This solicitation is for the Port Monmouth Hurricane and Storm Damage Reduction Project in Middletown Township, Monmouth County, New Jersey. The Department of the Army Corps of Engineers Engineering District New York seeks bids for Contract 5 to provide construction services for the project. Bids are due by the date specified in the solicitation document. Services required include construction activities to reduce damage from hurricanes and storms. The selected vendor will be awarded a firm fixed-price contract to complete the specified scope of work.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATCH LINE C-101C
MATCH LINE C-101D
PROPOSED LEVEE
EL. 13.5
TOP OF LEVEE
REFERENCE LINE
LEVEE TURN AROUND
TOW EL. 13.0
PROPOSED FLOODWALL
NN
INV. U/S 0.67, D/S 0.38
5' SPAN X 3' RISE (INSIDE) , 104 LF @ 0.27%
CROSSING LEVEE ACCESS
PROPOSED CONCRTE BOX CULVERT
T R
A P E Z O
ID
A L
S E
M I- T R
A P
T R
A N S
IT
IO
N
(TYP)
PROPOSED TOE OF LEVEE
(TYP)
PROPOSED TOE OF LEVEE
SEE NOTE 8
GUIDE RAIL
TO GENERATOR AND PUMP STATION BUILDING
PROPOSED ACCESS RAMP @ 7% MIN.
(TYP)
CONTRACTORS WORKING LIMITS
PROPOSED TEMPORARY EASEMENT
50'
ZONE/PERMANENT EASEMENT (TYP)
PROPOSED VEGETATION FREE
30'
ZONE/PERMANENT EASEMENT (TYP)
PROPOSED VEGETATION FREE
34.57'
30'
.7
.3
TIP ELV. -20.0
TOP ELV.: 11.5
BOTH SIDES OF PUMP STATION
15LF PZ22 SHEET PILE CUT OFF WALL
RAMP AND LEVEE SIDE SLOPE, SEE NOTE 6
FILL BEHIND HEADWALL TO MEET
HEADWALL ON UP AND DOWN STREAM END
WITH GATE
LEVEE ACCESS
PROPOSED
BASE CONTRACTCONTRACT OPTION 3
SEE NOTE 7
S T
A
SEE DETAIL S-504
BOLLARD, 12" FROM SLAB CORNER
BASE CONTRACTCONTRACT OPTION 3
2' X 2' X 6" GRAVEL SPLASH PAD
PAD 3.17' X 6.17'
RPZ ON 12" CONCRETE
INSULATED UTILITY BOX WITH
SIGN, R5-11
AUTHOR. VEHICLE ONLY
NO TRESPASSING SIGN
SHUT OFF VALVE
3/4" COPPER WATER LINE WITH
REMOVED BEFORE PLACING THE FILL FOR OPTION 3.
NOTE: ANY VEGETATION AND EROSION PROTECTION FEATURES SHALL BE
11 154
R E
V
IS
E D
T
IP
E L
O
F C
U T
O F
F W
A L
L
W A
T E
R L
IN
E
T O
R P
Z U
IT
/1
/2
/0
/2
S
IS
E P
L A
C-101B
P O
R M
O N
C
T C
-1 B
.d g n
M A
T C
H L
I N
E C
A
M A
T C
H L
I N
E C
E
V
:2 .5
H
V
:2 .5
H
SEE NOTE 2
EXISTING GRADES (TYP)
PROPOSED GRADING TO MEET
SEE NOTE 1
PROPOSED GENERATOR BUILDING
SEE NOTE 1
PUMP STATION
PROPOSED COMPTON CREEK
SWALE C3-MA
PROPOSED SEMI-TRAPEZOIDAL
EL. 0.2, GRADE SIDE SLOPES 1V:2.5H
PROPOSED PUMP STATION INTAKE SLAB
2.5H:1V (TYP)
PROPOSED SWALE SIDE SLOPE
SIDE SLOPES 1V:2.5H
BOTTOM WIDE 10', DEPTH 1.5'
PROPOSED TRAPEZOIDAL SWALE C3-MA
TYPICAL DETAIL 5 ON SHEET C-503.
INSTALL BEAM GUIDE RAIL WITH END SECTIONS AT STA. 10+00. GUIDE RAIL SHALL BE BUILT ACCORDING TO 8.
DETAIL 1 THIS SHEET. REFER TO SHEET G-101 FOR COMPLETE CONTRACT OPTION LIMITS.
END/START LEVEE WITH SLOPE 1V:2.5H AT THE BOUNDARY LIMITS OF THE CONTRACT OPTIONS AS SHOWN IN7.
CROSSING LEVEE ACCESS RAMP. FILL SHALL TIE IN WITH THE ACCESS RAMP AND LEVEE SIDE SLOPES.
FILL 2' HIGH BEHIND THE HEADWALL BOTH UP AND DOWN STREAM FOR EXPOSED BOX CULVERT 6.
REFER TO STRUCTURAL DRAWINGS FOR CUT OFF WALL DETAILS.5.
REFER TO SHEET B-101 FOR BORING DETAILS AND EARTHWORK NOTES.4.
STATION AT 5' OFFSET AND 3' OFFSET FROM EDGE OF THE LEVEE.
CONCRETE PAD FOR THE OIL/FUEL TANK SHALL BE LOCATED BETWEEN GENERATOR BUILDING AND PUMP3.
FILL, GRADE AT 0.5% FROM TOP OF SWALE.
SWALE GRADING TO MEET EXISTING GRADE: IF IN CUT CONTINUE SWALE SLOPES AT 1V:2.5H. IF IN 2.
REFER TO ARCHITECTURAL DRAWINGS FOR GENERATOR AND PUMP STATION BUILDING DETAILS.1.
NOTE:
SWALE C3-MB
60'
SCALE:1"= 30'
0 30'
7'X12', SEE NOTE 3
OIL TANK CONCRETE PAD
HEADWALL LA-1
HEADWALL LA-2
EXISTING GRADE
2.5
OPTION LIMITS
SLOPE LEVEE TO
SLOPE FOR OPTION 3
CONTINUE LEVEE FROM THE
TOP OF LEVEE
IS
S U
E D
A T
E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
Main StMain St
GriggsGriggs
G
W
W
W
W
W
G
.5
G=4.39
G
.5
G
.4
S S
S
R=5.16
R=4.79
R=4.86
WOODED
R e n fre w P l
Main St
I=1.58 I=1.96
I= .6
8" S
8" S
8" S
I=-3.16
I=
.3
I=-3.36 I=-2.22
I=
.6
I=-2.28
I=-0.98
12" D
D
6" G
6" G
6" G
6" W6" W6" W
W
8" W
6" W
I=1.99
I=1.16
OUTFALL
I= .3
O U
T F
A L L
I= .1
O U
T F
A L L
I=3.10
G
W
W
W
W
W
G
.5
G=4.39
G
.5
G
.4
S S
S
R=5.16
R=4.79
R=4.86
WOODED
R e n fre w P l
Main St
4+70.15PO
PI
1+25.83BA
PI
W
I=1.58 I=1.96
I= .6
8" S
8" S
8" S
I=-3.16
I=
.3
I=-3.36 I=-2.22
I=
.6
I=-2.28
I=-0.98
12" D
6" G
6" G
6" W6" W6" W
8" W
6" W
I=1.99
I=1.16
OUTFALL
I= .3
O U
T F
A L L
I= .1
O U
T F
A L L
I=3.10 .2
.9
.4
.2
.3
.2
.5
.8
CB
M B
M B
M B
C B
C B
CB
4.5
.5
R=4.30
I=-2.15
.2
.9
.4
.2
.3
.2
.5
.8
CB
M B
M B
M B
C B
C B
CB
4.5
.5
R=4.30
I=-2.15
4.9
.5
5.2
.1
4.9
5.1
.2
.1
.7
.2
.1
.1
MB
MB
MB
MB
MB MB
4.9
.5
5.2
.1
4.9
5.1
.2
.1
.7
.2
.1
.1
MB
MB
MB
MB
MB MB
.9
.9
.2
.9
.9
.2
P O
O L
P O
O L
.4
.4
F
B R
IS
V
IE
U
L L
O B
S T
R U
C T
E D
B R
IS
V
IE
L L
O B
S T
R U
C T
E D
W
Check Valve Inv. ____
Outlet Structure w/ Elastometric
Inv. 1.3' Out
Inv. 1.4' In
Flush Bottom Sluice Gate
Control MH w/ 36'x36' Hand-op
STA 6+00
Drainage Structure C3-1
5+00PO
5+16PO5+16PO
4+51.20PO
PC
4+88.41PO
PT
0+00BA
1+00BA
B
A
W
P U
M P C
H A
M B
E R D
E C
K P
L A
T F
O R
M
C H
A M
B
T
A S
H R
A C
K
G R
A V
IT
Y C
H A
M B
A S
H R
A C
K
P U
M P
C H
A M
B
PORMON_CT5_C-101B.dgn C-101B 7/8/2022 12:00:10 PM
V
G=2.99
G=3.23
G=3.26
Brainard Ave
Main St b a c k p i t c h
I n v e r t s m a y s h o w s l i g h t a c c u r a t e t o
.2 f r o m p h o t o m a p p i n g
I n v e r t s a r e c a l c u l a t e d a s k e d h e r e
N o t s u r e w h a t i s b e i n g
I= .3
I=
.3
I= .5
I=0.39 I=0.56
8" S
8" S
8" S I=-2.69I=-2.71
I=-1.00
18" D
2" G
6" G 6" G
2" G 2" G
6" G
8" W 8" W 8" W
6" W6" W
6" W
18" D
8" S8" S
8" S
I= .3
O U
T F
A L L
I= .1
O U
T F
A L L
3+84.25BA
PI
1+25.83BA
PI
6+00.00BA
PI
CB
.5
3.7
.1
.7
.5
.7
.9
CB
CB
6+20
6+20BA
.2
U
C
U
C
U
C
4.1
.5
.6
.4
.3
.5
4.5 4.8
.7
.5
.4
.1
.1
MB
MB
MB
MB
MB
MB
S
S
S
R=4.30
R=3.76
R=4.60I=-2.13I=-2.15 I=-1.10
D
IR
T D
IR
T
MB
0+00BA
1+00BA
B
A
B
A
4+00BA
5+00BA
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
NN
REFER NOTE 3 AND 4
INV. U/S 0.23, D/S 0.2
4' SPAN X 2' RISE (INSIDE), 46LF @ 0.06%
PROPOSED CONCRETE BOX CULVERT C3-BA
SEE NOTE 5
CONTRACT OPTION LIMITS
EL. 0.2
PROPOSED PUMP INTAKE SLAB
SLOPE (TYP)
SWALE TOP OF
PERMANENT EASEMENT (TYP)
15' NON-VEGATATION ZONE
CONNECT TO EXISTING CATCH BASIN
TO MEET EXISTING GRADE
CONTINUE SWALE SIDE SLOPE
SIDE SLOPES 1V:2.5H
TOP 6' WIDE, EL. VARIES (18" ABOVE PIPE)
COVER FOR ELIPTICAL PIPE
REFER TO NOTE 3 AND 4
INV. U/S 0.56, D/S 0.55
CLASS V, RCP 20 LF @ 0.06%
38" SPAN X 24" RISE
PROPOSED ELIPTICAL PIPE
INV. U/S 0.42, D/S 0.41
CLASS IV, RCP 20 LF @ 0.06%
38" SPAN X 24" RISE
PROPOSED ELLIPTICAL PIPE
INV. IN/OUT 0.42
RIM 4.24
PROPOSED MH BA-2
INV. IN/OUT 0.55
RIM 3.7 OPEN GRATE
PROPOSED MH BA-1
PERMANENT EASEMENT (TYP)
15' NON-VEGATATION ZONE
30'
PROPOSED TEMPORARY EASEMENT (TYP)
BA-2
PROPOSED HEADWALL
PS-1
PROPOSED HEADWALL
STA. 1+20BA
BASE CONTRACT
CONTRACT OPTION 1
SEE NOTE 5
CONTRACT OPTION LIMITS
SEE NOTE 5
CONTRACT OPTION LIMITS
BA-1
PROPOSED HEADWALL
(TYP)
CONTRACTORS WORKING LIMITS
PROPOSED TEMPORARY EASEMENT
12 154
D E
D E
L
IP
T
IC
A L
P
IP
E S
IZ
E
R E
V
IS
E D
N O
T
/1
/2
/0
/2
E P
L
R M
O N
C
T
C
-1
C
.d g n
C-101C
CLEARANCE WITH PROPOSED STORMWATER PIPE CROSSING.
UTILITY COMPANIES REQUIREMENTS AND SPECIFICATIONS TO DETERMINE AND MAINTAIN MINIMUM
REFER TO SHEET G-101 FOR COMPLETE CONTRACT OPTION LIMITS.5.
MAIN ST CROSSINGS WITH PROPOSED STORMWATER PIPE CROSSING.
SANITARY SEWER EXISTING COVER SHALL BE MAINTAINED AT BRAINARD AVE AND4.
UTILITY (GAS AND WATER) ALONG BRAINARD AVE AND MAIN ST SHALL BE CORDINATED WITH THE3.
REFER TO SHEET C-306 FOR SWALE CROSS SECTIONS.2.
REFER TO SHEET C-203 FOR SWALE PROFILE.1.
NOTE:
MATCH LINE C-101B
INV. U/S 0.41, D/S 0.23
BOTTOM WIDTH = 3.0', DEPTH = 1.5'
BRAINARD AVE. AND MAIN ST.
PROPOSED TRAPEZOIDAL SWALE BETWEEN
60'
SCALE:1"= 30'
0 30'
INV. U/S 0.55, D/S 0.42
CLASS IV, RCP 216 LF @ 0.06%
38" SPAN X 24" RISE
PROPOSED ELIPTICAL PIPE
PORMON_CT5_C-101C.dgn C-103 7/6/2022 9:57:04 AM
8.8'
Port Monmouth
W
W
V
G=6.98
G=7.06
G=7.83
G=8.46
G=8.28
CB
I=4.02
CB
CB
G=5.50
7 10
Port Monmouth Rd Rd
I .8
I= .6
O
U T F
A L L
VISIBLE CONNECTION
4'x4' GRATE, NO
STRUCTURE WITH
FLOODED CONC.
I=3.25
18" D
12" D
D
4" G 4" G 4" G
12" W
W
12" W
12" W
12" D 12" D
15" D
12" D
I=3.02
I=2.87
I=4.18
I=4.79
R R
R R
R R
R
R
R R
R R
+0
5.
S S
S
R=8.38 R=8.09
R=7.37
S
8" S 8" S
8" S I=-4.22
I=
.8
I=-2.46
I=-4.92
I=-3.80
I=-3.72 I=-4.25
7.
6.
6.
CB
CB
8.7
8.
7.7
8.7
CB
C B
C B
9.7
W
W
G=8.79
G=7.57
CB
I=5.26
Port Monmouth Rd
Fr om
Re co rd
I= .7
4" G
4" G
4" G
12" W
8" W
8" W
12" W
15" D
15" D
15" D
I=5.42
R
R
R R
R R
R R
+0
S
S
S
S
R=8.39
R=9.49
R=12.18
R=11.93
S
8" S
8" S 8" S
8" S
I=
.3
I=0.61
I=-0.44
I=-1.38
I=1.20
I= .3
I=1.05
I=-0.90
I=-1.46 8" S
R R
6.
CB
CB
W
12.6
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
NN
NN
IN CONCRETE
CONDUIT ENCASED
4 - 4" PVC, SCH 40
TELECOM. (VERIZON)
SEE NOTE 6
RAISE WATER MAIN
SEE NOTE 6
RAISE GAS MAIN
EXISTING 12" PIPE TO REMAIN, 43LF±
INV. 4.27 (EXIST. IN), INV. 4.71 (IN), INV. 4.27 (OUT)
RISING STEM SLUICE GATE, RIM 11.57
DRAINAGE STRUCTURE C3-5 WITH
GRT 6.57, INV. 4.0
NJDOT TYPE E CB#4
RCP @ 1.3%
85LF, 15" CLASS IV
TO REMAIN, EXIS. INV. 2.87
EXISTING CATCH BASIN
RCP @ 1.3%
22LF, 15" CLASS IV
CONDUIT ENCASED IN CONCRETE
2 - 4" PVC, SCH 40
TELECOM. (COMCAST)
PROPOSED RIM 9.54
EXISTING RIM 8.09±
RAISE SANITARY MANHOLE
PROPOSED RIM 14.54
EXISTING RIM 7.37±
RAISE SANITARY MANHOLE
TO BE REMOVED
BT40988MDT
EXISTING POLE
ELEC. VAULT (JCP&L) 12' X 6' X 7'
MAINTAIN EXIST. INV., SEE NOTE 9
SLUICE GATE, CB#5 GR. EL. 13.88±
TYPE E2 INLET WITH NON-RISING
REPLACE EXIS. CB WITH NJDOT
BT40991MDT
EXISTING POLE
20.06
30.06
ELEC. (JCP&L) 3 - 6" PVC, SCH 80
3 - 6" PVC, SCH 80
ELEC. (JCP&L)
(TYP)
SWEEP ANGLE 22.5°
PROPOSED CURB
ENCASED IN CONCRETE
4 - 4" PVC, SCH 40 CONDUIT
TELECOM. (VERIZON)
ENCASED IN CONCRETE
2 - 4" PVC, SCH 40 CONDUIT
TELECOM. (COMCAST)
4' X 4' X 4'
TELECOM. VAULT (COMCAST)
4' X 8' X 7'
(VERIZON)
TELECOM. VAULT
PILE RETAINING WALL
PROPOSED SOUTH SHEET
PILE RETAINING/FLOODWALL
PROPOSED NORTH SHEET
17 154
D A
N D
R E
V
IS
E D
R A
IN
A
G E
F E
A T
U R
E S
R E
V
IS
E D
N O
T
/1
/2
/0
/2
IL
IT
Y P
L
R M
O N
C
T C
-1 .d
C-102
40'10'
SCALE:1"=20'
0 20'
M A
T C
H L
IN
E
T H
IS
S
H E
E T
LEVEE
PROPOSED
S T
A
R
R
R O
A D
R A
IS
IN
G
(AKA BT40987) TO BE REMOVED
EXISTING POLE 216108-58450
BT40989MDT
EXISTING POLE
BT40990MDT
EXISTING POLE
CONNECT TELCOM. TO
LOCATION OF GAS AND WATER MAIN SHALL BE COORDINATED AND CONSTRUCTED AS PER THE UTILITY COMPANY SPECIFICATIONS.6
SANITARY MANHOLES AND CURB INLETS TO REMAIN SHALL BE RAISED AND ADJUSTED TO MATCH THE ROAD RAISING GRADES.5
FIELD ADJUSTMENT SHALL BE MADE AS NEEDED TO THE PROPOSED ALIGNMENT AS DIRECTED BY THE UTILITY COMPANY.4
ANY DEVIATION OF EXISTING UTILITIES SHOWN ON THE SURVEY SHALL BE REPORTED TO THE COR.3
ALL EXISTING UTILITIES SHOWN ARE APPROXIMATE AT THE TIME OF SURVEY, SIZE, LOCATION AND DEPTH SHALL BE FIELD VERIFIED.2
PROPOSED UTILITY CONDUITS SHALL BE CONSTRUCTED AS PER THE UTILITY COMPANY SPECIFICATIONS.1
NOTES:
PILE WALL BETWEEN THE EXISTING CATCH BASIN AND PROPOSED TYPE E2 INLET.
THE CONTRACTOR SHALL VERIFY ONSITE THE SIZE AND DIRECTION OF FLOW OF THE PIPE CROSSING THE SHEET 9
REFER TO SHEET C-508 FOR SANITARY SEWER PROFILE AND MANHOLE DETAILS.8
PROVIDE METAL SLEEVE AND SPACERS FOR ALL THE UTILITIES CROSSING THE LINE OF PROTECTION SHEET PILE.7
PROP. GR. EL. 9.77±
BASIN, SEE NOTE 5
RAISE EXISTING CATCH
PROP. GR. EL. 13.85±
BASIN, SEE NOTE 5
RAISE EXISTING CATCH
CULVERT C3-5, INV @ SWALE 5.51, INV. @ DS 4.71
REALIGN GAS LINE
REALIGN WATER LINE
REALIGN GAS LINE
OUTFALL, EL. 5.14
PROPOSED STORMWATER
8" DIP, 20LF @ EXISTING PIPE SLOPE
REPLACE EXISTING SEWER LINE WITH
EXISTING PIPE SLOPE
WITH 8" DIP, 5LF @
REPLACE EXISTING SEWER LINE
SEE NOTE 8
INV. OUT -2.01
INV. IN -1.99
MAINTAIN EXISTING INVERTS
RIM EL. 13.95
STEM SLUICE GATE
WITH 10"X10" NON RISING
PROPOSED SANITARY MH#1
33LF @ 0.5%
PROPOSED 15" RCP, CLASS III
PROP. GR. EL. 13.85 ±
BASIN, SEE NOTE 5
RAISE EXISTING CATCH
EXISTING POLE BT40986
CONNECTION ELECTRIC TO
TO EXISTING POLE BT40984
CONNECT TELECOM. (COMCAST)
3 - 6" PVC, SCH 80
ELEC. (JCP&L)
PROPOSED RIM 10.73
EXISTING RIM 8.39±
RAISE SANITARY MANHOLE
INV. 5.42
RIM 8.8
TO REMAIN
EXISTING CURB INLET4' X 8' X 7'
TELECOM. VAULT (VERIZON)
35LF @ 0.5%
CLASS III
PROPOSED 18" RCP
158LF @ 0.5%
PROPOSED 15" RCP, CLASS III
S T
A
E N
D R
O A
D R
A
IS
IN
G
ENCASED IN CONCRETE
2 - 4" PVC, SCH 40 CONDUIT
TELECOM. (COMCAST)
ENCASED IN CONCRETE
VERIZON CONDUITS
ENCASED IN CONCRETE
COMCAST CONDUITS
4' X 4' X 4'
TELECOM. VAULT (COMCAST)
18LF @ 0.5%
PROPOSED 18" RCP, CLASS III
INV. 5.22
GRT 9.08
CURB INLET CB#1
NJDOT TYPE B2
INV. 6.23
GRT 11.76
CURB INLET CB#2
NJDOT TYPE E2
UTILITY CROSSINGS
SEE NOTE 7 FOR
TO EXISTING POLE BT40985
CONNECT TELECOM. (VERIZON)
INV. 6.40
GRT 12.33
CURB INLET CB#3
NJDOT TYPE B2
M A
T C
H L
IN
E
T H
IS
S
H E
E T
PORMON_CT5_C-102.dgn C-102 7/6/2022 9:59:01 AM
22 154
D
R E
V
IS
E D
R A
IN
A
G E
F E
A T
U R
E P
R O
F
IL
E S
A D
D E
D N
O T
E
R E
V B
R A
IN
A
R D
A N
D S
W A
L E
C
-4 P
R O
F
IL
/1
/2
/0
/2
/0
/2
IN
E R
IO
R
D R
A
IN
A G
E P
R O
F
C-203
BE FIELD VERIFIED. ANY CONFLICT SHALL BE COORDINATED WITH COR.
EXISTING UTILITIES LOCATION SHOWN ARE APPORXIMATE AND SHALL 2
ASSOCIATED TO LOCATE THE START AND END OF THE SWALE ONLY.
NOT TALLY WITH THE PROJECT STATIONS. PROJECT STATIONS ARE
TOE OF THE LEVEE. THEREFORE THE LENGTH OF THE SWALE DOES
SWALE C3-1A/B, C3-MA/B/C, C3-4A/B AND C3-5A/B RUN ALONG THE 1
NOTES:
60'
SCALE:1"= 30'H
0 30'0
SCALE: 1"= 10'V
20'10'
P O
R M
O N
C
T C
-2 .d g n
FILL FILL
V :2 .5
H
-1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
-0+20 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 10+00 10+80
0+00 1+00 2+00 3+00 4+00 5+00 6+00
0+00 1+00 2+00
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 8+40
6+81
5+63 6+14.5
INV. 1.46
STA. 5+45
OUTFALL C3-1
INV. 3.5
STA. -0+59.52
BROADWAY
INV. 2.35
STA. 6+81.25
.3
S T
A
.2
IN
V
.2
S T
A
-9
SEMI-TRAP, SWALE C3-MA @ 0.26%
TRAPZ, SWALE C3-MA @ 0.26%
INV. 1.72
IN
V
.2
S T
A
.3
IN
V
.5
S T
A
S T
A
TRAP SWALE C3-MB @ 0.22% TRAP SWALE C3-MC @ 0.22%
FLOW
FLOW
IN
V
.5
S T
A
IN
V
.5
S T
A
IN
V
.2
S T
A
.5
O U
T F
A L
L C
-4
IN
V
.5
S T
A
.1
TRAP SWALE C3-4A @ 0.11% FLOW TRAP SWALE C3-4B @ 0.10%FLOW
IN
V
.5
S T
A
.6
O U
T F
A L
L C
-5
IN
V
.5
S T
A
.8
IN
V
.4
S T
A
.0
IN
V
.7
S T
A
TRAP SWALE C3-5B @ 0.65%
FLOW
-5
-5
-5
-5
6+00
TRAP. SWALE, 489 LF @ 0.03%
EXISTING GRADE (TYP)
EXISTING GRADE (TYP)
ST.
PUMP
INV. 0.56
EXISTING CB
.5
INV. 0.55
RIM 3.7
MH # BA-1
INV. 0.42
MH # BA-2
STA. 9+25
STA. 9+56
STA. 6+81
0+00
33LF
35LF
158LF
INV 6.23
GRT 11.70
CB# 2
INV 5.42
GRT 8.8
EXT CB
INV 5.23
GRT 9.08
CB# 1
INV. 5.14
DIFFERENT CONTRACT
12" CULVERT UNDER
SEMI-TRAP, SWALE C3-1A @ 0.34% SEMI-TRAP, SWALE C3-1B @ 0.65%
CROSSSECTION
CHANGE IN
IN
V
.4
IN
V
.013.0
30LF @ 0.98%
IN
V
.3
IN
V
.9
IN
V
.2
IN
V
.2
EL. 13.5
LEVEE
-0+20
TRAP. SWALE, 175LF @ 0.19%
TRAP. SWALE
IN
V
-0
.5
INV. -0.745
-4
-4
IN
V
.2
IN
V
.2
INV. 0.41 TRAP. SWALE, 318 LF @ 0.06%216 LF @ 0.06%
5+00PO 4+00PO 3+00PO 2+00PO 1+00PO 0+00PO
6+00BA 5+00BA 4+00BA 3+00BA 2+00BA 1+00BA 0+00BA
6+20BA
5+16PO
0+00C3-1O1+00C3-1O 1+00C3-4O 0+00C3-4O2+00C3-4O3+00C3-4O1+60C3-1O
0+00 1+00 2+00 3+00
INLET APPRON
MEET PUMP STATION
@ 18.4%
TRAPZ SWALE C3-5A
@ 8.03%
TRAP SWALE C3-5B
FLOODWALL
SWALE C3-1A/1B
RIP-RAPWITH SLUICE GATE
DRAINAGE STR.
@ 0.1%
30" RCP 34 LF
@ 0.5%
30" RCP 9LF
WING WALL
CONC. APRON
ELIPTICAL RCP PIPE
24"R X 38"W, CLASS IV
20 LF @ 0.06%
20 LF @ 0.06% 46 LF @ 0.06%
BOX CULVERT CLASS V
2'R X 4'W RCP
15" RCP @ 0.5% 18" RCP @ 0.5%
PROPOSED GRADE
GRADE
EXISTING
19.5 LF, 2' COVER
CULVERT C3-1
INLET APPRON
MEET PUMP STATION
@ 0.1%
30" RCP 17LF
WITH SLUICE GATE
DRAINAGE STR.
SEMI-TRAPZ TO TRAPZ
TRANSITION FLOODWALL TO LEVEE
INV. -2.8±
EX. 8" SANITARY PIPE
INV. -2.52±
EX. 8" SANITARY PIPE
104 LF @ 0.27%
5' SPAN X 3' RISE
RECT. BOX CULVERT
ACCESS RAMP
LEVEE
IN
V
.6
IN
V
.3
SE NOTE 2
EXISTING GAS AND WATER
0+00 1+00 2+00
SWALE C3-5B
CB#4
IN
V
.8
E X
IS
C
BIN
V
.7
E X
IS
C
B
85LF, 15" RCP @ 1.3%
@ 1.3%
22LF, 15" RCPSWALE C3-1 OUTLET SWALE C3-4 OUTLET
SWALE C3-4A / C3-4B
SWALE C3 - PUMP OUTLET
BRAINARD AVE
SWALE C3-MA
SWALE C3-1A / C3-1B
SWALE C3-MB
TO REMAIN
EXISTING 43LF, 12" PIPE
INV 6.40
GRT 11.7
CB# 3
18LF
TO CB#5
GRADE @ 1%
IN
V
.2
O U
T
IN
V
.7
IN
IN
V
.2
E X
IS
IN
G R
.5
D S
C
-5
IN
V
.0
G R
.5
C B
413 13
INV. @ SWALE 5.52, 16LF, 15" RCP @ 5.0%
SWALE 5A/5B OUTLET
ELIPTICAL RCP PIPE
24"R X 38"W CLASS V
SE NOTE 2
EXIST. GAS
EXIST WATER, SEE NOTE 2
SWALE C3-MC
ROAD RAISING DRAINAGE SYSTEM
DRAINAGE SYSTEM NORTH LEVEE ROAD TIE IN
BET. CB#4 AND CB#5
EIXISTING 12" WITH 15" PIPE
REMOVE AND REPLACE
NORTH RETAINING/FLOODWALL PZ35 SHEET PILE, EL. 13.0
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-203.dgn Plot 7/8/2022 10:12:15 AM
25 154
D E
D N
O T
/0
/2
O J E
C T
S E
C T
IO
R M
O N
C
T C
-3 .d g n
60'
SCALE:1"= 30'H
0 30'0
SCALE: 1"= 10'V
20'10'
C-301
PROTECTED UNPROTECTED UNPROTECTEDPROTECTED UNPROTECTEDPROTECTED UNPROTECTEDPROTECTED
LEVEE
PROPOSED
2.5
2.5
SWALE
SEMI-TRAP.
SWALE
TRAPEZOIDAL
GRADE
EXISTING
TOL EL. 13.5
ACCESS RAMP
30" RCP
FLOODWALL
PROPOSED
EXISTING GRADE
TOW. EL. 13.0
CROSS SECTION. REFER TO STRUCTURAL OR CIVIL DETAIL SHEETS FOR MORE DETAILS.
NOT SHOWN IN THE FOR CLEARITY ALL THE DETAILS OF FLOOD WALL AND OR LEVEE ARE2.
CROSS SECTIONS ARE TAKEN PERPENDICULAR TO REFERENCE LINE.1.
NOTES: 8
-5
0 20 40 60 80-20-40-60-80
-0+55
-5
-5
0 20 40 60 80-20-40-60-80
0+00
-5
-5
0 20 40 60 80-20-40-60-80
1+00
-5
-5
0 20 40 60 80-20-40-60-80
2+00
-5
-5
0 20 40 60 80-20-40-60-80
3+00
-5
-5
0 20 40 60 80-20-40-60-80
4+00
-5
-5
0 20 40 60 80-20-40-60-80
5+00
-5
-5
0 20 40 60 80-20-40-60-80
6+00
-5
-5
0 20 40 60 80-20-40-60-80
7+00
-5
-5
0 20 40 60 80-20-40-60-80
8+00
-5
-5
0 20 40 60 80-20-40-60-80
9+00
-5
-5
0 20 40 60 80-20-40-60-80
10+00
-5
-5
0 20 40 60 80-20-40-60-80
11+00
-5
-5
0 20 40 60 80-20-40-60-80
12+00
-5
-5
0 20 40 60 80-20-40-60-80
13+00
-5
-5
0 20 40 60 80-20-40-60-80
14+00
-5
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-301.dgn C-301 7/5/2022 11:55:16 AM
26 154
D E
D N
O T
/0
/2
O J E
C T
S E
C T
IO
R M
O N
C
T C
-3 .d
C-302SCALE: 1"= 10'V
0 10' 20'
SCALE:1"= 30'H
0 30' 60'
PROTECTED UNPROTECTED
LEVEE
PROPOSED
2.5
2.5
PROTECTED UNPROTECTED PROTECTED UNPROTECTED PROTECTED UNPROTECTED
TOL EL. 13.5
PROPOSED SWALE
STATION
PUMP
STATION
PUMP
BEHIND
LEVEE
CROSS SECTION. REFER TO STRUCTURAL OR CIVIL DETAIL SHEETS FOR MORE DETAILS.
NOT SHOWN IN THE FOR CLEARITY ALL THE DETAILS OF FLOOD WALL AND OR LEVEE ARE2.
CROSS SECTIONS ARE TAKEN PERPENDICULAR TO REFERENCE LINE.1.
NOTES: 8
-5
0 20 40 60 80-20-40-60-80
15+00
-5
-5
0 20 40 60 80-20-40-60-80
16+00
-5
-5
0 20 40 60 80-20-40-60-80
17+00
-5
-5
0 20 40 60 80-20-40-60-80
18+00
-5
-5
0 20 40 60 80-20-40-60-80
19+00
-5
-5
0 20 40 60 80-20-40-60-80
20+00
-5
-5
0 20 40 60 80-20-40-60-80
21+00
-5
-5
0 20 40 60 80-20-40-60-80
22+00
-5
-5
0 20 40 60 80-20-40-60-80
23+00
-5
-5
0 20 40 60 80-20-40-60-80
24+00
-5
-5
0 20 40 60 80-20-40-60-80
25+00
-5
-5
0 20 40 60 80-20-40-60-80
26+00
-5
-5
0 20 40 60 80-20-40-60-80
27+00
-5
-5
0 20 40 60 80-20-40-60-80
28+00
-5
-5
0 20 40 60 80-20-40-60-80
29+00
-5
-5
0 20 40 60 80-20-40-60-80
30+00
-5
OPEN
O P
E N
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-302.dgn Plot 7/5/2022 12:11:56 PM
27 154
D E
D N
O T
/0
/2
O J E
C T
S E
C T
IO
R M
O N
C
T C
-3 .d
C-303
SCALE: 1"= 10'
20'10' 60'
SCALE:1"= 30'
0 30'
2.5
2.5
PROPOSED SWALE
EXISITING GRADE
TOW VARIES
EXISTING DUNE SLOPE
EXISTING TOP OF DUNE
RETAINING WALL
SOUTH SHEET PILE
RAISING
PROPOSED ROAD
SHEET PILE
OF PROTECTION
PROPOSED LINE
RETAINING WALL
SOUTH SHEET PILE
TOW. VARIES
GRADING
ROAD RAISING
TOW EL. 13.5
FLOODWALL
RETAINING/
SHEET PILE
PROPOSED NORTH
FLOODWALL
RETAINING/
SHEET PILE
PROPOSED NORTH
CROSS SECTION. REFER TO STRUCTURAL OR CIVIL DETAIL SHEETS FOR MORE DETAILS.
NOT SHOWN IN THE FOR CLEARITY ALL THE DETAILS OF FLOOD WALL AND OR LEVEE ARE2.
CROSS SECTIONS ARE TAKEN PERPENDICULAR TO REFERENCE LINE.1.
NOTES:
-5
0 20 40 60 80-20-40-60-80
31+00
-5
-5
0 20 40 60 80-20-40-60-80
32+00
-5
-5
0 20 40 60 80-20-40-60-80
33+00
-5
-5
0 20 40 60 80-20-40-60-80
34+00
-5
-5
0 20 40 60 80-20-40-60-80
35+00
-5
-5
0 20 40 60 80-20-40-60-80
36+00
-5
-5
0 20 40 60 80-20-40-60-80
36+90
-5
-5
0 20 40 60 80-20-40-60-80
37+30
-5
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-303.dgn Plot 7/5/2022 12:13:35 PM
")4
", +14
2" (- "4
"2
SPLICE BOLT SLOT
")4
+1
", 4
2" (-
{POST BOLT SLOT
"4
"64
R=
"4
"2
"32
"8
RAIL BOLT SLOT
RAIL SPLICE
.0
"8
R=
"64
R=
0.042
"2
1V 1H
15'
TOP OF SWALE
1H 1V
TIP ELV. -55.0
TOP ELV. 7.0
CL
6'
1V:2.5H 1V :2.
5H
EXISTING GRADE
GEOTEXTILE SEPARATOR
SWALE
TRAPEZOIDAL
TOE DRAIN
BELOW EXISTING GRADE
INSPECTION TRENCH
M
IN
4'
18" GRAVEL
GEOTEXTILE
10'SEE DETAIL 3 SHEET C-504
SETTLEMENT PLATE
(TYP)
GEOTEXTILE
34 154
V
IS
E D
N O
T E
S D
E T
A
IL
A
N
/0
/2
E D
E T
A
C-503
O
R M
O N
C
T C
-5 .d g n
EL. 13.5
TOP OF LEVEE
EARTHEN LEVEE
NTS
2%
ROAD RAISING CROSS-SECTIONS
NTS
SECTION 1 - STA. 4+00 TO 4+80; STA. 9+20 TO 10+00
SECTION 2 - STA. 4+80 TO 5+43, STA. 7+75 TO 9+20
SECTION 3 - STA. 5+43 TO 7+75
SURFACE
BASE
COMP. SUBGRADE
6"
8"
FINISHED GRADE 2" R (SEE NOTE)
CLASS B
CONCRETE
TRANSPORTATION SPECIFICATIONS.
COUNTY DESIGN STANDARDS AND NEW JERSEY DEPARTMENT OF
THE CURB SHALL BE CONSTRUCTED ACCORDING TO THE MONMOUTH
NOTE:
FLOOD WALL
EXISTING GRADE
TOP OF SWALE
15' MEASURED FROM
WIHTOUT SWALE
15'
WITH SWALE
WITH SWALE
TOP OF SWALE
15' MEASURED FROM
WITHOUT SWALE
LEVEE
S W
A L
E
D E
P T
H
S W
A L
E
D E
P T
H
TOP OF SWALE
ALONG FLOODWALL
ALONG LEVEE
{ POST
")16
" (`4
"4
3"16
55°
"16
" (TYP.)16
R=
"16
"8
")2
" x 24
{POST BOLT SLOT (
`1
55°
"8
(TYP.)
"8
R=
" 2
" OR 26'-2
LENGTHS OF 13'- 6
RAIL ELEMENT SHALL BE SUPPLIED IN
SPLICE BOLT SLOTS
" 8 x 132
(TYP.)
"16
R=
1/16" (-0", +3/16")
POST
OUT
BLOCK
WASHER
WITH
NUT
55°
W-BEAM RAIL ELEMENT
BEAM GUIDE RAIL POST ASSEMBLY
RAIL SPLICE
RAIL ELEMENTS
RAIL BOLT
BOLTS (TYP.)
8 - SPLICE
LAP IN DIRECTION OF TRAFFIC
{ POST
RAIL ELEMENT
" FOR 6' POST8
3'- 7
"8
{ POST
12'- 6" (C. TO C. OF SPLICES)
{ POST
-9
6'-3" 6'-3" 6'-3"
RAIL SPLICE
GROUND LINE
CONCRETE CURB
NTS
BEAM GUIDE RAIL
NTS
VEGETATION FREE ZONE
NTS
M
IN
2.5% 2.5%
2%
2%
2.5
2.5
2%
2.5
SIX FOOT HIGH FENCE ABOVE SHEET PILE WALL NOT SHOWN FOR CLEARITY. REFER SHEET C-511.3.
REFER TO SHEET C-101G, C-201 AND C-202 FOR RETAINING WALL PROFILES.2.
STANDARDS AND NEW JERSEY DEPARTMENT OF TRANSPORTATION SPECIFICATIONS.
THE ASPHALT PAVEMENT COMPONENTS SHALL BE CONSTRUCTED ACCORDING TO THE MONMOUTH COUNTY DESIGN1.
NOTE:
SEE DETAIL C-502
CELLULAR CONFINEMENT SYSTEM
PROTECTED SIDE
UNPROTECTED SIDE
AROUND
12" FILTER SAND
4' SIDEWALK
4' SIDEWALK
6' SIDEWALK
6X6 W2.9/W2.9
WIRE MESH
COMPACTED SUB-BASE
CONCRETE SIDEWALK
4' / 6' WIDE
4,500 PSI CONC.
2%
2%
VARIES
ELEVATION
VARIES
ELEVATION
STA. 34+15 TO STA. 36+91 ONLY
SHEET PILE PZ22 CUT OFF WALL
BEAM GUIDE RAIL ON LEVEE SHALL BE INSTALLED PERPENDICULAR TO THE TRAFFIC WITH TWO POST, END SECTIONS ON EITHER SIDE AND APPROVE BY THE COR.5.
BEAM GUIDE RAIL SHALL BE INSTALLED SOUTH SIDE OF THE ROAD, 12" FROM FACE OF THE CURB AND ON LEVEE AT STA. 10+00 AS SHOWN ON THE PLANS.4.
INSTALLED BEAM GUIDE RAIL SHALL BE INSPECTED AND APPROVED BY THE ROAD AUTHORITY.3.
THE REPLACED AND PROPOSED BEAM GUIDE RAIL SHALL BE ACCORDING TO THE STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION REQUIREMENTS & SPECIFICATIONS.2.
THE EXISTING BEAM GUIDE RAIL REMOVED DURING CONSTRUCTION SHALL BE REPLACED.1.
NOTE:
MATERIAL SHALL BE FILLED IN 12" LOOSE LIFT AND COMPACTED TO ATLEAST 90% OF THE MAXIMUM DRY DENSITY PER ASTM D1557.
GRANULAR FILL MATERIAL CONFORMING TO SPECIFICATION SECTION 31 00 00, PARAGRAPH 2.1.7 EXCEPT FOR FILTER REQUIREMENTS. THE GRANUAL FILL
BE REMOVED BETWEEN STA. 10+00 AND STA. 31+00. CONTRACTOR SHALL DEWATER THE EXCAVATION AS NEEDED. CONTRACTOR SHALL PLACE SELECT
TOP 5' OF SOFT PEAT OR VERY LOOSE SAND SOIL UNDER THE EARTHEN LEVEE AND EXTENDING 10' OUTSIDE ON EACH SIDE OF THE LEVEE FOOTPRINT SHALL2
LEVEE SECTION IS TYPICAL EXCEPT FOR SHEET PILE CUT OFF WALL TO BE INSTALLED ONLY BETWEEN THE MENTIONED STATIONS.1
NOTES:
END SECTION (ROUNDED)
MIN.
3"
2.0'±
SPLICE BOLT SLOT
"8
" x132
RAD.
"4
"4
SPLICE BOLTS
C RAIL BOLT SLOTL
20'20'
MIX I-5, 2" THICK
BITUMONOUS CONCRETE SURFACE COURSE
MIX I-2, 6" THICK
BITUMINOUS STABILIZED BASE COURSE
MIX I-5, 6" THICK
SOIL AGGREGATE SUB-BASE COURSE
CONCRETE CURB
TOP ELEVATION VARIES
MEET E
XIS
TIN
G
MEET E
XIS
TIN
G MEET EXISTING
SHEET PILE WALL
RETAINING WALL
SHEET PILE
3' LAWN
3' LAWN
7'
3' LAWN
9'
SHEET PILE WALL
7'
2.12'
12"
12"
2.12'
GUIDE RAIL
GUIDE RAIL
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-503.dgn Plot 7/8/2022 10:18:50 AM
37 154
V
IS
E D
D
IM
E N
S
IO
N S
D E
T A
IL
U P
D A
T E
D E
T A
IL
T R
A P
Z
S W
A L
E L
IN
N
/1
/2
/0
/2
O R
M W
A T
E R
D E
T A
C-506
O
R M
O N
C
T C
-5 .d g n
PRECAST CONCRETE MANHOLE
NTS
PRECAST TYPE B2 CATCH BASIN
NTS
PLAN
BOTTOM
WIDTH
TRAPEZOIDAL SWALE
SEMI-TRAPEZOIDAL SWALE
SWALE IN FILL
SWALE IN CUT
MAINTAIN A MINIMUM COVER OF 18" ABOVE CONCRETE FLOODWALL PILE CAP.4.
EROSION CONTROL BLANKET TIE IN SHALL BE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS.3.
REFER TO SHEET C-201, C-204 AND SHEETS C-301 TO C-303 FOR SWALE PROFILE AND CROSS SECTIONS.2.
BOTTOM WIDTH AND DEPTH OF SWALE VARIES, REFER TO SITE PLAN FOR SWALE DESIGN DETAILS.1.
NOTE:
INTERIOR DRAINAGE SWALE
NTS
6"
2" (TYP.)
5"
M A
X
FLARED END SECTION
NTS
AND 1-1/4" STEEL BAR AS SHOWN. CONTRACTOR IS RESPONSIBLE FOR ANY PERMIT NEEDED.
ALL 5/8" DIAMETER STEEL BARS SHALL BE WELDED TOGETHER. EACH 5/8" STEEL BAR SHALL ALSO BE WELDED TO THE 3/8" STEEL PLATE3.
ALL STEEL BARS AND PLATES SHALL BE GALVANIZED WITH 2.0 OUNCES OF ZINC PER SQUARE FOOT.2.
TACK WELD WASHER TO PLATE AND BOLT TO WASHER.TACK WELD NUT TO BOLT ON UNDERSIDE.1.
NOTES:
SECTION
ELEVATION
PLAN
4"x4"x1/4" PLATE WASHER
T Y
P
1-1/4" DIA. BAR
WASHER
2" TYP.
1" MAX. CLEARANCE
TO SIDEWALL (TYP.)
FLARED END SECTION
4"x4"x1/4" PLATE WASHER
1-1/4" DIA. BAR
FLARED END SECTION
4" MAX.
PLATE WASHER
4"x4"x1/4"
TYP.
6" TYP.
TYP.
1-1/2" TYP.
TYP.
1-1/8" 7UNC x 6"
HEAVY CADMIUM-
PLATED HEX BOLT,
4" MIN. THREAD LENGTH
1-3/8" DRILLED HOLE
WASHER
(2) 1-1/8" 7UNC
PLATED HEX NUT
HEAVY CADMIUM-
1-1/4" DIA. BAR
PLATE WASHER
4"x4"x1/4"
" COTTER PIN4
" DIA. BARS (TYP.)8
" COTTER PIN4
"2 13"2
" PLATE8
" PLATE8
"4
"4
"16
" PLATE8
" BARS (TYP.)8
(TYP.)
" BARS8
A
B
A
B
4'
5'
SECTION A-A SECTION B-B
6"
5'-6"
6" 8
PAVEMENT
1V :2.
5H
1V:2.5H 1V :2.
5H
P T
H
S W
A L
1V:2.5H 1V:2.5H
P T
H
S W
A L
E
D E
P T
H
S W
A L
E
3'
1V:2.5H
6"
6'-0"
T Y
P
30"
5"
RIP-RAP OUTLET PROTECTION
NTS
CURB
IN CD-602-1.8
GRATE AS SHOWN
BICYCLE SAFE
LADDER RUNGS
THROUGH THE INLET.
OF THE MAIN PIPE
BE 0.80 OF DIAMETER
DEPTH OF INVERT TO
BACK AND GRATE
FRAME, CURB PIECE,
MEET EXISTING GRADE
GRADE @ 0.5% TO
EXISTING GRADE
EXISTING GRADE
FLOOD WALL
ANCHOR/NAIL
CONCRETE
TIE IN
BLANKET AS SPECIFIED
EROSION CONTROL
(VARIES)
BOTTOM OF SWALE
TO MEET TOE OF LEVEE
EXTEND SWALE SLOPE
MANHOLE CONICAL TOP
PRECAST REINF. CONC.
MANHOLE RISERS AS REQUIRED
PRECAST REINF. CONCRETE
RISER JOINT
PRECAST MANHOLE
AS PER ASTM C478
REINFORCEMENT STEEL
CONCRETE CRADLE
CLASS B CAST IN PLACE
CONCRETE BASE
PRECAST REINFORCED
COARSE AGGREGATE #57
3" MINIMUM
7"
MEET EXISTING (VARIES)
FINISHED GRADE TO
FRAME AND COVER
STANDARD MANHOLE
PRECAST HEADWALL
NTS
OUTFALL C3-4 DOES NOT REQUIRE RIP-RAP PROTECTION.2
FOR DETAILS.
OUTFALL C3-MAIN HAS CONCRETE APRON, REFER TO STRUCTURAL DRAWINGS 1
THE PRECAST MANHOLE SHALL BE ACCORDING TO THE NJDOT STANDARDS AND SPECIFICATIONS.1
TO MEET THE SITE CONDITIONS.
SELECT OPENING FOR THE FRAME AND GRATE SHALL BE ADJUSTED3
PARALLEL TO THE ROAD.
THE CATCH BASIN SHALL BE INSTALLED WITH THE LONGER SIDE2
ACCORDING TO THE NJDOT STANDARDS AND SPECIFICATIONS.
THE CATCH BASIN SHALL BE NJDOT TYPE B2 AND SHALL BE1
NOTES:
6"
6"
COARSE AGGREGATE #57
4'
P
T H
S W
A L
E
18" DIA. END SECTIONS
* 6" FOR 12" THROUGH
COARSE AGGREGATE #57
W
Lww
L
L
12"
H
12"
Ds
12"
10" 10"
C
L
4"CL
HORIZ - #5 @ 9" OC
VERT - #5 @ 9" OC
D r
D sW
D r
TOW
TOW
SHRINK GROUT
FILL W/NON-
ELIPTICAL PIPE (BA-1)
RECTANGULAR BOX CULVERT OR
2'
3' 3'
BLANKET AS SPECIFIED
EROSION CONTROL
TIE IN
TWO #5 @6" O.C. DIAGONAL (AT EACH OF FOUR CORNERS)
THREE #5 @6" O.C. VERTICAL (ON BOTH SIDES OF OPENING)
THREE #5 @6" O.C. HORIZONTAL (BOTH ABOVE AND BELOW OPENING)
ADDITIONAL REINFORCEMENT AROUND OPENING FOR RCP:2.
WING WALLS OF PS-1 IS IN THE OPPOSITE DIRECTION OF FLOW SEE SITE PLAN C-101C.1.
NOTE:
PLAN
ELEVATION
Wsp
Wsp
L
Do
W
D
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers US Army Corps
N E
W Y
O R
K
N Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W
D S
-2
-B -0
C
E N
A N
-E N
F E
B
-0
N
E W
Y O
R K
N
Y R
O O
M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-506.dgn Plot 7/5/2022 10:37:09 AM
1V :2.
5H
1V:2.5H
ACCESS LADER
HORIZ - #6 @ 12" OC
VERT - #8 @ 6" OC
.5
.5
41 154
D G
A T
E P
Z S
T E
P S
H
A T
C H
D O
O R
D E
T A
IL
C L
A R
IF
IE
D F
O O
T
IN
G T
H
IC
K P
IP
E
L E
N G
H
/1
/2
/0
/2
A
M
S
IS
M
A
IN
A G
E S
T R
U C
T U
R E
D E
T
C-510
O
R M
O N
C
T C
-5 .d g n
30"Ø CASS IV RCP
STEEL SHEETING
DEVICE AND INDICATOR
GEARS, STEM COVER, LOCKING
GATE LIFT WITH ENCLOSED
ALLOW CLEARANCE FOR HATCH FRAME ANGLES
4' X 3' ALUMINIUM HATCH FRAME AND GRATE
SEE NOTE 5
SLUICE GATE
MANUFACTURER, SEE MECHANICAL DRAWINGS
FILLER MATERIAL AS RECOMMENDED BY THE
FILL W/NON-SHRINK GROUT
SHRINK GROUT
FILL W/NON-
C OF SHEETINGL
PZ22 STEEL SHEETING
STA. 27+37
DRAINAGE STRUCTURE C3-4
PLAN
NTS
C-509
C-509
CL
PRECAST HEADWALL
NTS
REFER TO SHEET M-502, M-503 AND M-603 FOR SLUICE GATE DETAILS.5.
LEVEE FEATURES LIKE THE CELLULAR CONFINEMENT SYSTEM AND TOE DRAIN SHALL TERMINATE AT THE PIPE ON LANDWARD SIDE.4.
RAILINGS ON ALL SIDES OF DRAINAGE STRUCTURE, WHERE ACCESS LADDER IS LOCATED. 3.
SEE CIVIL DRAWINGS FOR PIPE INFORMATION. 2.
PROVIDE SUFFICIENT CLEARANCE FOR FLANGE MOUNTING PER MANUFACTURER'S REQUIREMENTS (REFER TO MECHANICAL DRAWINGS)1.
NOTES:
TOP OF LEVEE EL. 13.5
PIPE SECTION
NTS
SECTION
NTS
1V:2.5H
LEVEE SIDE SLOPE 1V:2.5H
INV. 2.23INV. 2.26
30"Ø CLASS IV RCP, 34 LF @ 0.1%
EL. 13.5
TOP OF LEVEE
SEE DETAIL 5
SEEPAGE FILTER DIAPHRAGM
SEE DETAIL 6
PIPE SPRING LINE
CONCRETE CRADLE TO
SEEPAGE FILTER DIAPHRAGM
NTS
PIPE CRADLE
NTS
CONCRETE
CAST IN PLACE
SEEPAGE FILTER
DONE USING SMALLER EQUIPMENT IN 6" FILTS.
COMPACTION OF SOIL ABOVE AND ON SIDES OF THE PIPE SHALL BE2
CRADLE SHALL BE CASTED IN PLACE IN TWO SECTIONS.1
NOTES:
TWO #5 @6" O.C. DIAGONAL (AT EACH OF FOUR CORNERS)
THREE #5 @6" O.C. VERTICAL (ON BOTH SIDES OF OPENING)
THREE #5 @6" O.C. HORIZONTAL (BOTH ABOVE AND BELOW OPENING)
ADDITIONAL REINFORCEMENT AROUND OPENING FOR RCP:1
NOTES:
SEEPAGE FILTER
NTS
SEE DETAIL 5
SEEPAGE FILTER DIAPHRAM
SEE DETAIL 7
SEEPAGE FILTER
4"
12"
30" RCP
HORIZ - #5 @ 9" OC
VERT - #5 @ 9" OC
C
L
12"
11.1
10" 10"
3 12" 12"
30" RCP
11' ±
#5 @ 6"
#5 @ 12"1
11'±
PROJECT REFRENCE LINE
PROPOSED GRADE
TOP & BOTTOM
#6 @ 12" OC EW
PZ22 STEEL SHEETING
SEE NOTE 3
SAFETY RAILING
ON OTHER WALL
FIXED LADDER METAL RUNGS 12" OC
#8 @6"OC
HORIZ - #6 @ 12" OC
VERT - #8 @ 6" OC
INV. 2.28
(3" CLEAR AROUND PIPE)
STEEL WALL SLEEVE WITH WATERSTOP
DRAWINGS
SEE MECHANICAL
FLAP GATE
1.541.5
6.
.1
30"Ø CLASS IV RCP, 17 LF @ 0.1%
1.5
41.5
2 3 1 .5
WRAPPED IN GEOTEXTILE SOCK
4" PERFORATED PVC PIPE, 6' LONG@ 30" PIPE INVERT
DRAINAGE PORT
CAPPED END
AT THE POINT OF ACCESS
PROVIDE LOCKABLE SWING GATE
M
IN
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
PORMON_CT5_C-510.dgn Plot 7/8/2022 10:24:09 AM
PORMON_CT5_C-512.dgn Plot 7/8/2022 10:35:55 AM
44 154
V
IS
E D
D E
T A
IL
A N
D
/0
/2
L
A N
T
IN
G D
E T
A
C-513
R M
O N
C
T C
-5 .d g n
C-513
HERBIVORY FENCE DETAIL
NTS
C-513
SHRUB INSTALLATION DETAIL
NTS
FACILITATE THE REFERENCING AND MONITORING OF THE INDIVIDUAL CELLS.
THE CONTRACTOR SHALL DEVELOP A CELL NUMBERING SYSTEM FOR HIS WORKING AND FINAL AS-BUILT DRAWINGS TO 3.
ACCESSIBLE AT LEAST FROM ONE SIDE FOR PERIODIC MAINTENANCE AND MONITORING OF THE INTERIOR VEGETATION.
HERBIVORY FENCE SHALL BE INSTALLED AS SHOWN IN THE DETAIL IN CLUSTER OF 4 TO 6 CELLS. EACH CELL SHALL BE2.
THE CONTRACTOR SHALL NOT REMOVE THE FENCING BEFORE THE COMPLETION OF 2-YEARS MAINTENANCE PERIOD.
HERBIVORY FENCE SHALL BE PLACE WITHIN THE SCRUB SHRUB, DUNE AND MARITIME FOREST PLANTING AREAS.1.
NOTES:
C-513
PERIMETER (DEER) FENCE
NTS
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
P O
R T
M O
N M
O U
T H
N
E W
J E
R S
E Y
P H
A S
E I
I, C
O N
T R
A C
T
R A
R
IT
A N
B A
Y A
N D
S A
N D
Y H
O O
K B
A Y
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
D
U C
T
IO
N
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
SHEET OF
New York District of Engineers
US Army Corps
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
IDENTIFICATION
SHEET
F E
B
W D
S -2
-B
-0
C E
N A
N -E
N
F E
B
-0
N E
W Y
O R
K N
Y
R O
O M
F E
D E
R A
L P
L A
Z A
HIGH WATER ELEVATION.
A MINIMUM OF 1' ABOVE THE MEAN
TOP OF HERBIVORY FENCE SHALL BE
NOTE:
TOP OF THE FENCE FABRIC AND ALONG THE INTERIOR NYLON TWINE EVERY 3 FEET.
(BOTH PERIMETER AND INTERIOR). THE FLAGGING SHALL ALSO BE TIED ALONG THE
OF TAPE FROM THE TIE, SHALL BE TIED TO THE TOP OF EACH HARDWOOD STAKE
NOTE FOR ON HERBIVORY FENCE: MYLAR FLAGGING, TRAILING AT LEAST 12 INCHES
MYLAR TAPE (TYP)
8' (MIN.) x 2" x 2" HARDWOOD STAKE (TYP.)
GRADE
EXISTING
TO STAKES WITH ZIP-TIES
2" X 2.75" MESH OPENINGS SECURED
BLACK DEER FENCE FABRIC
10'-0" (TYP) 3'-0" (TYP)
M
IN
5.691
PERIMETER STAKE (TYP)
NYLON TWINE (TYP)
FLAGGING TIED TO
PERIMETER (DEER) FENCE
INTERIOR STAKE
NYLON TWINE (TYP)
50'
100'
A
C C
E S
S
2' ACCESS
150'
FRESH WATER TO ELIMINATE AIR POCKETS
WATER-SETTLE SOIL INTO PLANTING HOLE WITH
NOTE:
KEEP 2" CLEAR OF BASE OF PLANT
4" LAYER OF HARDWOOD MULCH,
SOIL
TO RETAIN WATER; USE CLEAN
PERIMETER OF PLANTING HOLE
BUILD SOIL SAUCER AROUND
ALL BROKEN BRANCHES
BEFORE PLANTING. PRUNE
REMOVE PLANT FROM POT
NURSERY GROWN SHRUB.
BACKFILL PLANTING HOLE
ROOTS
TRIM GIRDLING
INTERIOR TWINE DETAIL
HERBIVORY FENCE CELL
PORMON_CT5_C-513.dgn Plot 7/5/2022 10:48:06 AM
9 9
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E
D A
T E
New York District of Engineers
US Army Corps
SHEET OF
.S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W Y
O R
K N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
H U
R R
IC
A
N E
S
T O
R M
D A
M A
G E
R E
D U
C T
IO
N
R A
R
IT
A N
B A
Y
S A
N D
Y H
O O
K B
A Y
P O
R T
M O
N M
O U
T H
N
J
P H
A S
E I
I, C
O N
T R
A C
T
EM 1110-2-2502 RETAINING AND FLOOD WALLS M.
DATED 30 JUNE 1989
EM 1110-2-3104 STRUCTURAL AND ARCHITECTURAL DESIGN OF PUMPING STATIONS, L.
STRUCTURES, INCORPORATING CHANGE 1, 20 AUGUST 2003
EM 111-2-2104 STRENGTH DESIGN FOR REINFORCED CONCRETE HYDRAULIC K.
USACE EM 1110-2-2100 STABILITY ANALYSIS FOR CONCRETE STRUCTURES J.
EM 1110-2-2000 STANDARD PRACTICE FOR CONCRETE FOR CIVIL WORKS STRUCTURESI.
IBC 2015H.
"SPECIFICATIONS FOR MASONRY STRUCTURES" ACI 530.1-13 / ASCE 6-13
"BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES" ACI 530-13 / ASCE 5-13
AMERICAN CONCRETE INSTITUTE, (ACI) G.
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" ACI 318-14
AMERICAN CONCRETE INSTITUTE, (ACI)F.
MANUAL, 14th ED.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION, (AISC) ASD STEEL CONSTRUCTION E.
"MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES", ASCE 7-10
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) D.
UFC 3-310-04 SEISMIC DESIGN FOR BUILDINGS, DATED JUNE 2013C.
UFC 3-310-01 STRUCTURAL LOAD DATA, DATED JUNE 2013B.
UFC 1-200-01 GENERAL BUILDING REQUIREMENTS A.
DESIGN STANDARDS AND REFERENCES:2.
AND FROM DAMAGE DURING ALL PHASES OF CONSTRUCTION.
ALL NECESSARY METHODS AND EQUIPMENT TO KEEP EXCAVATIONS FREE OF WATER
THE CONTRACTOR IS RESPONSIBLE FOR DESIGNING, PROVIDING, AND MAINTAINING J.
FROM THE DESIGNER NECESSARY DIMENSIONS NOT SHOWN ON THE DRAWINGS.
DO NOT SCALE DIMENSIONS FROM DRAWINGS. THE CONTRACTOR SHALL REQUEST I.
DRY CONDITIONS ONLY.
OF A GIVEN STRUCTURE. STRUCTURES ARE DESIGNED TO BE FULLY CONSTRUCTED IN
FOUNDATION EXCAVATIONS AT ALL TIMES DURING CONSTRUCTION AND INSTALLATION
WATER ELEVATIONS SHALLBE MAINTAINED TWO (2) FEET BELOW THE BOTTOM OF
ALL CONCRETE STRUCTURES SHALL BE CONSTRUCTED IN THE "DRY". THE GROUND H.
DRAWINGS PRIOR TO PLACING CONCRETE.
CONCRETE WITH THE ARCHITECTURAL, CIVIL, ELECTRICAL, AND MECHANICAL
CONTRACTOR SHALL COORDINATE ALL PIPE AND CONDUIT LOCATIONS THROUGH G.
UNLESS OTHERWISE NOTED.
ELEVATIONS ARE IN FEET AND REFER TO NORTH AMERICAN VERTICAL DATUM (NAVD88) F.
DRAWINGS.
SIMILAR CONDITIONS EVEN THOUGH NOT SPECIFICALLY REFERENCED ON THE
WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL APPLY FOR ALL LIKE OR E.
PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH ANY PHASE OF THE WORK.
CONDITIONS (BOTH NEW AND EXISTING), REPORTING ANY DISCREPANCIES TO THE COR
THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND GRADE D.
DIRECTIONS.
CONTRACTOR MUST PROVIDE TEMPORARY BRACING FOR THE STRUCTURE IN ALL
DURING ERECTION AND UNTIL ALL PERMANENT CONNECTIONS ARE MADE, THE
OTHER SUPPORTING ELEMENTS PROVIDED FOR CONSTRUCTION OF THE STRUCTURE.
AND SO INCLUDED IN THE DESIGN OF SHORING, BRACING, FORMWORK, AND ANY
PARTIALLY COMPLETED STRUCTURE SHALL BE CONSIDERED BY THE CONTRACTOR
COMPLETED STRUCTURE. APPLICATIONS OF CONSTRUCTION LOADS TO THE
THE STRUCTURE HAS BEEN DESIGNED TO RESIST DESIGN LOADS ONLY AS A C.
SAFETY REGULATIONS ARE TO BE FOLLOWED STRICTLY.
MEANS, METHODS, PROCEDURES, TECHNIQUES, AND SEQUENCE. ALL APPLICABLE
DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION
METHOD OR MEANS OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND
STRUCTURE, AND, EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE THE
THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED B.
SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO GENERAL NOTES.
THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE A.
GENERAL STRUCTURAL NOTES:1.
S T
R U
C T
U R
A L
N O
T E
S P
A R
T
A H
M J S
S-001
PSF100PUMP STATION OPERATING ROOM
SLAB ON GROUND LIVE LOAD:D.
1.04) WIND IMPORTANCE FACTOR, I
PARTIALLY ENCLOSED3) ENCLOSURE CATEGORY
C2) EXPOSURE CATEGORY
(3 SECOND GUST)
MPH1281) DESIGN WIND SPEED
WIND LOADS:C.
PSF83.2 8) SLIDING SNOW LOAD, Pslide
PSF42.0FROM ADJACENT BUILDING
PSF28.7APPLIED TO PUMPS
7) SNOW DRIFT LOAD
1.06) ROOF SLOPE FACTOR, Cs
UNHEATED AND OPEN AIR STRUCTURE
1.25) THERMAL FACTOR, Ct
FULLY EXPOSED ROOF
TERRAIN CATEGORY, C,
0.904) EXPOSURE FACTOR, Ce
PSF22.73) SLOPED ROOF SNOW LOAD, Ps
PSF25.02) GROUND SNOW LOAD, Pg
PSF22.71) FLAT ROOF SNOW LOAD, Pf
SNOW LOAD:B.
MAX EFFECT OF 300 PSF OR H20 TRUCKROOF LIVE LOAD:A.
PUMP STATION
PSF200GENERATOR BUILDING FLOOR
SLAB ON GROUND LIVE LOAD:E.
1.57) SEISMIC IMPORTANCE FACTOR, Ie
C6) SEISMIC DESIGN CATEGORY
D5) SITE CLASS
0.096G4) SD1
0.245G3) SDs
0.06G2) S1
0.23G1) Ss
SEISMIC:D.
1.04) WIND IMPORTANCE FACTOR, I
PARTIALLY ENCLOSED3) ENCLOSURE CATEGORY
C2) EXPOSURE CATEGORY
(3 SECOND GUST)
MPH1281) DESIGN WIND SPEED
WIND LOADS:C.
MAX= 36 PSF
SEE DIAGRAM ON S-0038) UNBALANCED SNOW LOAD
1.27) SNOW IMPORTANCE FACTOR, I
1.06) ROOF SLOPE FACTOR, Cs
1.05) THERMAL FACTOR, Ct (WARM ROOF)
PARTIALLY EXPOSED ROOF
TERRAIN CATEGORY, C,
1.04) EXPOSURE FACTOR, Ce
PSF21.03) SLOPED ROOF SNOW LOAD, Ps
PSF25.02) GROUND SNOW LOAD, Pg
PSF21.01) FLAT ROOF SNOW LOAD, Pf
PSF24.01) MINIMUM SNOW LOAD, Pm
SNOW LOAD:B.
PSF 30ROOF LIVE LOAD:A.
BUILDING RISK CATEGORY: IV
GENERATOR BUILDING
(SEE SHEET S-002 FOR ADDITIONAL GENERATOR BUILDING ROOF TRUSS LOAD REQUIREMENTS)
DESIGN LOADS AND DESIGN FACTORS:3.
REBAR SHALL NOT BE HEATED WITH A TORCH IN THE FIELD.M.
EMBEDMENT LENGTHS SHALL CONFORM TO THE TABLE SHOWN ON S-003.L.
BAR SIZE.
SPLICES OF DIFFERING BAR SIZES, SPLICE LENGTH SHALL BE BASED ON THE LARGER
LAP SPLICES SHALL BE CLASS B AND CONFORM TO THE TABLE SHOWN ON S-002. FOR K.
LEGS OR BE HOT DIP GALVANIZED AFTER FABRICATION.
BAR SUPPORTS FOR CONCRETE EXPOSED TO VIEW SHALL HAVE PLASTIC COATED J.
BY THE CONTRACTING OFFICER REPRESENTATIVE.
NO CONCRETE SHALL BE PLACED UNTIL ALL EMBEDDED WORK HAS BEEN INSPECTED I.
CODE AND ACI SP-66 (04) OR CRSI STANDARDS.
FOR CONTINUOUS REINFORCING SHALL BE DESIGNED IN ACCORDANCE WITH ACI 318-14
REINFORCING DETAILS SUCH AS LAP SPLICES, DOWELS, AND DEVELOPMENT LENGTH H.
DRAWINGS.
ALL EXPOSED CONCRETE EDGES SHALL HAVE A 3/4" CHAMFER OR AS SHOWN ON THE G.
ALL REINFORCEMENT IN THE PUMP STATION SHALL BE EPOXY COATED.F.
SHOP DRAWINGS FOR REINFORCEMENT STEEL SHALL SHOW THE CONCRETE COVER.
STRUCTURES MUST MEET ACI 318 GUIDELINES.
SHOWN ON THE DRAWINGS. THE CONCRETE COVER FOR REST OF THE CONCRETE
MINIMUM CONCRETE COVER OF 4 IN AS PER EM 1110-2-2104, UNLESS OTHERWISE
REINFORCING STEEL FOR CONCRETE HYDRAULIC STRUCTURES SHALL HAVE A E.
ALL WELDED WIRE MESH SHALL BE IN CONFORMANCE WITH ASTM A185. D.
03 30 00 CAST-IN-PLACE CONCRETE.
CONCRETE REINFORCING SHALL BE ASTM 615, GRADE 60 AND CONFORM TO SECTION C.
PSI 5000 1) ALL LOCATIONS
28-DAY COMPRESSIVE STRENGTH:
CAST-IN-PLACE CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUMB.
CONCRETE (ACI 301-10, INCORPORATING CHANGE, 2015).
STRUCTURAL CONCRETE (ACI 318-14) AND SPECIFICATIONS FOR STRUCTURAL
THE AMERICAN CONCRETE INSTITUTE BUILDING CODE REQUIREMENTS FOR
ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF A.
4. CONCRETE CONSTRUCTION NOTES:
R3B - NORMAL OPERATING + MDE
R3A - NORMAL OPERATING + OBE
R2 - NORMAL OPERATING + SHORT DURATION LOADS
R1 - NORMAL OPERATING
RETAINING WALL LOAD CASES (SEE EM 1110-2-2100 FOR DESCRIPTIONS):
C5 - MAXIMUM DIFFERENTIAL HEAD + IMPACT
C4 - NORMAL OPERATING
C3 - CONSTRUCTION
C2B - COINCIDENT POOL + MDE
C2A - COINCIDENT POOL + OBE
C1B - MAXIMUM SURGE + WAVE
C1A - INFREQUENT SURGE + WAVE
COASTAL FLOODWALL LOAD CASES (SEE EM 1110-2-2104 FOR DESCRIPTIONS):
0.02G4) S1 (1 SEC PERIOD SPECTRAL RESPONSE)
0.083G3) Ss (1 SEC PERIOD SPECTRAL RESPONSE)
0.06G2) S1 (0.2 SEC PERIOD SPECTRAL RESPONSE)
0.23G1) Ss (0.2 SEC PERIOD SPECTRAL RESPONSE)
SEISMIC LOADS:B.
EL 3.7 NAVD 884) EXTREME CONDITION (SEISMIC)
6.8 KIP/FTWAVE LOAD
EL 13 NAVD 883) UNUSUAL CONDITION (DESIGN FLOOD)
0.565 KIP/FTWAVE LOAD
EL 7.6 NAVD 882) USUAL CONDITION (10 YR RETURN)
1.67 KIP/FT1) VESSEL IMPACT
FLOOD LOADS:A.
FLOODWALL
J A
P
C E
N A
N -E
N W
D
S B
/0
/2
A
D D
E D
N O
T E
F O
R E
P O
X Y
C O
A T
E D
R E
B A
R
PM_Contract5_S-001.dgn S-001 7/7/2022 2:38:17 PM
PM_Contract5_S-003.dgn Plot 7/7/2022 2:26:55 PM
PORTMONPIICT5 PORT MONMOUTH PHASE II, CONTRACT 5
Amendment 0008
SECTION 01 88 00
PUMP STATION COMMISSIONING
09/06
PART 1 GENERAL
1.1 SUMMARY
This section provides general guidance for the development of the Pump Station Commissioning Plan, as well as descriptions of the activities that shall be performed during the commissioning period. The Pump Station Commissioning Plan shall consist of detailed pre-functional checklists, functional performance checklists, a commissioning schedule, and identification of the commissioning team.
The commissioning period shall begin only after all work required in related specification sections has been successfully completed, and all individual component tests, field tests, inspection reports, and operation and maintenance manuals required in these sections have been submitted and approved. The commissioning period will include the pre-functional checks, and the functional performance checks.
The pump station equipment and systems to be commissioned include but are not limited to the fuel system, electric driven pumps, exhaust systems, emergency generators, trash rake systems, and Supervisory Control and Data Acquisition (SCADA) equipment. Pump Station equipment and systems to be commissioned are specified in the following sections:
35 45 02.00 103 SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED FLOW TYPE
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
25 14 01 PUMP STATION INSTRUMENTATION AND CONTROL PANELS
26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY WITH AUXILIARIES
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH
This section also provides general guidance for final acceptance of the pump station.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 01 88 00 Page 1 07/06/22
Commissioning Plan ; G, DO
Pre-Functional Test Procedures ; G, RO
Functional Performance Test Procedures ; G, RO
SD-06 Test Reports
Pre-Functional Test Reports ; G, DO
Functional Performance Test Reports ; G, DO
1.3 COMMISSIONING PLAN
The Commissioning Plan is an overall document which outlines the organization, scheduling, allocation of resources, documentation, etc.
pertaining to the overall commissioning process. The Commissioning Plan shall be submitted 6 months prior to the start of the pre-functional checks and shall detail how the commissioning process will be organized, scheduled, and documented to include the following:
The organization of the commissioning team.
Submit a list of commissioning team members required in the paragraph COMMISSIONING TEAM below. Any proposed revisions to the list shall be made prior to the start of the impacted test.
A list of activities required to commission the subsystems and system and the functions of each member of the commissioning team.
A logical sequence schedule for each commissioning activity coordinated with all members of the commissioning team.
Submit a schedule for pre-functional checks, and functional performance checks.
Commissioning plan documentation forms for all components and systems submitted.
Pre-functional and functional performance checklists. Examples of pre-functional and functional performance checklists are appended to the end of this specification section. Contractor shall create checklists as necessary to document full compliance with the contract specifications, manufacturer's requirements, and the commissioning plan.
1.3.1 Pre-functional Test Procedures
Submit detailed procedures for pre-functional checks as described in paragraph PRE-FUNCTIONAL CHECKS below. Examples of pre-functional checklists are shown at the end of this section.
1.3.2 Pre-Functional Test Reports
Submit completed pre-functional checklists organized by system and subsystem, and submit as one package. The results of failed tests shall be included along with a description of the corrective action taken and retest results.
SECTION 01 88 00 Page 2
1.3.3 Functional Performance Test Procedures
Submit detailed procedures for functional performance tests as described in paragraph FUNCTIONAL PERFORMANCE TESTS. Examples of functional performance checklists are shown at the end of this section.
1.3.4 Functional Performance Test Reports
Submit completed functional performance checklists organized by system and subsystem, and submit as one package. The results of failed tests shall be included along with a description of the corrective action taken and retest results.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 COMMISSIONING TEAM
The commissioning team will consist of team members who will be designated by the Contractor and will represent the Contractor in the pre-functional checks, functional performance checks, and the endurance test. The commissioning team will attend a mandatory preparatory meeting no less than four weeks in advance of the pre-functional checks. In addition, the Government will be represented by a representative of the Contracting Officer, the Design Agent's Representative, and the using Agency. The team members shall be as follows:
Designation Function
Q Contractor's Chief Quality Control Representative M Contractor's Mechanical Representative P Pump Representative En Contractor's Engine Representative A Ancilliary Equipment Representative E Contractor's Electrical Representative T Contractor's Testing, Adjusting, and Balancing Representative C Contractor's Controls Representative O Contracting Officer's Representative D Using Agency's Representative
Additional team members will be required to monitor pump station functions from the remote location. The Contractor shall designate additional representatives as necessary to accomplish remote testing. The Contractor shall be responsible for maintaining a minimum of two reliable communications between teams (examples are IP phone, cell phone, landline telephone, or two way radio). The pre-functional checklists and functional performance checklists will be completed by the commissioning team.
Acceptance by each commissioning team member of each pre-functional checklist item shall be indicated by initials and date unless an "X" is shown indicating that participation…