06 13 35.00 18.pdf

PDF 19 KB Posted

Attached to
Rockaway Contract 2, Queens County, New York
Solicitation number
W912DS21B0008
Issued by

About this file

This document is a technical specification section outlining requirements for the installation of stabilization mats for temporary dune crossovers on a beach reinforcement project in Queens County, New York. The project involves furnishing labor, materials and equipment to construct and remove temporary stabilization mat crossovers according to plans. Stabilization mats must be ADA compliant with a minimum 5 or 6 foot width depending on location, 30 foot length, 0.24 lbs/sf weight, and UV and rust resistant material. Connectors and U-shaped anchors are required for installation. Site preparation includes clearing, grubbing and removing vegetation and structures. Installation requirements specify surface preparation, anchoring mat ends, connecting multiple mats, and slope requirements. Measurement and payment will be by the linear footage of installed stabilization mats. The solicitation is from the Army Corps of Engineers Engineering District New York for the Rockaway Contract 2 project.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0008Amend0009.pdf PDF
W912DS21B0008Amend0008.pdf PDF
Pages 22 to 42 Rockaway C2_Amendmen 7_Plans.pdf PDF
Pages from Pages 1 to 10 Rockaway C2_Amendmen 7_Plans.pdf PDF
2020_02_26_WQC_Package_0-9999-00228_00001.pdf PDF
B 32 to 117 Boring.pdf PDF
B24-B35 Geotech Memo.pdf PDF
2021_10_13_WQC_Package.pdf PDF
06 13 33.pdf PDF
Pages from Pages 11 to 21 Rockaway C2_Amendmen 7_Plans-2.pdf PDF
Rockaway Structural Drawings 2021-10-13_AMEND 007.pdf PDF
05 52 00.pdf PDF
2021_10_14_Authorization_to Proceed_CONTRACT 2.pdf PDF
W912DS21B0008 Amendment 0007.pdf PDF
01 57 19.pdf PDF
W912DS21B0008 Amendment 0006.pdf PDF
31 62 19.pdf PDF
01 22 00.00 10.pdf PDF
Rockaway C2_Amendmen 5_Plans.pdf PDF
Rockaway Structural Drawings - 2021-10-06 - AMEND 5.pdf PDF
W912DS21B0008 Amendment 0005.pdf PDF
32 94 00.pdf PDF
GSD Curves A1 to A17.pdf PDF
GSD Curves A18 to A25.pdf PDF
Weight Percent Passing A.pdf PDF
06 13 34.00 18.pdf PDF
GSD Curves B.pdf PDF
01 50 00.pdf PDF
W912DS21B0008 Amendment 00004.pdf PDF
Summary Statistics.pdf PDF
EastBorrowArea_90sort_Median xyz.txt TXT text file
5042_EAST-ROCKAWAY-CSRM-2021_MAPPED_NAVD88_ELEV XYZ.txt TXT text file
WestBorrowArea_90sort_Median xyz.txt TXT text file
WestBorrowArea_5x5_Median xyz.txt TXT text file
20200427_rkwyct1_conformed.pdf PDF
W912DS21B0008 Amendment 00003.pdf PDF
EastBorrowArea_5x5_Median xyz.txt TXT text file
W912DS21B0008 Amendment 00002.pdf PDF
Rockaway Sheet Pile Reference Line.pdf PDF
W912DS21B0008 Amendment 00001.pdf PDF
R4 Phase 2 Boardwalk Access Beach 97 to 105.pdf PDF
R5-Phase 3 Boardwalk Access Beach 105 to 126.pdf PDF
R1-3 Survey 2021 Rockaway Inlet sheets 1 to 76.pdf PDF
Rockaway C2 100 pc part 3 of 3.pdf PDF
R2- Rockaway Make Safe -Baffle Wall.pdf PDF
R1-1 Survey 2021 Rockaway Inlet sheets 1 to 76.pdf PDF
Rockaway C2 100 pc part 2-1 of 3.pdf PDF
Rockaway C2 100 pc part 1-1 of 3.pdf PDF
Rockaway C2 100 pc part 2-2 of 3.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCKAWAY REINFORCED DUNE AND CROSSOVER

Amendment 005

SECTION 06 13 35.00 18

STABILIZIED MAT DUNE CROSSOVERS

PART 1 GENERAL

1.1 SCOPE OF SECTION

The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all operations required for the construction and removal of temporary stabilization mat crossovers, as specified herein and shown on the contract drawings.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Work Plan for Temporary Stabilization Mat Dune Crossover; G, RO

SD-03 Product Data

Stabilization Mats ; G, RO

Submit information describing the quality and performance of the materials proposed with product data sheets.

SD-04 Samples

Stabilization Mat Sample Material ; G, RO

Submit a sample of the stabilization mat material to confirm the material includes a non-angular, slip-resistant surface.

SD-08 Manufacturer's Instructions

Stabilization Mat Installation and Maintenance ; G, RO

Submit stabilization mat manufacturer's installation, field repair, cleaning, and maintenance instructions.

1.3 SEQUENCING AND SCHEDULING

Reasonable public access to the beach must be provided during the course of construction of the project. Typically, portions of areas receiving beachfill are not accessible to the public until the completion of dune crossovers. In order to ensure reasonable public access, the contractor will comply with the order of work detailed in Section 01 14 00 WORK RESTRICTIONS, paragraph "Order of Work."

SECTION 06 13 35.00 18 Page 1

1.4 Work Plan for Stabilization mat Dune Crossover

Submit typical work plans for the construction of the Stabilization mat dune crossovers. The work plans shall include the labor, equipment, and methods to be used to construct dune crossovers, and shall demonstrate how the Contractor intends to comply with Paragraph "SEQUENCING AND SCHEDULING". Prepare an individual work plan for each type of crossover.

PART 2 PRODUCTS

2.1 STABILIZATION MATS

Stabilization mats shall be ABA/ADA compliant and shall provide a firm and slip resistant, flexible surface for pedestrian beach access with the following features:

a. Minimum continuous roll width of 66 inches 5 feet for walkway behind the dune between Beach 149th St and Beach 126th St. Minimum width of 6 feet 6 inch for all on grade crossovers type P1, P3 and P4. .

b. Minimum roll length of 30 feet.

c. Minimum weight not less than 0.24 lbs/sf and individual rolls shall be of such size and weight that they may be manageably moved by two people.

d. Manufactured from durable, UV stabilized material that is rot-proof and rust-proof in material and construction, and able to withstand extensive pedestrian and wheelchair traffic.

e. Material shall have a flat, open weave structure and finished edges to accommodate the anchoring devices required for installation.

f. Manufactured to provide a slip resistant surface in wet conditions and a non-angular comfortable walking surface for bare foot usage.

g. All components shall arrive fully factory fabricated and ready for field installation.

h. Color to be selected by Contracting Officer from manufacturer's standard colors.

i. Stabilization mat dune shall extend as shown on the plans. Typical mat shall extend from the landward existing grades, up and cross the dune, slope down to seaward toe of dune. Mats shall slope as shown on the plans and cross sections.

Provide Sample Material meeting requirements stated above.

2.1.1 Connectors

Furnish stabilization mats with an integral connector strip on each end of the mat with predefined, reinforced holes in the mat connector strip.

Connectors shall provide a factory manufactured method to seamlessly connect mats together at the ends.

SECTION 06 13 35.00 18 Page 2

2.1.2 Anchoring

Provide U-shaped galvanized or plastic pins to facilitate the installation and anchoring of the stabilization mats. Anchors shall be approximately six inches wide and a minimum 16 inches deep.

PART 3 EXECUTION

3.1 RESTRICTIONS ON DUNE CROSSOVER CONSTRUCTION

Refer to order of work under Section 01 14 00 WORK RESTRICTIONS, paragraph

13.1 Order of Work for restriction and sequence of dune crossovers.

3.2 SITE PREPARATION

Crossover construction may require, clearing and grubbing of dune vegetation and dune grass, and the removal of sand fence and posts. Clear and grub and remove existing structures only to the extent necessary for the installation of crossovers.

3.2.1 Clearing

Clearing shall consist of the satisfactory removal and disposal of vegetation, including snags, brush, and rubbish occurring within the areas to be cleared as necessary for the temporary crossover construction.

Stumps, roots, brush, and other vegetation in areas to be cleared shall be removed in their entirety. Dispose of cleared material off-site.

3.2.2 Grubbing

Grubbing shall consist of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots. Material to be grubbed, shall be removed to a depth of not less than 18 inches below the original surface level of the ground. Fill depressions made by grubbing with suitable beachfill material and compact to make the surface conform with the original adjacent surface of the ground. Dispose of grubbed material off-site.

3.2.3 Existing Sand Fence Demolition

Remove existing sand fence, including fencing and posts, that are in the footprint of the temporary stabilization mat crossover. All sand fence to be demolished shall first be approved by the Contracting Officer. Dispose of demolished sand fence material off-site.

3.2.4 Existing Structures Demolition

Existing stairs, ramps and other structures in conflict with reinforced dune and as shown on the drawings shall be demolished. No demolition debris shall be buried in the new dune fill. All structures to be demolished shall be approved by the Contracting officer. Dispose of the demolished structure materials off-site.

Geo-bag and trap bags in Dune footprint shall remain in place and shall be removed if they are in Berm footprint.

SECTION 06 13 35.00 18 Page 3

3.2.5 Excavation

Minimize excavation of existing or constructed dunes to facilitate temporary crossover construction. Stockpile excavated sand free of vegetation for reuse in restoring dune to its preconstruction configuration. Slope of temporary stabilization mat crossovers shall be no steeper than 1V:12H.

3.2.6 Temporary Stabilization Mat Dune Crossover Removal

Remove all existing mats as they shall be replaced with new mats.

3.2.6.1 Dune Reconstruction

Reconstruct disturbed dune utilizing the stockpiled material to the template and specific limits and sections as shown in the drawings.

Vegetate the dune. Newly placed fill shall be keyed into the existing dune.

3.2.6.2 Sand Fence and Existing Structure Reconstruction

Reconstruct all demolished sand fence and existing structures to pre-construction conditions or as directed by the COR.

3.3 STABILIZATION MAT INSTALLATION

3.3.1 STABILIZATION MAT INSTALLATION AND MAINTENANCE

a. Prepare the surface where the stabilization mats will be placed by raking the beach dune. Remove debris and foreign objects from the area.

The surface should be as smooth and flat as possible with slopes no steeper than 1V:12H.

b. Unroll the stabilization mat fully. Install the mat with the walking surface facing up.

c. Where the stabilization mat meets permanent pedestrian access structures on the landward side, the mat end shall be placed so there is no gap. Set the mat flush or below the permanent path to eliminate a tripping hazard. Dig a one to two inch trench and tuck the end of the mat into this trench and cover end of mat with beach sand.

d. Anchor the mat end using U-shaped pin anchors across the connector strip. Install the pins in the predefined holes in the mat connector strip. A connector strip is supplied on each end of the stabilization mat.

e. Anchor the beach end of the mat by digging a three inch trench. Fold the end of the mat into the trench firmly securing this end with four anchor pins inserted through the predefined holes in the mat connector strip.

f. Rake sand over the trench covering the end of the mat to prevent a tripping hazard.

3.3.1.1 Connecting Stabilization Mats

a. Install the successive mats by overlapping the connector strips, ensuring that the anchoring holes are lined up so that the anchor pins anchor both mats securely together.

SECTION 06 13 35.00 18 Page 4

b. Secure the mats with four U-shaped pins at each seam or as recommended by the mat manufacturer.

c. Continue connecting mat sections for the length of the access route.

Complete the installation by securing the end of the final stabilization mat section as specified above or per manufacturer's instructions.

3.4 MEASUREMENT AND PAYMENT

3.4.1 Stabilization Mats

The work specified in this section for the installation of stabilization mats will be measured for payment by the linear footage of stabilization mats satisfactorily installed and accepted. All costs in connection therewith shall be included in the contract unit price for the Bid Items titled, "Stabilization Mats".

-- End of Section --

SECTION 06 13 35.00 18 Page 5

06 13 35.00 18 - STABILIZIED MAT DUNE CROSSOVERS
PART 1 GENERAL
1.1 SCOPE OF SECTION
1.2 SUBMITTALS
1.3 SEQUENCING AND SCHEDULING
1.4 Work Plan for Stabilization mat Dune Crossover
PART 2 PRODUCTS
2.1 STABILIZATION MATS
2.1.1 Connectors
2.1.2 Anchoring
PART 3 EXECUTION
3.1 RESTRICTIONS ON DUNE CROSSOVER CONSTRUCTION
3.2 SITE PREPARATION
3.2.1 Clearing
3.2.2 Grubbing
3.2.3 Existing Sand Fence Demolition
3.2.4 Existing Structures Demolition
3.2.5 Excavation
3.2.6 Temporary Stabilization Mat Dune Crossover Removal
3.2.6.1 Dune Reconstruction
3.2.6.2 Sand Fence and Existing Structure Reconstruction
3.3 STABILIZATION MAT INSTALLATION
3.3.1 STABILIZATION MAT INSTALLATION AND MAINTENANCE
3.3.1.1 Connecting Stabilization Mats
3.4 MEASUREMENT AND PAYMENT
3.4.1 Stabilization Mats

File details come from the government source that posted it. Updated .