W912DS21B0008 Amendment 0006.pdf

PDF 856 KB Posted

Attached to
Rockaway Contract 2, Queens County, New York
Solicitation number
W912DS21B0008
Issued by

About this file

This document is an amendment to a solicitation for the Rockaway Contract 2 project in Queens County, New York. The amendment provides revised drawings and specifications, answers bidders' questions, and adds a new clause.

The project involves beach and dune restoration along Rockaway Beach, including excavation, backfill, dune reconstruction with vegetation and sand fencing, dune reinforcement with armor stone and sheetpile walls, demolition and rebuilding of pedestrian and vehicular crossovers, construction of a concrete walkway, vibration monitoring, and record drawing preparation. The solicitation is open to all responsible bidders and offers optional additional work for aluminum railings, reinforced plastic lumber, a seabeach amaranth pilot study, additional hydraulic fill, and timber groin removal. Bids are due by August 16, 2021 and the contract is to be awarded by the U.S. Army Corps of Engineers, New York District.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0008Amend0009.pdf PDF
W912DS21B0008Amend0008.pdf PDF
Pages 22 to 42 Rockaway C2_Amendmen 7_Plans.pdf PDF
Pages from Pages 1 to 10 Rockaway C2_Amendmen 7_Plans.pdf PDF
2020_02_26_WQC_Package_0-9999-00228_00001.pdf PDF
B 32 to 117 Boring.pdf PDF
B24-B35 Geotech Memo.pdf PDF
2021_10_13_WQC_Package.pdf PDF
06 13 33.pdf PDF
Pages from Pages 11 to 21 Rockaway C2_Amendmen 7_Plans-2.pdf PDF
Rockaway Structural Drawings 2021-10-13_AMEND 007.pdf PDF
05 52 00.pdf PDF
2021_10_14_Authorization_to Proceed_CONTRACT 2.pdf PDF
W912DS21B0008 Amendment 0007.pdf PDF
01 57 19.pdf PDF
31 62 19.pdf PDF
01 22 00.00 10.pdf PDF
Rockaway C2_Amendmen 5_Plans.pdf PDF
06 13 35.00 18.pdf PDF
Rockaway Structural Drawings - 2021-10-06 - AMEND 5.pdf PDF
W912DS21B0008 Amendment 0005.pdf PDF
32 94 00.pdf PDF
GSD Curves A1 to A17.pdf PDF
GSD Curves A18 to A25.pdf PDF
Weight Percent Passing A.pdf PDF
06 13 34.00 18.pdf PDF
GSD Curves B.pdf PDF
01 50 00.pdf PDF
W912DS21B0008 Amendment 00004.pdf PDF
Summary Statistics.pdf PDF
EastBorrowArea_90sort_Median xyz.txt TXT text file
5042_EAST-ROCKAWAY-CSRM-2021_MAPPED_NAVD88_ELEV XYZ.txt TXT text file
WestBorrowArea_90sort_Median xyz.txt TXT text file
WestBorrowArea_5x5_Median xyz.txt TXT text file
20200427_rkwyct1_conformed.pdf PDF
W912DS21B0008 Amendment 00003.pdf PDF
EastBorrowArea_5x5_Median xyz.txt TXT text file
W912DS21B0008 Amendment 00002.pdf PDF
Rockaway Sheet Pile Reference Line.pdf PDF
W912DS21B0008 Amendment 00001.pdf PDF
R4 Phase 2 Boardwalk Access Beach 97 to 105.pdf PDF
R5-Phase 3 Boardwalk Access Beach 105 to 126.pdf PDF
R1-3 Survey 2021 Rockaway Inlet sheets 1 to 76.pdf PDF
Rockaway C2 100 pc part 3 of 3.pdf PDF
R2- Rockaway Make Safe -Baffle Wall.pdf PDF
R1-1 Survey 2021 Rockaway Inlet sheets 1 to 76.pdf PDF
Rockaway C2 100 pc part 2-1 of 3.pdf PDF
Rockaway C2 100 pc part 1-1 of 3.pdf PDF
Rockaway C2 100 pc part 2-2 of 3.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er questions to prospective bidders for informational purposes only

2. Revise and re-issue specifications and draw ings

3. Revise the bid schedule

4. Add Clause 252.223-7999 NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Oct-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0008

X 9B. DATED (SEE ITEM 11)

16-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Oct-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0006

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

MOBILIZATION & DEMOBILIZATION

FFP

INFORMATIONAL PURPOSES ONLY

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AA 1 Job Mob/Demob Reinforced Dune & Crossovers

FFP

FOB: Destination

PSC CD: Y1KZ

0001AB 1 Job Mob/Demob Hydraulic Beachfill

FFP

EXCAVATION BACKFILL& DUNE RECONSTRUCTION

0002AA 842,170 Cubic

Yard

Excavation, Stockpiling and backfill

ESTIMATED QUANTITIES

0002AB 30,000 Cubic

Disposal of Unsuitable Fill and Debris

ESTIMATED QUANTITIES

0002AC 2,585,900 Cubic

Hydraulic Fill

ESTIMATED QUANTITIES

0002AD 70 Acre Vegetation

FFP

ESTIMATED QUANTITIES

0002AE 43,200 Square

Coir Blankets

ESTIMATED QUANTITIES

0002AF 110,000 Linear

Foot

Sand Fence

(dune, crossovers and walkway)

ESTIMATED QUANTITIES

0002AG 400 Short Ton Removal & Disposal of Timber Piles

FFP

ESTIMATED QUANTITIES

0002AH 268,000 Cubic

Regradiing Hydraulic Fill

Post Reinforced Dune Construction

ESTIMATED QUANTITIES

DUNE REINFORCEMENT

0003AA 385,000 Short Ton Type A Armor Stone

FFP

ESTIMATED QUANTITIES

0003AB 177,000 Short Ton Core Stone

FFP

ESTIMATED QUANTITIES

0003AC 7,100 Short Ton Gravel Base Course

FFP

ESTIMATED QUANTITIES

0003AD 120,000 Square

Geotextile

ESTIMATED QUANTITIES

0003AE 1,128,900 Square

NZ14 Sheetpile

ESTIMATED QUANTITIES

0003AF 35,000 Cubic

Concrete Cap

ESTIMATED QUANTITIES

DEMOLITION & DISPOSAL EXISTING CROSSOVER

0004AA 1 Job Demolition Type A

FFP

0004AB 1 Job Demolition Type B

FFP

0004AC 1 Job Demolition Type C

FFP

0004AD 1 Job Demolition Type D

FFP

0005 12,000 Square

PEDESTRIAN CROSSOVER TYPES P1, P3 AND P4

Stabilization Mats

ESTIMATED QUANTITIES

0006 9 Each

PEDESTRIAN ADA COMPLIANT CROSSOVERS TYPE

FFP

Construction of Type P2 Crossovers

0007 9 Each

PEDESTRIAN CROSSOVERS TYPE P5 REBUILD

FFP

Re-build Type P5 Crossovers

VEHICULAR CROSSOVERS TYPE V1

0008AA 6 Each Construction of Type V1 Crossovers

FFP

(VA25, VA37, VA75, VA86, VA97, VA101)

0008AB 1 Each Construction of Type V1 Crossovers

FFP

(VA32)

0009 5 Each Construction of Type V2 Crossovers

FFP

(VA41, VA49, VA57, VA67, VA69)

0010 3,580 SY

Walkway

FFP

5’ wide Stabilization Mat

0011 1 Job Vibration Monitoring

FFP

0012 1 Job As Built Record Drawing

FFP

PRE-PRICED CLIN $100,000.00

$100,000.00

0013 1 Job OPTION Option 1 - Additional Insurance

FFP

in accordance with specifications section 01 30 00 paragraph 1.8

0014 3,880 Linear

OPTION Option 2 - Aluminum Railings

For CO3, CO8, C015 & CO19

ESTIMATED QUANTITIES

0015 14,300 Square

OPTION Option 3 -Reinforced Plastic Lumber

For CO3, CO8, C015 & CO19

ESTIMATED QUANTITIES

0016 3,300 Linear

OPTION Option 4 - Aluminum Railings

For CO71, CO83, C098, CO99 & CO100

ESTIMATED QUANTITIES

0017 12,160 Square

OPTION Option 5 - Reinforced Plastic Lumber

For CO71, CO83, C098, CO99 & CO100

ESTIMATED QUANTITIES

0018 1 Job OPTION Option 6 - Seabeach Amaranth Pilot Study

FFP

(0.5 acre pilot study between STA 207+00 to STA 245+50)

0019 367,400 Cubic

OPTION Option 7- Hydraulic Fill

(STA-45+00 to STA 0+00)

ESTIMATED QUANTITIES

0020 5 Each OPTION Option 8 - Timber Groin Removal

FFP

Existing timber groins must be removed or cut 5 feet below existing grade .

The existing timber groins consist of timber piles, timber wales and timber sheet piles, and are approximately 250ft to 300ft. in length.

TOTALS:

TOTAL BASE – NO OPTIONS (ITEMS 0001 thru 0012) $________________

TOTAL OPTIONS (ITEMS 0013 thru 0020) $_________________

TOTAL BASE PLUS OPTION (ITEMS 0001 thru 0020) $_________________

NOTES:

1.Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the total base bid and optional bid items.

2. Any bid which is materially unbalanced as to prices for the Base Bid Items may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.

3. Bidders are required to bid on all items or their bids will be rejected.

4. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.

5. Tapering are included in the items and exact locations are on the plan sheets.

6. The Government is under no obligation to award any option. If Options are exercised, Bid items 0013-0020) will be exercised by December 31, 2024. No additional days will be added to the contract duration period .

ITEMS 13-17 (options 1-5) is the additional cost to replace timber decking and railings for the crossovers listed.

W912DS-21-B-0008

Amendment No.5

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

-G-002, C-101, C-102, C-103, C-112, C-113, C-129, C-200, C-202, C-301, C-302, C-303, C-306, C-312, C-501, C-503, C-506, S-101, S-102, S-103, S-104, S-201, S-202, S-203, S-204, S-501, S-508, S-509

2. The following DRAWINGS have been DELETED:

-C-508

3. The following DRAWINGS have been REVISED but NOT REISSUED:

-None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

-None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:

-Section 06 13 35.00 18 -Section 01 22 00.00 10 -Section 31 62 19 -Section 01 57 19

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

REVISED SPECIFICATIONS:

- Section 06 13 35.00 18– revised sizes in paragraph 2.1 (a)

- Section 01 22 00.00 10– revised multiple paragraphs and added paragraphs for seabeach amaranth pilot study.

- Section 31 62 19- revised multiple paragraphs and added language for test piles.

- Section 01 57 19- added seabeach amaranth pilot study paragraph to par 3.5.2

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.

Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.

RFI SET #2:

Question 3. Can the design shape of the core and armor stone be modified to have a continuous slope instead of a vertical face on the seaside of the structure?

Response: Yes, updated drawings to be posted with next amendment.

RFI SET #4:

Question 4. Drawing C-507, note 5 indicates that groins are to be removed East of 32nd street but upon inspection of the site there does not appear to be any timber groins at that location? Does this work get paid for under item No. 0002AG – Removal & Disposal of Timber Piles or Option Item 0020 – Timber Groin Removal?

Response: That work is under option Item No. 0020 – timber groin removal. Some photos, for information only, of exposed timber groins near B30/31, B29 and B28 –

RFI SET #6:

Question 12. The Mobi Mat width is called out in the 061335.0018 spec section as a minimum of 66” which is 5.5”. However, on the crossover schedule (C-200) it shows 6’6” Walking Width. Please clarify the width of the Mobi Mats.

Response: Revised section 06 13 35.00 18.

RFI SET #9:

Question 4. The existing baffle wall appears to extend to the southern (ocean) side of concrete walkway, with the portions of baffle wall extending on the beach side of the walkway being demoed at B147th St. and B142nd St. With sand fence on either side of the walkway this will result in 200’+ “dead end” at each street.

The call-outs indicate “5’ wide concrete walkway connecting street entries at baffle wall entrance (Typ).”

If the baffle wall remains across the walkway there will not be “connecting street entries”.

Are there any other sections of baffle wall to be demoed other than at B147th and B142nd Streets?

Response: No other sections of baffle wall to be demoed other than at B147th and B142nd.

Question 5. Can USACE please confirm treatment types for timber members, and piles. Typically CCA is used on the east coast and more accessible via treatment plants as well as MCA for timbers that come in contact with pedestrians. Currently AZCA is called out for some timbers.

Response: In the event that ACZA cannot be sourced, Chromated Copper Arsenate (CCA) pressure treated wood may be used under the condition that it must be clean and free of CCA surface deposits.

Wood with CCA surface deposits must be washed for at least 5 minutes under running water prior to use.

The washing must occur greater than 100 feet landward of any regulated wetland and/or water body. Any wood debris such as sawdust or wash waster must not enter any water body, including wetlands or protected buffer areas. The Contractor must be responsible for the quality of treated wood products.

Specification sections will be updated with these requirements in Amendment 7.

Question 6. For timber pile driving; Are piles driven to ultimate strength prior to embedment depth acceptable? If not is the intention to pre-auger all piles to achieve embedment depth? Please advise, thank you.

Response: Piles shall be driven to the specified embedment depth on the design drawings. Refer to specification section 31 41 16 and 31 62 19 for pile driving process.

RFI SET #10:

Question 1. Sheet C-508 and S-508 reference epoxy bar for the sidewalk and VA 32 crossover concrete.

No epoxy bar is referenced for the concrete cap at the sheetpile wall. Please confirm?

Response: Epoxy coated bar shall be used for the concrete cap at the sheet pile wall. A clarifying note will be incorporated into the Amendment 6 drawing set.

Question 5. Sheet S-504- Are the plates to be on both sides of the connection (2 ea./per connection)?

Assumed NS and FS are a reference to both sides.

Response: Confirmed. Plates will be on both sides of the connection.

Question 6. ACZA is a Douglas Fir treatment for the west coast. The east coast is predominantly Southern Yellow Pine treated with CCA. In addition to that, the timberworks specification (061333) and the Timber Marine Piles specification (316219) calls for Southern Yellow Pine. SYP is not treated with ACZA, only Douglas Fir.

Please see notations from suppliers:

“This preservative treatment is only used on the West Coast to the West Coast Forest products. Southern Yellow Pine is an East Coast Forest product and is used heavily for marine and foundation use. Under the AWPA Book of Standards regarding the application use a specifier chooses CCA for the East coast not a Douglas Fir ACZA West Coast Forest product. Both CCA & ACZA products are considered equal in the AWPA US5A application.”

“Please can you inform USACE that unfortunately treating the piling, lumber and timbers with ACZA is not an option. CCA is the industry standard and is what has been used in all their most recent contracts”

We request that CCA treatment be used for pilings and non-human contact timbers. We have had significant success in the region on USACE marine jobs with the use of CCA treatment.

Response: In the event that ACZA cannot be sourced, Chromated Copper Arsenate (CCA) pressure treated wood may be used under the condition that it must be clean and free of CCA surface deposits.

Wood with CCA surface deposits must be washed for at least 5 minutes under running water prior to use.

The washing must occur greater than 100 feet landward of any regulated wetland and/or water body. Any wood debris such as sawdust or wash waster must not enter any water body, including wetlands or protected buffer areas. The Contractor must be responsible for the quality of treated wood products.

Specification sections will be updated with these requirements in Amendment 7.

RFI SET #11:

Question 1. On Dwg S-509, Detail 1 call-out indicates “#6 ties @ 12” Max. Typ.”; Detail 3 call-out (apparently for the same bars) indicates “#4 bar, Typ.”. The overlap indicated ln Detail 1 (1’6”) is more consistent with a #4 bar than a #6. What size bar is to be used for the bent ties?

Response: Ties in the dune concrete cap are to be #6 bar. Overlap has been increased to 3’-0” and updates to drawings will be issued with Amendment 6 package.

Question 3. Lumber, including timber piles, is specified as being treated with ACZA (Ammoniacal Copper Zinc Arsenate). We are unable to find a timber supplier able to supply timber with that type of treatment.

Will the Corps accept an alternate treatment for those timbers?

What type of treatment was used on the Long Beach/Pt. Lookout crossovers? Will that same type of treatment be acceptable at Rockaway?

Response: In the event that ACZA cannot be sourced, Chromated Copper Arsenate (CCA) pressure treated wood may be used under the condition that it must be clean and free of CCA surface deposits.

Wood with CCA surface deposits must be washed for at least 5 minutes under running water prior to use.

The washing must occur greater than 100 feet landward of any regulated wetland and/or water body. Any wood debris such as sawdust or wash waster must not enter any water body, including wetlands or protected buffer areas. The Contractor must be responsible for the quality of treated wood products.

Specification sections will be updated with these requirements in Amendment 7.

RFI SET #12:

Question 1. Reference Addendum 04, RFI Set #8 from contractor: Question 4 identifies the conflict with Sumac.

Addendum 04 Provides Sumac specifies under 2.1 and advises to install based on 1.2, however 1.2 does not state Sumac in this paragraph. Please specify where Sumac will be planted. Will it be planted on Crest, North side or South side? Furthermore, the planting plan does not match the written spec in 1.2.

Response: Added the following language to section 32 94 00 - Sumac (Rhus aromatic): plant size 1 quart, planted 36" off center with staggered rows, each plant planted 7"-9" deep. Each plant shall be hand planted.

Planting shall occur between April 15 and June 1. The Planting plan is just a reference for the bidder. The sumac should be planted on the northside of the dune.

Question 6. Spec 32 94 00 paragraph 3.2 states nursery must be within 125 miles from site. Was the intent to also require genetics of plants within the same distance?

Response: There is no intent for genetics to be done on the plants.

Question 8. Is the planting plan intended to go over the entire 70 acres?

Response: Yes, planting shall take place on the entire dune (both slopes and crest).

RFI SET #13:

Question 1. The measurement of Crossovers ITEM 0005 for payment is in area (SY) so for types P1,P3 and P4 is the width measured from Sand fence to Sand fence or is just the surface of Mobi mat ?

Response: Surface of mobi mat.

Question 2. The Concrete Cap on drawing 1/S-509 typical section points to the bands as #6 rebar 12" OC. It calls out an overlap of 1'6" (24 diameters), this seems light. Typical Expansion joint detail 2/S-509 details same rebar as #4 @12" OC. Please clarify.

Response: Ties in the dune concrete cap are to be #6 bar. Overlap has been increased to 3’-0” and updates to drawings will be issued with Amendment 6 package.

252.223-7999 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009) As prescribed in Class Deviation 2021-O0009, Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors, use the following clause:

ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL

CONTRACTORS (DEVIATION 2021-O0009) (OCT 2021)

(a) Definition. As used in this clause –

United States or its outlying areas means—

(1) The fifty States;

(2) The District of Columbia;

(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;

(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and

(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.

(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).

(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/.

(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.

(End of clause)