Amendment_0003.pdf

PDF 28 KB Posted

Attached to
Long Beach Coastal Storm Risk Management Project Contract 1 Federal contract opportunity
Solicitation number
W912DS-15-B-0021
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Long Beach Coastal Storm Risk Management Project Contract 1, newest first.
File Type Posted
Bid_Abstract.pdf PDF
Amendment_0009.pdf PDF
Amendment_0009_G-002.pdf PDF
Amendment_0008.pdf PDF
Amendment_0008_Plans_for_Reach_1.pdf PDF
Amendment_0007_Spec_Section_01_35_26.pdf PDF
Amendment_0007_Spec_Section_35_31_29.40.pdf PDF
Amendment_0007_Plans_Reach_1.pdf PDF
Amendment_0007_Groin_52-55.jpg JPG image
Amendment_0007.pdf PDF
Amendment_0007_Section_00_21_16.pdf PDF
Amendment_0007_Plans_Reach_2.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0005_Table_of_Contents.pdf PDF
Amendment_0004.pdf PDF
Amendment_0002.pdf PDF
W912DS-15-B-0021-0001.pdf PDF
Long_Beach_Final100_OCT2815.pdf PDF
LONG_BEACH_PT_LKOUT_C1_R2_plans_20151027.pdf PDF
W912DS-15-B-0021.pdf PDF
LONG_BEACH_PT_LKOUT_C1_R1_plans_20151027A.pdf PDF
USACE_calculator_Long_Beach_NY_monthly_2015_(24_Aug_15).xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE52467010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

1) Extend the Bid Opening Date from 17 December 2015 to 13 January 2016 at 2:00 P.M Eastern Standard Time (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278

2. Answ er Bidders Questions. Responses to bidder inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:

in the space provided on the SF 1442, by separate letter by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0021

X 9B. DATED (SEE ITEM 11)

29-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Dec-2015

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-B-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

Long Beach Costal Storm Risk Management Project Contract 1

Amendment 0003

AMENDMENT 0003 to DRAWINGS and SPECIFICATIONS for Long Beach Costal Storm Risk Management Project Contract 1

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been ADDED:

- None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)

Question # 1) Section 01 35 26, page 4, subpart 1.5.1.1. Please advise if one or two SSHO are required for the project?

Answer # 1) The spec requires at least 1 SSHO per work site per shift unless the scope of work dictates the need for more safety coverage.

Question # 2) Can the Equipment Staging areas indicated on drawing G-003 be used for material stockpile areas?

Answer # 2) Yes.

Question # 3) Specification 35 31 29.40 page 5, subpart 2.2.1 Quality: Is sedimentary stone acceptable for use in this project? Based on conversations with the local stone suppliers, we understand that sedimentary stone has been approved by the Government on similar groin projects close to this project location.

Answer # 3) Stone may be acceptable as long as it meets the criteria as per the specifications.

Question # 4) G-002, Note 14, Specification 35 31 29.40: Do the designated stone stockpile locations need to be within the “designated work section” limitations of 2,000 linear feet? Can we stockpile stone outside of the “designated work sections”?

Answer # 4) Stone stockpiles can be outside the designated work sections with approval of the COR, the Town of Hempstead, and the City of Long Beach, and per requirements of the Water Quality Certificate.

Question # 5) CS-106, Groin 34 Rehab Profile, Specification 35 31 29.40: Stated detail indicated Existing Grade excavation to place Type A Armor Stone, what bid item should this cost be assigned to?

Answer # 5) This cost is assigned to CLIN 0008AA Removal, Stockpiling and Placement or Disposal of Reused Armor Stone for Groin Rehabilitation.

Question # 6) CS-103, Note 2, Specification 35 31 29.40: Note states that excavated sand will need to be stockpiled above elevation +5.0. Please verify that this material can be stockpiled outside of the designated stone stockpile areas.

Answer # 6) Excavated sand may be placed outside the designated stone stockpile areas upon approval of the COR and the Town of Hempstead.

Question # 7) We are still reviewing and performing takeoff for this project. Please indicate when RFI’s will no longer be accepted for consideration and when responses to the RFI’s can be expected.

Answer # 7) There is no deadline for when RFI’s can no longer be expected. RFI’s are being answered as quickly as possible.

Question # 8) This is a complex project and we have, to date, made a number of RFI requests. We have no indication when information will be forthcoming. We are still reviewing the project plans and documents. Additionally, there is a major holiday (Thanksgiving) occurring in the bid period that restricts the bid process. In order to allow the government time to respond to all RFIs received, to allow the bidders time to consider the RFI responses, and to facilitate submission of the best possible bid pricing, we respectfully request a bid extension of 2 weeks.

Answer # 8) Bid opening will be extended to January 13, 2016.

Question # 9) Is the permanent material (the stone, etc) on federal construction projects exempt from the state sales taxes?

Answer # 9) Bidders are responsible for determining applicability of taxes to the project, see FAR 52.229-3.

Question # 10) For bidding purposes, are we to assume the Town of Hempstead will accept all of the existing stone removed but not reused on site?

Answer # 10) Yes, the town of Hempstead will accept the removed stone but not reused on site.

Question # 11) When excavation must be performed below the mean low water elevation, must it be accomplished by hydraulic dredging?

Answer # 11) Mechanical dredging methods may be used.

Question # 12) Are there any load restrictions for hauling material over the roads indicated as access roads on Drawings G-003 for Reach 1 and G-002 for Reach 2?

Answer # 12) The contractor is responsible for all permits. This includes hauling material and equipment over identified access roads. The contractor will have to contact applicable DOT's to coordinate.

Question # 13) Please confirm that the existing grade as shown on Drawings CS-301 through CS-308 for Reach 1 represents the elevations prior to the beachfill that was placed in the Spring of 2014.

Answer # 13) Existing grades as shown on Drawings CS-301 through CS-308 for Reach 1 represent contours from April 2013, prior to the placement of beachfill of January-February 2014.

Question # 14) Will other locations for temporary dock facilities be considered or are they only allowed as shown on the drawings?

Answer # 14) Other facilities may be considered. It is up to the contractor to coordinate these facilities.

(End of Summary of Changes)