Amendment_15-R-0012-0002.pdf
PDF 75 KB Posted
- Attached to
- Explosive Research and Development Laboratory Facility (ERDLF) Re-Procurement, Picatinny Arsenal, NJ
- Solicitation number
- W912DS-15-R-0012
About this file
Amendment 0002
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE50993388
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise Block 13A and Block 13B of SF 1442
2. Change to plans and draw ings: S-110, SD111, S1112 and A-400 has been revised.
3. Change to Specifications: Section 00 22 11 Part 3.3 has been revised.
4. Change Proposal Due Date to 18 February 2016 at 2:00 P.M. (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278
5. Update Wage rates
5. Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jan-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-R-0012
X 9B. DATED (SEE ITEM 11)
04-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jan-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-R-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0002
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
Block 13B on the SF 1442 has been revised, the offer guarantee has changed from is not required to is required.
Block 13A of the SF 1442 has been revised, the number of offeror copies required has increased by 5 from 1 to 6.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
FY16 ERDLF Picatinny Arsenal, New Jersey Solicitation Number: W912DS-15-R-0012
Amendment 0002
AMENDMENT 0002 to DRAWINGS AND SPECIFICATIONS for FY16 ERDLF Picatinny Arsenal, New Jersey
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
‐ Drawing SD110 – Replace Demolition Note 3 in its entirety with the following:
“14” dia. X 3’-4” conc. piers. Verify each location and elevation. Remove those that are more than 2” out of horizontal and/or 1” vertical alignment. If steel frames are attached to footings to be removed, remove and reuse. Assume replacement of 90% of piers.”
‐ Drawing S-111 – Replace Construction Sheet Note 2 in its entirety with the following:
“Provide concrete foundations for steel walkway frames. Reuse existing if possible.
Assume replacement of 90% of foundations.”
‐ Drawing SD112 – Replace Demolition Note 1 in its entirety with the following:
“Remove existing foundations and/or rebar cages. Reuse existing if possible.
Assume replacement of 90% of foundations and rebar cages.”
‐ Drawing A-400 – Replace General Note 1 in its entirety with the following:
“Wall type indicated with □ refer to sheet A-540. The wall type details on sheet A-540 supersede any illustration of wall type on this page.”
‐ Drawing A-610 – Amend Room Finish Schedule to indicate both the Electrical Room (Room 107) and the Communications Room (Room 108) as 10’-0” ceiling height.
2. The following DRAWINGS have been REVISED and REISSUED:
None
3. The following DRAWINGS have been ADDED:
None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
‐ Section 00 22 11 –Volume 2 – Price Proposal and Pro Forma Information – replace paragraph GENERAL with the following:
“The price proposal and pro forma information shall be submitted in a separate binder labeled “Volume II” The sections shall parallel the submission requirements identified in the bid schedule. Provide six copies of bound written material in addition to the original.”
OFFEROR’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)
Question #1: Due to the complexity of this project we respectfully request a 3 week extension to the project due date.
Question #2: Proposal Due Date - Box 13A of the SF1442, states the due date as Feb 4th by 12:00 AM. Box 10 states that proposals are due by 2:00 PM. Amendment 01 stated the due date as Feb 3rd by 2:00 PM. Please clarify the due date and time for proposals.
Answer #1-2: USACE grants a 2 week extension to the project due date. Proposals are due February 18 by 1400 hours.
Question #3: Please provide an additional site visit or unofficial site visit be made available to review in more detail the existing conditions with our subcontract team.
Answer #3: As stated in W912DS-15-R-0012 Amendment 0001, there will be only one site visit for all prospective offerors. This site visit occurred on Tuesday, January 19, 2016.
Question #4: Number of Hard Copies - Box 13A of the SF1442 states that one original and one copy is required. However, page 10, para. 2.5, states that an original and six copies are required (the 6 copies is also mentioned on page 16, para. 3.3). Please clarify the required number of hard copies of each volume to accompany the original.
Answer #4: Box 13A of the SF1442 has been revised. Please submit one original and six (6) copies of each volume.
Question #5: Volume 2, Price and Pro Forma Information - Page 16 of 126, para 3.3 states that the price proposal shall be submitted in a separate binder. It goes on to say that the Pro Forma information should be submitted in a separate envelope. Please clarify what goes into the Pro Forma information envelope (is it TAB C - Required Pre-Award Information?). Please also clarify how many copies of the Pro Forma information is required (para 3.3.4.2 indicates one copy, but we will have two Price Volumes with Tab C)
Answer #5: Submit one original and six copies of each volume (Technical Proposal and Price Proposal). Include all information listed under “Volume 2: Price Proposal and Pro Forma Information” (Tabs A through E) in one volume (Volume 2). Disregard the instruction to include the separate Pro Forma Information envelope.
Question #6: Factor 2, Contractor Past Performance - On page 11, under Factor 2 Past Performance, the instructions describe submitting past performance information on projects using the PPQ form included in the RFP. May we include in our proposal submission, previously completed PPQs and CCASS/CPARS evaluations for our projects submitted under Factor 1, in lieu of requesting new PPQs from clients?
Answer #6: Yes
Question #7: KEY PERSONNEL RESUME FORM- Please confirm if it is acceptable for offerors to submit resumes in their own format as long as they contain the same information required on the form provided with the RFP.
Answer #7: Offerors may submit resumes in their own format as long as they contain all information listed on the form and on page 13, paragraph 3.1.3 Factor 3 ii, and they do not exceed three (3) pages.
Question #8: Drawing CS110 Sheet Note 10 states to provide a concrete pad per detail 3 on sheet CS500. This detail only provides sectional dimension and not overall pad size. Please provide size of pad.
Answer #8: Sheet CS500, detail 3, states: "Exact utility pad dimensions and locations of openings and sleeves through pad to be coordinated with equipment suppliers. Pad to be a minimum of 1'-0" larger than equipment on all sides." For approximations, takeoff can be done from drawing CS110.
Question #9: Drawing SD110 Demolition Note 3 requires a survey of the existing piers and replacement if they are out of alignment. As the quantity of replacements cannot be made until a survey is performed, please confirm that the scope is to only perform the survey. After the survey, if any are misaligned or in bad condition the replacement will be treated as a change order.
Question #10: Drawing S-111 Construction Sheet Note 2, states “to reuse existing if possible”.
For bidding purpose please confirm that we are to assume all foundations can be reused and that after field survey if any are misaligned or in bad condition the replacement will be treated as a change order.
Question #11: Drawing SD112 Demolition Note 1 state to “remove all existing foundations” please confirm this note only applies to the 14 foundations shown on this drawing.
Answer #9-11: For Drawings SD110, S-111, and SD 112, contractor is to assume replacement of 90% of existing.
Question #12: Drawing EX003 Details 3&4 reference drawing EX112 which is missing from the set. Please provide.
Answer #12: Drawing EX112 is located on page 173/200 of the plans downloaded from FBO site.
Question #13: Reflected Ceiling Plan on sheet A-141 shows the GWB ceilings in rooms 107 and 108 as 10’-0” height. Finish Schedule on sheet A-610 shows the GWB ceilings in rooms 107 and 108 as 9’-0” height. Please clarify.
Answer #13: The GWB ceilings in rooms 107 and 108 should be 10’-0” in height.
Question #14: Restroom Elevations 2 and 4 on sheet A-400 appear to graphically show the wall tile all the way to the ceiling. The partition type details on sheet A-540 only show wall tile to a height of 5’-0” AFF, with the exception of the shower stalls which shows tile to the ceiling.
Please clarify the height of the wall tile in the restrooms.
Answer #14: Sheet A-400, Detail 1, Enlarged Restroom Plan, indicates which wall type to be used in each location in the restroom. These wall types are detailed on sheet A-540. Follow the wall type details given on sheet A-540 for all wall tile restroom elevations.
Question #15: There is a conflict on the bid bond requirement between Block 13 B of the Standard Form 1442 and page 53 of the solicitation. Please confirm a bid bond is not required.
Answer #15: Block 13B on the 1442 has been revised, Bid bonds is required.
Question #16: RFP solicitation, page 70, paragraph 1.22 Labor surplus area expenditure requirements, requires a percentage of labor to come from the labor surplus area. Please provide the Labor Surplus Areas listing.
Answer #16: The solicitation, page 70, paragraph 1.22 states: The Contracting Officer will furnish upon request a list of labor surplus areas. A copy is attached and available at the Department of Labor site https://www.doleta.gov/programs/lsa.cfm. A description of Labor Surplus Areas is available at https://www.doleta.gov/programs/laborsurplus02.cfm. Morris County, Jefferson Township, and Rockaway Township are not listed as Labor Surplus Areas for 2016, so this paragraph does not apply.
Question #17: There is conflicting information in the solicitation with regards to a bid bond. The SF1442 states a bond is not required; Page 16 of 126 of the solicitation states to place bid bond under Vol 2 Tab B; Page 17 of 126 states to provide evidence of bondability; and Page 53 of 126 states that a bond is required for 20% NTE $3.0m. Please advise which of these is correct.
Answer #17: Block 13B on the 1442 has been revised, Bid bonds is required.
Question #18: What is the deadline for all RFI's?
Answer #18 5 days before proposal due date.
(End of Summary of Changes)