About this file

Amendment 0004

View the file

Other files

File Type Posted
ERDLF_second_site_visit_attendance_list.pdf PDF
Amendment_0017.pdf PDF
Amendment_0016.pdf PDF
Amendment_0016.pdf PDF
Amendment_16_spec_section_08_39_54.pdf PDF
Amendment_16_Plans.pdf PDF
Amendment_16_Plans.pdf PDF
Amendment_16_spec_section_08_39_54.pdf PDF
Amendment_0016.pdf PDF
Amendment_0015.pdf PDF
Amendment_0014_Plan_sheets.pdf PDF
Amendment_0014.pdf PDF
Amendment_0014_Technical_Specs.pdf PDF
W912DS-15-R-0012-Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Fan_Schedule.pdf PDF
PP504.pdf PDF
S-351_C_Structural_Wall_Detail.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
ERDLF_Site_Visit_Sign_in_Sheet_19_Jan_2016.pdf PDF
Amendment_15-R-0012-0003.pdf PDF
Amendment_15-R-0012-0002.pdf PDF
W912DS-15-R-0012_Amendment_0001.pdf PDF
W912DS-15-R-0012.pdf PDF
W912DS-15-R-0012_Specifications.pdf PDF
W912DS-15-R-0012_Plans.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE50993388

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Change to Specifications: Section 41 22 13.14 and Section 23 09 23.13 20 has been revised.

2. Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plansand specifications.

Proposal Due Date remains 18 February 2016 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Feb-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-R-0012

X 9B. DATED (SEE ITEM 11)

04-Jan-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Feb-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-R-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

FY16 ERDLF Picatinny Arsenal, New Jersey Solicitation Number: W912DS-15-R-0012

Amendment 0004

AMENDMENT 0004 to DRAWINGS AND SPECIFICATIONS for FY16 ERDLF Picatinny Arsenal, New Jersey

The purpose of this amendment is to respond to questions from Offerors and release the sign in sheet from the site visit held on 19 January 2016.

TO OFFERORS

The following changes shall be made to the specifications.

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- Section 41 22 13.14 – Cranes and Hoists

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- Submittal Register – Section 41 22 13.14 – Delete Specification Section 41 22 12.14.

- Section 23 09 23.13 20 – BACnet Direct Digital Control Systems for HVAC – Replace paragraph 2.1.c in its entirety with the following:

“All new DDC Systems shall be compatible with the existing DDC systems of Picatinny Arsenal, which are DELTA Controls.”

OFFERORS’ QUESTIONS AND GOVERNMENT REPLY

W912DS-15-R-0012

Question #1: Please confirm that underground sanitary sewer and water distribution is already in place and assumed operational and not part of the scope of work.

Answer #1: The underground sanitary sewer and water distribution are in place and not part of the scope of work.

Question #2: Drawing CS110 Sheet Note 2, states to provide Pink water containment area per details 7 on sheet CS500. The details do not show the design or dimension for the ramp at pink water containment. Please provide ramp sizing and design.

Answer #2: The ramp note on CS110 is referring to the grade change providing a low point for the pink water containment area as shown by the contour on CG110.

Question #3: Specification 41 22 13.14 requires two hoists, but they are not shown on any drawings. Please confirm requirement and provide additional design guidance.

Answer #3: Hoists are not required. Specification Section 41 22 13.14 shall be deleted.

Question #4: Please provide installation details for interior fiberglass reinforced panel over the various substrates.

Answer #4: FRP panels shall be installed per manufacturer’s instructions for each substrate.

Question #5: Refer to BacNet Controls Section 23 09 23.13 20, par. 2.1c, page 13, “DECTA contractors”. Please provide contact information for DECTA as we have not been able to find them.

Answer #5: There is a spelling error and the paragraph should read:

“2.1.c. All new DDC Systems shall be compatible with the existing DDC systems of Picatinny Arsenal, which are DELTA Controls.”

(End of Summary of Changes)