About this file

Fan schedule

View the file

Other files

File Type Posted
ERDLF_second_site_visit_attendance_list.pdf PDF
Amendment_0017.pdf PDF
Amendment_0016.pdf PDF
Amendment_0016.pdf PDF
Amendment_16_spec_section_08_39_54.pdf PDF
Amendment_16_Plans.pdf PDF
Amendment_16_Plans.pdf PDF
Amendment_16_spec_section_08_39_54.pdf PDF
Amendment_0016.pdf PDF
Amendment_0015.pdf PDF
Amendment_0014_Plan_sheets.pdf PDF
Amendment_0014.pdf PDF
Amendment_0014_Technical_Specs.pdf PDF
W912DS-15-R-0012-Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
PP504.pdf PDF
S-351_C_Structural_Wall_Detail.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
ERDLF_Site_Visit_Sign_in_Sheet_19_Jan_2016.pdf PDF
Amendment_15-R-0012-0003.pdf PDF
Amendment_15-R-0012-0002.pdf PDF
W912DS-15-R-0012_Amendment_0001.pdf PDF
W912DS-15-R-0012.pdf PDF
W912DS-15-R-0012_Specifications.pdf PDF
W912DS-15-R-0012_Plans.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAN SCHEDULE (ENGLISH UNITS)

MARK BUILDING NEW OR LOCATION SERVICE TYPE CFM S.P. FAN DRIVE ACCESSORIES REMARKS

EXIST IN. W.G. RPM HP VOLTS/PH

XEF-1 PROCESS BLDG NEW ROTARY PRESS RM 211 ROTARY PRESS RM 211 1 1045 0.25 1926 DIRECT 3/4 208/3 1-8 1,6

XEF-2 PROCESS BLDG NEW ASSEMBLY RM 214 ASSEMBLY RM 214 1 660 0.18 1259 DIRECT 1/4 208/3 1-8 1,6

XEF-3 PROCESS BLDG NEW INSPECTION RM 216 INSPECTION RM 216 1 660 0.18 1259 DIRECT 1/4 208/3 1-8 1,6

XEF-4 PROCESS BLDG NEW BP MIXER RM 210 BP MIXER RM 210 1 770 0.17 1435 DIRECT 1/4 208/3 1-8 1,6

XEF-5 PROCESS BLDG NEW UTILITY RM 207A UTILITY RM 207A 1 935 0.12 1693 DIRECT 1/2 208/3 1-8 1,6

XEF-6 PROCESS BLDG NEW DRYING OVEN RM 207 DRYING OVEN RM 207 1 550 0.16 1070 DIRECT 1/4 208/3 1-8 1,6

XEF-7 PROCESS BLDG NEW HOLSTEN STILLS RM 208 HOLSTEN STILLS RM 208 1 550 0.1 1033 DIRECT 1/4 208/3 1-8 1,6

XEF-8 PROCESS BLDG NEW MELT/POUR RM 206 MELT/POUR RM 206 1 880 0.15 1476 DIRECT 1/2 208/3 1-8 1,6

XEF-9 PROCESS BLDG NEW CONT WASTE TANK RM 222 CONT WASTE TANK RM 222 1 660 0.22 1279 DIRECT 1/4 208/3 1-8 1,6

XEF-10 PROCESS BLDG NEW SHOP RM 218 SHOP RM 218 1 990 0.25 1834 DIRECT 3/4 208/3 1-8 1,6

XEF-11 PROCESS BLDG NEW CONTROL RM 300 CONTROL RM 300 1 320 0.17 748 DIRECT 1/4 208/3 1-8 1,6

XEF-12 PROCESS BLDG NEW CONDITIONING OVEN RM 219 CONDITIONING OVEN RM 219 1 550 0.18 1242 DIRECT 1/4 208/3 1-8 1,6

XEF-13 PROCESS BLDG NEW TENNY OVEN RM 213 TENNY OVEN RM 213 1 550 0.18 1083 DIRECT 1/4 208/3 1-8 1,6

XEF-14 PROCESS BLDG NEW CURING OVEN RM 209 CURING OVEN RM 209 1 550 0.14 1058 DIRECT 1/4 208/3 1-8 1,6

XEF-15 PROCESS BLDG NEW GRUENBERG OVEN RM 215 GRUENBERG OVEN RM 215 1 770 0.15 1426 DIRECT 1/4 208/3 1-8 1,6

XEF-16 PROCESS BLDG NEW MACHINING RM 302 MACHINING RM 302 1 650 0.18 1242 DIRECT 1/4 208/3 1-8 1,6

XEF-17 PROCESS BLDG NEW MACHINING RM 301 MACHINING RM 301 1 650 0.18 1242 DIRECT 1/4 208/3 1-8 1,6

XEF-18 PROCESS BLDG NEW comm and elect ?? comm and elect ?? 1 330 0.17 748 DIRECT 1/4 208/3 1-8 1,6

XEF-19 PROCESS BLDG NEW CONTROL RMS 220 & 221 CONTROL RMS 220 & 221 1 220 0.25 688 DIRECT 1/4 208/3 1-8 1,6

XEF-20 PROCESS BLDG NEW MELT/POUR RM 206 MELT/POUR RM 206 1 720 0.18 1005 DIRECT 1/4 208/3 1-8 1,6

XEF-21 PROCESS BLDG NEW CONDITIONING OVEN RM 219 CONDITIONING OVEN RM 219 1 300 0.18 717 DIRECT 1/4 208/3 1-8 1,6

XEF-22 PROCESS BLDG NEW MACHINING RM 302 MACHINING RM 302 1 450 0.18 929 DIRECT 1/4 208/3 1-8 1,6

XEF-23 PROCESS BLDG NEW MACHINING RM 301 MACHINING RM 301 1 450 0.18 929 DIRECT 1/4 208/3 1-8 1,6

EF-1 PROCESS BLDG NEW LOADING DOCK 223 FIRE SPRINKLER RM 222 2 155 0.25 1360 DIRECT 1/4 120/1 1-5, 7-8 3,6

EF-2 PROCESS BLDG NEW LOADING DOCK 223 CORRIDORS 2 450 0.25 1369 DIRECT 1/4 120/1 1-5, 7-8 3,6

EF-3 FIELD OFFICE NEW BATHROOMS BATHROOMS 3 450 0.375 1600 DIRECT 1/4 120/1 1-5, 8 3,6

EF-4 PROCESS BLDG NEW LOADING DOCK 223 MECH RM 201 2 900 0.375 1600 DIRECT 77W 120/1 1-5, 7-8 3,6

EF-5 PROCESS BLDG NEW LOADING DOCK 223 WASH/DRYING RM 200 2 155 0.25 1360 DIRECT 172W 120/1 1-5, 7-8 3,6

EF-6 PROCESS BLDG NEW CORRIDOR 004 ELECT RM 203 2 260 0.25 1075 DIRECT 1/4 120/1 1-5, 7-8 3,6

SF-1 FIELD HOUSE NEW COMM RM 108 COMM RM 108 3 75 0.25 1050 DIRECT 1/140 120/1 1-5, 8 3,5-6

SF-2 PROCESS BLDG NEW COMM RM 204 COMM RM 204 2 75 0.25 1050 DIRECT 1/140 120/1 1-5, 8 3,5-6

FAN TYPE: FAN ACCESSORIES:

1. POWER BLOWER, SPARK RESISTANT FAN AND CONSTRUCTION 1. PROVIDE WITH STARTER AND MEANS

2. INLINE CENTRIFUGAL, SPARK RESISTANT FAN AND CONSTRUCTION TO DISCONNECT

3. INLINE CENTRIFUGAL 2. VIBRATION ISOLATORS

3. BELT AND MOTOR GUARD

REMARKS: 4. PROVIDE HIGH EFF MOTOR

1. BASIS OF DESIGN AEROVENT PB 5. THERMAL OVERLOAD PROTECTION

2. BASIS OF DESIGN GREENHECK SP 6. INLET GUARD

3. BASIS OF DESIGN GREENHECK SQ 7. RECTANGULAR WALL DISCHARGE CAP

4. BASIS OF DESIGN GREENHECK RSF 8. ELECTRONIC SPEED CONTROL

5. CONTINUOUS OPERATION TO MEET IT REQUIREMENTS

6. FANS MUST BE CAPABLE OF BEING CONTROLLED AND MONITORED BY BLDG DDC SYSTEM.

MOTOR

File details come from the government source that posted it. Updated .