 2:00PM EST on 26 April 2022 (or as amended) to:

U.S. Army Corps of Engineers, New York District, Contracting Division, Room 16-300, 26 Federal Plaza, New York, NY 10278-0090

Due to heightened security at U.S. Government installations, all Bidders are instructed to allow ample time to get through the security checkpoint in order to have their bids delivered before 2:00PM EST on the date of the bid opening.

X

MOHENDA R SURAGE 917-790-8088

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Mar-2022

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________570 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________See Specs

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Apr 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

212-264-3013FAX:TEL: (917)790-8026 TEL: FAX:

W912DS22B0003 81

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DS22B0003

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

FFP

MOBILIZATION AND DEMOBILIZATION

FOB: Destination

PSC CD: Y1PZ

NET AMT

0002 1 Job

EARTHEN LEVEE

All work necessary to construct the earthen embankment levee between STA 9+90 to STA 29+80, including but not limited to the embankment, ramps, toe drain, and inspection trench, excavation and shoring, in accordance with the drawings and specifications, but not including Bid Items 0004.

0003 4,400 Linear

Foot

PILES (BUILDINGS)

All work necessary to furnish and install steel piles for generator building in accordance with the drawings and specifications, but not including Bid Items 0008- 0011. The Contractor's equipment must be able to drive piles with lengths ranging from 50 feet to 100 feet.

ESTIMATED QUANTITY

0004 1 Job

PUMP STATION AND GENERATOR BUILDING

All work necessary to construct the pump station and generator building including foundation, utility connections, pumps, operations, electrical panels, oil tank distribution, 0005 1 Each

TEST PILES

All work necessary to furnish and install test pile sets consisting of two (one primary and one secondary) piles in each set but not including bid items 0006a, 0006b, and options 0008a and 0008b.

STATIC COMPRESSION LOAD TESTS

*****This line item is NOT PRICED and is for INFORMATIONAL PURPOSES only.

0006AA 1 Each

STATIC COMPRESSION LOAD TESTS FOR PRIMARY TEST PILES

All work to perform static compressive load tests for the primary test piles including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; placing and removing load frame for each test; placing and removing test loads and test equipment; extracting reaction or support piles;

backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto. The number of primary static compressive load tests is three for the entire project.

0006AB 1 Each

STATIC COMPRESSION LOAD TESTS FOR SECONDARY TEST PILES

All work to perform static compressive load tests for the secondary test piles including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; placing and removing load frame for each test; placing and removing test loads and test equipment; extracting reaction or support piles;

backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto.

0007 1 Job

BASE APPURTENANT ITEMS - (INCLUDINING BUT NOT LIMITED TO C3-

4 DRAINAGE STRUCTURE STA. 27+36.50)

All work necessary to construct the drainage swales with erosion control matting, stormwater outlet pipes including motorized sluice gate, concrete structure for the outlet and inlet of the pipes, and electric lines, manholes, manhole covers, removal and plugging of existing culvert and utility mains, clearing, grubbing and stripping, topsoil, planting and seeding, erosion and sediment control measures, levee cellular confinement system, levee and floodwall geotextile separator, and site restoration, in accordance with the drawings and specifications.

0008 1 Job

VIBRATION MONITORING OF STRUCTURES

All work necessary to monitor the vibration of structures, in accordance with the drawings and specifications. This CLIN applies to all vibration and monitoring in the Base.

0009 7 Each

JOB PILE DYNAMIC TESTS

All work for performing dynamic load tests for job piles including calibration of testing equipment; use of testing equipment; use of equipment used to apply the loading; wave equation analysis; CAPWAPC or similar analysis; submission of load test results/report; and all operations incidental thereto.

0010 1 Each

TEST PILE DYNAMIC TESTS FOR PRIMARY TEST PILES

All work for performing dynamic load tests for the test piles including calibration of testing equipment; use of testing equipment; use of equipment used to apply the loading; wave equation analysis; CAPWAPC or similar analysis; submission of load test results/report; and all operations incidental thereto.

0011 1 Each

TEST PILE DYNAMIC TESTS FOR SECONDARY TEST PILES

All work for performing dynamic load tests for the test piles including calibration of testing equipment; use of testing equipment; use of equipment used to apply the loading; wave equation analysis; CAPWAPC or similar analysis; submission of load test results/report; and all operations incidental thereto.

0012 1 Job

EROSION AND SEDIMENT CONTROL

All material and labor required to install erosion and sediment control protection measures including but not limited to silt fence, hay bales, catch basin filters, tree protection, construction entrance, cellular confinement system on the levees in accordance with the drawings and specifications. This CLIN applies to all erosion and sediment control measures in the Base.

LANDSCAPING

All material and labor required to retore all the disturbed area and vegetation along the levees including but not limited to seeding, mulching, planting in accordance with the drawings and specifications.

0013AA 9,150 Each

SHRUBS

All material and labor required for the placement and maintenance of shrubs in accordance with the project specifications and landscape plans.

0013AB 14.99 Acre

SEEDING

All material and labor required for the seeding, maintenance, and mowing of the seeding areas in accordance with the project specifications and landscape plans.

0013AC 2.86 Acre

HERBIVORY FENCE

All material and labor required for the fabrication, installation, and maintenance of a temporary herbivory fence around the cell perimeter of the restored planting areas in accordance with the project specifications and landscape plans.

PLANTING AREA

0014AA .37 Acre

DUNES NORTH OF PORT MONMOUTH RD. (FORMER CONTRACT 3

AREA)

All material and labor required for the seeding, maintenance, and mowing of the seeding areas in accordance with the project specifications and landscape plans.

0014AB .64 Acre

SOUTH OF PORT MONMOUTH RD. (FORMER CONTRACT 3 AREA)

All material and labor required for the seeding, maintenance, and mowing of the seeding areas in accordance with the project specifications and landscape plans.

0014AC .63 Acre

PLANTING AREA - NORTH OF PUMP STATION (FORMER CONTRACT 2

AREA)

All material and labor required for the seeding, maintenance, and mowing of the seeding areas in accordance with the project specifications and landscape plans.

0014AD .10 Acre

SOUTH OF PUMP STATION (FORMER CONTRACT 2 AREA)

All material and labor required for the seeding, maintenance, and mowing of the seeding areas in accordance with the project specifications and landscape plans.

0015 1 Job

SURCHARGE FILL

All work necessary to construct the surcharge fill at STA 27+36.5, including but not limited to surcharge fill, temporary rerouting of existing sewer line, temporary drainage line, excavation, shoring, undercutting and replacement of 5 ft thick unsuitable material within the surcharge footprint with levee material, dewatering, geotextile installation, two settlement monitoring plates, surcharge fill compaction inspection, various relevant laboratory tests in accordance with the drawings and specifications

0016 1 Job

RE-ROUTE UTILITY: AMERICAN WATER

All material and labor required to retore/relocated AMERICAN WATER owned utilities in accordance with the drawings and specifications.

OPTION OPTION 1

FFP

All material and labor required to construct from STA 1+20BA through STA 6+20BA. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

0017AA 1 Job

OPTION OPTION 1

FFP

VIBRATION MONITORING OF STRUCTURES

All work necessary to monitor the vibration of structures, in accordance with the drawings and specifications. This CLIN applies to all vibration and monitoring in Option 1.

0017AB 1 Job

OPTION OPTION 1

FFP

EROSION AND SEDIMENT CONTROL

All material and labor required to install erosion and sediment control protection measures including but not limited to silt fence, hay bales, catch basin filters, tree protection, construction entrance, cellular confinement system on the levees in accordance with the drawings and specifications. This CLIN applies to all erosion and sediment control measures in Option 1.

OPTION OPTION 2

FFP

All material and labor required to construct from STA 29+80 through STA 37+30 and STA 0+00RR through STA 12+54RR. This option may be exercised within 18 months after Notice to Proceed of the Base Contract. If Option 2, CLIN 0018, is exercised, so will all subCLINs 0018AA through 0018AD.

0018AA 1 Job

OPTION OPTION 2

FFP

ROAD RAISING AND SHEET PILE RETAINING WALL

All work necessary to construct the road raising including the sheet pile retaining wall between STA 30+70 to STA 34+15 and between STA 4+80RR to STA 9+20RR, including but not limited to excavation, earthen fill, grading, underground utilities and its appurtenances, road pavement and its appurtenances

0018AB 1 Job

OPTION OPTION 2

FFP

EARTHEN LEVEE

All work necessary to construct the earthen embankment levee between STA 29+80 to STA 31+00 and STA 33+85 to STA 37+30, including but not limited to the embankment, ramps, toe drain, and inspection trench, excavation and shoring, in accordance with the drawings and specifications, but not including Bid Items 0004.

0018AC 1 Job

OPTION OPTION 2

FFP

VIBRATION MONITORING OF STRUCTURES

All work necessary to monitor the vibration of structures, in accordance with the drawings and specifications. This CLIN applies to all vibration and monitoring in Option 2.

0018AD 1 Job

OPTION OPTION 2

FFP

EROSION AND SEDIMENT CONTROL

All material and labor required to install erosion and sediment control protection measures including but not limited to silt fence, hay bales, catch basin filters, tree protection, construction entrance, cellular confinement system on the levees in accordance with the drawings and specifications. This CLIN applies to all erosion and sediment control measures in Option 2.

OPTION OPTION 3

FFP

All material and labor required to construct from STA 00+00 through STA 9+90.

This option may be exercised within 18 months after Notice to Proceed of the Base Contract. If Option 3, CLIN 0019, is exercised, so will all subCLINs 0019AA through 0019AN.

0019AA 1 Job

OPTION OPTION 3

FFP

FLOODWALL

All work necessary to construct the reinforced concrete T-wall between STA 0+00 and STA 9+75 including but not limited to concrete wall foundation, sheet pile cut-off wall, toe drain, excavation, shoring, dewatering, and backfill with satisfactory material in accordance with the drawings and specifications, but not including Bid Items 0001, 0003, and Option 0002a.

0019AB 24,000 Linear

Foot

OPTION OPTION 3

PILES (FLOODWALL)

All work necessary to furnish and install steel piles for floodwall in accordance with the drawings and specifications, but not including Bid Items 0008-0011. The Contractor's equipment must be able to drive piles with lengths ranging from 50 feet to 100 feet.

ESTIMATED QUANTITY

0019AC 2 Each

OPTION OPTION 3

FFP

TEST PILES

All work necessary to furnish and install test pile sets consisting of two (one primary and one secondary) piles in each set but not including bid items 0006a, 0006b, and options 0008a and 0008b.

0019AD 2 Each

OPTION OPTION 3

FFP

STATIC COMPRESSION LOAD TESTS FOR PRIMARY TEST PILES

All work to perform static compressive load tests for the primary test piles including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; placing and removing load frame for each test; placing and removing test loads and test equipment; extracting reaction or support piles;

backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto. The number of primary static compressive load tests is three.

0019AE 2 Each

OPTION OPTION 3

FFP

STATIC COMPRESSION LOAD TESTS FOR SECONDARY TEST PILES

All work to perform static compressive load tests for the secondary test piles including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; placing and removing load frame for each test; placing and removing test loads and test equipment; extracting reaction or support piles;

backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto. The number of secondary pile tests that will be performed are not fixed and are up to the discretion of the Contracting Officer. The quantity shown is the maximum number of tests that may be performed on the secondary piles.

0019AF 33 Each

OPTION OPTION 3

FFP

JOB PILE DYNAMIC TESTS

All work for performing dynamic load tests for job piles including calibration of testing equipment; use of testing equipment; use of equipment used to apply the loading; wave equation analysis; CAPWAPC or similar analysis; submission of load test results/report; and all operations incidental thereto.

0019AG 2 Each

OPTION OPTION 3

FFP

TEST PILE DYNAMIC TESTS FOR PRIMARY TEST PILES

All work for performing dynamic load tests for the test piles including calibration of testing equipment; use of testing equipment; use of equipment used to apply the loading; wave equation analysis; CAPWAPC or similar analysis; submission of load test results/report; and all operations incidental thereto.

0019AH 2 Each

OPTION OPTION 3

FFP

TEST PILE DYNAMIC TESTS FOR SECONDARY TEST PILES

All work for performing dynamic load tests for the test piles including calibration of testing equipment; use of testing equipment; use of equipment used to apply the loading; wave equation analysis; CAPWAPC or similar analysis; submission of load test results/report; and all operations incidental thereto.

0019AJ 82 Each

OPTION OPTION 3

FFP

SPLICING

All work necessary to splice steel piles within the Option 3 in accordance with the drawings and specifications.

0019AK 1 Job

OPTION OPTION 3

FFP

EARTHEN LEVEE

All work necessary to construct the earthen embankment levee between STA 9+30 to STA 9+95 including but not limited to the embankment, ramps, toe drain, and inspection trench, excavation and shoring, in accordance with the drawings and specifications, but not including Bid Items 0004.

0019AL 1 Job

OPTION OPTION 3

FFP

APPURTENANT ITEMS - C3-1 DRAINAGE STRUCTURE (STA. 5+45)

All work necessary to construct the drainage swales with erosion control matting, stormwater outlet pipes including motorized sluice gate, concrete structure for the outlet and inlet of the pipes, and electric lines, manholes, manhole covers, removal and plugging of existing culvert and utility mains, clearing, grubbing and stripping, topsoil, planting and seeding, erosion and sediment control measures, levee cellular confinement system, levee and floodwall geotextile separator, and site restoration, in accordance with the drawings and specifications.

0019AM 1 Job

OPTION OPTION 3

FFP

VIBRATION MONITORING OF STRUCTURES

All work necessary to monitor the vibration of structures, in accordance with the drawings and specifications. This CLIN applies to all vibration and monitoring in Option 3.

0019AN 1 Job

OPTION OPTION 3

FFP

EROSION AND SEDIMENT CONTROL

All material and labor required to install erosion and sediment control protection measures including but not limited to silt fence, hay bales, catch basin filters, tree protection, construction entrance, cellular confinement system on the levees in accordance with the drawings and specifications. This CLIN applies to all erosion and sediment control measures in Option 3.

0020 10 Each

OPTION OPTION 4

FFP

SPLICING

All work necessary to splice steel piles within the Base in accordance with the drawings and specifications. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

0021 2,750 Cubic

Yard

OPTION OPTION 5

CONTAMINATED NON-HAZARDOUS MATERIAL

All work for handling, transport, treatment, and off-site disposal of upland material exceeding NJDEP non-residential soil cleanup criteria and classified as contaminated non-hazardous (ID 27 Waste) suitable for landfill cover, roadway subbase and recycling facilities, complete. Quantities are estimated. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

ESTIMATED QUANTITY

0022 2,750 Cubic

Yard

OPTION OPTION 6

HAUL AND DISPOSE OF EXCESS OR UNSATISFACTORY MATERIAL AT

OFFSITE LOCATION

All work necessary to haul and dispose of excess or unsatisfactory material at an approved off-site location in accordance with the drawings and specifications.

Quantities are estimated. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

ESTIMATED QUANTITY

0023 1 Job

OPTION OPTION 7

FFP

LIABILITY INSURANCE

NJDEP, Monmouth County, and Middletown Township Liability Insurance. The amount bid will be the maximum amount payable. Actual payment will be based on actual costs up to bid amount. This option may be exercised within 90 days after Notice to Proceed of the Base Contract.

OPTION OPTION 8

FFP

STATIC TENSION LOAD TESTS If Option 8, CLIN 0024, is exercised, so will all subCLINs 0024AA through 0024AB.

0024AA 2 Each

OPTION OPTION 8

FFP

STATIC TENSION LOAD TESTS FOR PRIMARY TEST PILES

All work to perform static tension load tests for the primary test piles including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; placing and removing load frame for each test; placing and removing test loads and test equipment; extracting reaction or support piles;

backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto. The number of primary static tension load tests is two. These tests apply to Option 3 scope only. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

0024AB 2 Each

OPTION OPTION 8

FFP

STATIC TENSION LOAD TESTS FOR SECONDARY TEST PILES

All work to perform static tension load tests for the secondary test piles including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; placing and removing load frame for each test; placing and removing test loads and test equipment; extracting reaction or support piles;

backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto. These tests apply to Option 3 scope only. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

OPTION OPTION 9

FFP

RE-ROUTE UTILITY: VERIZON

0025AA 1 Job

OPTION OPTION 9

FFP

RE-ROUTE UTILITY: VERIZON

Utility provided material and labor required to retore/relocated Verizon owned utilities in accordance with the drawings and specifications. Contractor is to verify that the work is performed by an approved contractor. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

THIS CLIN IS NOT TO EXCEED $175,000.00.

0025AB 1 Job

OPTION OPTION 9

FFP

RE-ROUTE UTILITY: VERIZON

All Contractor material and labor required to retore/relocated Verizon owned utilities in accordance with the drawings and specifications. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

OPTION OPTION 10

FFP

RE-ROUTE UTILITY: COMCAST

0026AA 1 Job

OPTION OPTION 10

FFP

RE-ROUTE UTILITY: COMCAST

Utility provided material and labor required to retore/relocated Verizon owned utilities in accordance with the drawings and specifications. Contractor is to verify that the work is performed by an approved contractor. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

THIS CLIN IS NOT TO EXCEED $20,000.00.

0026AB 1 Job

OPTION OPTION 10

FFP

RE-ROUTE UTILITY: COMCAST

All Contractor material and labor required to retore/relocated Comcast owned utilities in accordance with the drawings and specifications. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

OPTION OPTION 11

FFP

RE-ROUTE UTILITY: JCP&L

0027AA 1 Job

OPTION OPTION 11

FFP

RE-ROUTE UTILITY: JCP&L

Utility material and labor required to retore/relocated JCP&L owned utilities in accordance with the drawings and specifications. Contractor is to verify that the work is performed by an approved contractor. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

THIS CLIN IS NOT TO EXCEED $250,000.00.

0027AB 1 Job

OPTION OPTION 11

FFP

RE-ROUTE UTILITY: JCP&L

All Contractor material and labor required to retore/relocated JCP&L owned utilities in accordance with the drawings and specifications. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

0028 1.04 Job

OPTION OPTION 12

FFP

Wetland Mitigation Bank Credits

Purchase credits from a NJDEP approved wetland mitigation bank certified to sell credits in Watershed Management Area 12 for project impacts to freshwater wetlands. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

0029 2 Each

OPTION OPTION 13

FFP

Portable Eye Wash Station

Purchase of specified equipment for the former Contract 2 facility. This option may be exercised within 18 months after Notice to Proceed of the Base Contract.

Section 00 20 00 - Instructions for Procurement

TOTALS

TOTAL BASE CLINs 0001-0016 $_______________

TOTAL OPTION CLINs 0017-0029 $_______________

TOTAL BASE AND OPTION CLINs 0001-0029 $_______________

Section 00 21 00 - Instructions

INSTRUCTIONS

BID SUBMISSION INSTRUCTIONS:

Contractors are required to deliver Bids to 26 Federal Plaza, Room 16-300. The designated receiver of bids is Ivan V. Damaso at 917-790-8176. Bids are due no later than 15 April 2022 at 2:00pm EST. Bid opening will start at 2:00pm EST.

NOTE: If dropping bids off in person, please advise via email to ivan.v.damaso2@usace.army.mil and nicholas.p.emanuel@usace.army.mil.

Contractors are encouraged to wear a mask on the main floor and are required to wear a mask on Floor 16. The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Bidders are responsible for ensuring that bids are submitted so as to reach the designated receiver and designated location. Bidders are responsible for allowing sufficient time for the bids to be received in accordance with the instructions provided. Contractors will not be allowed to physically be in the conference room during the bid opening. However, bidders are encouraged to call into the following teleconference line:

Call number

+1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 476 8533

Bidders must keep their phone on mute as to not disrupt the reader. Please limit the amount of company employees calling into the line so that the line does not disconnect. The abstract of bids will be posted to the SAM.gov website.

ADDITIONAL INSTRUCTIONS:

Potential bidders are reminded that only the minimum documents are required for bid submission:

1. Signed SF33.

2. Acknowledged amendments.

3. Filled out bid schedule and totals.

4. Bidders must check off box (d) in 52.204-8 Annual Representations and Certifications (DEC 2019) for being on SAM.gov.

5. Full bid documents on one (1) CD-ROM.

CPARS:

The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI) be collected on DoD contracts. The Contractor Performance Assessment Reporting System (CPARS) is a web-enabled application the supports the completion, distribution and retrieval of all contract performance evaluations. Contractor Representative are responsible for reviewing and commenting on evaluations submitted on the Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/index.htm.

NOTICE REGARDING BID BONDS, PEFORMANCE BONDS, AND PAYMENT

BONDS:

The Standard Forms (SF24, SF25, and SF25A) for these bonds have been revised as of August 2016. When including your bid/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your bid/offer nonresponsive.

WAGE DETERMINATION:

A U.S. Department of Labor Wage Determination has been included. For Construction contracts, the wage rate is located at the end of this document. If a U.S. Department of Labor Wage Determination has not been included, it should be added by amendment prior to the date set for receipt of bids/proposals. In the event a Department of Labor Wage Rate has not been attached to this contract, neither the contractor nor any subcontractor under the contract shall pay any of his employees performing work under the contract (regardless of whether they are service employees) less than minimum wage specified by Section 6(a)(1) of the Fair Labor Standards Act, as amended.

Section 00 45 00 - Representations and Certifications

CLAUSES INCORPORATED BY REFERENCE

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

CLAUSES INCORPORATED BY FULL TEXT

52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2020)

(a) This provision implements section 523 of Division B of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts.

(b) If the Offeror is proposing a total contract price that will exceed $5.5 million (including options), the Offeror shall certify that, to the best of its knowledge and belief, it--

(1) Has [ ] filed all Federal tax returns required during the three years preceding the certification;

(2) Has not [ ] been convicted of a criminal offense under the Internal Revenue Code of 1986; and

(3) Has not [ ], more than 90 days prior to certification, been notified of any unpaid Federal tax assessment for which the liability remains unsatisfied, unless the assessment is the subject of an installment agreement or offer in compromise that has been approved by the Internal Revenue Service and is not in default, or the assessment is the subject of a non-frivolous administrative or judicial proceeding.

(End of provision)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern--

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13

CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the Contracting Officer explicitly requires it for an order issued under a multiple-award contract.

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees if the acquisition--

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code assigned to contract number .

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) concern eligible under the WOSB Program. [Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.

[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: .] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(5) Economically disadvantaged women-owned small business (EDWOSB) concern. [Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. [The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: .] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer's name and title.]

(End of clause)

52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021)

(a) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) (Construction Wage Rate Requirement statute)), daily and weekly number of hours worked, deductions made, and actual wages paid.

Whenever the Secretary of Labor has found, under paragraph (d) of the clause entitled Construction Wage Rate Requirements, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B), the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

(b)(1) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Contracting Officer. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under paragraph(a) of this clause, except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose and may be obtained from the U.S. Department of Labor Wage and Hour Division website at https://www.dol.gov/agencies/whd/forms. The Prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the Contracting Officer, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a Prime Contractor to require a subcontractor to provide addresses and social security numbers to the Prime Contractor for its own records, without weekly submission to the Contracting Officer.

(2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify--

(i) That the payroll for the payroll period contains the information required to be maintained under paragraph (a) of this clause and that such information is correct and complete;

(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in the Regulations, 29 CFR Part 3; and

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

(3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH- 347 shall satisfy the requirement for submission of the "Statement of Compliance" required by subparagraph (b)(2) of this clause.

(4) The falsification of any of the certifications in this clause may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of Title 31 of the United States Code.

(c) The Contractor or subcontractor shall make the records required under paragraph (a) of this clause available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting Officer or the Department of Labor. The Contractor or subcontractor shall permit the Contracting Officer or representatives of the Contracting Officer or the Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

Section 00 70 00 - Conditions of the Contract

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct DEC 2021 52.203-14 Display of Hotline Poster(s) DEC 2021 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

JUN 2020

52.204-2 Alt II Security Requirements (MAR 2021) - Alternate II APR 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other Covered Entities

DEC 2021

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

DEC 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

DEC 2021

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

OCT 2020

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

DEC 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.210-1 Market Research DEC 2021 52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.214-26 Audit and Records--Sealed Bidding JUN 2020 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -

Modifications - Sealed Bidding

JUN 2020

52.214-28 Subcontractor Certified Cost Or Pricing Data--Modifications- -Sealed Bidding

JUN 2020

52.214-29 Order Of Precedence--Sealed Bidding JAN 1986

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-- Modifications

JUN 2020

52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits

(PRB) Other than Pensions

JUL 2005

52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data -- Modifications

DEC 2021

52.217-5 Evaluation Of Options JUL 1990 52.217-9…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .