W912DS-16-B-00070008.pdf

PDF 65 KB Posted

Attached to
Green Brook Segment B3 Federal contract opportunity
Solicitation number
W912DS-16-B-0007
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0008

View the file

Other files for this federal contract opportunity

Other files attached to Green Brook Segment B3, newest first.
File Type Posted
W912DS-16-B-0007_Bid_Abstract.pdf PDF
W912DS-16-B-00070009.PDF PDF
16-0258.pdf PDF
W912DS-16-B-00070007.pdf PDF
W912DS-16-B-00070006.pdf PDF
W912DS-16-B-00070005.pdf PDF
W912DS-16-B-00070004.pdf PDF
W912DS-16-B-0007-0003.pdf PDF
W912DS-16-B-0007-Amendment_0002.pdf PDF
GB_SEG_B3_C-104WCB_REV1.pdf PDF
final-report-URS-geotech.pdf PDF
GB_SEG_B3_SS709WCB_REV1.pdf PDF
GB_SEG_B3_C-503WCB_REV1.pdf PDF
W912DS-16-B-0007-Amendment_0001.pdf PDF
GB_SEG_B3_C-501WCB_REV1.pdf PDF
GB_SEG_B3_C-101WCB_REV1.pdf PDF
4-STRUCT_A W_100__NPS_4-28-2016_-_modified_drwgs_only.pdf PDF
GB_SEG_B3_SB101WCB_REV1.pdf PDF
GB_SEG_B3_C-102WCB_REV1.pdf PDF
EM_1110-2-6056.pdf PDF
W912DS-16-B-0007.pdf PDF
Specifications_-_B3_100__NPS_4-12-2016.pdf PDF
Segment_B3_(NPS)_Drawings_-_4-15-2016.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE60531834

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er Questions to prospective bidders for informational purposes only

2. Revise spec section 09 97 02 Floodw all Painting Inserts

3. Issue NJ State Permit

The Bid Opening Date Remains 28 July 2016 at 2:00 P.M. EST

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods:

In the space provided on the SF 1442, by separate letter, or by signing block 15 below FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE

WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0007

X 9B. DATED (SEE ITEM 11)

06-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jul-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0008

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.).

Q: specification 09 97 02, paragraph 3.5, System 25 Painting Schedule – Please provide more definition regarding the Pump Station Wet Well Exposed‐to‐View Surfaces to be painted. We are having difficulty understanding the intent of the specification description. Painting subcontractors are confused as to the scope of work as well.

Do these surfaces include the interior walls, base slab (the bottom slab elevations 32.00 sloping to 25.15 at the pump cells), and the underslab surfaces below the slab at elevation 43.50? Also please clarify the surfaces which do not receive the 4th and 5th coat.

Are areas topped by grating such as the pump discharge channel considered Exposed‐to‐View Surfaces?

A: Please see revised spec section 09 97 02

REVISED SPECIFCIATION

Green Brook Flood Risk Management Project Segment B-3

Specification Section 09 97 02 Painting – Floodwall

3.3 PAINT SYSTEMS APPLICATION

3.3.4 System No. 25

Coatings shall be applied in accordance with the manufacturer’s recommendations at the recommended coverage rate. Paint colors used shall be applied in the locations shown on the Contract Drawings and as described herein.

3.5 PAINTING SCHEDULES

SYSTEM 25

Items or surfaces to be painted and coated:

a. Floodwall: The entire height of wall, both sides, from top of pile cap to top of wall. Includes fluted fin areas and column areas.

Paint color locations shall be as noted on the Contract Drawings.

b. Floodwall: Precast concrete cap panels along top of wall, exposed-to-view surfaces only. Butting ends of cap panels need not be coated. Use paint color B as noted on the Contract Drawings.

c. Pump Station Cast-In-Place Concrete Retaining Wall, Exposed-to-View

Surfaces: The entire height of the exposed side of the wall from top of footing to top of wall, including the top surface of the wall and the exposed portion on the soil side above grade. Use paint color A unless directed otherwise by the Contracting Officer.

d. Pump Station Wet Well Exposed-to-View Surfaces: All concrete wall and slab surfaces exposed to view to an observer located anywhere outside the wet well. Verify locations with the Contracting Officer.

Use paint color A unless directed otherwise by the Contracting Officer. All concrete surfaces, including floor, ceiling and walls between the trash rack and the sluice gates are considered exposed to view surfaces and shall be painted. Surfaces inside the sluice gates in the pump sump area and the gravity channel area do not require painting. The 3rd and 4th coats (anti-graffiti coating) are not required on the wet well surfaces between the trash rack and sluice gates. See the exception note below concerning surfaces inside the trash rack.

PAINTING

Surface Preparation. All form tie holes, pin holes, voids and honeycombing shall be filled and all fins removed before coating.

Surface shall be roughened as required to produce a CSP 2 surface profile in accordance with ICRI 310.2R-2014. Concrete shall have cured for a minimum of 28 days before coating commences. Surface preparation shall be in accordance with the manufacturer’s recommendations.

Paint System.

1st coat: Tamms H/P Primer by Euclid Chemical Company

2nd & 3rd coats: Aquastain T-96 penetrating liquid polymer stain by Euclid Chemical Company.

Paint Color A: Suede Paint Color B: Pueblo Paint colors shall be applied where indicated on the Contract Drawings or specified herein.

4th & 5th coats: Tamms AG 400 Top Coat Permanent Anti-Griffiti Coating by Euclid Chemical Company. Color: Clear

The 4th and 5th coats (anti-graffiti coating) are not required on the wet well surfaces inside the trash rack.

1st & 2nd coats: Increte Systems Stone Essence Semi-Transparent Stain by Euclid Chemical Company.

Paint Color A: Bronze (see test section notes below) Paint Color B: Mission Tan (see test section notes below)

3rd coat: Tamms AG 400 Basecoat Permanent Anti-Graffiti Coating by Euclid Chemical Company. Color: Clear

4th coat: Tamms AG 400 Topcoat Permanent Anti-Graffiti Coating by Euclid Chemical Company. Color: Clear

Test Section: Before production coating commences, the Contractor shall coat a test section of the floodwall to verify that coating products and application methods produce the desired colors on the project concrete. The Contracting Officer will designate the location of the test section. The test section shall be coated with the crew, equipment, surface preparation and application method and coverage proposed for use on the remainder of the project. The Contracting Officer may revise stain colors after viewing the test section at no additional cost to the Government.