Amendment_0002.pdf
PDF 37 KB Posted
- Attached to
- Long Beach Coastal Storm Risk Management Project Contract 1 Federal contract opportunity
- Solicitation number
- W912DS-15-B-0021
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0009_G-002.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0008_Plans_for_Reach_1.pdf | ||
| Amendment_0007_Plans_Reach_1.pdf | ||
| Amendment_0007_Groin_52-55.jpg | JPG image | |
| Amendment_0007_Spec_Section_01_35_26.pdf | ||
| Amendment_0007_Spec_Section_35_31_29.40.pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0007_Section_00_21_16.pdf | ||
| Amendment_0007_Plans_Reach_2.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0005_Table_of_Contents.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| W912DS-15-B-0021-0001.pdf | ||
| LONG_BEACH_PT_LKOUT_C1_R2_plans_20151027.pdf | ||
| W912DS-15-B-0021.pdf | ||
| LONG_BEACH_PT_LKOUT_C1_R1_plans_20151027A.pdf | ||
| Long_Beach_Final100_OCT2815.pdf | ||
| USACE_calculator_Long_Beach_NY_monthly_2015_(24_Aug_15).xlsx | XLSX spreadsheet |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE52467010
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is:
1. Revise the Specifications
2. Answ er Bidders Questions. Responses to bidder inquiries are provided "for info purposes only" and does not revise solicitation, plans and specifications.
3. Bid Opening Date remains 17 December 2015 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278
NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:
in the space provided on the SF 1442, by separate letter by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0021
X 9B. DATED (SEE ITEM 11)
29-Oct-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Nov-2015
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-B-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 00002
Long Beach Costal Storm Risk Management Project Contract 1
W921DS-15-B-0021
Amendment 0002
AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Long Beach Costal Storm Risk Management Project Contract 1
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- None
3. The following DRAWINGS have been ADDED:
- None
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
Spec Section 01 56 10.00 18 is not relevant and is deleted completely from specifications package.
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
Spec Section 00 73 00 paragraph 26. STORAGE AREAS: Add the following sentence to the end of paragraph 26: “Temporary chain-link fence shall be installed around the staging areas to include field trailers, storage containers, and equipment/material storage, and removed upon completion of construction.”
Spec Section 00 73 00 paragraph 13. QUANTITY SURVEYS, paragraph f. is updated to say “Cross-sections shall be taken on 25-ft. centers maximum and at locations of change in type of construction.”
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
Spec section 01 57 20.00 10, section 3.9.1.1, paragraph 1.) include Rob Smith as the project biologist, Robert.j.smith@usace.army.mil, 917-790-8729 along with the New York District Contracting officer.
Spec section 01 57 20.00 10, section 3.9.1.1, paragraph 1.) include Jenine Gallo, Jenine.Gallo@usace.army.mil, 917-790-8617, as backup coordinator for NOAA ESA and CAA.
Spec Section 01 54 00 MOBILIATION AND DEMOBILIZATION: Add the following paragraphs:
“1.4 TEMPORARY FENCING
1.4.1 General
Temporary fence shall be installed as needed. The fence shall be removed by the Contractor at the completion of the work or when directed by the Contracting Officer, or his representative, and all material used shall remain the property of the Contractor.
1.4.2 Beach Access
Beach access ramps or stairs to the work area will be enclosed by the Contractor by erection of a sand fence if they are within 500 feet of the designated work area.
1.4.3 Work Areas
Sand fence will be installed on the beach enclosing designated work sections from the northern limit of the work section to the mean high water line. The fence shall also be installed along the back shore to prevent entry to the work area. In the City of Long Beach sufficient room to allow public passage alongshore landward of the groin rehabilitation work sections must be maintained. The fencing material for this purpose shall be a wood sand fence with a minimum height of four (4) feet fastened to eight (8) foot long cedar posts on maximum 10 foot centers. Orange (plastic) safety fence may be used subject to approval by the COR. Adequate security personnel shall be provided by the Contractor to restrict unauthorized entry into the work area during all times of operation.
1.4.4 Security
A combination of fencing above the high water line securing the east, west and north sides of the work area and a warning tape to the low water line shall be provided. A sign indicating "No Trespassing Construction Area" shall be placed on the fence every 50 feet of length.
1.4.5 Payment
No separate payment shall be made for this temporary fencing, and all costs in connection therewith shall be included in the contract unit price for Item No. 0001 Mobilization and Demobilization.”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)
Question # 1) Section 3.1.1 indicates hopper dredge will be placing sand along designated areas on the beach from Kismet to Seaview, Suffolk County, New York, New York. Is the dredging at these areas included as part of this project (Groin Construction & Rehabilitation) including providing a full time endangered species monitor? If so, please provide further information and requirements for this dredging.
Answer # 1) There is no sand placement as a part of this contract. Spec section 01 56 10.00 18 has been removed.
Question # 2) Please provide fabrication details for the public safety sign shown o Page 10 of section 00 73 00. To include the size of the sign panel, material, graphic format, color, and size and type faces to be used.
Answer # 2) Details on signs including the public safety signs are located in the Technical Specifications, after the Main Table of Contents.
Question # 3) Section 35 31 29.40, page 5, subpart 2.1.3 Stone Weights Question: Does the contractor QC person need to be present at the certified weigh in at the quarry in order to sign the tickets? Also, does this QC person need to be employed by the Contractor?
Answer # 3) At the quarry, the certified weight tickets signed by certified weight master shall be sufficient; contractor QC person does not need to be present. The QC (CQC System Manager) MUST be an employee of the prime contractor.
Question # 4) Does the removed stones need to be cleaned prior to groin placement?
Answer # 4) There is no requirement to clean stone removed from existing structures prior to placing them in structures to be rehabilitated. Stone being reused must meet criteria of new stone classification and approval by the COR, per Specification 35 31 29.40, paragraph 3.11.4. Also, per Specification 35 31 29.40, paragraph 2.2, reused stone shall not contain cracks, joints, faults, seams or bands of minerals or deleterious materials which would result in breakage or reduction of specified stone weights or dimensions during or after placement.
Question # 5) Please confirm that the Beach Fill grade line is not applicable to this contract.
Answer # 5) Reference General Note #12, sheet G-002 (Reach 1) and G-101 (Reach 2). Beach fill will be placed under separate contract.
Question # 6) Will the contractor be able to stockpile stone in the Reach 1 non-year-round work designated stone stockpiling areas during April 1st through August 31st?
Answer # 6) Reference Water Quality Certificate, Natural Resource Permit Conditions, number 5 which states “No on-beach activities (groin construction or rehabilitation, equipment and materials staging or storage, sand placement or grading, construction of vehicle accesses or walkovers, etc) are allowed in the area between Groin 52 and Groin 56 as shown on the preliminary plans between the dates April 1 and August 321 of each year …”. Groin 52 is located at approximately E1,085,650, just east of the Lido Beach Towers.
Question # 7) Will the removed stones need to be subjected to the same required tests as the new stones?
Answer # 7) Testing per Specification 35 31 29.40, Table 1, paragraph 2.2.1 is not required for removed stone. Stone being reused must meet criteria of new stone classification and approval by the COR, per Specification 35 31 29.40, paragraph 3.11.4. Also, per Specification 35 31 29.40, paragraph 2.2, reused stone shall not contain cracks, joints, faults, seams or bands of minerals or deleterious materials which would result in breakage or reduction of specified stone weights or dimensions during or after placement.
Question # 8) Please advise on the correct distance per section for survey. Section 00 73 00 indicates 20 feet center maximum, Section 01 22 00.00 indicates section surveyed at no greater than 25 feet.
Answer # 8) See No 3 in SPECIFICATIONS: "Spec Section 00 73 00 paragraph 13. Quantity Surveys, paragraph
f. is updated to say "Cross-sections shall be taken on 25-ft centers maximum and at locations of change in type of construction."
Question # 9) Will the contractor be allowed to move, expand, or add additional rock stockpile locations?
Answer # 9) Yes, the contractor will be allowed to move, expand, or add additional rock stockpile locations with approval of the COR, the Town of Hempstead, and the City of Long Beach, and per requirements of the Water Quality Certificate.
Question # 10) Does the Stone Stockpile, Rock Stockpile, Access Roads, Equipment Staging Areas, or Staging Areas required to have fencing around them?
Answer # 10) Temporary fencing requirements are clarified by the following changes:
Section 00 73 00 paragraph 26. STORAGE AREAS: Add the following sentence to the end of paragraph 26: “Temporary chain-link fence shall be installed around the staging areas to include field trailers, storage containers, and equipment/material storage, and removed upon completion of construction.”
Section 01 54 00 MOBILIATION AND DEMOBILIZATION: Add the following paragraphs:
“1.4 TEMPORARY FENCING
1.4.1 General
Temporary fence shall be installed as needed. The fence shall be removed by the Contractor at the completion of the work or when directed by the Contracting Officer, or his representative, and all material used shall remain the property of the Contractor.
1.4.2 Beach Access
Beach access ramps or stairs to the work area will be enclosed by the Contractor by erection of a sand fence if they are within 500 feet of the designated work area.
1.4.3 Work Areas
Sand fence will be installed on the beach enclosing designated work sections from the northern limit of the work section to the mean high water line. The fence shall also be installed along the back shore to prevent entry to the work area. In the City of Long Beach sufficient room to allow public passage alongshore landward of the groin rehabilitation work sections must be maintained. The fencing material for this purpose shall be a wood sand fence with a minimum height of four (4) feet fastened to eight (8) foot long cedar posts on maximum 10 foot centers. Orange (plastic) safety fence may be used subject to approval by the COR. Adequate security personnel shall be provided by the Contractor to restrict unauthorized entry into the work area during all times of operation.
1.4.4 Security
A combination of fencing above the high water line securing the east, west and north sides of the work area and a warning tape to the low water line shall be provided. A sign indicating "No Trespassing-Construction Area" shall be placed on the fence every 50 feet of length.
1.4.5 Payment
No separate payment shall be made for this temporary fencing, and all costs in connection therewith shall be included in the contract unit price for Item No. 0001 Mobilization and Demobilization.”
Question # 11) Will equipment be allowed to stay on the beach during non-working days or off hours?
Answer # 11) Yes, as long as the equipment being stored are actively being used, properly protected during non-working hours, and stored within the active work limits.
Question # 12) Sheet G-101 note 15, G0102, G-103: Please provide the purpose and reasoning of the no work area and time frame. Please advise of any preparatory work required for the no work time period.
Fencing? Make safe area? Is there any monitoring and/or work required by the Contractor in this time period? Also, if the contract work is complete in this area, are there any other requirements during the no work time frame after the work completion?
Answer # 12) The purpose and reasoning of the no-work zone and time frame is to allow public use of the beach between Magnolia Blvd and Long Beach Blvd during the heaviest beach use time of Memorial Day through Labor Day. Preparatory work prior to Memorial Day would include moving all equipment and materials out of the designated no-work zone, including stockpiled stone, and cleaning the beach such that it is suitable for public use. Fencing will be required around active work sections at groins being rehabbed (ref. Response to RFI#13) or as directed by the COR. No work is required by the Contractor within the no-work zone between Memorial Day and Labor Day. Transport of equipment and materials through the no-work zone will be as directed by the COR. Work by the Contractor can continue east and west of the no-work zone. Completion of contract work in the no-work zone and elsewhere is subject to acceptance requirements in Section 35 31 29.4 paragraph 3.15 ACCEPTANCE SECTIONS and Section 00 73 00 paragraph 31 FINAL EXAMINATION AND ACCEPTANCE.
Question # 13) Specification Section 00 21 16 was provided in the bidding documents. Are we to assume this is a direct replacement for Specification Section 00 21 13 referenced in the Main Table of Contents page MOTC-1?
Answer # 13) Section 00 21 16 – INSTRUCTIONS, CONDITIONS AND NOTICE TO OFFEROR is a contract section, not a specification.
Question # 14) I have read through the solicitation and the instructions, and found no reference to any pre-bid meeting or a deadline for RFIs. Please advise.
Answer # 14) There is no pre-bid meeting for this solicitation. There are no deadlines for RFI’s.
Question # 15) Are there CAD files available to use during the preparation of our bid?
Answer # 15) CAD design files will not be made available to use during preparation of the bid.
Question # 16) My company is interested in bidding on the above mentioned project. I had a few questions to ask of you and if we could potentially set up a site visit. Please call me at your earliest convenience.
Answer # 16) Please send in your questions. Long beach is open to the public and you may conduct your own site visit. Please be aware that there is only public parking available on Lido Blvd in the Pt. Lookout area.
Question # 17) Per Specification 01 22 00.00 10, Paragraph 1.3.1, existing stone removed is to be measured with scale weights. What are the requirements for scale weighing? Can a calibrated load cell on a piece of equipment be used?
Answer # 17) The contractor can submit variance on the weighing method but it would have to be acceptable and approved by the COR.
(End of Summary of Changes)