Text version
W16ROE50993388
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1.Revise draw ing: SD111 2.Change Proposal Due Date to 3rd March 2016 at 2:00 P.M. (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278
3. Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-R-0012
X 9B. DATED (SEE ITEM 11)
04-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-R-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0005
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-Feb-2016 12:00 AM to 03-Mar-2016
02:00 PM.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
FY16 ERDLF, Picatinny Arsenal, New Jersey
Amendment 0005
AMENDMENT 0005 TO DRAWINGS for FY16 ERDLF Picatinny Arsenal, New Jersey
The purpose of this amendment is to respond to questions from Offerors.
TO OFFERORS
The following changes shall be made to the drawings.
DRAWINGS
The following DRAWINGS have been REVISED but NOT REISSUED:
‐ Drawing SD111 – Replace Demolition Note 1 in its entirety with the following:
“14” dia. X 3’-4” conc. piers. Verify each location and elevation. Remove those that are more than 2” out of horizontal and/or 1” vertical alignment.
Reuse steel frames attached to footings to be removed, if possible. Assume replacement of 90% of piers and steel frames.”
OFFERORS’ QUESTIONS AND GOVERNMENT REPLY
Question #1: Due to the complexity of this project we respectfully request an additional 2 week extension to the project due date.
Answer #1: USACE grants an additional 2-week extension. Proposals are due March 3, 2016 by 1400 hours.
Question #2: Drawing SD-111 demolition note #1 says “reuse steel frames attached to footings to be removed”, however drawing S-120 says “replace metal walkway frames as needed”. As the quantity of replacements cannot be made until a survey is performed, please confirm that the scope is to only perform the survey. After the survey, if any are damaged or in bad condition the replacement will be treated as a change order.
Answer #2: Contractor is to assume replacement of 90% of steel frames.
Question #3: Drawing S-111 Construction Sheet Note #1 reads “Grout under all existing baseplates. If existing anchor rods are rusted or bent, replacement is required. Shore existing construction. Remove steel column so existing pier can be demolished and re-poured with new anchor bolts.” As the quantity of replacements cannot be made until a survey is performed, please confirm that the scope is to only perform the survey. After the survey, if any are damaged or in bad condition the replacement will be treated as a change order.
Answer #3: Confirmed.
Question #4: The Walkway Stair shown 2/A-111 appears to have the right hand side guardrail continue along the landing, however the guardrail is shown as ending at the top landing in details 3&4/A-450. Please clarify.
Answer #4: For Walkway Stair on 2/A-111, follow the details 3&4/A-450.
Question #5: Finish schedule shows FRP-E finish at the unheated corridors. Floor Plans identify these as partition Type 6, which per A540 only has FRP cladding. Please confirm that there is only FRP cladding in these areas and not an interior finish.
Answer #5: Finish schedule key indicates FRP-E as Fiberglass Reinforced Panel (Exterior). Follow details on A-540.
Question #6: Drawing F-503 shows a schematic of an Ultra High Speed deluge system.
Under the legend it shows that all dashed lines are for future installation and to be determined. Will these items costs for material and labor (pilot lines, flame detectors, solenoids, manual pulls, vents, drains, valve/discharge nozzles, and wiring to panel) be part of this contract, and installed after processing and machining equipment is set, or will it be separate pricing for future work?
Answer #6: The user has yet to determine the exact equipment for each room or the equipment’s location so finalizing the deluge system would be premature. The items that are dashed are not part of this contract.
Question #7: Are we required to pave the road?
Answer #7: No. Pave indicated areas such as parking area as indicated by plans.
Question #8: On Drawing CG110, confirm that the line marked “SF” is the silt fence.
Answer #8: Confirmed.
Question #9: On Drawing S-110 between columns 11 and 12; confirm that Detail c/S- 301 applies to this location.
Answer #9: Confirmed.
(End of Summary of Changes)