Amendment_0008.pdf
PDF 42 KB Posted
- Attached to
- Explosive Research and Development Laboratory Facility (ERDLF) Re-Procurement, Picatinny Arsenal, NJ
- Solicitation number
- W912DS-15-R-0012
About this file
Amendment 0008
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE50993388
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Change draw ings: F-503, A-450, A-201, F-001, A-400, S-111, S-112, SX120, SD120, S-120, SX121, SD121, S-122, S110, S-351, PP504, M-602 , A-610 and A-310 has been revised.
2. Change to Specifications: Specification section 05 12 00 par 1.3, Section 05 52 00 par 2.9, Section 05 52 00 par 2.10.1, section 07 22 00 par 2.3.1 and Section 23 09 23.13 par 1.5.4. has been revised.
3. Answ er Offerors Questions. Responses to offerors inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION,REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-R-0012
X 9B. DATED (SEE ITEM 11)
04-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Mar-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-R-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008
`FY16 ERDLF Picatinny Arsenal, New Jersey Solicitation Number: W912DS-15-R-0012
Amendment 0008
AMENDMENT 0008 TO DRAWINGS for FY16 ERDLF Picatinny Arsenal, New Jersey The purpose of this amendment is to respond to questions from Offerors
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
The following DRAWINGS have been REVISED but NOT REISSUED:
- F-503, the following note shall be added to section 1. GENERAL: “E. Exact location of deluge system to be determined by Contracting Officer’s Representative.”
- A-450 – detail 6, Stair Section at Loading Dock Area – add note to metal nosing stating: “Balco, P-200; Nystrom, C2.125E; Wooster Products, Inc., Type 101; or any equal product may be used.”
- A-201 – details 1 and 2 Concrete stair labels shall be deleted in their entirety and both replaced with the following: “Concrete stairs and landing with painted steel railing”
- F-001 – General Fire Protection Note 11 shall be deleted in its entirety and replaced with the following: “Portable fire extinguishers (and fire extinguisher cabinets, if required) shall be provided by the fire protection contractor throughout the building at a maximum distance of 75 feet between each extinguisher.”
- A-400 – Enlarged Restroom Plan: the benches across from the lockers (called out as item 11 on existing plan) shall be called out as item 18. Item 18 shall be added to the Bathroom and Toilet Accessories Schedule as Scranton products Tufftec benches or approved equal.
- S-111, S-112, SX120 SD120, S-120, SX121, SD121, S-121, S-122 – replace labels that read “5”x5” @ 8’-0” Steel Frame (Typ)” with the following: “5”x5”, 3/16”
THICKNESS @ 8’0” O.C. STEEL FRAME (TYP)”
- S-110 – The following shall be added to Construction Sheet Note 1: “Design steel grating in accordance with NAAMM MBG 531 for bar type grating. Galvanize steel floor gratings.
a. Design floor gratings to support a live load of 100 pounds per square foot for the spans indicated, with maximum deflection of L/240.
b. NAAMM MBG 531, band edges of grating with bars of the same size as the bearing bars. Weld banding in accordance with the manufacturer's standard for trim unless otherwise indicated. Design tops of bearing bars, cross or intermediate bars to be in the same plane and match grating finish.
c. Slip resistance requirements must exceed both wet and dry a static coefficient of friction of 0.5.”
- M-602 – The fan schedule accompanying this amendment shall be added to M- 602.
- A-610 – On the Special Items Key, in the Remarks column of the Window Shading System, replace existing with the following: “W-S1, 3% Opening, See Finish Note 11”
- S-351 – The Structural Wall Detail accompanying this amendment shall replace detail C on sheet S-351.
- PP504 – PP504 has been reformatted to better depict details. See accompanying sheet.
- A-310 – In both details 6, the “Security Grille” annotations shall be replaced with the following: “Security Grille, sized to cover area of wall”
SPECIFICATIONS
The following SPECIFICATIONS have been DELETED IN THEIR ENTIRETY:
- Specification section 05 30 00 STEEL DECKS
The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Specification Section 05 12 00 Structural Steel, par. 1.3 AISC Quality
Certification shall be deleted in its entirety and replaced with the following: “1.3 AWS Certified Fabricators: Work must be fabricated by AWS Certified Fabricators.”
- Specification Section 05 52 00 Metal Railings, par. 2.9 Protective Coating shall be deleted in its entirety and replaced with the following: “Provide painted steelwork as indicated in accordance with ASTM. Touch up abraded surfaces with an approved paint or repair compound.”
- Specification Section 05 52 00 Metal Railings, par. 2.10.1 Steel Handrails – the last sentence of the first subparagraph shall be revised to read: “Provide steel railings of 1 ½ inches nominal size, painted.” The last sentence of the paragraph shall be revised to read: “Provide painted railings, including pipe, fittings, brackets, fasteners, and other ferrous metal components.”
- Specification Section 07 22 00 Roof and Deck Insulation par. 2.3.1 Vapor Retarder – the following shall be added to the paragraph: “An appropriate alternative to the vapor retarder, such as a polyurethane sheeting, may be acceptable in lieu of the felt vapor retarder. Any substitutions must be approved by the Contracting Officer’s Representative.”
- Specification Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC – par. 1.5.4 shall be replaced in its entirety with the following: “New equipment finishing shall be factory provided from the manufacturer’s standard finishes.”
OFFERORS’ QUESTIONS AND GOVERNMENT REPLY
Question #1: The ultra-high speed system general arrangement diagram on F-503 indicates four discharge nozzles & flame sensors. Please confirm there are only 4 systems required.
Answer #1: Contractor to provide 4 systems as shown on Sheet F-503. Provide sufficient piping to install systems in any room shown on Sheet F111. Contracting Officer’s Representative will determine final equipment location and configuration.
Question #2: Drawing FP111, please indicate which rooms require the ultra-high speed system.
Answer #2: See response to previous question, locations to be provided by Contracting Officer’s Representative.
Question #3: For the ultra-high speed system, please provide the sizes and types of equipment in these rooms that needs to be protected.
Answer #3: Contracting Officer’s Representative will determine final equipment location and configuration.
Question #4: Are there any environmental issues with the soil on site?
Answer #4: There are no known environmental issues with the soil on site.
Question #5: Have the existing underground utilities (water sewer, electric) been tested and approved?
Answer #5: The underground utilities have not been tested or approved
Question #6: Are the head walls and rip rap existing?
Answer #6: Head walls and rip rap are existing
Question #7: Where the trench drains meet existing concrete walls:
A) How thick is the existing concrete?
B) Are we affecting the structural integrity by sawcutting and removing the concrete below the walls?
C) Provide detail showing how new trench drain meets existing walls.
Answer #7: A) 1’-6” B) Do not remove concrete below concrete walls.
C) Detail at concrete wall is similar to section D/S-301 w/concrete wall replacing stud wall, both walls are in the same plane.
Question #8: Regarding the pinkwater tank:
A) Is any liner required?
B) What is the invert for the 8” PVC pipe leaving the tank?
C) Please clarify Detail 7/CS110 on Drawing CG500. The bottom of the tank is 1’ below grade yet there is an 8” pipe and 8” of concrete plus the valve box; more than the 1’ depth.
Answer #8: A): No liner is required.
B) and C): Detail 7/CS110 is the containment pad outside the facility where the transfer to the transport vehicle will occur, not the area inside the facility which holds the pinkwater tank. The pinkwater tank does not gravity drain, as it will be pumped out via the 30” manhole covers shown on PP502 and a pumper truck. The tanker will sit inside the containment area outside the building while filling. On Detail 7/CS110, pipe slopes down from the containment area to connect to the existing pvc pipe.
Question #9: Qualification of welders and tests must be in accordance with AWS D1.1/D1.1M, however Section 05 12 00 Structural Steel states that all work must be fabricated in an AISC Certified Fabrication Plant. AISC Certification is not listed as a requirement under Sections 05 30 00 Steel Decks, Section 05 51 33 Metal Ladders, or Section 05 52 00 Metal Railings. Please clarify AWS Certified only fabricators are an acceptable selection for this project or if the more stringent AISC Certification is required.
Answer #9: AWS Certification is acceptable.
Question #10: Abrasive Metal Nosings are shown only at the Loading Dock Stair, detail 6/A-450. Please confirm that nosings are not also required at the walkway stair shown 3&4/A-450.
Answer #10: Abrasive Metal Nosings are not required at the walkway stair.
Question #11: Abrasive Metal Nosings are not listed in the specifications, (detail 6/A- 450). Please provide manufacturer, make and model number to be used.
Answer #11: Balco, P-200; Nystrom, C2.125E; Wooster Products, Inc., Type 101; or any equal product may be used.
Question #12: Steel pipe handrails at Loading Dock Stair and Walkway Stair shown A- 111 and A-450 call for painted steel. However, specifications 05 52 00 Metal Railings and elevations 1&2/A-201 require galvanized steel. Please confirm the rails painted and not galvanized.
Answer #12: Handrails shall be painted
Question #13: Dock Levelers detail 8/A-450 shows what appears to be an embedded 8” channel. Please confirm the channel is existing.
Answer #13: There is a channel – cannot confirm the method of embed, nor the size of the channel.
Question #14: Please indicate the desired width of the Dock Leveler.
Answer #14: Full Width of the loading dock overhead door.
Question #15: There is currently no specification section for the Fiberglass Reinforced Panel Enclosure at wall types 4-6 or as shown on details 7&8/A-500 or details 1, 3, 5, or 9 on A-560. Please provide and clarify.
Answer #15: Provide product equivalent to FRP-I and FRP-E shown on finish schedule.
Follow manufacturer’s recommendations for installation.
Question #16: There is currently no specification section for the continuous insect screen in the corridors shown B/A-300 or 3/A-560. Please provide and clarify.
Answer #16: It is intended to just be a roll of insect screening that is attached with the flat aluminum bar at the top and bottom of the screen location for the length of the walkway.
Question #17: Please provide side elevation drawings of the Magazine Building.
Answer #17: The magazines are existing and no additional elevations have been provided other than the original design drawings.
Question #18: Please provide elevation drawings of the Processing Area Building along line column line 10 at the loading dock stair, the loading dock face, and along column line 13 at the walkway stair.
Answer #18: This building structure is existing and no additional elevations have been provided outside what was in the original design package.
Question #19: Please provide full building section views of the Processing Area Building between column lines 1-10, and 13-20 similar to section view A/A-300 at the Contaminated Waste Water Tank Room with correct roof and slab elevations.
Answer #19: This structure is existing and no additional as-built information or elevations have been provided other than the original design drawings.
Question #20: Please provide full building section views of the Magazine Building and Field Office Building similar to section view A/A-300 at the Processing Area with correct roof and slab elevations.
Answer #20: These structures are existing and no additional as-built information or sections have been provided other than the original design drawings.
Question #21: Please indicate quantities or locations of Fire Extinguishers, there are currently none shown in the plans.
Answer #21: Fire extinguishers shall be provided at a maximum distance of 75 feet between each extinguisher.
Question #22: Please indicate what type of benches are required near the lockers shown 1/A-400 that are called out as Schedule Item #11, which is for fold down seats, however these cannot be fold down seats because they are not in the shower stalls.
Answer #22: Use Scranton products Tufftec benches to match toilet partitions (or equivalent product)
Question #23: Drawing S-110 Construction Sheet Note #1 calls for 1x3/16” 19W4 Painted Bar Grating which is fabricated from steel bar. The only specification section we’re provided on grating is section 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating, however FRP Grating is not called out anywhere on the drawings. Please clarify and provide new specifications for the steel bar grating.
Answer #23: Bar grating shall satisfy the following requirements:
Design steel grating in accordance with NAAMM MBG 531 for bar type grating.
Galvanize steel floor gratings.
a. Design floor gratings to support a live load of 100 pounds per square foot for the spans indicated, with maximum deflection of L/240.
b. NAAMM MBG 531, band edges of grating with bars of the same size as the bearing bars. Weld banding in accordance with the manufacturer's standard for trim unless otherwise indicated. Design tops of bearing bars, cross or intermediate bars to be in the same plane and match grating finish.
c. Slip resistance requirements must exceed both wet and dry a static coefficient of friction of 0.5.
Question #24: Drawings SX-120 and SX-121 indicate 1-1/2” 22GA Type B deck by United Steel or approved Equal at the Processing Area and Magazine, however these drawings are for existing conditions and do not indicate any required replacement or repairs. Please remove section 05 30 00 Steel Decks from the project documents, or provide locations or quantities that do require new steel deck if needed.
Answer #24: Specification section 05 30 00 is removed from specifications.
Question #25: Drawing A-310 Both 6 Detail shows Security Grilles. The security grilles are not sized. Please clarify need by providing additional design.
Answer #25: The Grilles are to be sized to cover the area of the wall.
Question #26: Corridors 006 and 008 abut the magazine building and the field office building, respectively. The Finish schedule identifies FRP-E finish on both the North and South elevations. The south elevations of these corridors are shown on the floor plans as wall types 1, 8 and 10. Sheet A540 does not show corrugated FRP on any of these wall types. Please confirm that corrugated FRP is only intended for the exterior corridor walls.
Answer #26: Corrugated FRP is required only for the exterior corridor walls. Wall types 8 and 10 do require FRP Panel, however it is flat type FRP-I. Wall type 1 does not require FRP.
Question #27: Please confirm there is no stud framing required between posts in wall type 6.
Answer #27: Stud framing is not intended to be required unless FRP manufacturer chosen requires it for support.
Question #28: FRP-I is shown on the finish schedule in various rooms, of various wall type. Only some of these wall types are shown with applied FRP on sheet A540. Please confirm that the intent is to include FRP-I as shown on the finish schedule.
Answer #28: FRP shall be provided per finish schedule and details 6 on sheet A-310.
Question #29: The drawings are vague on areas requiring Ultra High Speed deluge systems. From the drawings, it seems to be rooms: 210, 211, 215, 219, and 301. Is this correct? Drawing AX110 – Composite Existing Floor Plan, shows equipment layouts.
Are these correct, or have they changed? We will need this information to price quantities of equipment needed.
Answer #29: Contractor to provide 4 systems as shown on Sheet F-503. Provide sufficient piping to install systems in any room shown on Sheet F111. Contracting Officer’s Representative to determine final equipment location and configuration.
Question #30: Finish schedule shows FRP-E finish in corridors 001, 002, 003 and 004, North and South elevations. The North elevation is identified as wall type 4, which per sheet A540 has Gypsum board up to 10’ AFF and corrugated FRP above that. The South elevation wall types vary, but none of them (types 8, 9, 11, 13, 14) are shown with corrugated FRP on sheet A540. Please confirm that sheet A540 is accurate and FRP-E is only on the exterior wall of the corridor, and only above 10’ AFF.
Answer #30: That is correct - sheet A540 is accurate and FRP-E is only on the exterior wall of the corridor, and only above 10’ AFF
Question #31: In regard to the steel walkway frames. The drawings only indicate a “5x5” steel frame and do not specify a wall thickness. Please specify if the 5x5 square tube is to have 3/16”, 1/4”, 5/16”, 3/8”, or 1/2" thick walls. Additionally, please confirm the baseplate size and anchors shown detail A/S-301 are to be used for the walkway frames. This section is also called out on S-110 for the Processing Area Building which utilize HSS4x4x5/16 columns on Line A.
Answer #31: Use a 3/16” wall thickness. The baseplate size is the same for the walkway frames.
Question #32: A vapor retarder is not shown in the roofing details of the drawing set.
Section 07 22 00 Roof and Deck Insulation specifies a felt base sheet with hot asphalt application. However, in order to place felt at the metal deck areas on the Processing Area Building roof a substrate board would need to be placed prior to the use of a self-adhered or pinned vapor retarder. This would increase the overall height of the roof, and as hot asphalt doesn’t typically work very well with EPDM systems we recommend a 6mil polyurethane sheeting in lieu of the felt vapor retarder. Please confirm that this is acceptable.
Answer #32: This is acceptable
Question #33: Section 07 22 00 Roof and Deck Insulation specifies the use of a ½” thick protection board on the roof. There is currently no protection board shown on the drawings, nor do the existing conditions photographs on the plans show the use of a protection board as being built in place. Please clarify.
Answer #33: Please use ½” protection board as specified
Question #34: Field Office fans SF-1 is missing from the Ventilation Schedule on M-601.
Please provide.
Answer #34: See attached fan schedule.
Question #35: Refer to ERDL Facility Spec. Section 23 09 23.13 20 Page 10; the specification refers to ‘corrosion resistance’ performance in the controls section. “1.5.4 Finish of New Equipment; New equipment finishing shall be factory provided.
Manufacturer's standard factory finishing shall be proven to withstand 125 hours in a salt-spray fog test. Equipment located outdoors shall be proven to withstand 500 hours in a saltspray fog test. Salt-spray fog test shall be according to ASTM B117, with acceptance criteria as follows: immediately after completion of the test, the finish shall show no signs of degradation or loss of adhesion beyond 0.125 inch on either side of the scratch mark.” Please provide a source for this material - the companies we have talked to can’t meet the spec.
Answer #35: Revise the paragraph as follows:
1.5.4. New equipment finishing shall be factory provided from the manufacturer’s standard finishes.
Question #37: The Div. 12 Window blind specification section calls for mini blinds but the finish schedule says A610 "sheer weave" - please advise.
Answer #37: The note reference should be 11. Mini blinds may be used per the specification. A use of the specified product is for blinds.
Question #38: Drawing A-111 between columns 1 - 5 shows new wall Type 7 which is a 12" poured concrete wall. However, Drawing SX110 shows there is only an existing 8" foundation wall at this location. Is this the intent or are we to replace the foundation at this location. If so, please provide details.
Answer #38: The intent is for this to be a 12" wall. Dowels noted on the drawings shall be imbed 4" at these locations. See attached detail to replace detail C/S-351.
CONTINUATION
Proposal Due Date remains 29 March 2016 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278