W912DS21B0008 Amendment 00003.pdf

PDF 1 MB Posted

Attached to
Rockaway Contract 2, Queens County, New York
Solicitation number
W912DS21B0008
Issued by

About this file

This document is an amendment to a solicitation for the Rockaway Contract 2 project in Queens County, New York. The amendment incorporates updated wage rates, extends the bid opening date to October 12, 2021, includes a deadline for requests for information of October 5, 2021, and answers questions from prospective bidders. It also adds language on new entry requirements for federal protective service facilities. The solicitation is for construction services including dredging, beach fill placement, and dune reinforcement structure installation. The estimated value of the contract is between $200-250 million. The soliciting agency is the Department of the Army Corps of Engineers New York District.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0008Amend0009.pdf PDF
W912DS21B0008Amend0008.pdf PDF
Pages 22 to 42 Rockaway C2_Amendmen 7_Plans.pdf PDF
Pages from Pages 1 to 10 Rockaway C2_Amendmen 7_Plans.pdf PDF
2020_02_26_WQC_Package_0-9999-00228_00001.pdf PDF
B 32 to 117 Boring.pdf PDF
B24-B35 Geotech Memo.pdf PDF
2021_10_13_WQC_Package.pdf PDF
06 13 33.pdf PDF
Pages from Pages 11 to 21 Rockaway C2_Amendmen 7_Plans-2.pdf PDF
Rockaway Structural Drawings 2021-10-13_AMEND 007.pdf PDF
05 52 00.pdf PDF
2021_10_14_Authorization_to Proceed_CONTRACT 2.pdf PDF
W912DS21B0008 Amendment 0007.pdf PDF
01 57 19.pdf PDF
W912DS21B0008 Amendment 0006.pdf PDF
31 62 19.pdf PDF
01 22 00.00 10.pdf PDF
Rockaway C2_Amendmen 5_Plans.pdf PDF
06 13 35.00 18.pdf PDF
Rockaway Structural Drawings - 2021-10-06 - AMEND 5.pdf PDF
W912DS21B0008 Amendment 0005.pdf PDF
32 94 00.pdf PDF
GSD Curves A1 to A17.pdf PDF
GSD Curves A18 to A25.pdf PDF
Weight Percent Passing A.pdf PDF
06 13 34.00 18.pdf PDF
GSD Curves B.pdf PDF
01 50 00.pdf PDF
W912DS21B0008 Amendment 00004.pdf PDF
Summary Statistics.pdf PDF
EastBorrowArea_90sort_Median xyz.txt TXT text file
5042_EAST-ROCKAWAY-CSRM-2021_MAPPED_NAVD88_ELEV XYZ.txt TXT text file
WestBorrowArea_90sort_Median xyz.txt TXT text file
WestBorrowArea_5x5_Median xyz.txt TXT text file
20200427_rkwyct1_conformed.pdf PDF
EastBorrowArea_5x5_Median xyz.txt TXT text file
W912DS21B0008 Amendment 00002.pdf PDF
Rockaway Sheet Pile Reference Line.pdf PDF
W912DS21B0008 Amendment 00001.pdf PDF
R4 Phase 2 Boardwalk Access Beach 97 to 105.pdf PDF
R5-Phase 3 Boardwalk Access Beach 105 to 126.pdf PDF
R1-3 Survey 2021 Rockaway Inlet sheets 1 to 76.pdf PDF
Rockaway C2 100 pc part 3 of 3.pdf PDF
R2- Rockaway Make Safe -Baffle Wall.pdf PDF
R1-1 Survey 2021 Rockaway Inlet sheets 1 to 76.pdf PDF
Rockaway C2 100 pc part 2-1 of 3.pdf PDF
Rockaway C2 100 pc part 1-1 of 3.pdf PDF
Rockaway C2 100 pc part 2-2 of 3.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Incoroporate updated w age rates.

2. Extend the bid opening date to 12 October 2021.

3. Include a deadline for RFI of 05 October 2021.

4. Answ er questions to prospective bidders for informational purposes only

5. Add New Federal Protective Service-Protected Federal Facility Entrance Requirements language to Section 00 70 00.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

1 55

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0008

X 9B. DATED (SEE ITEM 11)

16-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Sep-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 003

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

-None

2. The following DRAWINGS have been ADDED:

-None

3. The following DRAWINGS have been REVISED but NOT REISSUED:

-None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

-None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

-None

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:

-None

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

-Section 01 57 19 -Section 01 14 00 -Section 35 31 29.40 -Section 01 22 00.00 10

REVISED SPECIFICATIONS:

-Section 01 57 19 – Part of Paragraph 3.4.3 “Preservation and Recovery of Archaeological Resources” was revised to state “Monitoring will be required where soil will require excavation prior to the placement of the reinforced dune stones. Placement of other stones that do not require the earth beneath to be excavated or disturbed will not require monitoring. The contractor will provide a qualified archaeologist, who meets the standards of 36 CFR Part 61 (Appendix A) to monitor excavations.”

-Section 01 14 00 par 1.3.1 – first sentence revised to “There shall be no work nor access between Memorial Day and Labor Day, unless coordinated with the COR, between streets B108th and B90th.”

- Section 35 31 29.40 par 2.3.1 - gradation requirements for armor stone was revised

- Section 01 22 00.00 10 par 1.3.7.2 revised unit of measure to short ton.

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.

Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.

RFI SET #1:

Question 1. Will the USACE please provide the XYZ survey data for the project that was used and shown in the specs packages?

Response: XYZ survey data provided.

Question 2. Paragraph 3.5.1.1 “Piping Plover, Least Tern and Red Knot” within Section 01 57 19 states the following, “No construction activities associated with this project may take place from March 21 - September 1 from Beach 6th St to Beach 85th St. Pre-construction surveys shall be undertaken in the remainder of the project area by an approved qualified biologist (on the basis of behavioral observations regarding territorial, courtship, nest building, egg laying, and brood rearing).”

a. Can the USACE please clarify if this environmental window applies to the dredging Contractor? Will the dredging Contractor not be able to perform beach fill operations between Beach 6th Street and Beach 85th Street from March 21st to September 1st?

Response: That is correct, the environmental window applies to the dredging contractor. Work cannot be performed in this area from March 21st to September 1st.

Question 3. Paragraph 1.7 “CONNECTION WITH WORK OF OTHER CONTRACTS” states the following, “During the period of this contract, other contracts may be in force for the construction of other features of work on or adjacent to the site of work being accomplished under this contract. The Contractor must arrange his plant and must schedule and perform the work as to effectively cooperate with all other contractors and Government agencies.”

a. Are there any other Contractors or Projects, other than Rockaway Contract 1 groin construction, scheduled to work or currently working on or adjacent to the project site?

Response: The USACE has only Rockaway Contract 1 groin construction project on the project site.

Question 4. Paragraph 3.4.1 “Construction Monitoring” of spec section 01 57 19 states, “The Contractor shall provide a qualified archaeologist(s) to monitor construction in areas to be discussed with Corps Archaeologist for items that might have historical, archaeological, or cultural value.” However, Paragraph

3.4.3 “Preservation and Recovery of Archaeological Resources” of the same spec section states, “The Corps will provide a qualified archaeologist, who meets the standards of 36 CFR Part 61 (Appendix A) to monitor excavations.”

a. Can the USACE please clarify if Archaeological monitoring will be the Contractor’s responsibility or if it will be provided by the USACE?

Response: Part of Paragraph 3.4.3 “Preservation and Recovery of Archaeological Resources” was revised to state “Monitoring will be required where soil will require excavation prior to the placement of the reinforced dune stones. Placement of other stones that do not require the earth beneath to be excavated or disturbed will not require monitoring. The contractor will provide a qualified archaeologist, who meets the standards of 36 CFR Part 61 (Appendix A) to monitor excavations.”

Question 5. Paragraph 1.7.k within Section 31 24 00.00 18 “Beach Fill Placement” states the following, “New York State Water Quality Certificate. The contractor shall comply with all requirements identified in the NYSDEC Water Quality Certificate (WQC) and NYC dredge permit including all special conditions. A copy of the WQC is included in Section 00 90 02 of this specification.”

a. Can the USACE please provide the NYC Dredge Permit or clarify if obtaining this is the responsibility of the Contractor?

Response: The USACE will be responsible for getting the WQC and are in the process of obtaining it from

NYSDEC.

Question 6. Can the USACE please clarify when the potential dredging Contractor would receive Notice to Proceed?

Response: Estimated about 15 days after award, which is based on sufficient performance and payment bonds being submitted.

Question 7. Can the USACE provide appropriate plan layouts of the groins being constructed or extended in Rockaway Contract 1?

Response: All proposed groins from Rockaway contract 1 groin construction are shown on G-101 for situational awareness. Contract 1 plans will be provided for situational awareness.

RFI SET #2:

Question 4. On the plans, the type A stone is shown to be 3-5 ton, but in the specs, the range is 3-7.5 tons.

Which is correct?

Response: 3-5 ton is correct. Section 35 31 29.40 par 2.3.1 gradation requirements for armor stone was revised and note to use Upper 25% weight at toe was removed.

TYPE A ARMOR STONE

Weight(tons, short) Percent Lighter by Weight 5 100 4 50 3 0

Question 5. On the plans, it calls for a 6" treated gravel bed. Is this the same stone that's called "base course stone" in spec section 35 31 29.40 2.3.3?

Response: Yes.

Question 8. Considering the volatility of the global steel market, and the quantity and value of steel required under the contract, will the Government consider including an Economic Price Adjustment Clause (FAR 52.216-2 or similar) into the contract as prescribed by FAR 16.203?

Response: This is an invitation for bid therefore FAR 52.216-2 is not applicable.

Question 10. Can the construction of the dune reinforcement structure begin when a portion of the dredging is completed?

Response: Yes.

Question 11. Can the dredge window be extended until March 9 of 2023?

Response: Beachfill deadline extended to March 14, 2023.

Question 12. Section 01 14 00 1.3.1 states "There shall be no work/access restriction between Memorial Day and Labor Day..." No work restriction would mean that contractors are allowed to work during that time.

Is this correct?

Response: No, first sentence was revised in section 01 14 00 par 1.3.1. There is no work and no access during the time specified and in the specified area, unless coordinated with the COR.

RFI SET #3:

Question 1. Section 01 14 00 – 1.2.2 states that dredging can be performed 24 hours a day including Sundays and Government holidays. Later in the same section, (1.3.1) the specifications state that environmental restrictions apply to all dredging work. These two sections appear to contradict one another. Would you please clarify what restrictions, if any, apply to the dredging operations?

Response: Environmental restrictions apply to all construction operations, including dredging.

Question 2. The Contract 1 Construction Schedule provided in Section 01 14 00 shows Groins W9 and W10 being constructed from 08-Feb-23 to 11-Jul-23. Part of this work is taking place within the ‘no work’ restriction between Labor Day and Memorial Day. Please confirm that the Contractor for Contract 1 is exempt from this restriction.

Response: Contract 1 is not exempt; schedule for Contract 1 was provided for information only and is subject to change.

Question 3. The Contract 1 Construction Schedule provided in Section 01 14 00 shows Groins E1 and ER2 being constructed from 05-Oct-23 to 16-Apr-24. Part of this work is taking place within the ‘no work’ environmental restriction between March 21st and September 1st. Please confirm that the Contractor for Contract 1 is exempt from this restriction.

Response: Contract 1 is not exempt; schedule for Contract 1 was provided for information only and is subject to change.

Question 4. The Contract 1 Construction Schedule provided in Section 01 14 00 shows Groin W8 being constructed from 14-Mar-24 to 30-Jul-24. Part of this work is taking place within the ‘no work’ restriction between Labor Day and Memorial Day. Please confirm that the Contractor for Contract 1 is exempt from this restriction.

Response: Contract 1 is not exempt; schedule for Contract 1 was provided for information only and is subject to change.

Question 5. Have any existing Seabeach Amaranth been identified in the project work area? If so, can this information be provided to the Contractor prior to bid submission?

Response: Yes, it was between Beach 60th and 40th streets; it is called out on sheets C-126 to C-128, but it could show up in other places also.

Question 6. In the Introduction to the Biological Opinion, reference is made to re-initiation of the formal consultation if the project has changed from the 15% to 30% design. Is there any plan/need to perform a re-initiation?

Response: At this point in time we don’t see any need to re-initiate. The Biological Opinion is a reference document for section 01 57 19.

Question 7. Within the Biological Opinion, reference is made to no-dredge/work restriction for piping plover from April 1 to September 1 from Beach 19th Street to Beach 70th Street. Specification section 01 14 00 states that dredging can be performed 24 hours a day including Sundays and Government holidays. Which direction takes precedence?

Response: The actual plover window is March 21st through September 1st, which is in the WQC. Refer to specification section 01 57 19 paragraph 3.5.1.1 for piping plover, least tern and red knot environmental restrictions.

RFI SET #4:

Question 1. Specification Section 32 94 00 Part 2.1 Plant Material references 1 quart 36” length plants. 36” length plants are not compatible with 1 quart containers. Please specify which is preferred, 36” length or 1 quart containers?

Response: Quart size is the correct reference.

Question 2. Item No. 0002AG – Removal & Disposal of Timber Piles in the solicitation indicates a unit of measure of 400 “short ton”. Specification section 01 22 00.00 10 “Price and Payment Procedures, section

1.3.7.2 on page 7 indicates a unit of measure of “Cubic yard”. Which is correct? Where on the project is the removal of timber piles required?

Response: Short ton; section 01 22 00.00 10 par 1.3.7.2 revised unit of measure to short ton. C-507, note 5 states “GROINS LOCATED EAST OF BEACH 32ND ST. SHALL BE REMOVED. EXACT LOCATIONS

SHALL BE FIELD DETERMINED AND AS APPROVED BY THE COR.”

Question 3. Does Item No. 0002AG include the removal of the 11 timber groins located on the west end of the project between Beach 147th and Beach 132nd?

Response: No, it does not include the removal of the 11 timber groins in the west end of the project.

RFI SET #5:

Question 2. Is it possible to consider CCA treatment of timber material in lieu of AZCA as specified? Please advise, thank you.

Response: No CCA treatment. AZCA has been deemed acceptable by NYSDEC without the need for the additional cleaning process during construction.

RFI SET #6:

Question 1. Schedule of Rockaway 1 Contract per 01 14 00 page 4, please provide a location for each of these groins shown on the schedule, additionally the completion dates of the groins are after the base hydraulic fill completion of 12/1/22 as per 1.3.1. Is it the intention to have beach fill completed before the groins of Contract 1 are finished ?

Response: Yes.

Question 2. Environmental restrictions windows are mentioned in a few different places throughout the contract, can a comprehensive schedule of work restrictions be provided on one sheet to insure we have them all ?

Response: Section 01 57 19 and Water Quality Certificate.

Question 9. We request an extension of 5 days to the bid date till October 1, 2021.

Response: Bid opening is postponed to October 12, 2021.

RFI SET #7:

Question 1. Is there a deadline to submit questions? If so please provide the final date allowed to submit questions.

Response: Yes, October 5, 2021.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 27-Sep-2021 02:00 PM to 12-Oct-2021 02:00 PM.

The required performance has changed from Project Title: Rockaway Contract 21. 100% Unrestricted Full and Open Competition w ith HubZone Price Evaluation preference.2. NAICS Code 237990, Size Standard $30,000,000.00.3. Project Magnitude Range: Betw een $200,000,000 to $250,000,000.004. Submit Bids no later than 2:00PM EST on 27 Sep 2021 to:U.S. Army Corps of EngineersNew York District, Contracting Division26 Federal Plaza, Room 16-300New York, NY 10278-0090Due to heightened security at U.S. Government installations, all Bidders are instructed to allow ample time to get through the security checkpoint in order to have their bids delivered before 2:00PM on the date of the bid opening.5. Contract Specialist is Nicole Fauntleroy, nicole.f auntleroy@usace.army.mil to Project Title: Rockaway Contract 21. 100% Unrestricted Full and Open Competition w ith HubZone Price Evaluation preference.2. NAICS Code 237990, Size Standard $30,000,000.00.3.

Project Magnitude Range: Betw een $200,000,000 to $250,000,000.004. Submit Bids no later than 2:00PM EST on 12 October 2021 to:U.S. Army Corps of EngineersNew York District, Contracting Division26 Federal Plaza, Room 16-300New York, NY 10278-0090Due to heightened security at U.S. Government installations, all Bidders are instructed to allow ample time to get through the security checkpoint in order to have their bids delivered before 2:00PM on the date of the bid opening.5. Contract Specialist is Nicole Fauntleroy, nicole.f auntleroy@usace.army.mil.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by full text:

NEW FPS ENTRY REQUIREMENTS

NOTICE: New Federal Protective Service-Protected Federal Facility Entrance Requirements “This notice is being issued consistent with the White House Safer Federal Workforce Task Force guidance, issued on July 29, 2021, the Frequently Asked Questions for Vaccinations issued on August 6, 2021 and FAQs for Testing issued on August 18, 2021 (and any subsequent updates), and consistent with Executive Order 13991 and the corresponding Office of Management and Budget Memorandums M-21-15 and M-21-25 at https://www.saferfederalworkforce.gov/. Effective August 25, 2021, Federal employees, contractors, and visitors who enter a Federal facility or site must follow facility signage and requirements, and agency safety protocols, regarding vaccination and testing documentation. Contractors and visitors attempting to gain entry at General Services Administration owned or leased facilities secured by Federal Protective Service must complete the Certification of Vaccination form available at https://www.saferfederalworkforce.gov/downloads/CertificationVaccinationPRAv7.pdf and show the form upon entry. Contractors and visitors who are not fully vaccinated or who decline to disclose their vaccination status must also be prepared to show proof of a negative Coronavirus Disease 2019 (COVID-19) test from within the previous three days, in accordance with Safer Federal Workforce Task Force requirements and agency requirements, as applicable. Other than complying with building signage and instructions for masking and social distancing, no Certification of Vaccination form or accompanying COVID-19 paperwork is currently required for entrants seeking a public service or benefit.”

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

DETERMINATIONS & REQUIREMENTS

A U.S. Department of Labor Wage Determination has been included, titled: General Wage Decision NY20210003 dated 09/10/2021 and NY20210028 dated 01/01/2021. For Construction contracts the wage rate is located at the end of this document. If a U.S. Department of Labor Wage Determination has not been included, it should be added by amendment prior to the date set for receipt of bids/proposals. In the event a Department of Labor Wage Rate has not been attached to this contract, neither the contractor nor any subcontractor under the contract shall pay any of his employees performing work under the contract (regardless of whether they are service employees) less than minimum wage specified by Section 6(a)(1) of the Fair Labor Standards Act, as amended.

WAGE RATES

"General Decision Number: NY20210003 09/10/2021

Superseded General Decision Number: NY20200003

State: New York JN 9/10/2021

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29

CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 03/12/2021 2 04/16/2021 3 05/21/2021 4 06/04/2021 5 07/02/2021 6 07/16/2021 7 07/23/2021 8 08/06/2021 9 08/13/2021 10 09/03/2021 11 09/10/2021

ASBE0012-001 12/30/2019

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 69.01 34.16

HAZARDOUS MATERIAL HANDLER.......$ 39.00 12.75

* BOIL0005-001 01/01/2021

Rates Fringes

BOILERMAKER......................$ 63.38 33%+47.22+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2020

Rates Fringes

BRICKLAYER.......................$ 62.54 29.40

MASON - STONE....................$ 67.88 36.91

BRNY0001-002 07/01/2020

Rates Fringes

Pointer, cleaner and caulker.....$ 55.97 29.64

BRNY0004-001 07/01/2019

Rates Fringes

MARBLE MASON.....................$ 59.44 36.88

BRNY0007-001 01/01/2021

Rates Fringes

TERRAZZO FINISHER................$ 55.21 36.97

TERRAZZO WORKER/SETTER...........$ 57.92 37.78

BRNY0007-002 12/02/2019

TILE FINISHER....................$ 46.20 31.70

BRNY0020-001 07/01/2019

Rates Fringes

MARBLE FINISHER..................$ 47.41 34.64

BRNY0024-001 01/01/2018

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 40.89 26.69

BRNY0052-001 12/02/2019

Rates Fringes

Tile Layer.......................$ 59.73 35.37

CARP0001-003 07/01/2021

Rates Fringes

CARPENTER (HEAVY & HIGHWAY)......$ 56.93 52.79

CARP0001-009 07/01/2021

Rates Fringes

CARPENTER (BUILDING &

RESIDENTIAL)

Carpenters..................$ 54.75 46.43 Soft Floor Layers...........$ 54.75 46.43

CARP0740-001 07/01/2021

MILLWRIGHT.......................$ 57.00 54.06

CARP1556-006 07/01/2021

Rates Fringes

Dock Builder & Piledrivermen.....$ 56.93 52.79

CARP1556-007 07/01/2021

Rates Fringes

Diver Tender.....................$ 51.34 52.79 Diver............................$ 71.80 52.79

CARP1556-011 07/01/2021

Rates Fringes

Carpenters:

TIMBERMEN...................$ 52.05 52.24

ELEC0003-001 04/11/2019

Rates Fringes

ELECTRICIAN

Electricians................$ 56.00 76.725%+16.25 Jobbing, and maintenance and repair work.............$ 28.50 51.243%+7.50+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049-001 03/31/2019

QUEENS COUNTY

Rates Fringes

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 34.45 23.06 Heavy Equipment Operator....$ 45.93 28.24 Lineman and Cable Splicer...$ 57.41 29.72 Tree Trimmer................$ 30.09 14.12

ELEV0001-002 03/17/2018

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 64.48 36.21+a+b Modernization and Repair....$ 50.49 40.399+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus

Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014-001 11/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

(HEAVY & HIGHWAY)

GROUP 1....................$ 104.53 29.50

GROUP 2....................$ 86.33 29.50

GROUP 3....................$ 89.09 29.50

GROUP 4....................$ 86.96 29.50

GROUP 5....................$ 85.25 29.50

GROUP 6....................$ 81.88 29.50

GROUP 7....................$ 83.41 29.50

GROUP 8....................$ 81.02 29.50

GROUP 9....................$ 79.32 29.50

GROUP 10....................$ 75.85 29.50

GROUP 11....................$ 70.91 29.50

GROUP 12....................$ 72.47 29.50

GROUP 13....................$ 73.01 29.50

GROUP 14....................$ 55.20 29.50

GROUP 15....................$ 51.35 29.50

POWER EQUIPMENT OPERATOR

(PAVEMENT-HEAVY & HIGHWAY)

Asphalt Plants..............$ 66.86 29.50 Asphalt roller..............$ 78.95 29.50 Asphalt spreader............$ 81.02 29.50

POWER EQUIPMENT OPERATOR

(STEEL ERECTION)

Compressors, Welding Machines....................$ 45.34 31.15 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 76.43 31.15 Three drum derricks.........$ 79.54 31.15

POWER EQUIPMENT OPERATOR

(UTILITY)

Horizontal Boring Rig.......$ 77.09 29.50 Off shift compressors.......$ 64.15 29.50 Utility Compressors.........$ 51.02 29.50

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Rubber Tire Backhoes over 37,000 lbs, Track Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50 150' to 249' boom - add .75 250' to 349' boom - add 1.00 350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75 150' to 249' boom - add 2.00 250' to 349' boom - add 2.25 350' to 450' boom - add 2.75 Tower crane - add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014-002 11/01/2020

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 81.39 29.50

GROUP 2....................$ 86.19 29.50

GROUP 3....................$ 75.29 29.50

GROUP 4....................$ 68.45 29.50

GROUP 5....................$ 51.15 29.50

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75

150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-001 07/01/2021

Rates Fringes

POWER EQUIPMENT OPERATOR

HEAVY AND HIGHWAY

GROUP 1....................$ 74.65 38.00

GROUP 2....................$ 72.40 38.00

GROUP 3....................$ 68.62 38.00

GROUP 4....................$ 64.82 38.00

GROUP 5....................$ 44.45 38.00

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cherrypickers 20 tons and over and loaders (rubber-tired and/or tractor type with a manfufacturer's rated capacity of six cubic yards and over

GROUP 2: Rubber Tire Backhoes up to and including 37,000 lbs, Basin Machines, Groover, Mechanical Sweepers, Bobcat, Boom Truck, Barrier Transport (Barrier Mover) and machines of a similar nature, Boat Captains, Boat Operators, operation of Churn Drills and machines of a similar nature, Stetco Silent Hoist and machines of a similar nature, Vac-alls, Meyers Machines, John Beam and machines of a similar nature, Ross Carriers and Travel Lifts and machines of a similar nature, Bulldozers, Scrapers, and Turn-a Pulls, Tugger Hoist (used exclusively for handling excavated material), Tractors with attachments, Hyster and Roustabout Cranes, Cherrypickers, Austin Western, Grove and machines of a similar nature, Scoopmobiles, Monorails, Conveyors, Trenchers, Loaders- Rubber-tired and Tractor, Barber Greene, Eimco Loaders and Eimco Backhoes, Mighty Midget and similar breakers and tampers, Curb and Gutter Pavers and Motor Patrol, Motor Graders and all machines of a similar nature, Locomotives ten (10) tons or under, Mini-Max, Break-Tech and machines of a similar nature, Milling Machines, robotic and demolition machines and machines of a similar nature including Bobcat, Pile Rig Rubber-tired Excavator (37,000 lbs. and under), 2 man auger GROUP 3: Minor Equipment such as Tractors, Post Hole Diggers and Drivers, Ditch Witch (Walk Behind), Road Finishing Machines, Rollers (five (5) tons and under), Tugger Hoists, Dual Purpose Trucks, Fork Lifts and Dempsey Dumpsters

GROUP 4: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) gradalls and concrete pumps or similarly equipment manned by two-men

GROUP 5: Oilers for the following equipment: (all gasoline, electric, diesel, or air operated) shovels, cranes (draglines), backhoes, pavers, trenching machines, gunite machines, compressors (3 or more in battery)

Premiums for Cranes:

100'-149' boom - add 1.75 150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

ENGI0015-002 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

BUILDING

GROUP 1....................$ 65.94 32.95

GROUP 2....................$ 63.98 32.95

GROUP 3....................$ 57.42 32.95

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Oiler GROUP 2: Oilers on Crawler Cranes, Backhoes, Trenching machines, Gunite machines, Compressors (3 or more in Battery) GROUP 3: Gradalls: Concrete Pumps, Power Houses - All equipment in same is manned by two (2) men only, Driving Truck Cranes

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

IRON0040-002 07/01/2020

BRONX, NEW YORK, RICHMOND

IRONWORKER, STRUCTURAL...........$ 52.70 80.24

IRON0046-003 07/01/2019

Rates Fringes

IRONWORKER

METALLIC LATHERS AND

REINFORCING IRONWORKERS.....$ 44.65 46.67

IRON0197-001 07/01/2020

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 53.13 54.60

IRON0361-002 07/01/2020

KINGS, QUEENS

Rates Fringes

Ironworkers:

(STRUCTURAL)................$ 52.70 80.24

IRON0580-001 07/01/2020

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 45.65 57.62

LABO0006-001 07/01/2016

LABORER (Cement and Concrete Workers).........................$ 42.48 17.35

LABO0029-001 07/01/2017

Rates Fringes

Laborers:

Heavy Blasters (hydraulic trac drill).....................$ 47.15 35.49 Blasters...................$ 46.27 35.49 Hydraulic Trac Drill.......$ 41.29 35.49 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self-Propelled Hydraulic Asphalt and Concrete Breaker...........$ 39.34 35.49 Powder Carriers............$ 35.17 35.49

* LABO0078-001 09/01/2021

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re-spray Fireproofing, etc).........$ 38.05 19.35

LABO0079-001 07/01/2018

LABORER (Building Construction) Demolition Laborers (Interior) Tier A.....................$ 37.44 23.60 Tier B.....................$ 26.63 17.57 Mason Tender/General Laborer.....................$ 40.65 28.85

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2016

Rates Fringes

LABORERS (FREE AIR & TUNNEL).....$ 72.67 47.72

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel

Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles

LABO0731-001 07/01/2021

Rates Fringes

LABORER

Building, Heavy and Residential Construction LABORER: (Asbestos, Lead, Hazardous Waste Removal (including soil)/CEMENT/CONCRETE......$ 43.50 48.48

UTILITY LABORER............$ 43.35 48.48

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010-001 07/01/2019

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 42.98 43.91

FORMSETTERS................$ 46.85 43.91

LABORERS...................$ 42.98 43.91

Landscape Planting & Maintenance................$ 42.98 43.91 Maintenance Safety Surface.$ 42.98 43.91 Slurry/Sealcoater/Play Equipment Installer........$ 42.98 43.91 Small Equipment Operator (Not Operating Engineer)...$ 42.98 43.91 Small Power Tools Operator.$ 42.98 43.91

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1010-002 07/01/2019

Rates Fringes

Laborers-Asphalt Construction:

Micro Paver.................$ 47.45 43.91 Raker.......................$ 46.85 43.91 Screedperson................$ 47.45 43.91 Shoveler (Production Paving Only)................$ 42.98 43.91 Small Equipment Operator (Asphalt)...................$ 42.98 43.91

PAIN0009-001 05/01/2020

Rates Fringes

GLAZIER..........................$ 46.55 44.77

PAINTER

Painters, Drywall Finishers, Lead Abatement Worker......................$ 45.70 27.67 Spray, Scaffold and Sandblasting................$ 48.70 27.67

PAIN0806-001 10/01/2020

Rates Fringes

Painters:

Structural Steel and Bridge.$ 51.50 49.63

PAIN1974-001 09/28/2020

Painters:

Drywall Tapers/Pointers.....$ 48.47 27.91

PLAS0262-001 08/01/2019

Rates Fringes

PLASTERER........................$ 45.73 30.37

PLAS0262-002 08/01/2019

KINGS AND QUEENS COUNTIES

Rates Fringes

PLASTERER........................$ 45.73 30.37

PLAS0780-001 07/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 51.97 33.56

PLUM0001-001 07/01/2021

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 45.25 19.06

PLUMBERS:...................$ 71.25 39.95

PLUM0638-001 07/01/2020

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 41.75 14.00

SPRINKLER FITTERS,

STEAMFITTERS................$ 59.05 58.34

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008-003 07/01/2020

Rates Fringes

ROOFER...........................$ 44.25 34.87

SHEE0028-002 07/31/2014

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 50.91 36.70

RESIDENTIAL CONSTRUCTION....$ 27.22 16.48

TEAM0282-001 07/01/2020

Rates Fringes

TRUCK DRIVER

Asphalt.....................$ 42.68 46.9025+a Euclids & Turnapulls........$ 45.62 50.5625+a High Rise...................$ 53.79 49.2025+a

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the

EO

is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers.

indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

"General Decision Number: NY20210028 01/01/2021

Superseded General Decision Number: NY20200028

State: New York JN 9/10/2021

Construction Type: Heavy Dredging

Counties: Bronx, Kings, Nassau, Queens, Richmond, Suffolk and Westchester Counties in New York.

HOPPER DREDGE CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

SUNY1993-003 05/24/1993

Rates Fringes

Self-Propelled Hopper Dredge, Drag Tender......................$ 8.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .