Amendment_0005_Table_of_Contents.pdf
PDF 15 KB Posted
- Attached to
- Long Beach Coastal Storm Risk Management Project Contract 1 Federal contract opportunity
- Solicitation number
- W912DS-15-B-0021
About this file
Table of Contents
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0009_G-002.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0008_Plans_for_Reach_1.pdf | ||
| Amendment_0007_Plans_Reach_1.pdf | ||
| Amendment_0007_Groin_52-55.jpg | JPG image | |
| Amendment_0007.pdf | ||
| Amendment_0007_Section_00_21_16.pdf | ||
| Amendment_0007_Spec_Section_01_35_26.pdf | ||
| Amendment_0007_Spec_Section_35_31_29.40.pdf | ||
| Amendment_0007_Plans_Reach_2.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| W912DS-15-B-0021-0001.pdf | ||
| LONG_BEACH_PT_LKOUT_C1_R2_plans_20151027.pdf | ||
| W912DS-15-B-0021.pdf | ||
| LONG_BEACH_PT_LKOUT_C1_R1_plans_20151027A.pdf | ||
| Long_Beach_Final100_OCT2815.pdf | ||
| USACE_calculator_Long_Beach_NY_monthly_2015_(24_Aug_15).xlsx | XLSX spreadsheet |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Long Beach Island, New York Coastal Storm Risk Management Project, Contract No. 1, Reach 1 – Point Lookout and Reach 2 – City of Long Beach
MTOC - 1
MAIN TABLE OF CONTENTS
SECTION TITLE
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
00 24 00 EVALUATION FACTORS FOR AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SUPPLEMENTARY CONDITIONS
LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
00 90 00 WAGE RATES
00 90 01 WATER QUALITY CERTIFICATE
00 90 02 TRANS-ATLANTIC SUBMARINE CABLES
TECHNICAL PROVISIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 35 AIR EMISSIONS REQUIREMENTS
01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 01.00 18 PROJECT SCHEDULE
01 33 00.00 18 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 18 CONTRACTOR QUALITY CONTROL
01 54 00.00 18 MOBILIZATION AND DEMOBILIZATION
01 56 10.00 18 ENDANGERED SPECIES OBSERVERS
(HOPPER DREDGES ONLY)
01 57 20.00 18 ENVIRONMENTAL PROTECTION FOR CIVIL WORKS
APPENDIX A MONITORING SPECIFICATIONS FOR HOPPER DREDGES
APPENDIX B MONITORING SPECIFICATIONS FOR MECHANICAL DREDGES
APPENDIX C SEA TURTLE HANDLING AND RESUCITATION
APPENDIX D DREDGE OBSERVER FORM – HDP
APPENDIX E INCIDENT REPORT OF SEA TURTLE TAKE
Long Beach Island, New York Coastal Storm Risk Management Project, Contract No. 1, Reach 1 – Point Lookout and Reach 2 – City of Long Beach
MTOC - 2
NMFS NMFS Batch BiOp 3-7-14 pages 176 to 181
01 78 00.00 18 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 01 51 VIBRATION MONITORING OF STRUCTURES
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 20 00.00 10 CONCRETE REINFORCING
03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 39 00.00 10 CONCRETE CURING
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 92 00 JOINT SEALANTS AND FILLERS
DIVISION 31 – EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 31 29.40 STONE CONSTRUCTION
| MAIN TABLE OF CONTENTS |
| LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS |
| TECHNICAL PROVISIONS |
File details come from the government source that posted it. Updated .