GB_SEG_B3_SS709WCB_REV1.pdf
PDF 581 KB Posted
- Attached to
- Green Brook Segment B3 Federal contract opportunity
- Solicitation number
- W912DS-16-B-0007
About this file
SS709
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DS-16-B-0007_Bid_Abstract.pdf | ||
| W912DS-16-B-00070009.PDF | ||
| 16-0258.pdf | ||
| W912DS-16-B-00070008.pdf | ||
| W912DS-16-B-00070007.pdf | ||
| W912DS-16-B-00070006.pdf | ||
| W912DS-16-B-00070005.pdf | ||
| W912DS-16-B-00070004.pdf | ||
| W912DS-16-B-0007-0003.pdf | ||
| W912DS-16-B-0007-Amendment_0002.pdf | ||
| GB_SEG_B3_C-104WCB_REV1.pdf | ||
| final-report-URS-geotech.pdf | ||
| GB_SEG_B3_SB101WCB_REV1.pdf | ||
| GB_SEG_B3_C-102WCB_REV1.pdf | ||
| EM_1110-2-6056.pdf | ||
| GB_SEG_B3_C-503WCB_REV1.pdf | ||
| W912DS-16-B-0007-Amendment_0001.pdf | ||
| GB_SEG_B3_C-501WCB_REV1.pdf | ||
| GB_SEG_B3_C-101WCB_REV1.pdf | ||
| 4-STRUCT_A W_100__NPS_4-28-2016_-_modified_drwgs_only.pdf | ||
| W912DS-16-B-0007.pdf | ||
| Specifications_-_B3_100__NPS_4-12-2016.pdf | ||
| Segment_B3_(NPS)_Drawings_-_4-15-2016.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-M
A Y -2
X X
X
G B S
E G B
S
S
W C
B .d g n
S-709
T Y
P
IC
A L S
T E
E L M
IC
R
O P
IL
E D
E T
A
IL
S
A N
D P
IL
E S
H E
E T P
IL
E D
A T
A
T .M .T
S .E .M
/0
/2
A M
E N
D M
E N
T fiof Engineers
US Army Corps of Engineers
US Army Corps
IS
S
U E D
A T
E
N E
W Y
O R
K
N E
W Y
O R
K
N E
W Y
O R
K D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A M
M A
N N W
H
IT
N E
Y J
O
IN
T V
E N
T U
R E
SHEET OF 116
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
J A
C O
B S
A N
S I
D
A P
R
IL
IDENTIFICATION
SHEET
B O
R O
O F M
ID
D
L E
S E
X N
J
S E
G M
E N
T B -3
G R
E E
N B
R O
O K S
U B -B
A S
IN
O
F T
H E R
A R
IT
A N R
IV
E R
G R
E E
N B
R O
O K F
L O
O D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T
W
D S -1
-B -0
GROUT FILL
#18 CENTER
REINF. BAR
BEDROCK
EL. VARIES
GROUT FILL
#18 CENTER
REINF. BAR
SCALE: NTS
6" CRUSHED STONE
’-0
" M
IN
’-0
" M
IN
. E
M B
E D
M E
N T
DESIGNATION
MONOLITH
PILES
NO. OF
MONOLITH M54
MONOLITH M55
MONOLITH M56
MONOLITH M57
MONOLITH M58
MONOLITH M59
MONOLITH M60
MONOLITH M61
MONOLITH M62
MONOLITH M63
MONOLITH M64
MONOLITH M65
MONOLITH M66
CASING ELEV.
DESIGN TIP OF
BAR ELEV.
REINFORCING
TOP OF
BATTER
PILE
CASING (FT.)
LENGTH OF
TOP ELEV.
SHEET PILE
TIP ELEV.
SHEET PILE
MICROPILE SCHEDULE
35.75
35.75
31.75
31.75
31.75
31.75
28.25
28.25
28.25
28.25
28.25
28.25
28.25
3V:1H
TYPICAL MICROPILE DETAIL
MICROPILE, SEE SCHEDULE
PILE CAP
’-4
1’-6"
TOP OF PILE
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
3V:1H
17.10
17.60
17.60
17.60
17.60
17.60
17.60
17.60
37.45
37.45
33.45
33.45
33.45
33.45
29.95
29.95
29.95
29.95
29.95
29.95
29.95
-17.87
-16.87
-15.87
-14.37
-11.87
-1.87
-1.37
36’-6"
35’-6"
30’-3"
28’-8"
26’-0"
15’-5"
11’-3"
11’-3"
11’-3"
11’-3"
11’-3"
11’-3"
11’-3"
58’-4"
57’-3"
52’-0"
50’-5"
47’-9"
37’-3"
33’-0"
35.75
35.75
31.75
31.75
31.75
31.75
28.25
28.25
28.25
28.25
28.25
28.25
28.25
18.00
18.00
18.50
19.00
19.00
26.00
TEST PILE 1
TEST PILE 2
AS REQ’D
AS REQ’D
1.10
2.10
3.10
4.60
7.10
17.60
17.60
AS REQ’D
AS REQ’D
-1.37
-1.37
-1.37
-1.37
-1.37
-1.37
-1.37
-1.37
17’-9"
17’-9"
13’-3"
12’-9"
12’-9"
26.00
26.00
26.00
26.00
26.00
26.00
26.00
- 49.00 26.00MONOLITH M67 - - - - - - 23’-0"-
CASING ELEV.
TOP OF
SHEET PILE SCHEDULE
(FT.)
LENGTH
(SEE NOTE 3) (SEE NOTE 9)
33’-0"
33’-0"
33’-0"
33’-0"
33’-0"
33’-0"
5’-9"
2’-3"
2’-3"
2’-3"
2’-3"
2’-3"
2’-3"
2’-3"
C MICROPILEL
C A S
IN
G E
M B
E D
M E
N T
IN
T
O B
E D
R O
C K
GENERAL NOTES
17) FOR GENERAL NOTES, SEE SHEET S-101.
18) ROCK ELEVATIONS SHOWN ARE ESTIMATED BASED UPON FIGURE 8 "GENERALIZED SUBSURFACE PROFILE ALONG THE ALIGNMENT" OF
THE GEOTECHNICAL AND HTRW INVESTIGATION FINAL REPORT DATED DECEMBER 5, 2012.
(FT.)
REBAR
LENGTH OF
ELEV.
REBAR
DESIGN TIP OF
(SEE NOTE 7)
4 AND 7)
(SEE NOTES
DOUBLE HEAVY HEX
NUTS WITH 3/4" x 6" DIA.
PLATE WASHER
BOTTOM OF PILE CAP
IN
T
O B
E D
R O
C K
(B O
N D Z
O N
E
CENTRALIZER SPACED AT
APPROX. 10’-0" MAX. CTRS. AND
WITHIN 5’-0" OF TOP AND BOTTOM
CENTRALIZER SPACED AT
APPROX. 10’-0" MAX. CTRS., AND
WITHIN 5’-0" OF TOP AND BOTTOM
MIN. 3 REQUIRED IN BOND ZONE
MICROPILE NOTES
1) MICROPILES SHALL BE SUPPLIED AND INSTALLED IN ACCORDANCE WITH SPECIFICATION SECTION 31 63 29.
2) MICROPILE CASING TO CONFORM TO ASTM A252 GRADE 3 SEAMLESS SCHEDULE 80 PIPE WITH O.D. = 10 3/4" AND 1/2" WALL THICKNESS.
SEE SPECIFICATION SECTION 31 63 29 FOR REINFORCING BAR AND GROUT MATERIAL REQUIREMENTS. SEE SPECIFICATION
SECTION 09 97 02 FOR PILE CASING COATING REQUIREMENTS.
3) THE MICROPILE CASING SHALL EXTEND A MINIMUM 2’-0" INTO BEDROCK. TIP ELEVATION SHOWN REFLECTS ESTIMATED ROCK ELEVATION
IN AREA BASED UPON THE LIMITED BORING INFORMATION AVAILABLE AND MAY NOT MATCH THE ACTUAL BEDROCK ELEVATION.
CONTRACTOR SHALL VERIFY BEDROCK ELEVATION DURING DRILLING OPERATIONS.
4) THE MICROPILES SHALL BE SOCKETED A MINIMUM 22’-0" INTO COMPETENT BEDROCK. ACTUAL LENGTH OF SOCKETS SHALL BE DETERMINED
BY LOAD TEST RESULTS AND THE DEPTH TO THE TOP OF COMPETENT BEDROCK. THE ROCK CONDITION SHALL BE VERIFIED BY THE
CONTRACTOR’S GEOTECHNICAL/GEOLOGICAL ENGINEER DURING MICROPILE INSTALLATION.
5) THE REINFORCING BARS SHALL EXTEND INTO THE PILE CAP AS SHOWN IN THE TYPICAL DETAIL AND EXTEND THE FULL LENGTH OF PILE.
6) SPACERS SHALL BE INSTALLED TO MAINTAIN THE ALIGNMENT OF THE REINFORCING BAR DOWN THE MICROPILE SHAFT. SEE SPECIFICATION
SECTION 31 63 29 FOR ADDITIONAL REQUIREMENTS.
7) LENGTH VALUES SHOWN REFLECT BATTERED LENGTHS. THE LENGTHS INDICATED ARE DESIGN LENGTHS GIVEN FOR BIDDING PURPOSES ONLY.
ACTUAL LENGTHS SHALL BE BASED ON THE MICROPILE LOAD TEST RESULTS AND THE ACTUAL DEPTH TO BEDROCK. SEE THE SPECIFICATIONS.
8) ANY MOVEMENT OF MICROPILES FROM PLAN LOCATION REQUIRES CONTRACTING OFFICER APPROVAL. CONTRACTING OFFICER TO
CONSULT WITH ENGINEER OF RECORD PRIOR TO APPROVAL.
SHEET PILE NOTES
9) SHEET PILE SHALL BE DRIVEN TO TIP ELEVATION SHOWN OR EMBEDDED INTO ROCK TO REFUSAL. SEE PLAN AND PROFILE SHEETS S-103
THRU S-105. FOR MONOLITHS WHERE SHEET PILE SHALL BE DRIVEN INTO ROCK TO REFUSAL, TIP ELEVATION SHOWN IS ESTIMATED ROCK
ELEVATION IN AREA. REFUSAL IS DEFINED AS 15 BLOWS PER INCH WITH AN APPROVED PILE HAMMER OPERATING AT THE MANUFACTURER’S
RECOMMENDED STROKE AND SPEED. UNDER ANY CONDITION SHEET PILE SHALL NOT BE OVERSTRESSED AND JOINTS SHALL NOT BE
DAMAGED DURING DRIVING. LENGTH VALUES SHOWN ARE FOR BIDDING PURPOSES ONLY.
10) SEE SPECIFICATION SECTION 09 97 02 FOR SHEET PILE COATING REQUIREMENTS.
VERIFICATION LOAD TEST NOTES
11) VERIFICATION COMPRESSION AND TENSION TEST SHALL BE PERFORMED AT THE LOCATIONS SHOWN ON THE DRAWINGS OR AS
DESIGNATED BY THE CONTRACTING OFFICER. THE TEST PILES ARE NON-PRODUCTION PILES AND SHALL BE INSTALLED AND TESTED IN
ACCORDANCE WITH SPECIFICATION SECTION 31 63 29.
12) THE TEST PILES SHALL BE INSTALLED VERTICALLY.
13) DESIGN COMPRESSIVE CAPACITY OF MICROPILE = 180 KIPS. DESIGN TENSILE CAPACITY OF MICROPILE = 110 KIPS.
14) THE VERIFICATION COMPRESSIVE TESTING LOAD AND TENSILE TESTING LOAD SHALL BE AT LEAST 360 KIPS AND 220 KIPS RESPECTIVELY.
IF LARGER LOADS ARE TO BE TESTED, THE CONTRACTOR SHALL VERIFY THE STRUCTURAL CAPACITY OF THE TESTING MICROPILES AS
WELL AS THE REACTION SYSTEM.
15) FOR THE ACCEPTANCE CRITERIA OF MICROPILE VERIFICATION TESTS, SEE SPECIFICATION SECTION 31 63 29.
16) THE LOADING FRAME AND TEST APPARATUS ARE ILLUSTRATED ON SHEETS S-710 AND S-711 FOR CONTRACTOR�S REFERENCE EXCEPT
THE MANDATORY NOTES. THE CONTRACTOR SHALL DESIGN THE REACTION SYSTEM AND SUBMIT IT TO THE CONTRACTING OFFICER FOR
APPROVAL.
| GB_SEG B3_SS709WCB |
| References |
| PW_WORKDIR:d0819359 |
| GB_SEG B-3 BS border.dgn |
dets, GB_SEG B3_SS709WCB.dgn, details
File details come from the government source that posted it. Updated .